Discusses 970318 Meeting W/Util to Discuss Status of Recovery & Restart Effforts for Plant,Units 1,2 & 3.Meeting Slides Encl
ML20137N348
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/28/1997
From: Lanning W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kenyon B
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 9704080336
Download: ML20137N348 (96)


Text

r Th g

, r4 W March 28,1997 Mr. Bruce D. Kenyon President and Chief Executive Offie .

Northeast Nuclear Energy Company P. O. Box 128 Waterford, Connecticut 06385-0128

SUBJECT:

MEETING

SUMMARY

Dear Mr. Kenyon:

This letter documents the meeting that was held between the Northeast Nuclear Energy Company and the Nuclear Regulatory Commission on March 18,1997 to discuss the status of yot.: recovery and restart efforts for Millstone Units 1,2 and 3. We found the meeting to be informative and useful for the staff and managers to gain first hand knowledge of your plans and actions. At the meeting, you announced that, because of resource constraints for the Independent Corrective Action Verification Process (ICAVP),  !

parallel efforts to complete the ICAVP would not be employed. The change in strategy will j impact the completion of the ICAVP efforts for Units 1 and 2; however, the extent of the schedular delays will not be fully understood for approximately 2-3 weeks.  ;

i For the next meeting we discussed proposed agenda items which included: 1) NNECO's ,

oversight program to include the NSAB; 2) the status of your actions on NRC Inspection Report 96-201 enforcement items; and 3) Performance Indicators.

We will contact you in the future to schedule further meetings of this type. A copy of the your meeting slides is attached and will be placed in the Public Document Room. j l

Sincerely, ORIGINAL SIGNED BY: J. Durr for:

Wayne D. Lanning Deputy Director, inspections 'j/ ,

SPO,NRR 8

Enclosure:

NNECO Meeting Slides I Docket Nos. 50-245;50 336;50-423 NRC NICEN1H COPY 9704080336 970328 PDR ADOCK 05000245 p PDR

.. l l

Mr. Bruce D. Kenyon 2 cc w/ encl:

N. S Carns, Senior Vice President and Chief Nuclear Officer ,

L. M. Cuoco, Esquire  :

J. R. Egan, Esquire V. Juliano, Waterford Library l Department of Public Utility Control S. B. Comley, We The People ,

State of Connecticut SLO Designee l Citizens Awareness Network (CAN)

R. Bassilakis, CAN l J. M. Block, Attorney, CAN ~

{

S. P. Luxton, Citizens Regulatory Commission (CRC)  ;

i Representative Terry Concannon E. Woollacott, Co-Chairman, NEAC l cc w/o encl:

R. T. Laudenat, Acting Director - Regulatory Affairs for Millstone Station  :

M. H. Brothers, Vice President - Millstone, Unit 3 J. McElwain, Unit 1 Recovery Officer M. Bowling, Jr., Unit 2 Recovery Officer I

D. M. Goebel, Vice President, Nuclear Oversight J. K. Thayer, Recovery Officer, Nuclear Engineering and Support  ;

P. D. Hinnenkamp, Director, Unit Operations J. F. Smith, Manager, Operator Training .

F. C. Rothen, Vice President, Work Services J. Stanziewics, Training Recovery Manager  ;

R. Johannes, Director - Nuclear Training l 4

b I

I l

t 4 -

_ . _ -. ._ ___ ~__ _ _.

l Mr. Bruce D. Kenyon 3 Distribution w/ encl:

Region i Docket Room (hol concurrences)

Nuclear Safety Information Center (NSIC)

PUBLIC FILE CENTER, NRR (with original concurrences)

NRC Resident inspector M. Kalamon, SPO, R1 ,

W. Lanning, Deputy Director of Inspections, SPO, RI D. Screnci, PAO Distribution w/enet (VIA E-MAIL): '

J. Anderson, PM, SPO, NRR M. Callahan, OCA '

R. Correia, NRR W. Dean, OEDO S. Dembek, PM, SPO, NRR R. Frahm, Jr., NRR G. Imbro, Deputy Director of ICAVP Oversight, SPO, NRR r D. Mcdonald, PM, SPO, NRR P. McKee, Deputy Director of Licensing, SPO, NRR  !

