MONTHYEARML20217L7681999-10-19019 October 1999 Forwards Insp Rept 50-458/99-12 on 990822-1002.Four Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy RBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams ML20217J3751999-10-15015 October 1999 Informs That Applicable Portions of NEDC-32778P, Safety Analysis Rept for River Bend 5% Power Uprate, Marked as Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) IR 05000458/19990071999-10-0505 October 1999 Refers to Util Ltr Re Apparent Violations Described in Insp Rept 50-458/99-07 Issued on 990804 & Forwards Nov.Insp Described Two Apparent Violations Related to River Bend Station Division I EDG RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp ML20212D8901999-09-16016 September 1999 Discusses 6 Month Review of Plant Midcycle Ppr.Advises of Plans for Future Insp Activities.Forwards Historical Listing of Plant Issues,Referred to as PIM ML20216F7881999-09-15015 September 1999 Forwards Insp Rept 50-458/99-10 on 990830-990903.No Violations Noted.Insp Covered Licensed Operators Requalification Training Program & Observation of Requalification Activities 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents ML20211Q7721999-09-0909 September 1999 Expresses Appreciation for ,In Response to NRC 990702 Re Denial of Notice of Violation Cited in Concerning Insp Rept 50-458/98-16.Reply Found to Be Responsive to Concerns Raised in NOV RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted ML20211Q3921999-09-0808 September 1999 Forwards Insp Rept 50-458/99-08 on 990711-0821.One Violation Being Treated as Noncited Violation ML20211Q5541999-09-0808 September 1999 Discusses Meeting Conducted on 990830 in St Francisville,La Re Overall Performance Issues During 990403-0703 Refueling/ Maintenance Outage.Due to Proprietary Nature of Some Subject Matters,Meeting Closed to Public.Attendance List Encl ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211E2071999-08-23023 August 1999 Discusses Insp Rept 50-458/99-07 in Which 2 Violations Were Identified & Being Considered for Escalated Enforcement Action.Response Should Be Submitted Under Oath or Affirmation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept ML20211A9291999-08-17017 August 1999 Forwards Insp Rept 50-458/99-11 on 990719-23.Areas Examined Included Portions of Licensee Physical Security Program. No Violations Noted ML20210T8881999-08-16016 August 1999 Forwards Replacement Pages 9-18 for Insp Rept 50-458/99-09, Issued on 990730 IR 05000458/19980101999-08-13013 August 1999 Forwards Summary of 990805 Mgt Meeting with Licensee in Arlington,Tx Re Radiological Control Problems Noted in Insp Repts 50-458/98-10 & 50-458/99-04.With Attendance List & Licensee Presentation ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210U3751999-08-12012 August 1999 Informs That Info Contained in Presentation, River Bend Station Fuel Recovery Project,Dtd 990622, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20210Q7691999-08-11011 August 1999 Forwards Request for Addl Info Re Licensee River Bend Individual Plant Exam External Events,Under GL 88-20,suppl 4,dtd 910628 ML20210R4591999-08-10010 August 1999 Ack Receipt of Which Transmitted Plant Emergency Plan,Rev 20 Under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required,Based on Determination That Changes Does Not Decrease Effectiveness of EP ML20210N1641999-08-0404 August 1999 Forwards Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210K4641999-08-0303 August 1999 Forwards SE Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Power-Operated Gate Valves, Issued on 950817 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1351999-07-30030 July 1999 Forwards Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Three Violations Being Treated as Noncited Violations ML20210J9691999-07-30030 July 1999 Discusses 990719 Meeting with Util in Arlington,Tx Re Region IV Staff Findings of Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees & Organization Chart Encl RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL