ML20128C276

From kanterella
Revision as of 23:29, 8 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Rept for Mar 1985,consisting of Refueling Info Omitted from Original Rept
ML20128C276
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/31/1985
From:
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20128C258 List:
References
NUDOCS 8505280237
Download: ML20128C276 (1)


Text

r

~

- Refueling Information Ebrt Calhoun - Unit No.1 -

Report for the month ending March, 1985 ,

Scheduled date for next refueling shu.tdown. October, 1985 1.

2. Scheduled date for restart following refueling. December, 1985
3. Will refueling or restmption of operation thereafter require a technical specification change or other license amendment? Yes
a. If answer is yes, what, in general, will these be? -

Technical Specification change to accommodate increased radial peaks due to further reduction in radial leakage,

b. If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Conmittee to deter-mine whether any unreviewed safety questions are associated with'the core reload,
c. If no such review has taken place, when is it scheduled?
4. Scheduled date(s) for subnitting proposed licensing action and support information. September, 1985
5. Inportant licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Methodology Changes June, 1985

6. The number of fuel assenblies: a) in the core 133 assemblics b) in the spent fuel pool 305 c) spent fuel pool storage capacity 729 g52g{ggggyB5 d) planned spent fuel pool May be increased storage capacity via fuel ein R PDR consolidation
7. 'Ihe projected date of the last refueling that can be ,

discharged to the spent fuel pool asstaning the present licensed capacity. 1996 Prepared by k M V

tute April 1,1985

(/ '