L. Plisco, Chief, SPO, NRR S. Reynolds, Technical Assistant, SPO, NRR D. Screnci, PAO i inspection Program Branch (IPAS)

W. Travers, Director, SPO, NRR I

i DOCUMENT NAME: G:\318MTG. MIN To seceive a copy of thie document, Indicate in the bos: "C" = Copy without attachment / enclosure *E" = Copy with attachment / enclosure "N* = No copy 0FFICE Rl/ & g , , IE Rl/SP A l / l l NAME DURR' F LANNI5G DATE 03/1g/97 03/28/97 03/ /97 03/ /97 t

0FFICIAL RECORD COPY t

1 4

I

Northeast Utilities Briefing for the NRC Restart Assessment Panel Waterford Town Hall March 18,1997 Northeast Utilities System

~ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ - - _ - _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ - . ,, .

4 i

i Opening Remarks Bruce Kenyon President & C.E.O.

Northeast Nuclear Ene'rgy Co.

Northeast Utilities System i

l k

1 Overview 1

! Buzz Carns Senior Vice President &

Chief Nuclear Officer - Millstone Northeast Restart Assessment Utilities System ,

Panel Meeting 3/18/97

i NU Presentation Agenda l

  • Unit 3 Restart Activities Mike Brothers
  • Unit 1 Restart Activities Jack McElwain
  • Unit 2 Restart Activities Marty Bowling l
  • Employee Concerns Dave Goebel
  • Closing Buzz Carns

~

Northeast Restart Assessment

Utilities System ,

Panel Meeting 3H8/97 l

l

1 4

4 a

Unit 3 Restart Activities

Mike Brothers .

4

, Vice President - Millstone Unit 3 Northeast Restart Assessment Utilities System ,

Panel Meeting 3/18/97

i Unit 3 ICAVP Readiness I

!

  • Sargent & Lundy is proposed contractor
  • ICAVP Audit Plan submitted to NRC
  • 18 systems required for start of ICAVP
  • Unit 3 ready for ICAVP -- May 8,1997
  • Wave 1 Progress

-calculation reviews 833 / 845 completed l -FSAR annotations 2863/ 2909 completed l

l -UIR / OIRs 397 / 397 completed

^

l l

i Northeast Restart Assessment Utilities System ,

Panel Meeting 3/18/97 l

l

i Submittal of Corrected FSAR

  • Periodic addendums to the 1996 Annual Submittal
  • 1997 Annual Submittal -- 6/30/97
  • Periodic addendums to the 1997 Submittal
through 9/30/97 '

i

  • Maintain future FSAR change requests i available for NRC review '

l Northeast Restart Assessment Utilities System ,

Panel Meeting 3/18/97

- -- -- - - - - - - - m. .._ m _ . . . _ _ .....__m.__ , m_. . .-;.-.. .._. _ . ..m.--.;

9 l Unit 3 NRC Closure Packages 4

l

  • 59 items scheduled, first 12 packages delivered on time
  • Scheduling items from inspection 96-201
  • Expert panel, Management Quality Committee and licensing reviews i

Northeast Restart Assessment Utilities System ,

Panel Meeting 3/18/97

Letdown Heat Exchanger

! Replacement i

  • Multi-stage Heat Exchanger -leaking between lower head and tubesheet

. e Bolting susceptible to boric acid '

! degradation l

  • Rig / move Heat Exchanger into Auxiliary l Building -- March 11 - March 17 l
  • Install Heat Exchanger -- March 25 - April 3 Northeast Restart Assessment Utilities System ,

Panel Meeting 3/18/97

r

--~~ , -  ;

gg e h 2/3/97 no Cq a WC 2/17/97 -

="1 OO

@ $3

@+

3/3/97 -

i j

h  !'

i

@ f n 3/31/97 -

O  !

g

~

3' 4/14/97 -

  • l ,

, j t d 4/28/97 -

f unus e i 5/12/97 -

f

5/26/97 -
- [

i 6/9/97 -

l '

8 6/23/97 -

/

o lio 7/7/97 / ""4 o @::5

. t O 7/21/97 -

1 8/4/97 -

h  ;

.' i 8/20/97 -

i ~

9/3/97 -

,i I

' 9/17/97 y j 10/1/97 ,;

D

@M n 10/15/97 -:

~m .

gQ 10/29I97

~:

$ g

2. 11/12/97 r 3 M
  • i

@m M o M d

%32 i i

3 t n

N .

t I b

l i

Modifications Remaining o N8 d $N$$$

g I d2C 2/12/97 i

h '

L M  :

. w

$ 2/19/97 t~

g 2/26/97 DA summum l

O l ,

5 l O 3/5/97 l I1 3/12/97 e ct.

mmmu m  !

"'ll  ;

un's8 M  :

3/19/97 Q Mh M

3/26/97 7 a -

O immmea t i

4/2/97 f.- .

O  !

I 4/9/97 C M

^

ap 3 l Mgg 4,1e/97

=.' ~

i th [

R4 4/23/97 g .

