OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY H. B. Giles DATE May 15.1996 TELEPHONE (313) 586-1522 OPERATING STATUS 1.

Unit name: Fermi 2 NOTES: (1) Calculated using weighted averages to reflect variations in rating (MDC i

and DER). (2) Currently limiting power to 96%

i 2.

Reporting period: April.1996 CTP maximum due to turbine limitations.

3.

Licensed thermal power (MWt): 3430 Nameplate and DER ratings reflect 98% CTP j

i 4.

Nameplate rating (Gross MWe): 1179 due to turbine throttle valve limitations.

5.

Design elect rating (Net MWe): 1116 i

6.

Max dependable cap (gross MWe): 924 i

7.

Max dependable cap (Net MWe): 876 8.

If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

NLA 4

9.

Power level to which restricted, if any (MWe Net):

(2)

10. Reasons for restriction, if any:

(2) 3 THIS MONTH YEAR TO CUMULATIVE DATE 11.

Hours in reporting period 719 2.903 72.493 12.

Hours reactor was critical 244 2.315.5 50.667.1 13.

Reactor reserve shutdown hours 0

0 0

14.

Hours generator on-line 197.2 2.268.2 47.904.5 15.

Unit reserve shutdown hours 0

0 0

i

]

16.

Gross thermal energy gen (MWH) 606.192 7.332.744 146.943.947 17.

Gross elect eneay gen (MWH) 165.490 2.039.580 47.430.097 l

l 18.

Net Elect energy gen (MWH) 156.998 1.942.196 45.307.665 19.

Unit service factor 27.4 78.1 66.1 20.

Unit availability factor 27.4 78.1 6_6J

)

1 21.

Unit cap factor (using MDC net) 24.9 76.4 59.9 (1) 22.

Unit cap factor (using DER net) 19.6 59.9 56.7 (1) i 23.

Unit forced outage rate 72 6 21.9 21.4 Shutdowns scheduled over next 6 months (Type, Date, Duration of each): Refuel. Sept. 27.

24.

1996. 52 days

25. If shutdown at end of report period, estimated date of startup:
26. Units in test status (prior to commercial operation):

FORECAST ACHIEVED 1

Initial Criticality NL4 N!_A Initial Electricity N/A N/A Commercial Operation NLA NL4 4