Informs That on 970324,NRC Staff Completed Semiannual Plant Performance Review (PPR) of Plant.Details of Current Insp Plan for Next 12 Months Encl
ML20141B055
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/07/1997
From: Rogge J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Feigenbaum T
CONNECTICUT YANKEE ATOMIC POWER CO.
References
NUDOCS 9705150115
Download: ML20141B055 (4)


Text

_ , _ . _ _ _ _ . _ . . _ _ _ _ _ - . _ . . _ . _ . . _ _ _ . - _ _ - _ - _ _ . - _

4a 4

l May 7, 1997 1

Mr. Ted C. Folgenbaum Executive Vice President and Chief Nuclear Officer c/o R. A. Mellor, Director Site Operations and Decommissioning Connecticut Yankee Atomic Power Company 362 injun Hollow Road East Hampton, CT 06424-3099

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - HADDAM NECK On March 24,1997, the NRC staff completed the semiannual Plant Peri ~mance Review (PPR) of Haddam Neck. The staff conducts these reviews for all ww% nuclear power plants to develop an integrated understanding of safety performt %. The results are used i by NRC management to facilitate planning and allocation of inspection resources. The PPR l for Haddam Neck involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period September 1,1996 to March 3, 1997. PPRs provide NRC management with a current summary of licenses performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Haddam Neck PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our current inspection plan for the next 12 months, however, more changes may be necessary as we continue to transfer to a post-operational phase inspection plan. The rationale'or basis for each inspection outside the core inspection i program is provided so that you are aware of the reason for emphasis in these program

. areas. Resident inspections are not listed due to their ongoing and continuous nature.

We willinform you of any changes to the inspection plan. If you have any questions, please j contact the new Branch 8 Chief, Richard J. Conte, after May 12,1997 at (610) 337-5183. J Sincerely, i Original Signed By:

John F. Rogge, Chief Reactor Projects Branch 8 Division of Reactor Projects Docket Nos. 50-213 150007 II!I!I!II[IlII, II 9705150115'70507 9 PDR ADOCK 05000213 0 PM

Mr. Tod C. Feigenbaum 2

Enclosure:

Inspection Plan cc w/ encl:

B. Kenyon, President and Chief Executive Officer D. Goebel Vice President - Nuclear Oversight F. Rothen, Vice President - Nuclear Work Services 1 J. Thayer, Recovery Officer, Nuclear Engineering and Support I L. Cuoco, Senior Nuclear Counsel G. van Noordonnen, Manager, Nuclear Licensing R. Johannes, Director - Nuclear Training J. Smith, Manager, Operator Training  ;

W. Meinert, Nuclear Engineer  !

R. Bassilakis, Citizens Awareness Network l J. Block, Attorney for CAN l J. Brooks, CT Attorney General Office i M. DeBold, Town of Haddam State of Connecticut SLO I

Distribution w/ encl:

Region i Docket Room (with concurrences) ,

Nuclear Safety information Center (NSIC)

PUBLIC NRC Resident inspector DRS Director, Region i DRS Deputy Director, Region i DRS Branch Chiefs, Region i DRP Director, Region i DRP Deputy Director, Region 1 4 DRP Branch Chiefs, Region i E. Conner, DRP M. Oprendek, DRP C. O'Daniell, DRP

- =

Mr. Ted C. Feigenbaum 2 Distribution w/enci (VIA E-MAIL):

W. Dean, OEDO {

S. Weiss, NRR, DRPM, PDND l M. Fairtile, PM, NRR l R. Jones, NRR I' M. Callahan, OCA W. Travers, SPO R. Correia, NRR D. Taylor, NRR ,

D. Screnci, PAO, ORA j inspection Program Branch, NRR flPAS) i i

DOCUMENT NAME: G:\ BRANCH 8\FPR\HNPPRLTR.597 I To receive a copy of this docunwret, indicate in the box: "C" = Copy without I attachment / enclosure "E" = Copy with attachment / enclosure N" = No copy OFFICE Rl/DRP _ l Rl/DRP l l NAME EConner MC JRogge 9 e DATE 5/7/97 5/7/97 OF'FICIAL RECORD COPY i

l l

I I-1 i

j Enclosure

]

i l HADDAM NECK SPECIAL INSPECTION PLAN  !

i i

N

~

INSPECTION ~ , TITLE / PROGRAM AREA ,

S '

c j

, ;eg 5DATESy (COMMENTS g ,

l Regionalinitiative foliow-up on l IP 92904-4 Follow-up Plant Support 6/9/97 licenses corrective actions in the j area of radiological controls.

cupational Exposure Assessment at ogi nelinitiative of exposure

!T 83100-2 6/9/97 3

Permanently Shutdown Reactors control.

i g_.

! IP 40500-1 valuation of Ucensee Self-Assessment 4 Capability 6/16/97 Core type inspection.  !

1 j Evaluation of Management Controls and Safety review of operating, l Yi 2561/002 Spent Fuel Pool Activities at Permanently 7/21/97 work, and modification d

Shutdown Reactors procedures.

IP 81700-2 Physical Security Program for Reactors 12/8/97 Core type inspection.

Notes:

IP - Inspection Procedure Tl -

Temporary instruction

' Core -

Minimum NRC Inspection Program (mandatory at all plants)