W n-.  !

ee mumm e  !

ym,' 4/30/97 o 3 I

l. O  !

c -

c

, *i e

{

d'ystems i o 5 8 8 8 8 8 8 1/8/97 l h2

^

1/15/97 ]

g

^

y, 1/22/97 l O. lllf 1/29/97 men m i

@Q

]

~

mg 2/5/97  ;

% 2/12/97 }mdT same a I l g 2/19/97

~

I O 2/26/97 l 3 3/5/97 i

i 3/12/97 ,

j 3/19/97 [ '

l 3/26/97 { j f 49 l f 4/16/97 ~~ /

! lu 4/23/97 ~~ / mumu a  ;

l c fl 4/30/97 ^!

  • hh 5/8/97 T @ 5/15/97 h 5/22/97 ~

S l

~ -

5/29/97 {'

1

! 6/5/97 l immmu a  !

6/12/97 { q j 6/19/97  ;

2 g 6/26/97 m#

~.

% 7/3/97 ~~

-. g h gg 7/10/57 { l 7/17/97

@b 7/24/97 mmme n [

g@ 7/31/97 ^l  ;

M 8/7/97 i

l :WE! e,13,e7 g

8~=

s i ,

r

t Procedures o 8 $ b 1/29/97 O2 N i ,

2/5/97 --

  • O  !

$Q 2/12/97 --

O .

{.{

5 1lc 2/19/97 --  ;

g \

2/26/97 -

$** 3/5/97 ni,  !

D

  • /'

3/12/97 --

g 3*

3/19/97 +

3/26/97 -- l

[

h{5 l 4/2/97 --

l d  !

4/9/97 l

m. '

4/16/97 --

e 4/23/97 --

l  ;

4/30/97 --

h  !

5/7/97 -

O  ! q s. t 5/14/97 -

[ j hh '

/

f, i

'82a/dI 6/4/97 --

6/11/97 --

! A 6'  !

- 6/18/97 --

l -

l (

6/25/97 --  ! l

[ 3

)

7/2/97 -

7/9/97 l

' h i5  ;,,';;:  !

j i

3K o}

my O

mM 7/30/97 -- l A

. i 8/6/97 --! '

m#. 8/13/97 p@ .

dB m#

  • o 1

Nf *3 i

+

1

O o

  • O f

(

1/12/97 s. h s2

  • g3 1/19/97 s.

> GD @ M 32R Y. 1/26/97 s-i r 9 2/2/97 eg. 2/9/97 -

l 9

~

N B 2/16/97 l

, i -

p l 2/23/97 s 3/2/97 C

g _

_. 3/9/97 s- .

O,. l 3,i6/97 y3 g2 -

i

'E 3/23/97 2A

.A g

=,

3/30/97

)

M N r 1 5 l $$

m' CA) l .

4

, , . . . - - , .--,,---,,--,.,n--------.- ,,,,-, -. . --..n-.-n. ._, - _ - - .n.,.--, -- . . -

g o cn 5 5 8N8 88 dZ 1/29/97 f

O.C --

(

gQ e*-

2/5/97 3,

$.*$, 2/12/97 f (f) g 2/16/97 M Immun a 2/23/97 l s- .

l 3 I 3/2/97 !  :

l g --

i $ '

hi __

4 l

8, 8

3/16/97 l 5 9 1 j 3/23/97 l 3/30/97 l ,,,,,,

4/6/97

l h

unu$g i

[

M8 i 3 4/13/97  ; 1 7  : l 5 4/20/97 l i MME E h gw L

g 4/27/97 l f 5/4/97 f 5/11/97 I f l j l l l 5/18/97  :

I

}-

i 5/25/97  ;  :

h 1

D 2 e lE S 6/1/97

__ j l

E

! 6/8/97

~

6/15/97 j  ! I e,22,97 E$ l j .3 D (A 6/30/97 A ummun m  ;

" N  :

$$ W  !

s~ .

, f 1/27/97 o $$$$$$$$

g e2 e.

-m e .

bh 2/3/97 - N l @$ h w n E i

  • 2/10/97 h f 5 OEO  :

2/17/97 -

s-

.- i su .

i E 2/24/97  ; s-  !

f -

. ol l mumm um"  !

ri E 3/3/97 -

! s-o@ '

h

! i ,  :

g 3,4 0,e7 .-

o i C

3/17/97

! o mmm a 2% i s=$ i

== i a ,

N E f h eb 3/24/97 -- f N I

$ i E >

$ a$ 3/31/97 Q,,  !

