Monthly Operating Repts for Sept 1996 for Zion Generating Station
ML20129B371
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 09/30/1996
From: Cygan J, Schwartz G
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ZAD-96-009, ZAD-96-9, NUDOCS 9610220414
Download: ML20129B371 (14)


Text

Corntnonwealth fijtusn (nntjun)

  • ~*

Znin Generating Station

, 101 Shilt ih Ikinicunt

/. ion.11,6(HP)9 2797

'Tel H 17 7 e 20M4 October-10, 1996 2AD-96-009 Nuclear Regulatory Commission Document Control Desk Washington. DC 20555

Dear Sir:

Attached is the September Operating Status Report.

. it i G. K. S'cfw#rtz -

Station Manager l Zion Station  !

CKS/jlc Enclosure cc: Regulatory Assurance USNRC Document Control H. Keiser W. Beach (NRC) ,

D. Farrar D. R. Eggett INP0 Div. of Enforcement Health State of Illinois /IDNS F. Yost NRC Inspector. Zion f IDNS Inspector. Zion Op; rating Engrs.

C. Y. Shiraki Master File 9610220414 960930 PDR ADOCK 05000295 R PDR ZCLERK-1

.wniunn comiuny m

l .

OPERATING DATA REPORT DOCKET NO. 50-295 t DATE 10/10/96 COMPLETED BY J. CYGAN TELEPHONE (847)746-2084 X3169 4

OPERATING STATUS a

1. Unit Name: Zion Unit 1
2. Reporting Period: 0000 090196 to 2400 093096 Notes 4
3. Licensed Thermal Power (MWt): 3250
4. Nameplate Rating-(Gross MWe): 1085
5. Design Electrical Rating (Net MWe):  :.040
6. Maximum Dependable Capacity (Gross MWe): :.085

'7. Maximum Dependable Capacity (Net MWe):  :.040

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give

. Reasons: N/A.

9. Power Level To Which Restricted. If Any (Net MWe): N/A i 10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 720.0 6.575.0 199.439.0

. 12. Number Of Hours Reactor Was Critical 325.1 5.255.1 135.294.0

13. Reactor Reserve Shutdown Hours 0.0 0.0 2.612.8
14. Hours Generator On-Line 310.4 4.959.7 131.356.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 911.170.0 15.731.404.0 387.427.001
17. Gross Electrical Energy Generated (MWH) 298.894.0 5.248.624.0 126.154.697
18. Net Electrical Energy Generated (MWH) 280.218.0 5.029.973.0 120.192.925
19. Unit Service Factor 43.1 75.4 65.9
20. Unit Availability Factor 43.1 75.4 65.9
21. Unit Capacity Factor (Using MDC Net) 37.4 73.6 57.9 i
22. Unit Capacity Factor (Using DER Net) 37.4 73.6 57.9
23. Unit Forced Outage Rate 56.9 16.4 16.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY i COMMERCIAL OPERATION i

2 CLERK-2 l

l

~ _ .

~

OPERATING DATA REPORT J

DOCKET NO. 50-304 DATE 10/10/96 COMPLETED BY J. CYGAN TELEPHONE (847)746-2084 X3169 OPERATING STATUS

\^

1. Unit Name: Zion Unit 2
2. Reporting Period: 9000 090196 to 2400 093096 Notes
3. Licensed Thermal Power (MWt): 3250

, 4. Nameplate Rating (Gross MWe): 1085 5 .' Design Electrical Rating (Net MWe):  :.040

6. Maximum Dependable Capacity (Gross MWe): 1085
7. Maximum Dependable Capacity (Net MWe): 1040,

, 8. If Changes Occur in Capacity Ratings (Items Numaer 3 Through 7) Since Last Report. Give Reasons: N/A

