Revised Monthly Operating Rept for June 1996 for Fermi 2
ML20134L798
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/30/1996
From: Giles H
DETROIT EDISON CO.
To:
Shared Package
ML20134L775 List:
References
NUDOCS 9702190291
Download: ML20134L798 (1)


Text

. _ . - _ _ - -- . _ . -- .- . - . . -.

OPERATING DATA REPORT l

DOCKET NO. 50-341 COMPLETED BY H. B. Giles l DATE July 15.1996 TELEPHONE (313) 586-1522 l

! OPERATING STATUS

1. Unit name: Fermi 2 NOTES: (1) Calculated using weighted ,

averages to reflect variations in rating (MDC

]

and DER). (2) As of 06/21/96, limiting power l

2. Reporting period: June.1996 to 91% CTP maximum due to main turbine l
3. Lice 1 sed thermal power (MWt): 3430 bearing vibrations.  !
4. Nameplate rating (Gross MWe): 1179 Nameplate and DER ratings reflect 98% CTP
5. Design elect rating (Net MWe): 1116 due to turbine throttle valve limitations.
6. Max dependable cap (gross MWe): 924
7. Max dependable cap (Net MWe)
876 l

4

8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons: l N/A
9. Power level to which restricted, if any (MWe Net): (2)
10. Reasons for restriction, if any: (2) j i

THIS MONTH YEAR TO CUMULATIVE  !

DATE l

11. Hours in reporting period 720 4.367 73.957 l
12. Hours reactor was critical 720 3.779.5 52.131.1 l
13. Reactor reserve shutdown hours 9 Q Q
14. Hours generator on-line L2Q 3.732.2 49.368.5
15. Unit reserve shutdown hours Q Q Q l
16. Gross thermal energy gen (MWH) 2.222.088 11.960.712 151.571.915  ;
17. Gross elect energy gen (MWH) 616.350 L3_27.090 48.717.607 l 1
18. Net Elect energy gen (MWH) 582.006 3.161.287 46.526.756 I
19. Unit service factor 100.0 85.5 66.8 4
20. Unit availability factor 100.0 85.5 66.8
21. Unit cap factor (using MDC net) 92.3 82.6 60.5 (1)

. 22. Unit cap factor (using DER net) 72.4 64.9 57.0 (1)

23. Unit forced outage rate Q 14.5 20.9
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): Refuel. Sect. 27.

1996. 52 days 2

25. If shutdown at end of report period, estimated date of startup: N/A
26. Units in test status (prior to commercial operation): N/A ,

4 FORECAST ACHIEVED Initial Criticality N/A N/A Initial Electricity N/A N/A

Commercial Operation N/A N/A l

9702190291 970214 PDR ADOCK 05000341 R PDR