>Q5 (4 N

s  ;

O

LARs ,

L1 . . e a a u h

d2 gg 1/20/97 ,,

E1 2y

@@ 1/27/97 ,,

  1. CD kk

~

l g 2/3/97 ,,

G -

A a- F f

$ 2/10/97 ,,

[ 2/17/97 ,

\

l J

2/24/97
0 e

i  :

! Y l

[

4 ]; 3/3/97 ,,

/ i I 3/10/97 j g

3/17/97 ,.. ,

gunga I"'0" 3/24/97

% 3/31/97 f EB -

../ ,,o l E  !

$d 4/7/97 x'  ;

@h y) 3 .

=, '

M

$h &)

38 a

i 1- - . -. .. . -. . - - . - -- .. -

l LERs issued a a m o a en c> w m e 8 -t O O E $

k c

k Mar-97 ma  !

^

h l! O  !

[ Apr-97 Im MF l

El 1 x May-97 l l 1 NG  !

l l

r g

d Jun-97 ve I f

[

~

su,.e7 C <: l l :s e -

k Aug-97  ;

? c+ t g Sep-97  ;

}:e s  !

l 3$  % @ l E b Oct-97 %w  !

RA l. i p

g' 'ig Nov-97 O l C cc Bj  ;

l gg Dec-97 N

g3 ,

N [

t

. r,

\

l ed 2, N

Jan-97 EO .

5$ Feb-97 u!

O3 rs) gg  :

l 5ra -

l 3/5/97 -

p i

!  ! **RRn l 3/12/97 -  :

'h l **RRn l

a lE: 3/19/97 -

1

/ 3 CD 1 & .i l

m 3/26/97 -

/

,f h amen, t

e a.. .

w.

f Apr-97 -

f' h

  • l O.f3m " ' ' '

I May-97 -

i -

/ I ""h umme a Jun-97 -

/

3n

,x 2 antea menm e Jul-97 -

3(

N M

.Q E

Aug-97 -

Bg I

! m i Qm Sep-97 QM 35, = l 1 i

"l3 N

l

l i l

l Total % Remaining c2 p.gBBBBBBBBS 9  !

, 1/8/97 -

g 77

@@ ~~

l &

@ 1/15/97 j' '

n 1/22/97

[ '

\ -

,, 1/29/97 l M .

1 2/5/97 l, ,

/

q

~

l P

2/12/97  :

l 5N me i

E-

~

/

2/19/97

/

2/26/97 3 ,/

/

h g

f

~

3/5/97 g

? -

l p 3/12/97 / @

am .

E MA 3/19/97

%)

2m 3/26/97

~

3 2 N

i

$.3 g3

%I l

f f

i D O2 O '

l 1 h.n Cf. y k

2/19/96 N.

hh --

@k 2/26/96 1 _ T,  :

I 3/4/96 h

oO 3/11/96 3/18/96 g - -

e

[ 3/23,9e 4/1/96

{Em

! E 4/8/96  !

h D

l a_

4/15/96

,,,, , e b 4/22/96 3:a C4 i

3 @ 4/29/96 te -

g 5/6/96 N

%h

=!.

!!E T 31 s

3 O

Number of Evals o $b$$

{'

DEC m JAN c.1 i,

, OO

r 8 X.

O N FEB m F

l

@g N*g F ga o, MAR E mumm a

  • g g APR , N

$ l W JUN 9

f ""'

I OO

[

^"l s,

OCT

~

Co  ;

~

NOV Number of Corrective Actions 3Go l

$bbb

'I DEC o

c+ <

JAN bM '

N '

FEB

{

l

^" W "

se lM _

e APR

!g ".!

E'E8 8 l

%m -

R.

gQ -2 MAY 3 O b M

fJUN l i

(Q

$g Q

> JUL

QM D3 AUG i s

i .

Major Milestones For Unit 3 Restart

  • 3/1* -- Resolve Deficiencies for EDG Aux, l

RSS/QSS, AFW

  • 3/6* -- Resolve Deficiencies for SW, SBO,
EDG
  • 3/11*-- Resolve Deficiencies for EDS -

Electrical Distribution i

l

  • 3/12*-- Commence Wave 1 SSA's (1/2 Maint.

l Rule Systems) '

l

  • 4/29 -- Complete Wave 1 SSA's (1/2 Maint.