ML20210E9001999-07-23023 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1,Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20196L0501999-07-0606 July 1999 Informs That NRC Insp Rept 50-458/99-03 Issued on 990519 with Errors in Tracking Numbers Assigned to Seven Noncited Violations & Error Re Actual Location of SRO During Refueling Activities.Revised Pages 2 & 4 Encl ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196K6851999-06-30030 June 1999 Ack Receipt of & Denial of NOV in Response to Transmitting NOV & Insp Rept 50-458/98-16.Listed Info Documents Results of Review of Response to Violation Re fire-induced Circuit Faults ML20196K0671999-06-30030 June 1999 Forwards Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations of NRC Requirements Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy.Meeting Scheduled for 990726 RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld ML20196E0601999-06-18018 June 1999 Forwards Insp Rept 50-458/99-05 on 990418-29.Four Violations Identified & Being Treated as Noncited Violations 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217L7681999-10-19019 October 1999 Forwards Insp Rept 50-458/99-12 on 990822-1002.Four Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217J3751999-10-15015 October 1999 Informs That Applicable Portions of NEDC-32778P, Safety Analysis Rept for River Bend 5% Power Uprate, Marked as Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) IR 05000458/19990071999-10-0505 October 1999 Refers to Util Ltr Re Apparent Violations Described in Insp Rept 50-458/99-07 Issued on 990804 & Forwards Nov.Insp Described Two Apparent Violations Related to River Bend Station Division I EDG ML20212D8901999-09-16016 September 1999 Discusses 6 Month Review of Plant Midcycle Ppr.Advises of Plans for Future Insp Activities.Forwards Historical Listing of Plant Issues,Referred to as PIM ML20216F7881999-09-15015 September 1999 Forwards Insp Rept 50-458/99-10 on 990830-990903.No Violations Noted.Insp Covered Licensed Operators Requalification Training Program & Observation of Requalification Activities ML20211Q7721999-09-0909 September 1999 Expresses Appreciation for ,In Response to NRC 990702 Re Denial of Notice of Violation Cited in Concerning Insp Rept 50-458/98-16.Reply Found to Be Responsive to Concerns Raised in NOV ML20211Q3921999-09-0808 September 1999 Forwards Insp Rept 50-458/99-08 on 990711-0821.One Violation Being Treated as Noncited Violation ML20211Q5541999-09-0808 September 1999 Discusses Meeting Conducted on 990830 in St Francisville,La Re Overall Performance Issues During 990403-0703 Refueling/ Maintenance Outage.Due to Proprietary Nature of Some Subject Matters,Meeting Closed to Public.Attendance List Encl ML20211E2071999-08-23023 August 1999 Discusses Insp Rept 50-458/99-07 in Which 2 Violations Were Identified & Being Considered for Escalated Enforcement Action.Response Should Be Submitted Under Oath or Affirmation ML20211A9291999-08-17017 August 1999 Forwards Insp Rept 50-458/99-11 on 990719-23.Areas Examined Included Portions of Licensee Physical Security Program. No Violations Noted ML20210T8881999-08-16016 August 1999 Forwards Replacement Pages 9-18 for Insp Rept 50-458/99-09, Issued on 990730 IR 05000458/19980101999-08-13013 August 1999 Forwards Summary of 990805 Mgt Meeting with Licensee in Arlington,Tx Re Radiological Control Problems Noted in Insp Repts 50-458/98-10 & 50-458/99-04.With Attendance List & Licensee Presentation ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210U3751999-08-12012 August 1999 Informs That Info Contained in Presentation, River Bend Station Fuel Recovery Project,Dtd 990622, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20210Q7691999-08-11011 August 1999 Forwards Request for Addl Info Re Licensee River Bend Individual Plant Exam External Events,Under GL 88-20,suppl 4,dtd 910628 ML20210R4591999-08-10010 August 1999 Ack Receipt of Which Transmitted Plant Emergency Plan,Rev 20 