Notice of Violation from Insp on 860107-0214
ML20140E798
Person / Time
Site: Yankee Rowe
Issue date: 03/24/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20140E786 List:
References
50-029-86-02, 50-29-86-2, NUDOCS 8603280201
Download: ML20140E798 (1)


Text

. _ _

~ .

l 1

APPENDIX A NOTICE OF VIOLATION

Yankee Atomic Electric Company Docket No. 50-29

, ' Yankee Nuclear Power Station License No. DPR-3

.As a result of the inspection conducted January 7 - February 14, 1986, and in ac-i cordance with the NRC Enforcement Policy.(10 CFR 2, Appendix C) published in the Federal Register on March 8, 1984 (49 FR 8583), the following violation was iden-tified:

4 Technical Specification 6.8.1 requires that written procedures shall be es-tablished that meet or exceed the requirements and recommendations of Appendix "A" of Regulatory Guide 1.33, Revision 2. Regulatory Guide 1.33 requires im-plemented procedures for Technical Specification surveillance tests. Technical Specification 4.3.3. specifies a once per shift surveillance requirement con-sisting of a channel check to demonstrate operability of the Steam Generator Blowdown Monitor instrumentation channels. This surveillance is to include a qualitative assessment of channel behavior.

Contrary to the above, on January 8,1986, it was determined that a written procedure was not established that prescribes the required qualitative as-sessment of channel behavior that would ascertain the once per shift oper-ability of the Steam Generator Blowdown Monitor.

This is a Severity Level V Violation (Supplement I.E.'.

Pursuant-to the provisions of 10 CFR 2.201, Yankee Atomic Electric Company-is hereby required to submit to this office within thirty days of the date of the letter transmitting this Notice, a written statement or explanation in reply, in-

. cluding: (1) corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the 7 date when full compliance will be achieved. Where gooo cause is shawn, considera-tion will be given.to extending this response time.