ML20137T497

From kanterella
Revision as of 04:40, 2 September 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-324/97-02 & 50-325/97-02 on 970119- 0301 & Notice of Violation
ML20137T497
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/31/1997
From: Shymlock M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Campbell W
CAROLINA POWER & LIGHT CO.
Shared Package
ML20137T500 List:
References
EA-97-120, NUDOCS 9704160107
Download: ML20137T497 (5)


See also: IR 05000324/1997002

Text

{{#Wiki_filter:I

                                                                                               1
                                  March 31, 1997
      EA 97 120
      Carolina Power & Light Company
      ATTN: Mr. W. R. Campbell
                Vice President
      Brunswick Steam Electric Plant
      P. O. Box 10429
      Southport, NC 28461

,

      SUBJECT:      NRC INTEGRATED INSPECTION REPORT N05. 50-325/97-02, 50 324/97 02
                    NOTICE OF VIOLATION
      Dear Mr. Campbell:
      On March 1,1997, the NRC completed an inspection at your Brunswick reactor
      facility. The enclosed report presents the results of that inspction.
      During the six weeks covered by this inspection period our inspectors found
      that your staff generally took a safety conscious approach to the activities
      conducted at the Brunswick plant. We are concerned, however, about six
      violations of NRC requirements that were identified. The first violation was
      for failure to follow an o)erating procedure for restoring an open valve to a
      locked closed position. T11s violation was of concern because independent
      verification failed to detect this error. The second violation was a
      maintenance rule violation for failure to adequately do a historical search of
      system surveillance testing. This violation was of concern because the
      reactor protection system circuit breakers were not properly classified and
      were being incorrectly monitored. The third violation was for failure to have
      adequate design control measures for design verification of configuration
      changes. This violation was of concern because design verification is
      required to be performed to insure that the design basis is properly
      translated into design output. The fourth violation was for failure to
      implement an inspection program for safety related miscellaneous structural
      steel. This violation was of concern because the inspection requirements to
      ensure proper installation had been deleted. The fifth violation was for
      failure to take prompt corrective action once a discrepancy was identified for
      an Emergency Core Cooling System stroke time values. This violation was of
      concern because when this discrepancy was first identified no action was taken
'
      to correct plant p ocedures to indicate the correct stroke time values. The              ;
      sixth violation was for failure to have chemicals identified as required by              .
      quality assurance requirements. This violation was a concern because of the              I
      prcgrammatic problems identified.
      The violations are cited in the enclosed Notice of Violation and the
      circumstances surrounding the violations are described in detail in the
      enclosed report. Please note that you are required to respond to this letter
      and should follow the instructions specified in the enclosed Notice when
                                                                                     }\
                                                                                      ;
                                                                                       '
                                                                                                ,
                                                                                                l
      preparing your response. The NRC will use your response, in part, to
                               1600N                                                            l
  !$84228$8K3?888s24
  G
                                                                lil.14lMlpp'MHg                 l
                      PDR                                                    '
                                                                                         5 01 J
          -            -                   .     . _ . . . .   . - - .    _ - - . - . . - .
   CP&L                                             2
   determine whether further enforcement action is necessary to ensure compliance
   with regulatory requirements.
   In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
   thi-s letter and its enclosures will be placed in the NRC Public Document Room
   (PDR).
                                               Sincerely,
                                               %*isnedbyM.B.Standock

l l '

                                               Milton B. Shymlock, Chief
                                               Reactor Projects Branch 4
                                               Division of Reactor Projects
   Docket Nos. 50-325 and 50-324
   License Nos. DPR 71 and DPR-62

'

   Enclosures:    1.     Notice of Violation                                                '
                  2.     NRC Inspection Report                                              l
   cc w/encls:

! W. Levis, Director !