Under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required,Based on Determination That Changes Does Not Decrease Effectiveness of EP ML20210N1641999-08-0404 August 1999 Forwards Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210K4641999-08-0303 August 1999 Forwards SE Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Power-Operated Gate Valves, Issued on 950817 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1351999-07-30030 July 1999 Forwards Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Three Violations Being Treated as Noncited Violations ML20210J9691999-07-30030 July 1999 Discusses 990719 Meeting with Util in Arlington,Tx Re Region IV Staff Findings of Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees & Organization Chart Encl ML20210E9001999-07-23023 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1,Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20196L0501999-07-0606 July 1999 Informs That NRC Insp Rept 50-458/99-03 Issued on 990519 with Errors in Tracking Numbers Assigned to Seven Noncited Violations & Error Re Actual Location of SRO During Refueling Activities.Revised Pages 2 & 4 Encl ML20196K6851999-06-30030 June 1999 Ack Receipt of & Denial of NOV in Response to Transmitting NOV & Insp Rept 50-458/98-16.Listed Info Documents Results of Review of Response to Violation Re fire-induced Circuit Faults ML20196K0671999-06-30030 June 1999 Forwards Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations of NRC Requirements Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy.Meeting Scheduled for 990726 ML20196E0601999-06-18018 June 1999 Forwards Insp Rept 50-458/99-05 on 990418-29.Four Violations Identified & Being Treated as Noncited Violations ML20195G3121999-06-0909 June 1999 Ack Receipt of Re Changes to River Bend Station Emergency Plan,Rev 19.No Violations of 10CFR50.47(b) Were Identified ML20195G3671999-06-0909 June 1999 Ack Receipt of Ltr Dtd 981016,which Transmitted River Bend Station Emergency Plan,Rev 18 Under Provision of 10CFR50, App E,Section V.No Violations of 10CFR50.54(q) Identified During Review ML20195D6041999-06-0303 June 1999 Discusses EOI Request That Attachment 4,NEDC-32549P, Safety Review for River Bend Station Cycle 7 Final Feedwater Temp Reduction, Rev 0,be Withheld from Public Disclosure. Determined Info Proprietary & Will Be Withheld DD-99-08, Informs That to Extent That Union of Concerned Scientists Requests Commission Undertake Formal Review of DD-99-08 & Hold Meeting to Directly Receive View on Decision,Request Denied.With Certificate of Svc.Served on 9905211999-05-20020 May 1999 Informs That to Extent That Union of Concerned Scientists Requests Commission Undertake Formal Review of DD-99-08 & Hold Meeting to Directly Receive View on Decision,Request Denied.With Certificate of Svc.Served on 990521 ML20206U4321999-05-18018 May 1999 Forwards Notice of Withdrawal of Licensee 961106 Request for Approval of Deviation from Approved Fire Protection Program to Extent Program Incorporated Technical Requirements of Section III.G.2 of App R to 10CFR50 ML20206U6081999-05-18018 May 1999 Forwards Insp Rept 50-458/99-03 on 990307-0417.Eight Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20207A8051999-05-15015 May 1999 Forwards Insp Rept 50-458/99-06 on 990419-23.No Violations Noted.Inservice Insp Activities at River Bend Station Were Being Implemented in Accordance with ASME Code & Regulatory Requirements ML20206N7081999-05-12012 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328. Reorganization Chart Encl ML20206N8811999-05-12012 May 1999 Forwards Notice of Withdrawal of 981120 Amend Request for License NPF-47.Proposed Amend Would Have Established New TS 3.10.9, Control Rod Pattern - Cycle 8, Added to Section 3.10, Special Operations ML20206H9191999-05-0707 May 1999 Informs That on 990407,NRC Administered Generic Fundamentals Exam Section of Written Operators Licensing Exam.Facility Did Not Participate in Exam,However Copy of Master Exam with Key Encl.Without Encl NUREG-1434, Discusses Licensee 960418 Request