, Rule Systems)

  • completed as scheduled 23 t -

4 1

i Major Milestones For Unit 3 Restart

  • 5/8 -- Commence Independent CIA Verification Program (ICAVP)
  • 7/14 -- Complete Remaining SSA's '
  • 8/9 -- Complete Independent C/A Verification Program (ICAVP)

Northeast Restart Assessment Utilities System Panel Meeting 3/18/97 l

i Unit 3 Challenges

  • AWO Backlog l

l

  • Modifications 4 a

l Northeast Restart Assessment Utilities System ,,

Panel Meeting 3/18/97

i Unit 1 Restart Activities

l 1 Jack McElwain l Recovery Officer
Millstone Unit 4 1

l Northeast Restart Assessment l Utilities System ,

Panel Meeting 3/18/97

I l

Unit Readiness

  • 22 Systems for Reload -- includes 50% Maintenance Rule Systems i
  • Progress to Date Northeast Restart Assessment Utilities System ,

Panel Meeting 3/18/97

l Corrective Action Program

  • Revised Corrective Action Process

- accountability

- quality and timely evaluations

- effective issue and commitment tracking

- effective issue trending ,

Northeast Restart Assessment Utilities System ,

Panel Meeting 3/18/97 ,

l Corrective Action Program ,

  • Training to ensure employee l understanding of program
  • Establishment of strong line management ownership and accountability
  • Performance indicators to status program health '

Northeast Restart Assessment Utilities System ,

Panel Meeting 3/18/97

  • i

_ N e oc GUA bk mu C .

t n - LUJh a .e$

h te h8 l iE Nus E dN YAM w e g 34 '

g

& RPA g

at '

Q 9

p a M E F

RAM gh fE ~

BEF EQ

~ h ,k i

L NAJ 9 l ..

T iiii a55 snoitcA evitcerroC fo rebmuN 8 m

a sunu "

VON l N TCO b

g PES GUA g

m } &

NUJ

" t a

w YAM gE E

mg g @ s d f 5 RAM RPA S*

N a

p 77 gG gy BEF "b o+

asmus NAJ { 2I Q  !

>}

a a slave fo rebmuN

i I

l l

\ . .

% of Condition Reports 888o 888 O

o o o o -

-c Oct-96 l E@

k Nov-96 G) .

n Dec-96 f n,

w m

k Jan-97 Feb-97 ma i

Mar-97 f

amme s  ;

Apr-97 iD  !

O May-97 N Me f

E i

y Jun-97

, D s

~ i Jul-97

f 3m

ae l gQ l Aug-97 M -

Imme m  ;

h Sep-97 g cm>

. = M yM

-4 3 a '

me >

g3

y% e e (

P i

Nov-96 o @ .$ ro $w $ #

+e Cm Dec-96 <>

"*# r

  • m==

- . - i hh Jan-97 I '"

a

$ Feb-97 -

II #"

OO  !

M C -

CD 3/6/97 -

18 .,

!Oo -

i 3/13/97 -

- +

CD 3/20/97 - <,'

O '

N 3/27/97 -

i i

j 1

4/3/97 Co  !

s seg

! 4.

. tIl mx Ea 4/10/97 N h,. -

g i  % E 4/17/97  !

RA @ [

Sb e  !

m i n<>

m i m

Cm ,

e lll3 >

N >

+

j .r

Corrective Action Program

  • Additional Enhancements:

-Upgraded Root Cause Analysis capability

-Self-Assessment Program

-Worker Observation Program i

Northeast Restart Assessment Utilities System ,,

Panel Meeting 3/18/97

l l

Attributes a saaeaas O j Ad Per I q

Chem 4 mu y ,

Ctrl < g CA g  ;

l Des u  :

FP Q

~

FME n f

g

~ ~

F HP l

[

M, m

Hsek p m i (g l y g IS  ! 3  ;

WkPer 5 summ e g l Rad W up l M Sec N l mm4 l

I STAR  !

Q l

I S Doc  ! )

I Trg WP "I

o i

as88ssaesg

!  % Issues / Attributes g

-l N

j[ B a e .

2

l l

a ro a e cm 8888888o 8o 50$g$g mummme g.y e-ree - H  ;

E1 i fM  !

{.7 13-Feb g  %##

rs; g 4' i i g1 10-Mar l 1 4 @  !

i 3 22-Mar  !

l @ ,  !

T emmu m  :

5-Apr l 19-Apr 3-May l

, C) u 17-May l

i mm gnuk

^

31-May h eb T

14-Jun j q

-+

28-Jun i o

q l

g 12-Jul I

as h

5i

e. m Ml

&R m e.

m et l

Dm ee @

m 3-2

.m S3

$* I 9

t ro a en co 5 0 % 5 5 ES l 8888888888 d2 N O. O El Feb-97

) i 1

e? M i

'A MO 3 l

$. Mar-97 C &  !

i 3 I OsO i Apr-97 h g i u May-97 7 -

O@  ;

~

U C Jun-97 o I 9 l W"E 2 -  :

gQ* gb  :

C O MS l

  • g 1 Jul-97 4 ,

g M ,

m a

" J l

, SR

% g .. Q d

Ed m  !

