ML20154N322

From kanterella
Revision as of 16:15, 22 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Document Signifying Implementation of Amends 170 & 162 to Licenses NPF-35 & NPF-52,respectively on 981001
ML20154N322
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/15/1998
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-M99629, TAC-M99630, NUDOCS 9810210251
Download: ML20154N322 (2)


Text

_ . . ._ . . . .

, gp tt: .%

., g & UNITED STATES j

2 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666 4001 w &

October 15,1998 MEMORANDUM FOR: Docket File FROM: Peter S. Tam, Senior Project Manager Pioject Directorate ll-2 , g Division of Reactor Projects - 1/II '

Office of Nuclear Reactor Regulation

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -

IMPLEMENTATION OF AMENDMENTS 170 and 162 TO

, OPERATING LICENSES (TAC M99629 AND M99630)

The attached document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment Nos.170 (for Unit i) and 162 (for Unit 2) on October 1,1998.

Docket Numbers 50-413 and 50-414 Distribution Docket file

//

'/

.j PUBLIC H. Berkow c 9810210251 981015 "S QC PDR P

ADOCK 05000413 PDR

[t??*[IC'TV-ub--'d 5" 6 ' --- '

L d

'; t , , , ,

-2

10/16/98 FRI 00:20 FAI @ 004 NuclekPolOy Manual- Volume 2

- , , NSD Appendix D. 221. Implementation Sheet APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET FACu ITY-.OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPIEMENTATION SHEET .

m EP6NS O MN'S O ONS UNIT NO. Erl EPfD 3 TS No. "Rkat 14 Js.u-3 DATE RECEIVED lbPhcf 4 4-r.11+.9,v.1.,

anx s r.3 ,

AMENDMENT. NO. l~/ 0/1 f. "L DESCRIPTION Low h anivof Ove#/wwurem

_PrGfwh [Vlea4ve,lCetJ0tah TX Ame,9 ,eE

1. IMPLEMENTATION DATES A. NRC ISSUE DATE (Date of NRC Cover Letter): 2 L 4P B. NRC EFFECTIVE DATE (From Text of NRC letter): 8 I l

C. STATION IMPLEMENTATION DATE (No later than NRC Efective Date): /0 7 !7

2. PLANT NOTIFICATION l .7 ff Via E-Mail. Distribution; Include Site Techmcal Contacts
3. RGC TECHNICAL CONTENT REVIEW CRITERIA O A. All Discrepancies Have Been Resolved Via NRC Interface.

M. ' No Inadvertent Changes Were Made To TS Sheets Involved. , -}

VC. TS Change Was Issued As Requested By DP .

TECHNICAL REVIEWER: v --

M an- _

'?/! Pef l su y (-;

(List Discrepancies On Attached Page) # D CHECKED BY: b M+b I II9 l (List Dzscrepancies On Attached Page) Date

  • f
4. PIP NUMBER (If generated): _  % C '18 '" 3 Il'7 l %5. [ALL APPLICABLE C'ITVE ACTIONS FROM ASSIGNED PIP COMPLETED

/0 !'72 VERIFIED BY:

- A v w y -

Ref atory Compliance Date

] 6. [ALL PRE-IMP TION ITEMS (n EMS 1-5) COMPLETED  !

l VERIFIED DY: j M - /D f j l Re ry Compliance Date l 7. FINAL IMPLEMENTATION APPROVAL i I

A/b M l Manager, Regulatory Compliance Date I

  • W kl!A I Manager, Safeiy Assurance Date l

l l