Draft Memo Advising of Assignment of Jg Davis as Chairman of Review Group to Resolve Issues Identified in Ofc of Inspector & Auditor Rept 86-10.Rept Requested by 870130
ML20147E488
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/17/1986
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Jennifer Davis
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20147E473 List:
References
FOIA-87-677 NUDOCS 8803070078
Download: ML20147E488 (1)


Text

-

110tMe8379 an)

/ UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION W ASHINGTON, D. C. 20SSS

{e f n

% DP. AFT 12/17/86-A MEMORANDUM FOR: John G. Davis, Director Office of Nuclear Material Safety and Safeguards FROM: Victor Stello, Jr.

Executive Director for Operations

SUBJECT:

OIA REPORT REVIEW: OIA FILE #86 ESTABLISHMENT OF REVIEW GROUP In order to resolve issues which OIA Report 86-10 has raised, I am taking the following action:

1. You are assigned as Chairman of a Review Group to resolve issues as described below. G. Arlotto, J. Heltemes and C. Paperiello are assigned as members of the Group. ,
2. The task of the Review Group is to review the technical issues identified in OIA report 86-10 and to determine and document in a report to me (1) the safety significance of those issues for Comanche Peak, i.e., ,

whether actions should be taken to rectify any unsafe conditiont; (2) whetner the issues when identified were appropriately handled as to L process and disposition; and, (3) determine whether the current augmented t review and inspection effort at Comanche Peak is sufficient to compensate for any identified weakness in Region IV's Q/A inspection programs.

3. You may task other NRC staff or utilize contractors as required, although I recommend that you keep your requirements to the atinimum possible.

Naressary funds will be made available at your request by PN. T. Westennan i and H. Phillips will be detailed tn support your independent review on a

( full-time basis; other rembers of RIY are at your full disposal as you

! may require. Similarly, IE and NRR staff working on Cor.anche Peak are l

available to assist.

4. Copies of the report and enclosures will be provided to you by separate Cover.
5. I would like to have your report in my hands by January 30, 1987, eso3070078 880203 Victor Stello, Jr.