for Amend for Plant That Would Permit Addl Method of Fuel Movement & Loading in Core Upon Removal of Control Rods from Defueled Core Cells.Nei TSs Task Force Process Will Be Used to Review TSTF-2261999-05-0505 May 1999 Discusses Licensee 960418 Request for Amend for Plant That Would Permit Addl Method of Fuel Movement & Loading in Core Upon Removal of Control Rods from Defueled Core Cells.Nei TSs Task Force Process Will Be Used to Review TSTF-226 ML20206J2291999-05-0303 May 1999 Discusses Responding to NOV Issued on 990105.NOV Was Based on NRC Conclusions That Licensee Provided NRC Inspector with Info Licensee Knew Was Inaccurate & Incomplete ML20206E6381999-05-0303 May 1999 Ack Receipt of 990305,990315 & s Responding to NOV & Proposed Imposition of Civil Penalty, .EOI Paid Civil Penalty & Requested Withdrawal of NOV & Civil Penalty for Reasons Stated.Finds NOV & Civil Penalty Appropriate ML20206E4531999-04-27027 April 1999 Discusses Request That Attachment 4, Final Calculation of RBS Cycle 9 SLMCPR (Safety Limit for Mcpr), Submitted with 981216 License Amend Request,Be Withheld from Public Disclosure.Determined Info Proprietary & Will Be Withheld ML20206A2031999-04-21021 April 1999 Discusses EOI Second 10-year IST Program for River Bend Station Submitted on 980106 & 980910 Which Included One Pump Relief Request & Two Valve Relief Requests.Forwards SE Authorizing Pump Relief Request & One Valve Relief Request ML20205N7251999-04-13013 April 1999 Forwards Summary of 990408 Meeting with EOI in Jackson, Mississippi Re EOI Annual Performance Assessment of Facilities & Other Issues of Mutual Interest.List of Meeting Attendees & Licensee Presentation Slides Encl ML20205J5331999-04-0606 April 1999 Ack Receipt of Denying Request from NRC That Addl Info Be Provided Prior to Informal Public Hearing Held on 990222 Re River Bend Station & Perry Nuclear Power Plant 10CFR2.206 Petitions ML20205K0681999-04-0505 April 1999 Submits Summary of 990325 Meeting Re Engineering Performance at Site & Assessment of Organization Strengths & Opportunities for Improvement.List of Attendees & Matl Used in Presentation Enclosed ML20205A4531999-03-26026 March 1999 Forwards Insp Rept 50-458/98-10 on 990222-26.Violation Noted & Being Treated as Non-Cited Violation.Concludes That Radiation Work Permit Program Poorly Implemented Until July 1998 Because of Inadequate Program Implementing Procedures ML20205D7691999-03-26026 March 1999 Forwards Insp Rept 50-458/99-02 on 990124-0306.One Violation Identified & Being Treated as non-cited Violation.Licensee Conduct of Activities During Insp Generally Characterized by safety-conscious Operations & Sound Engineering ML20205D5361999-03-26026 March 1999 Forwards Ser,Accepting Util 980107 Request for Alternative to Augmented Reactor Pressure Vessel Exam Requirements for Plant,Unit 1 Pursuant to 10CFR50.55a(g)(6)(ii)(A) for First 10-year Insp Interval.Technical Ltr Rept Also Encl ML20204G8081999-03-24024 March 1999 Refers to 990303 Reply to NRC NOV & Proposed Imposition of Civil Penalty .Since Licensee Paid Civil Penalty & C/A Found Responsive to NRC Concerns,Matter Considered Closed ML20205A4021999-03-23023 March 1999 Forwards Insp Rept 50-458/99-301 on 990222-0303.No Violations Noted.Insp Included Evaluation of Three Applicants for Senior Operator Upgrade & for Senior Operator Instant & Eight Applicants for Reactor Operator License ML20205F3131999-03-19019 March 1999 Advises of Planned Insp Effort Resulting from River Bend PPR Review,Which Was Completed on 990211.Performance of River Bend Staff During Assessment Period Was Acceptable 1999-09-09
[Table view] |
Text
'
.
]
.
ps mic% UNITED STATES p t, NUCLEAR REGULATORY COMMISSION h $ REGION IV S 611 RYAN PLAZA DRIVE, SUITE 400
+9..... AR LINGTON. TEXAS 76011 8064 November 7, 1996 EA 96-329 John R. McGaha. Vice President - Operations River Bend Station 1 Entergy Operations, Inc.
P.O. Box 220 St. Francisville. Louisiana 70775 SUBJECT: NOTICE OF VIOLATION (NRC Inspection Report No. 50-458/96-26)
!
