Draft Memo Advising of Assignment of Jg Davis as Chairman of Review Group to Resolve Issues Identified in Ofc of Inspector & Auditor Rept 86-10.Rept Requested by 870130
ML20147E488
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/17/1986
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Jennifer Davis
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20147E473 List:
References
FOIA-87-677 NUDOCS 8803070078
Download: ML20147E488 (1)


Text

-

110tMe8379 an)

/

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

{

f W ASHINGTON, D. C. 20SSS en DP. AFT 12/17/86-A MEMORANDUM FOR: John G. Davis, Director Office of Nuclear Material Safety and Safeguards FROM:

Victor Stello, Jr.

Executive Director for Operations

SUBJECT:

OIA REPORT REVIEW: OIA FILE #86 ESTABLISHMENT OF REVIEW GROUP In order to resolve issues which OIA Report 86-10 has raised, I am taking the following action:

1.

You are assigned as Chairman of a Review Group to resolve issues as described below.

G. Arlotto, J. Heltemes and C. Paperiello are assigned as members of the Group.

2.

The task of the Review Group is to review the technical issues identified in OIA report 86-10 and to determine and document in a report to me (1) the safety significance of those issues for Comanche Peak, i.e.,

whether actions should be taken to rectify any unsafe conditiont; (2) whetner the issues when identified were appropriately handled as to process and disposition; and, (3) determine whether the current augmented t

L review and inspection effort at Comanche Peak is sufficient to compensate for any identified weakness in Region IV's Q/A inspection programs.

3.

You may task other NRC staff or utilize contractors as required, although I recommend that you keep your requirements to the atinimum possible.

Naressary funds will be made available at your request by PN.

T. Westennan i

and H. Phillips will be detailed tn support your independent review on a

(

full-time basis; other rembers of RIY are at your full disposal as you may require.

Similarly, IE and NRR staff working on Cor.anche Peak are l

available to assist.

4.

Copies of the report and enclosures will be provided to you by separate Cover.

5.

I would like to have your report in my hands by January 30, 1987, eso3070078 880203 PDR FOIA Victor Stello, Jr.