   Site Operations
   Brunswick Steam Electric Plant

, P. O. Box 10429 l Southport, NC 28461

   R. P. Lopriore                                                                           !
   Plant Manager                                                                            !
   Brunswick Steam Electric Plant                                                           ~
   Carolina Power & Light Company

l P. O. Box 10429 '

   Southport, NC 28461
   J. Cowan, Vice President
   Operations & Environmental
      Support      MS OHS 7
   Carolina Power & Light Company
   P. O. Box 1551
   Raleigh, NC 27602
   Gerald D. Hicks

l Manager Regulatory Affairs ! Carolina Power & Light Company ! P. O. Box 10429 ,

   Southport, NC 28461
 ,
   (cc w/encls cont'd - See page 3)

! l l

                                             .                                              a
 . _    . _ _ _ _ .      __ _ . _ _ _ . _ _ . _ . _ _ . . _ _ _ _ _ .   _ _ . _ ___

, i

     CP&L                                                             3

l

(cc w/encls cont'd)

i W. D. Johnson, Vice President

       and Senior Counsel
Carolina Power & Light Company

l P. O. Box 1551

     Raleigh, NC 27602

j Dayne H. Brown Director j Division of Radiation Protection , N. C. Department of Environmental 4 Health & Natural Resources i P. O. Box 27687 i Raleigh, NC 27611 7687 3 Karen E. Long i Assistant Attorney General i State of North Carolina i P. O. Box 629 l Raleigh, NC 27602

     Robert P. Gruber

i

     Executive Director

i Public Staff - NCUC i P. O. Box 29520 s Raleigh, NC 27626 0520

                                                                                    )
     Public Service Commission
     State of South Carolina
     P. O. Box 11649
     Columbia, SC 29211
     Jerry W. Jones. Chairman
     Brunswick County Board of
       Commissioners
     P. 0. Box 249
     Bolvia, NC 28422                                                               1
     Dan E. Summers
     Emergency Management Coordinator
     New Hanover County Department of
       Emergency Management
     P. O. Box 1525
     Wilmington, NC 28402
                                                                                    l
     William H. Crowe, Mayor
     City of Southport                                                              l
     201 East Moore Street                                                          '
     Southport, NC 28461
     Distribution w/ enc 1:          (See page 4)
                                                                                    1
CP&L                                                   4
Distribution w/ encl:
M. Shymlock, RII
D. Trimble, NRR
J. Coley, RII
R. Aiello, RII-
J. Lenahan, RII
W. Rankin, RII

-D. Thompson, RII

PUBLIC
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
8470 River Road, SE
Southport, NC 28461
                                                                                                                -
                                                                                                                ,
                                                                                                                b
                                                                                                                i
                                                                                                                .
                                                                                                                  !
                                                                                                                  l
           *(See previous concurrence)
       OrFICE    Rft:0RP       Rft:DRP         Rff:DRP        RIf:0RS        Rif 0RS   i     Rif!DRS
    SICAATURE                      ,                ,              h                     j
                                                                                               f-f
          NAME   GWiseman:ser  CPatterson      EBrown         JLAahan         Coley          JKrfn
          DATE     03 / N / 97  03 /      / 97  03 /     / 97  03_/ 6 \ / 97  03,/ ) l / 97    3 / 3 [ / 97
         COPY 7   [5)       NO   YES       NO    YES      N0   NES
                                                                    I
                                                                         NO   [[S)        NO  % NO
        OFFICIAL'ftECORD COPY    DOCUMENT NAMi G:\BRU\IPO 4 R\9702
                                                                                                                  l
                                                                                                                  !
                                                                                           _        _       _,.

03-31-1977 05:02PN FROt1 TO 1 404I515789 P.02

  CP&L                                                      4
  Distaibution v/ enc 1:
  M. 51ymlock, RII
  D. Trimble. NRR
  J. Coley, RII
  R. Aiello. RII
  J. Lenahan, RII
  W. Rankin. RII
  D. Thompson, RII
  PUBLIC
  NRC Resident Inspector
  U.S. Nuclear Regulatory Commission
  8470 River Road. SE
  Southport, NC 28461
         orricf  RIf JRP          AfI:tRP ,       Af f :0RD        kff:0kt       Rff?DR3       Aff:ms
      S!$NATW
           mAME GWisesee:ser      CPatt         d tBrown
                                                           .h    '
                                                                   JLanahan      JColey        JKroh
           DATE   03 /    / 97     03 /.1/ / 97     93 / $ / 97      03 /   / 97  03 /   / 97   03 /   / 97
          COPY?    VIS     N0       YE3     NC       YE3      NO     YE5     NO   YES     11 0   YES    *)
         WPILI L Mk00K] 00PT        UDGUPILNT #wrii. GiWU\1RGUF R\97UZ
                                                                                                                 l
                                                                                                      TOTAL P.02
                                                                                                                 !

}}