Dear Mr. McGaha:
i This refers to an inspection conducted on July 29 through August 27. 1996, at the River Bend Station (RBS) reactor facility. This special inspection included a review of the failure to perform or to properly complete ;
surveillance testing on several safety-related components The results of the inspection were discussed with your staff on September 6.1996, and the subject inspection report was issued on September 10. 1996. The cover letter to the inspection report noted that the apparent violations identified in the report were being considered for escalated enforcement but that it was not necessary to conduct a predecisional enforcement conference in order for the NRC to make an enforcement decision. As such. we gave you the opportunity to either request a predecisional enforcement conference or respond to the apparent violations in writing. You did not request a conference but.
instead, responded to the apparent violations by letter dated October 10.
1996.
Based on the information developed during the inspection and the information that you provided-in your October 10 response. the NRC has determined that violations of NRC requirements occurred. These violations are cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding them are described in detail in the subject inspection report. The violations involve the failure to perform surveillance testing in accordance with the requirements specified in the Technical Specifications. The six violations involve the failure to perform or adequately aerform surveillance testing on the following equipment: (1) the Division I 3attery (2) the Division Ill battery. (3) the drywell airlock. (4) the drywell combination equipment hatch / personnel door. (5) the prefilters for the standby gas treatment, control room fresh air, and fuel building ventilation systems, and (6) a primary containment penetration isolation valve.
As noted in your October 10 letter, prior to the identification of these violations, RBS identified surveillance program weaknesses, and a corrective action plan and improvement initiatives were underway. In July 1996, after issues were identified related to the Division I station service battery performance discharge data. RBS initiated a Significant Event Response Team
"
9611130197 961107 PDR G ADOCK 05000458 PDR
.
. . ..
,
.
!
ENTERGY OPERATIONS. INC. -2-(SERT) and developed corrective actions based on the SERT's findings. When your staf f reviewed other surveillance activities for similar problems. RBS found the remainder of the surveillance discrepancies. :
Your October 10 letter stated that you believe there is adequate justification ,
for imposition of one Severity Level IV violation based on several factors ;
regarding the circumstances of the violations (e.g. . self-identified. 1 comprehensive corrective actions, lack of actual safety significance, and I others). While we generally agree with the circumstances as you '
characterized. they do not provide a basis for NRC to conclude that the circumstances amounted to Severity Level IV violations. The NRC's concern is i that these issues collectively represent a breakdown in your surveillance' -l testing program and, as such, represent a significant regulatory concern. -
Therefore, these violations are classified in the aggregate in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions" (Enforcement Policy). NUREG-1600, as a Severity Level III problem. j in accordance with the Enforcement Policy, a base civil penalty in the amount of $50.000 is considered for a Severity Level 111 problem. Because your facility has not been the subject of escalated enforcement actions within the last 2 years. the NRC considered whether credit was warranted for Corrective Action in accordance with the civil penalty assessment process in Section VI.B.2 of the Enforcement Policy. Based on the various corrective actions taken by RBS staff, the NRC determined that corrective action credit is warranted. RBS took prompt corrective actions for each of the violations, including procedure revisions. discussions with personnel regarding personal accountability, enhanced training, and an additional staff engineer to provide oversight of the surveillance testing program. In addition, corrective action credit was warranted because of the comprehensive nature of the corrective actions addressing the programmatic issues. Specific corrective actions to address the program concerns included followup by Ouality Assurance.
additional training on technical specification bases, departmental "all-hands" l meetings, comparison of the RBS program with other sites, surveillance program l self-assessment, evaluations of 3rocedure verification and validation and i l focusing additional management o]servations on the performance of surveillance tests.
I Therefore, to encourage prompt identification and comprehensive correction of i violations, and in recognition of the absence of previous escalated l enforcement action. I have been authorized not to propose a civil penalty in j this case, However, significant violations in the future could result in a civil penalty.
The NRC has also concluded that information regarding the reasons for the
'
violations. the corrective actions taken and planned to correct the violations and prevent recurrence, and the date when full compliance will be achieved is already adequately addressed on the docket in the subject NRC inspection report. LER 96-014-00 dated August 9. 1996, and your October 10 response.
'
Therefore, you are not required to respond to this letter unless the description therein does not accurately reflect your corrective actions or
,
your position. In that case. or if you choose to provide additional
!