2h Aug-97 ) [

i

=:

E

. C1.  !

m g% lell3 l

l

  • l

l Design Modifications a a  !

o S 8 $ $ $ $ ,

Jan-97 00 h 7 Feb-97

"" m ma 3 y 7 T% Mar-97 g  !

Q

~

T

$ Apr-97 '

5 . . 9 May-97 l Jun-97 m

l Jul-97 < >

Q.

mune a i

N Aug-97  ;

4 -

O i Sep-97 g Oct-97 n

mmme a j Nov-97

-O g  :

M

, i Dec-97 i aip . <

k h! C*

= o se  !

.iw mae m a e-f, F

g l

i i

D3 $ d '

g@ s: >

y* -

r

......-n.,--,---.--.---,.-.-------.-.,-,..--...nc.,- .--.,..-.~--.n.

. a~.,--- -.--.-n., - - . - - . - - - - - . - - - , . . , -

installed B/J's f a aaseasas @

C2  :

$$ 2/1/97 EE CG 2/15/97 V#'%

5 !lD mm  %#

l 3/1/97 9 y ..

h  !

3 3/15/97 4/1/97 l 4/15/97 O  !

5/1/97 W "" '99  !

5/15/97 ' '

l b i 6/1/97  %  !

M 6/15/97 O  !

7/1/97 ) f m i

)'O 7/15/97 i a@

e. y E  !'

t ':L n C h..k E[

a E . ,

$3 '

h d I g8-s  :

  • {

l

CRP Deficiencies c7 cn 8 5 @ M 8 3 2/1/97 s's cm g

2/15/97 O CD R  !

3/1/97 N 3/15/97 O

4/1/97 4/15/97 E

5/1/97 g a

~

""91 5/15/97 b

6/1/97i  !

f 6/15/97 ii )  !

7/1/97 ii b

- t G '

}2 7/15/97 ii g a8  ;

Ee n  ;

it a n j

  • h , C  !

E

=a e

^

  • Se 45" l

{ "

$i 8

1

%__. - - - . - . - _ _-..._-----......,r-- -

- - - - . ~ , . - - - - - -

l l

l Operator Workarounds N A m m 8 M  %

i d2 2/1/97 "O O. c E 2. @ '

h* 2/15/97 9 mo Q l 'M 3/1/97 N a O i 3/15/97 9 l

4/1/97 4/15/97 o

9 g  ;

5/1/97 i i

S 5/15/97 i 9  :

6/1/97 O  !

C  !

6/15/97 i g

~

7/1/97 i M

7/15/97 g3 , j

=g i aa

=2 a c  !

  • b 3

.. gm I

m 1 r 3

( N

,i

l i

NRC Open items -

Unit 1 140 120 i iPackages Provided 100 + Scheduled Cosures 80 60 40 20

! 0 . . . - ' i i .

feb tmr apr rmy jun jul aug sep oct i

l l Northeast Restart Assessment l Utilities System 41 Panel Meeting 3/18/97 l

i i i i

License Amendment Requests l

i ._

(LARs) - Unit 1 _

10 1 l 9

l g Submitted .

8 i 7 g h NUSO '

l,l,l......

. 6 l l0 jan feb mar apr nay jun july aug sep l _ -_

Northeast Restart Assessment Utilities System 42 Panel Meeting 3/18/97

Unit 1 Milestone Schedule

  • April Unit-wide self assessment
  • 4/10/97 Challenge Board for CMP l Group I systems i
  • May Unit self-assessment
validation
  • 5/15/97 22 systems ready for core reload
  • 6/30/97 Long-term improvement plan developed  :

i 43

1

(

l Unit 2 Restart Activities i

Marty Bowling Recovery Officer Millstone Unit 2 Northeast Restart Assessment Utilities System ,,

Panel Meeting 3/18/97 4

CMP and ICAVP Milestones ,

I

  • 12/96 Program assessment by Nuclear Oversight l

I

  • 2/97 Process assessment by Nuclear Oversight
  • 2/14 Parsons Power recommended as ICAVP contractor for MP2 l

!

