Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves
ML20153C109
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/18/1998
From: Godfrey D
AFFILIATION NOT ASSIGNED
To:
NRC
References
REF-PT21-98 NUDOCS 9809230342
Download: ML20153C109 (3)


Text

. . _ .

y :-

'e \

r -

SEP-10-1998 16:55 . TRENTEC. INC. 513 528 9292 P.01/02 Tentec 4600 E'ast Tech Drive Cincinnati. Ohio 45245 513/528 7900 + FAX 5t3/528-9292 D*%[ggf4g lMa* ?

Post it* Fax Note 7671 9/18/98 to gg,c oA41,, '**iAtx4 / D A G c* T%4ec.

co w _

Pa=**

NRC Operations Center vnon. .

r=.

Telephone: (301) 816-5100 ro, ggg g g,g; Telecopy: (301) 816-5151 To whom it may'concem:

Based upon information accumulated by Trentec, Inc., it has been determmed that a number of capacity control valves purchased from York International as commercial grade items and dedicated for safety-related use by Fanvell & Hendricks, Inc. (prior to being acquired by Trentec,Inc.) were subsequently found to contain a manufacturing l

defect. The manufacturing defect is due to improper machining of the holes in the valves, as indicated in the anached correspondence between Trentec and York International. The York International Part Numbers for this valve are: 3C t-21538 000(when purchased as a single item) and 064-20838C (as a subcomponent of a compressor).

Valves of this type were supplied as safety-related to Baltimore Gas & Electric Co. Il Trentec bas been in contact with that utility regarding this condition, and return of the potentially defective valves has been requested in order to replace any improperly machined parts. At the present time, there is no indication that any of the defective 7/

valves have been installed in safety-related systems, however further information will be obtained from the utility in the immediate future to confirm the status of the supplied valves.

Respectfully, j r V

~

Dwaine A. Godfrey, Sr President 9809230342 990918 PDR ADOCK 05000317 S PDR ,_

A .' 0 ] 3

SEP-10-1998 16:56 . TRENTEC. INC. 513 528 9292 P.02/02 EEYORKmmwncut ew -

FAX 9 September,1998 To: Brian Miracle, Trentec (513) 528-9292 From: Mark Sievert, York Imemational (717) 337 1440 Re: York Capacity control Valves All capacity control valves (subcomponent P/N 064-20838C) in inventory here at York PA and at the Ycrk Parts cemer in Baltimore have been checked for the incorTect machining (location) of holes as you described in your letter of 19 August. One part was found with the defect. This pan has been scrapped. All others met the drawing.

This is a specialty part, not manufactured in production with fixtures, but custom machined in our specialty machine shop. If any discrepam parts were built into compressors, the compressor would function, but would not load / unload. Customer operators would not be able to switch from 4 cylinders to 6, or vice versa, indicating a bad pan.. The specialty machine shop personnel have been made aware cf the problem; and we will continue to monitor field operations for compressors in this condition.

Thank you for your assistance. Please contact me at (717) 771- 6284 if you have further questions.

Mark R. Sievert Sr. Quality Assurance Engineer York Intemational ,

i j

I l

1 e

, , OCD

, 0 3 ~1 f

GENERAL INFORMATION or OTHER EVENT NUMBER: 34804 LICENSEE: TRENTE'C, IllC, CINCINNATI, OHIO NOTIFICATION DATE: 09/18/98 CITY: CINCINNATI REGION: 3 NOTIFICATION TIME: 16:55 [ET]

COUNTY: STATE: OH EVENT DATE: 09/18/98 LICENSE #: AGREEMENT: N EVENT TIME: 12 : 00 [EDT)

DOCKET: LAST UPDATE DATE: 09/18/98 NOTIFICATIONS DAN HOLODY, R1 RDO NRC NOTIFIED BY: DWAINE GODFREY MONTE PHILLIPS, R3 RDO HQ OPS OFFICER: DICK JOLLIFFE VERN HODGE NRR EMERGENCY CLASS; NOT APPLICABLE l 10 CFR SECTION:

CCCC 21.21 UNSPECIFIED PARAGRAPH EVENT TEXT

- 10CFR PART 21 REPORT - DEFECTIVE CAPACITY CONTROL VALVES -

SEVERAL CAPACITY CONTROL VALVES PURCHASED BY TRENTEC, INC, CINCINNATI, OHIO, FROM YORK INTERNATIONAL CORPORATION, YORK, PENNSYLVANIA, AS COMMERCIAL GRADE ITEMS AND DEDICATED FOR SAFETY-RELATED USE BY FARWELL

& HENDRICKS, INC (PRIOR TO BEING ACQUIRED BY TRENTEC, INC) WERE SUBSEQUENTLY FOUND TO CONTAIN A MANUFACTURING DEFECT. THE MANUFACTURING DEFECT IS DUE TO IMPROPER MACHINING (LOCATION) OF HOLES IN THESE VALVES.

THE YORK INTERNATIONAL PART NUMBERS FOR THIS VALVE ARE #364-21538-000 (WHEN PURCHASED AS A SINGLE ITEM) AND #064-20838C (WHEN PURCHASED AS A SUBCOMPONENT OF A COMPRESSOR) .

VALVES OF THIS TYPE WERE SUPPLIED AS SAFETY-RELATED VALVES TO BALTIMORE GAS & ELECTRIC (BG&E) COMPANY (CALVERT CLIFFS).

TRENTEC PERSONNEL HAVE BEEN IN CONTACT WITH BG&E PERSONNEL REGARDING THIS CONDITION AND HAVE REQUESTED THAT THESE POTENTIALLY DEFECTIVE VALVES BE RETURNED TO TRENTEC SO THAT ANY IMPROPERLY MACHINED PARTS COULD BE REPLACED.

AT THE PRESENT TIME, TRENTEC HAS NO INDICATION THAT ANY OF THE DEFECTIVE VALVES HAVE BEEN INSTALLED IN SAFETY-RELATED SYSTEMS. HOWEVER, TRENTEC PLANS TO OBTAIN FURTHER INFORMATION FROM BG&E IN THE IMMEDIATE FUTURE TO CONFIRM THE STATUS OF THE SUPPLIED VALVES.