PNO-V-86-037, on 860701,licensee Initiated Shutdown from 30% Power Due to Increased Seal Leakage from Reactor Coolant Pump 2B.Shutdown Will Be Maintained to Replace Reactor Coolant Pump Seals.Outage Will Last 8-12 Days

From kanterella
Revision as of 02:30, 28 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
PNO-V-86-037:on 860701,licensee Initiated Shutdown from 30% Power Due to Increased Seal Leakage from Reactor Coolant Pump 2B.Shutdown Will Be Maintained to Replace Reactor Coolant Pump Seals.Outage Will Last 8-12 Days
ML20206T536
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 07/03/1986
From: Miller L, Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
References
PNO-V-86-037, PNO-V-86-37, NUDOCS 8607080172
Download: ML20206T536 (1)


-

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-V-86-37 Date: 07/03/86 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by Region V staff on this date.

FACILITY: Arizona Nuclear Power Project Emergency Classification Palo Verde Unit 2 Notification of Unusual Event DOCKET NO. 50-529 Alert Site Area Emergency General Emergency.

X Not Applicable

SUBJECT:

REACTOR COOLANT PUMP SEAL REPLACEMENT (0UTAGE GREATER THAN 48 HOURS)

The licensee initiated a shutdown from 30% power on July 1, 1986, as a result of increased s esal leakage from the 2B Reactor Coolant Pump. The licensee plans to maintain the unit in cold shutdown for the purpose of replacing reactor coolant pump seals which have progressively deteriorated during the course of plant testing. Initially, seals will be raplaced on the 2A and 2B pumps. Possible replacement of a third pump seal is being evaluated. The outage.is expected to last approximately 8-12-days after which power ccesnsion testing at the 50% power plateau will be resumed.

This information is current as of 9:00 am, MST, on July 3, 1986.

CONTACT: R. Zimmerman L. Miller, Jr.

(602) 386-5760 (415) 943-3869 DISTRIBUTION H St. MNBB Phillips E/W Willste Air Rights 12:WMail:

Chairman Palladino EDO NRR IE NMSS ADM:DMB Comm. Zech PA . OIA - RES  ; DOT:Trans Only Comm. Bernthal MPA AEOD Comm. Roberts ELD

[ Ccam. Asselstine Regions:

SECY .

INFO /J5/,.,NSAC /dl5 7 ACRS Licensee: // S1C, ,