Rev 1 to DEI-9, Control of Cmcs Generated for Component Support Hanger Packages
ML20199M087
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/20/1981
From: Tanya Hood, Scruggs C
BROWN & ROOT, INC. (SUBS. OF HALLIBURTON CO.)
To:
Shared Package
ML18052B537 List: ... further results
References
FOIA-85-59 DEI-9, NUDOCS 8607100097
Download: ML20199M087 (1)


Text

c i l EROWN & ROOT, INC. INSTRUCTION  ! ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 8/20/81 DEI-9 1 A 1 of i TITLE: ORIGINATOR: A 8-/3 8 /

OATE CONTROL OF CMC's GENERATED FOR REVIEWED BY: m ,mi -p J/'/7/8/

COMPONENT SUPPORT fj g' 0 ATE HANGER PACKAGES (/

APPROVED BY: # bWs [/AJ'/

CONSTRUCTION PROJECT rp$$ER TE 4 INDEXED 1.0 INTRODUCTION The purpose of this procedure is to describe the distribution and control of CMC's affecting Component Support Hanger Packages.

1.1 REFERENCE f

2.0 ROC D 2.1 CMC's will be prepared by Site Engineering and Welding Engineering, as applicable, in accordance with Engineering

-Instructions and issued directly to the Hanger Package or the BRH if the Hanger Package has not been prepared. The CMC number will be referenced on the Weld Data Card by the organization making the distribution.

2.2 Copies of these CMC's wi-1.1 be distributed to the DCC for record purposes and will not be distributed to the BRH as such distribution and statusing is performed as in paragraph 2;1'.

NOTEi".Due to the extensive changes made in issuing Revision 1, change bars normally appearing in the right margin have been omitted.

./ DE -- 9 - ~