I l i
l
- ,
1
)
ENTERGY OPERATIONS. INC. -3- l information. you should follow the instructions specified in the enclosed Notice.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of this letter. its enclosure, and your October 10 response will be placed in the NRC Public Document Room. 1
Sincerely
.
. Callan Reg onal Administrator Docket No. 50-458 License No. NPF-47 Enclosure: Notice of Violation cc (w/ enclosure):
Executive Vice President and Chief Operating Officer Entergy Operations. Inc.
P.O. Box 31995 Jackson. Mississippi 39286-1995 Vice President Operations Support Entergy Operations. Inc.
P.O. Box 31995 Jackson, Mississippi 39286-1995 General Manager Plant Operations River Bend Station Entergy Operations. Inc.
P.O. Box 220 St. Francisville. Louisiana 70775 Director - Nuclear Safety River Bend Station Entergy Operations. Inc.
P.O. Box 220 St. Francisville. Louisiana 70775 Wise. Carter. Child & Caraway P.O. Box 651 Jackson. Mississippi 39205 J
.
r
.
ENTERGY OPERATIONS. INC. -4-Mark J. Wetterhahn. Esq.
Winston & Strawn 1401 L Street. N.W.
Washington. D.C. 20005-3502 Manager - Licensing River Bend Station Entergy Operations. Inc.
P.O. Box 220 St. Francisville. Louisiana 70775 The Honorable Richard P. Ieyoub ~
Attorney General P.O. Box 94095 Baton Rouge. Louisiana 70804-9095 H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge. Louisiana 70806 President of West Feliciana Police Jury l P.O. Box 1921 St. Francisville. Louisiana 70775 Larry G. Johnson. Director Systems Engineering Cajun Electric Power Coop. Inc.
10719 Airline Highway P.O. Box 15540 Baton Rouge. Louisiana 70895 William H. Spell. Administrator Louisiana Radiation Protection Division P.O. Box 82135 Baton Rouge. Louisiana 7088t.-2135
<
!
!
l l
l -
..
.
l
.
ENTERGY OPERATIONS. INC. -5-TRIBUTION:
LPDR Enforcement Coordinators l SECY RI. RII. RIII CA JGilliland. PA (0-2G4)
JTaylor, EDO (0-17G21) -HBell, OIG (T-5028)
JMilhoan. DEDR (0-17G21) GCaputo. 01 (0-3E4)
JLieberman, OE (0-7H5) '
EJordan, AE00 (T-4D18)
LChandler. OGC (0-15B18) LTremper. OC/LFDCB (T-9E10)
JGoldberg, OGC (0-15B18) OE: (0-7H5)
Director. NRR (0-12G18) OE:EA (2) (0-7H51 RZimmerman, NRR/ADP (0-12G18) ;NUDOCS
.
i DWiggington NRR (0-13H3) ;
)
RIV OISTRIBUTION:
E-mail to:
0EMAIL DChamberlain (DDC)'
SJCollins (SJC) 1 BHenderson (BWH)
'
MHammond(MFH2)
CHackney (CAH)
WBrown (WLB) JDyer(JED2)
LWilliamson (ELW1) KPerkins(KEP)
AHowell (ATH) SRI PHHarrell (PHH) KBrockman(KEB) !
TPGwynn (TPG) GAPick (GAP) !
Copies to:
RIV Files i MIS Coordinator LJCallan* Reading File GSanborn*EAFile RSLO DOCUMENT NAME: G:\EA\ DRAFT \EA96329 To receive copy of document, indicate in box: "C" = Copy wdhout enclosures "E" = C,opy,with enclosures "N" = No copy
,
ES m , l, C:DRP/D m a D:DRP 1. RC /g/1;/ A/DRA JM .
GMVasquez Tj/V PHHarreMW JEDyer 046 WLBro#V M TPGwynn V ' T l 11/ /96 "~ 11/l/96 % 11// /96 11/ /, /96 11/ 6/96 i RA G /
LJCWiMn ,
11/f/96 0FFICIAL RECORD COPY
\
120032 i
._ -. . -_ . _ _ . _ _ _ _
._...,.
