Proposed Tech Specs,Modifying 880524 Application for Amends to Licenses DPR-24 & DPR-27 to Include Requirement That Channel Check for Table 15.4.1-1, Reactor Containment Pressure Be Conducted Once Per Shift
ML20206D322
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/07/1988
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20206D308 List:
References
NUDOCS 8811170045
Download: ML20206D322 (1)


Text

.

TABLE 15.4.1-1 (2 of 4) .

Channel -

No. Description Check Calibrate Test Remarks

10. Rod Position Bank Counters 5(1)** N.A. N.A. (1) With analog rod position
11. Steam Generator Level $** R M(1)** (1) Includes test of logic for reactor trip ca. Iow-low level and automatic sctuation logic for auxiliary t'eedwater pumps
12. Steam Generator Flow Mismatch 5** R M**
13. Charging Flow N.A. R N.A. l
14. Residual Heat Removal Pump Flow N.A. R N.A.
15. Boric Acid Tank Level D R N.A.
16. Refueling Water Storage Tank Level N.A. R N.A.
17. Volume Control Tank Level N.A. R N.A.
18. Reactor Containment Pressure 5 R M(1)** (1) Isolation valve signal [
19. Radiation Monitoring System D R M (1) Radioactive Effluent Monitoring Instrumentation Survelliance Require-ments are specified in 15.7.4.
20. Boric Acid Control N.A. R N.A.
21. Containment Water Level M R N.A.
22. Turbine Overspeed Trip
  • N.A. R M(1)** (1) Block trip
23. Accumulator Level and Pressure 5 R N.A.

^ Overspeed Trip Mechanism, and Independent Turbine Speed Detection and Valve Trip System

    • Not required during periods of refueling shutdown, but must be performed prior to starting up if it has not been perforned during the previous survelliance period.

Unit 1 Amendment No.

Unit 2 Amendment No. 11yo 00 7,,