Notice of Violation from Insp on 960729-0827.Violations Noted:Licensee Failed to Perform SR 3.8.4.8 within 18 Month Required Frequency
ML20134G454
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/07/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20134G438 List:
References
50-458-96-26, EA-96-329, NUDOCS 9611130205
Download: ML20134G454 (3)


Text

4 NOTICE OF VIOLATION Entergy Operations. Inc. Docket No. 50-458 River Bend Station License No. NPF-47 EA 96-329 During an NRC inspection conducted on July 29 through August 27. 1996, violations of NRC requirements were identified. In accordance with the

" General Statement of Policy and Procedure for NRC Enforcement Actions."

NUREG-1600 the violations are listed below:

Technical Specification Surveillancs Requirement 3.01 states, in ) art.

that Surveillance Requirements shall be met during the MODES or otler specified conditions in the Applicability for individual Limiting Conditions for Operation, unless otherwise stated in the Surveillance Requirement.

A. Surveillance Requirement 3.8.4.8 requires the licensee to verify that battery capacity is a 80% of the manufacturer's rating when subjected to a 3erformance discharge test. The FREQUENCY of this test is 60 montas AND 18 months, when the battery shows degradation or has reached 85% of expected life.

Contrary to the above the licensee failed to perform Surveillance Requirement 3.8.4.8 within the 18-month required frequency, the appropriate frequency since the battery had shown degradation.

(01013) 3 i

B. Surveillance Requirement 3.8.4.7 requires the licensee to verify  ;

that battery capacity is adecuate to supply, and maintain in OPERABLE status, the requirec emergency loads for the design duty cycle when subjected to a battery service test. The FREQUENCY of this test is 18 months.

Contrary to the above, the licensee failed to perform Surveillance Requirement 3.8.4.7 within the 18-month required frequency.

(01023) '

C. Surveillance Requirement 3.6.5.2.5 requires the licensee to verify, from an initial pressure of 75 psig that the drywell air lock seal pneumatic system pressure does not decay at a rate equivalent to > 0.67 psig for a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The FREQUENCY of this test is 18 months.  ;

Contrary to the above. the licensee failed to perform Surveillance Requirement 3.6.5.2.5 because a satisfactory test of the drywell air lock seal system was not performed within the required 18-month frequency. (01033)

D. Surveillance Requirement 3.6.5.1.2 requires the licensee to verify. from an initial pressure of 75 psig, that the personnel ,

door inflatable seal pneumatic system pressure does not decay at a  !

9611130205 961107 PDR ADOCK 05000458 G PDR _

, , i, ENTERGY OPERATIONS. INC. rate equivalent to a 0.67 psig for a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The FREQUENCY of this test is 18 months.

Contrary to the above, the licensee failed to perform Surveillance Requirement 3.6.5.1.2 because a satisfactory test of the personnel door inflatable seal pneumatic system was not performed within the required 18-month frequency. (01043)

E'. Surveillance Requirement 3.7.2.2 requires the licensee to perform i required CRFA [ control room fresh air) filter testing in g.. accordance with Ventilation Filter Testing Program. Surveillance Requirement 3.6.4.3.2 requires the licensee to perform required SGT [ standby. gas treatment] filter testing in accordance with Ventilation Filter Testing Program. Surveillance Requirement '

3.6.4.6.2 requires the-licensee to perform required fuel building ventilation charcoal filtration filter testing in accordance with Ventilation Filter Testing Program.

The Ventilation Filter Testing Program. Section 5.5.7.d of the Technical Specification recuires the licensee to demonstrate for each of the ESF [engineerec safeguards features] systems that the pressure' drop across the prefilters is less than the value speci fied 'below.

Contrary to the above. the licensee failed to perform Surveillance Requirements 3.7.2.2. 3.6.4.3.2. and 3.6.4.6.2 because testing of the system prefilters was not performed. (01053) l F. Surveillance Recuirement 3.6.1.1.1 requires the licensee to i

cerform requirec leakage rate testing in accordance with the 3rimary Containment Leakage Rate Testing Program. The FREQUENCY of this test is in accordance with the Containment Leakage Rate Testing Program.

l The Primary Containment Leakage Rate Progr'am, as provided in Procedure ADM-0050. Revision 4. states.. in part. that if the -

leakage for Valve 1SWP-MOV503A is less than 1200 scfm for two i

' consecutive tests, then the valve can be tested every 5 years vice every 2 years.

l Contrary to the above. the licensee failed to aerform Surveillance Requirement 3.6.1.1.1 because the as-found leacage for Valve'1SWP-MOV503A was not measured during the last test

)erformance and the licensee incorrectly assumed that the valve lad passed the leakage criteria. and as a result, the test at the 2 year interval was not performed. (01063) i l l

j These violations represent a Severity Level III problem (Supplement I).  ;

1 I

i l

I l _ . . _ , -

ENTERGY OPERATIONS. INC. The NRC has concluded that information regarding the reasons for the violations, the corrective actions taken and planned to correct the violations and prevent recurrence and the date when full compliance will be achieved is already adequately addressed on the docket in NRC Inspection Report 50-458/96-

26. LER 96-014-00 dated August 9. 1996, and Entergy's October 10, 1996.

" Response to Apparent Violations." However. Entergy Operations. Inc.

(Licensee), is required to submit a written statement or explanation pursuant to 10 CFR 2.201 if the description therein does not accurately reflect its corrective actions or its Josition. In that case or if the Licensee chooses to respond. clearly mark t1e response as a " Reply to a Notice of Violation."

and send it to the U.S. Nuclear Regulatory Commission. ATTN: Document Control Desk. Washington. D.C. 20555 with a copy to the Regicnal Administrator. Region IV. 611 Ryan Plaza Drive. Suite 400. Arlington. Texas 76011 and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).

Dated at Arlington. Texas this 7th day of November 1996 J