! 9. Power Level To Which Restricted. If Any (Net MWe>: N/A 1

10. Reasons For Restrictions. If Any: N/A j This Month Yr-to-Date Cumulative
11. Hours In Reporting Period 720.0 6.575.0 L93.152.0
12. Number Of Hours Reactor Was Critical 432.5 5.846.4 138.378.7 4
13. Reactor Reserve Shutdown Hours 0.0 0.0 226.1
14. Hours Generator On-Line 432.5 5.688 6 135.098.8 '
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1.377.370.0 17.631.458.0 402.647.369
17. Gross Electrical Energy Generated (MWH) 453.402.0 5.846.647.0 130.102.951
18. Net Electrical Energy Generated (MWH) 427.792.0 5.618.358.0 124.095.088
19. Unit Service Factor 60.1 86.5 69.9
20. Unit Availability Factor 60.1 86.5 69.9 l
21. Unit Capacity Factor (Using MDC Net) 57.1 82.2 61.8 l
22. Unit Capacity Factor (Using DER Net) 57.1 82.2 61.8  ;
23. Unit Forced Outage Rate 00.0 1.3 13.3  ;
24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each): l l

Refuelino Outaae (22R14) Startina Seotember 19. 1996 and Lastina 58 days. ,

25. If Shut Down At End Of Report Period. Estimated Date of Startup: i
26. Units In Test Status (Prior to Commercial Operation); Forecast Achieved 4

INITIAL CRITICALITY

! INITIAL ELECTRICITY

, COMMERCIAL OPERATION t

J e

ZCLERK-3

UNIT SHUTDOWNS AND POWER REDUCTIONS .

DOCKET NO. 50-295 UNIT NAME Zion Unit 1 .

DATE 10/10/96 -

COMPLETED BY J. CYGAN .

TELEPHONE (847) 746-2084 x3169 REPORT MONTH September 1996 1 Duration 2 Method of Licensee System Component Cause & Corrective No. Date Type (Hours) Reason Shutting Event Code 4 Code 5 Action to Down 3 Report # Prevent Recurrence Reactor 6 8/27/96 F 310.4 A 2 Unit 1 Was Manually Tripped To Repair The NRV Block Valve On 8/27/96. Unit 1 Went Back On Line On 9/18/97 And Remained On Line For The Rest Of The Reporting Period.

1 2 3 4 F: Forced Reason: Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File

D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)

ZCLERK-4

^

UNIT SHUTDOWNS AND POWER REDUCTIONS -

DOCKET NO. 50-304 UNIT RAME Zion Unit 2 .

DATE 10/10/96 -

COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 x3169 REPORT MONTH September 1996 1 Duration 2 Method of L;;ensee System Component Cause & Corrective No. Date Type (Hours) Reason Shutting Event Code 4 Code 5 Action to Down 3 Report # Prevent Recurrence Reactor 7 9/19/96 S 432.5 C 1 Unit 2 Went Off-Line For Refueling Outage ,

Z2R14.

1 2 3 4 F: Forced Reason: ~

Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)

ZCLERK-5

AVEPAGE DAILY UNIT POWER LEVEL I

I DOCKET NO. 50-295 UNIT _ Zion Unit 1 DATE 10/10/96 COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 -

x3169 MONTH Seotember 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)  !

1 -12 17 -14 l 2 -12 18 226 3 -12 19 468 4 -12 20 916 5 -12 21 1008 6 -13 22 1006 7 -13 23 1010 8 -13 24 1027 l 9 -13 25 1037 10 -13 .,

26 1036 11 -13 27 1036 j 12 -13 28 1042 13 -13 29 1042 14 -14 30 1041 15 -14 31 16 -14 I

INSTRUCTIONS l On this format, list .the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

ZCLERK-6

l .

AVERAGE DAILY UNIT POWER LEVEL r DOCKET NO. 50-304 UNIT Z1on Unit 2 DATE 10/10/96 COMPLETED BY J. CYGAN TELEPHONE (847) 746-2084 X3M9 Seotember -1996-DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL '

(MWe-Net). (MWe-Net) 1 1031 17 1008 2 1030 18 889 3 1028 19 -13  ;

4 1027 20 -13 l 5 1023 21 -13 6 1008 22 -13 7 1006 23 -13 8 1007 24 -12 9 1006 25 -12  !

