Notice of Violation from Insp on 910225-26.Violation Noted:Inspectors Observed on 910225,insufficient Numbers of Trained Security Officers on Second Shift to Meet Contingency Plan & Procedural Commitments
ML20128P692
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/15/1991
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20128P671 List:
References
50-458-91-09, 50-458-91-9, NUDOCS 9610180057
Download: ML20128P692 (1)


Text

- - - - - _ . - - - - - - . - - - - - . - - _ - . - - - - . - - -

APPENDIX A NOTICE OF VIOLATION Gulf States Utilities CocKet No. 50-458 River Benc Station (RBS) License No. NPF-47 During an NRC inspection conducted on February 25-26, 1991, a violation of NRC l reouirements was identified. The violation involvec inadeouate security f:rce staffing. In accordance with the " General Statement of Policy and Proceaure for NRC Enforcement Actions," 10 CFR Part 2, Appencix C (1990), the violaticn l

1 is listed below:

Section 2.0 of the River Bend Station Operating License NPF-47 reouires that the licensee maintain in effect and fully imolement all orovisions of l the Commission approvec physical security plan (PSP). This inciuces l amencments and changes mace pursuant to tne autnerity of 10 CFR 50.5a(o).

l RBS PSP reouires detailed croceaures to imolement the RBS Safecuaras Contingency Plan (SCP). RBS Procecure PSP-a-409, Revision 2. as amencec l

by Interim Procedure Change IPC-4-400-2-1, in succort of :ne SCP. ecuires

a certain numoer of security officers eacn snif
to meet all oossioie contingencies.

Contrary to the above, the inspectors coservec :n February 25, 1391. :nere were insufficient num' o ers of trained security efficers en :ne secena snift at 7 a.m. to meet contingency plan anc procecural commitments.

This is a Severity Level :V violation (Sucolemen: III) (253/91C9-011.

Pursuant to :ne provisions of 10 CFR 2.201 Gulf Sta es Utilities is rereoy recuirea to suomit a written statement or explanation to tne U.S. Nuclear Regulatory Ccmmission, ATTN: Document Control Ces(. dasningten. J.C. 20555 with a cocy to the Regional Administrator, Region IV, anc if acolicacie, a ::oy to the NRC Resicent Inspector, within 30 days of :ne cate of the 1e::er transmitting this Notice of Violation (Notice). This reply snould be clearly marked as a " Reply to a Notice of Violation" ano snould incluce for eacn violation: (1) the reason for the violation, or, i# contestec, ne casis for discuting tne violation, (2) the corrective steos tnat have oeen taken ana :ne results acnieved, (3)' the corrective steps that will be taken to avoic furtner violations, and (4) the date when full compliance will be acnievea. :f an adeouate reply is not received within the time specified in this Notice, an i orcer may oe issued to show cause why the license snould not ce moaified, suspenced, or revoked, or why such other action as may be proper snould not ce taKen. Where good cause is shown, consideration will be given to extencing the response time. Under the authority of Section 182 of the Act. 42 U.S.C. :32, this resconse shall be submittec under oath or affirmation.

Dated a Arlington, Texas this 15thday of April 1991 ENCLOSURE CONTAINS MfEGUARDS INFORMAil04 i