  • 3/3 Letter to NRC for May 5th ready for ICAVP ,
  • 3/18 Start independent Technical Self Assessment 45

l l

L CMP and ICAVP Milestones .

i i

  • 4/3 Parsons Power submits ICAVP
Audit Plan to NRC
  • 5/5 Ready for ICAVP (50% of MR Group 1 systems complete) l
  • 8/28 Maintenance Rule Group 1 & 2 l Systems complete for restart

l l

d' l

Configuration Management Program .

Process Flow - Unit 2 Operating FSAR License & Accident Commitment Analysis 0

\ Licensing Basis (LB) i Specifications 6 Tests and Drawings Design Basis (DB) Test 1

Calculations Systems and 7 Records '

t Programs Walkdowns e ures Correct.ive Verify Operations, Verify Plant Conforms to DB

^"'I " '

" ' " ' * " * " ' ' ** "El Program Conform to DB ,

10CFR50.54(f)

Response

47

Maintenance Rule Group 1 Status (30 Systems) - Unit 2 System Name (12ICAVP Systems) Percent Complete Pressurizer 25 4

Reactor Vessel 30 i Low Pressure Safety injection 25 Containment Spray 25

! ESF Ventilation 30 l Main Steam 30 l Auxiliary Feedwater 30 l 125 Volt DC 30 Diesel Fuel Oil 30-

Emergency Diesel Generator Ventilation 30 Reactor Protection System 25 Emergency Diesel Generator 25

~

ICAVP Contractor Selection i

4 i

i l

Northeast Restart Assessment l

Utilities System 49 Panel Meeting 3/18/97 L --- _ _ _ _ -- _ _ _-_ _-_- _-__ _ - _ _-- - _ _---_-_ _ -_-_ -__ _ _ __-- _ - _ - _ -- -_ _---__ _ !

! Financial and Organizational l Independence l

1 Corporation l

  • Parsons has no financial interest in NU or  ;

its original design contractors

~

  • Parsons is doing no current work at Millstone
  • Previous work by Parsons is small in

! relation to revenues from other sources

  • Parsons is doing no work for the NRC i

Northeast Restart Assessment

Utilities System ,,

Panel Meeting 3/18/97

j . -

l l

l Financial and Organizational Independence (cont)

I Team Members

  • Resumes indicate no prior work at MP2 -

confirmed by Security review

  • Each member required to certify independence from NU and its design contractors involved in original unit design i Northeast Restart Assessment Utilities System ,,

PanelMeeting 3/18/97

Previous Work Performed by .

Parsons All Nuclear Units- i 1984 Quality Assurance services  ;

1992 Process mapping services for MOV, HELB,

and CMP Millstone 1 and 2 and CT Yankee Review of check valve program 1990 Millstone 2 and 3 l 1992 Erosion / corrosion inspection criteria and

! independent review of piping corrosion l (subcontracted by Altran Corp) 52 1

i . .!

l Policy on Restricting L

Future Work i

The contract willpreclude Parsons' work for 12 months at Millstone i

Northeast Restart Assessment Utilities System 53 Panel Meeting 3M8/97

- .- i

ICAVP Parsons Power Project Organization Parsons Power Quality

President Assurance NU interface N ~

I

/

s Project Director / ICAVP Oversight Team ,

NRC Interface -

Deputy Project Director Advisory (Expert)

Panel 1

\ '

l Mechanical Systems Electrical - I&C Systems (10) Proj.ect Support (5)

(14)

Process Models & Licensing & Risk Operational Analysis (5) Assessment (5) 54

\

Qualifications of Project i Team General Qualifications l

j

  • Core Team includes 12 MS degrees,6 Ph.D degrees,23 Professional 4 Engineers, and 3 former Senior Reactor Operators (SROs)
  • Core Team has approximately 25.5 years average experience in the power industry
  • Team leader is a Parsons executive es

O

  • Qualifications of Project l Team (continues)

!

  • Engineering Disciplines mechanical engineering (11) electrical engineering

~

(5) instrument and control engineering (4) civil / structural engineering (3)

  • Plant Operations and Maintenance (5)
  • Licensing (3)
  • Other Specialists (4) 56

I

! Change to Parsons Project Team

  • Parsons procedure for changing personnel will be approved by the NRC-

- technical experience l - independence l

l '

Northeast Restart Assessment Utilities System ,,

Panel Meeting 3/18/97

Parsons Process for Differing Professional Opinions (DPOs)

!