4 10 999 26 -12 11 953 27 -12  ;

12 921 28 -12 i l

13 1015 29 -12 ,

14 1004 30 -12 1 15 1010 31

16. 1008 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

I ZCLERK-7

{

September 1996

SUMMARY

OF OPERATING EXPERIENCE J

!) NIT 1 Unit 1 began September off-line because of a continuation of repairs on the pressurizer PORV block valve (valve had stalled and lost indication).

On September 18,1996 at 0138 hours0.0016 days <br />0.0383 hours <br />2.281746e-4 weeks <br />5.2509e-5 months <br /> Unit I was back on line and remained on-line for the remainder of the repcrting period. Unit 1 concluded the reporting period at 1080 MWe power level (99.9% reactor power) and with an availability factor of 43.1% for the month of September.

UNIT 2 I

Unit 2 began September on-line at 1084 MWe power level (100% reactor power).

l i- Unit 2 was taken off-line at 0032 on September 19. 1996 for a refueling outage (Z2R14) which is scheduled to last for 58 days.

A k

1 ZCLERK-8

. \

4 September 1996 MAJOR MAINTENANCE t

EQUIPMENT NAME WORK PERFORMED

~

(UNIT 1)

OB IA COMP Breaker Inspection /MCC Cubicle Inspection

Completed DOS
08/05/96 - 09/18/96 OB CC PP Perform Complete Pump Overhaul Completed 005: 07/07/96 - 09/05/96 1A C/CB PP Replace Pump Housing Completed 00S: 05/23/96 - 09/20/96
1A SA COMP Lube Oil Cooler Completed 005: 09/40/96 - 09/09/96 OB IA COMP Repair Packing Follower 005: 09/29/96 4

i COMMENT:

  • No return to service date. ,

. i ZCLERK-9 1

l 1

September 1996 MAJOR MAINTENANCE EQUIPMENT NAME WORK PERFORMED (UNIT 2) i 2B C/CB PP Perform PM/ Change Lubrication i 00S: 07/30/96 1 1

28 MFW PP Inspect / Clean / Replace Filter Completed 00S: 08/26/96 - 09/18/96 2B RHR PP Motor Meggaring Completed 005: 09/04/96 - 09/06/96 28 AFW PP Lube Oil Cooler Completed DOS: 09/05/95 - 09/05/96 2A IA COMP Compressor Replacement DOS: 07/14/96 ,

28 SA COMP Calibrate 2PSL-SA13 Completed l 00S: 09/16/96 - 09/24/96 I

l I

l l

COMMENT:

  • No return to service date.

ZCLERK-10

'^

. ,- )

REFUELING INFORMATION RE0 VEST 00ESTIONS:

1. Name of facility.
2. Scheduled date for next refueling shutdown.
3. Scheduled date for restart following refueling.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If answer is yes, what, in general, will these be?

If answer is no. has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?

If no such review has taken place, when is it scheduled?

5. x neduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
7. The number of fuel assemblies: (a) in the core and (b) in the spent fuel storage pool.
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned.

in the number of fuel assemblies.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

/

Page 1 of 4 4

ZCLERK-11~ ,

l ,

REFUELING INFORMATION REQUEST UNIT 1 - ANSWERS:

1. Zion Unit 1.
2. Cycle 15 is scheduled to shutdown April 5, 1997 for refueling.
3. Cycle 16 is scheduled to start up May 25, 1997.
4. The following License Amendments are required to allow resumption of operation after Refueling Outage Z1R15.

e Increase Steam Generator plugging limit. Required to ensure Unit derating will not be required based on Steam Generator plugging.

The Reload Safety Analysis for cycle 16 will be completed during Z1R15.