ENTERGY OPERATIONS, INC. -5-DISTRIBUTION:
PDR IE 14 LPDR Enforcement Coordinators SECY RI. RII. RIII CA JGilliland. PA (0-2G4)
'
JTaylor. EDO (0-17G21) HEell. OIG (T-5D28)
JMilhoan. DEDR (0-17G21) GCaputo. OI (0-3E4) ,
JLieberman. OE (0-7H5) EJordan. AE00 (T-4D18)
LChandler. OGC (0-15B18) LTremper. OC/LFDCB (T-9E10)
JGoldberg. 0GC (0-15B18) OE: (0-7H5)
Director. NRR (0-12G18) OE:EA (2) (0-7H5) ;
RZimmercen. NRR/ADP (0-12G18) NUDOCS i DWiggington, NRR (0-13H3)
RIV DISTRIBUTION:
E-mail to:
0EMAIL DChamberlain (DDC)
SJCollins (SJC)
BHenderson (BWH) MHammond(MFH2)
CHackney (CAH) l WBrown (WLB) JDyer(JED2)
LWilliamson (ELW1) KPerkins(KEP)
AHowell (ATH) SRI l PHHarrell (PHH) KBrockman(KEB)
TPGwynn (TPG) GAPick (GAP)
l Copies to:
RIV Files MIS Coordinator LJCallan> Reading File GSanborn>EAFile l RSLO l
DOCUMENT NAME: G:\EA\ DRAFT \EA96329 To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = C,opy,with enclosures "N" = No copy ES m , l, C:DRP/D , a D:DRP 1. RC /#f}/ A/DRA LM l GMVasquez fj/V PHHarre?M- JEDyer @f WLBro#hyV IPGwynn V 'T
"
11/ ) /96 11/f/96 V 11// /96 11/ /, /96 11/ G/96 RA /7( /
LJCM.Mn 11/f/96 l
OFFICIAL RECORD COPY
!
!
. ~ . . . -..
, . - - .- _ - - - . . - . - --
v.
'
l 5 l l
ENTERGY OPERATIONS. INC. -5-
) TRIBUTION:
]
!
LPDR Enforcement Coordinators SECY RI. Ril. RIII
-
CA JGilliland. PA (0-2G4)
JTaylor. EDO (0-17G21) HBell. OIG (T-5028)
, JMilhoan. DEDR (0-17G21) GCaputo. 01 (0-3E4)
"
JLieberman. OE (0-7H5) EJordan. AE00 (T-4D18) i t LChandler. OGC (0-15B18) LTremper. OC/LFDCB (T-9E10)
JGoldberg. OGC (0-15B18) OE: (0-7H5)
1 -
Director. NRR (0-12G18) OE:EA (2) (0-7H51 1 RZimmerman. NRR/ADP (0-12G18) .NUDOCS ' l DWiggington. NRR (0-13H3) '
i RIV DISTRIBUTION:
'
E-mail to:
OEMAIL DChamberlain (DDC)
SJCollins (SJC) :
BHenderson (BWH) MHammond(MFH2) i CHackney (CAH) I t
WBrown (WLB) JDyer(JED2) !
LWilliamson (ELW1) KPerkins(KEP) :
. AHowell (ATH) SRI ,
PHHarrell (PHH) KBrockman(KEB) l TPGwynn (TPG) GAPick (GAP)
!
!
'
Copies to: !
RIV Files !
MIS Coordinator LJCallan* Reading File GSanborn*EAFile *
RSLO DOCUMENT NAME: G:\EA\ DRAFT \EA96329 To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = C,opy,with enclosures "N" = No copy, ES m , l, C:DRP/D m a D:DRP 1, RC /g/f;/ A/DRA If/_ ;
GMVasquez fj/U PHHarreM)%r JEDyer (j W WLBroWh F TPGwynn V ' f
"
11/1/96 11/J/96 V 11// /96 11/ /, /96 11/ G/96 l RA nk / l LJC2Mn 11/f/96 0FFICIAL RECORD COPY Y\