ML20138L035

From kanterella
Revision as of 12:25, 29 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Violation from Insp on 851030-1122
ML20138L035
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 12/13/1985
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20138L009 List:
References
50-373-85-36, 50-374-85-37, NUDOCS 8512190145
Download: ML20138L035 (1)


Text

- - _- . - ._ .-_ -. -. .- _

J NOTICE OF VIOLATION 4

1- Commonwealth Edison Company Docket No. 50-373

. Docket No. 50-374 As a result of the inspection conducted between October 30 and November 22, 1985, and in accordance with the General Policy and Procedures for NRC Enforcement Actions (10 CFR Part 2, Appendix C), the following violations were identified:

Technical Specification 6.2.B requires that radiation control procedures be maintained, made available to all personnel, and adhered to.

~ LaSalle Radiation Protection Procedure LRP-1120-2 requires that immediately before entering a high radiation area, the person entering must call the Operating Shift Supervisor (OSS) or his designated alternate to inform him of the entry and appropriate duration. The procedure also requires that immediately after departing a high radiation area, the persons departing must call the OSS or his designated alternate to inform him that a safe exit has

been made.

! Contrary to the above, calls are not routinely made to inform the OSS or his designated alternate that a high radiation area entry will be made and to inform of a safe exit.

This is a Severity Level IV. Violation (Supplement IV).

-Pursuant to the provision of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each item of noncompliance: (1) corrective action taken and the results achieved; (2) corrective action to be taken to J

avoid further noncompliance; and (3) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown. ,

11 -l3- Tss Dated bJiN W. D. Shafer,/Uhief

/

. Emergency Prdparedness and Radiological Protection Branch 1

8512190145 851213 PDR ADOCK 05000373 G PDR

,