Notice of Violation from Insp on 850930-1004
ML20151N626
Person / Time
Site: 07000371, 05000930 Entergy icon.png
Issue date: 12/24/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20151N623 List:
References
50-298-85-26, NUDOCS 8601030036
Download: ML20151N626 (2)


Text

. - - . . _ , - . - - _ . . .. -. .- - -

. .- . --

N O

-

... ,

.

APPENDIX A

. NOTICE OF VIOLATION L

'

Nebraska-Public Power District Docket: 50-298/85-26 j Cooper Nuclear Station License: DPR-46

.

~

During an NRC inspection con'ucted d on September 30 through October 4, 1985, -

i three violations of NRC requirements were identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR

-

. Part 2, Appendix C (1985), the violations are listed below:

, Waste Gas Radioactivity Monitor Calibrations

~

}

Environmental Technical Specification 3.4.3.a.8 requires that "All waste

{ . gas monitors shall be calibrated at least quarterly by means of a known

radioactive source."

i- '

i Contrary to the above:

'

The following gaseous radiation monitors were not calibrated on a ,

. quarterly frequency:

[ Radwaste building ventilation monitor was not calibrated with a known radioactive source between the period January 7 through

! ~ July 10, 1985.

j The elevated release point (ERP) ventilation monitor was not

calibrated with a known radioactive source between the periods i February 22 through July 26, 1984, and January 8 through July 9, 198 . Turbine building ventilation monitor was not calibrated with a known

.

radioactive source between the period May 4 through October 16, 198 :- Reactor building ventilation monitor (primary containment) was not-calibrated with a known radioactive source in 1984 prior to

,

July 27, 1984, and between th'e period October 17, 1984, through i April 9, 198 '

, The ERP-GE "A"-and "B"' monitors'were not calibrated wit'h.a known radioactive source between1the period October 3, 1984,'through

} March 18, 1985.

! Steam jet air ejector radiation monitor was not calibrated with a known radioactive source between the period August 28, 1984, through July 23, 198 . The control room ventilation monitors RMV-1A, 1B, and 1C were not calibrated with a known radioactive source between the period

November 29, 1984, through March 25, 198 This is a Severity Level IV violation (Supplement IV)(298/8526-01).

t .2

!

B601030036 851224 PDR ADOCK 05000298 0 pm i

'

  1. ;

- __~ -,__ , , - _ , _ _ _ ~ _ _ . _ , _ . _ _ _ . _ _ _ _ , -

. . _ _ _ _ - _ - - _

-

.

, .

k

. , 2

.

Y Maintenance and Test Procedure Compliance

.

Technical Specification 6.3.3 requires that maintenance and test procedures be provided to satisfy routine inspection, preventative maintenance programs, and operating license requirements. Station instrument and control (I&C) Procedure 7.5.2.6,Section VI.C requires that health physics be contacted prior to performing work in the Traversing Incore Probe (TIP) enclosur Contrary to the above, on. August 28, 1985, two individuals from the I&C

,

department' entered the TIP enclosure to perform work without contacting health physic This is a Severity Level IV violation (Supplement IV)(298/8526-02). Radiation Protection Procedure Compliance Technical Specification 6.3.4 requires that radiation control procedures

>

be maintained consistent with the requirements of 10 CFR Part 20. Statio Health Physics Procedure 9.1.1.4 requires a raecial work permit for all jobs which may involve work in the presence of high radiation, in areas in which high levels of radioactive contamination exists, in areas of hazardous airborne radioactivity concentrations, or work involving industrial safety hazard Contrary to the above, on August 28, 1985, two individuals entered the TIP enclosure and performrd work in a.high radiation area and in high airborne radioactivity concentrations without the issuance of~a special work permi This is a Severity Level IV violation (Supplement IV)(298/8526-03).

Pursuant to the provisions of 10 CFR 2.201, Nebraska Public Power District is hereby required to submit to this office within 30 days of the date of the .

letter-transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the reason for the violations if admitted, (2) the corrective steps which have been taken and the results achieved, (3) the corrective steps which will be taken to avoid further violations, and

-

(4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

,

Dated at Arlington, Texas, this 24th day of December , 198 s

.