5. Projected submittal of License Amendment is the last half of November,1996.
6. Not applicable.
7. The number of fuel assemblies (a) in the core is 193. and (b) in the spent fuel storage pool from Zion Unit 1 is 932.
8. The present licensed spent fuel pool storage capacity (shared with Zion Unit
2) is 3012 fuel assemblies. Of these 3012 storage locations. 11 are unavailable and 239 are inaccessible pending completion of the Offset Tool Modification (M22-90-0-008A, C).
9. The projected date of the last refueling than can be discharged to the spent fuel pool, assuming the present licensed capacity of 3012 locations (11 out of 3012 are unavailable) is April 2006 (from Z1R21) based on the 1996 Projected Comed Overhaul Schedule. This assumes the Offset Tool Modification (M22-90-0-008A, C) will be installed prior to June 2003. This projected date is subject to change based on outage durations or Overhaul Schedule changes.

2 of 4 ZCLERK-12

REFUELING INFORMATION REQUEST UNIT 2 - ANSWERS:

1. Zion Unit 2.
2. Cycle 14 is scheduled to shutdown September 19. 1996 for refueling.
3. Cycle 15 is scheduled to start up November 16, 1996.
4. The following. Outstanding License Amendment Requests are required for startup of Unit 2 following Refueling Outage Z2R14.

e Appendix J option B - sent to NRC.

  • F* - sent to NRC.
  • CE Sleeving - Amendment sent to NRC.
5. The following outstanding proposed License Amendments are required for startup from Z2R14.

e Appendix J option B - allows elimination of ILRT. Initial submittal was August 29, 1996. Submittal was revised October 4 1996 and September 20. 1996.

e F* - Required for Steam Generator re-roll work planned for outage.

Initial submittal was August 16, 1996. Submittal was supplemented October 4. 1996.

e CE Sleeving - Required to support revised methodology to be used in outage. Initial submittal was September 3. 1996.

e Reload and Core Operating Limits Report (COLR) scheduled for On Site Review September 18. 1996.

6. New fuel to be reloaded into Unit 2 Cycle 15 core will incorporate the following design changes:

e Selected standard Integral Fuel Burnable Absorber (IFBA) patterns have l been updated following a West 1nghouse Core Engineering investigation of peripheral IFBA rod loading within the fuel assembly. The net effect of this change is to achieve the most efficierit absorber orientation at Beginning of Life (BOL) and for burnups through 5000 i MWD /MTV. These patterns provide self-limiting features that mitigate j the extent of DNB propagation. In addition. these IFBA patterns provide significant peaking factor and reactivity holddown benefits.

I i

3 of 4 ZCLERK-13

REFUELING INFORMATION REQUEST UNIT 2 - ANSWERS- (Continued) e IFBA rods will have a nominal B-10 enrichment loading with a reduction in backfill pressure from 200 to 100 psig. The nominal B-10 loading is 1.77 mg/ inch. Rod internal gas pressure has an effect on two of the fuel rod design criteria that are evaluated for the reload: Rod internal pressure and clad stress criteria. The Zion Unit 2 Cycle Specific fuel design analysis has been performed and has demonstrated that the design criteria were met.

7. The number of fuel assemblies (a) in the core is 0 (Unit 2 is shutdown for refueling, and Core offload was completed 10/5/96).

(b) in the spent fuel storage pool from Zion Unit 2 is 1177 (193 assemblies offloadcd from Unit 2 core, plus 76 new fuel assemblies to be reloaded into core, plus previous 908 Unit 2 assemblies residing in the spent fuel pool).

8. The present licensed spent fuel pool storage capacity (shared with Zion Unit
2) is 3012 fuel assemblies. Of these 3012 storage locations,11 are unavailable and 239 are inaccessible pending completion of the Offset Tool Modification (M22-90-0-008A, C).
9. The projected date of the last refueling that can be discharged to the spent fuel pool, assuming the present licensed capacity of 3012 locations (11 out of 3012 are unavailable) is April 2006 (from Z1R21) based on the 1996 Projected Comed Overhaul Schedule. This assumes the Offset Tool Modification (M22-90-0-008A, C) will be installed prior to June 2003. This projected date is subject to change based on outage durations or Overhaul Schedule changes.

l 4

4 of 4 l l

ZCLERK-14