  • Project Director is responsible for resolving differences between the Core Team and the
Technical Advisory Panel l
  • The Deputy Project Director is responsible for resolving differences within the Core Team
  • Notification made to NRC of DPO initiation l and resolution ,
  • Unresolved differences be submitted to the l

Project Director and the QA Manager l

  • NU Employee Concerns Program may also be utilized 58

Conclusions

  • Parsons meets all provisions of the NRC Order

- independence

- technical capability

  • Well-qualified team

- weII-formulated project plan

- experienced team

- company executive as project leader Northeast Restart Assessment Utilities System ,,

Panel Meeting 3/18/97

Corrective Action Program Progress

  • Revised Corrective Action Program Procedure implemented
  • Department staffing

- Self-Assessment Coordinator (1)

- Root Cause Specialists (3)

- Corrective Action Coordinators (7)

  • No NRC open items currently overdue Northeast Restart Assessment Utilities System ,

Panel Meeting 3/18/97

l Corrective Action Program Progress (cont.)

l

  • 12 open item closure packages l provided to NRC. (Schedule for remaining items is updated weekly.)

4 ,

  • Issue Trending Report on 4/15/97 for first quarter 1997
  • Self-assessment of Corrective Action Program by 4/30/97 Northeast Restart Assessment Utilitics System Panel Meeting 3/18/97 i

e .-

Attributes of Management Self-Assessment

!

  • Scope should over all areas important l to safe operation l
  • Standards should be defined and promoted
  • Assessment criteria should be
measurable performance and should be able to detect both short and long-term trends l

l

\ Northeast Restart Assessment Utilities System ,

Panel Meeting 3/18/97

Attributes of Management Self-Assessment (cont.)

  • Frequency should be sufficient to keep management at all levels updated with current performance
  • Purpose and results should be visible to all plant staff 3
  • Training, qualification, and experience of personnel involved in the assessment program must be appropriat6 to the activity being assessed Northeast Restart Assessment Utilities System Panel Meeting 3/18/97

Management Self-Assessment Technique Matrix ,

I Preventive Monitoring Reactive Self-Check KPis Root Cause

Pre-Job Briefs Benchmarking IRT Shift Turnovers Trending INPO Assist Visit 3-Way Communications Review of Programs Training and Processes Peer Observations Post-job Briefs i Northeast Restart Assessment Utilities System ,

Panel Meeting 3/18/97

Condition Report Status - Unit 2 200 1400

= 1200 b - = 1000 m

800 m 100 E 5 s 0- i  !
i , i

+ _ 0 1/11 1/18 1/25 2/1 2/8 2/15 2/22 bl1 3/8 3/15 Week Ending m No. Initiated During Week i iNo. Closed During Week -. No. O or P at End of Week Northeast Restart Assessment Utilities System ,,

PanelMeeting 3/18/97

O dy l

  1. of Condition Reports f w". C a a a a a 0%

o 8 8 8 8 8 8 8 8 8 N

.. lll7 2/4/97 O@ ..

I Q

====.O 5 CD 2/6/97 _ ymm> O m= g ,

j .L l 2/10/97 _

3 3 0 2/12/97 ._

s 2/14/97 $$  ; O 2.

  • 2/18/97 .:: yO ,

7

~

2/20/97 $_

i 2/24/97 $$

l (/) g g

2/26/97 i g 2/28/97 -- aO 3/4/97 $$ h 3/6/97 $$ i s  %

i 3/10/97 -_

\

N(

M r I

l 3/12/97 __

l

@N _

3/14/97 ..$ E I 3/18/97 $5 l N l nm 3

3/20/97 --

O i

% @ 3/24/97 II 3 RA "3 (/)  :

eg O

3/26/97 $$

i l

p.h

@. m m 3/28/97 i I

i wh  ;

&3 me g *ll3 N  ;

h

,,-.nn-. . - , . - . . - - . . . , , , . - , . -

,.n-. g .- - . , . - , , - - - - , .--,n. , ,

l l

l i

Numberof Evals Q

c2 OO d

ns g- JAN m

.s a a a i O

""1 E 5 FEB m O.1

lr h

"s [o F

! @E2 a MAR g p pg APR '"

I

@k

'd O

S D Bf "b

MAY s

E i

(*--

i l

y $ JUN 0

y

& i 3 JUL f

ko AUG dl h 4

m SEP -l

~

-m  ;

I c OCT O ,

NOV (A -

DEC 5 Numberof Corrective Actions O

,.g .

n s

a s

cn s

m 8 a" 8 O  %

8 @,

oj y JAN

e. 2 5 FEB s

g O MAR sg .

a

  • APR g h Q e es hh Dm y

~ $ C aun @

~g ,

[

Nk JUL I k O AUG fa (Q g SEP s

seem s Q% W N

E=-

s A

No. of Condition Reports

- .e.. .... ,

O. C O Jan-97 Feb-97 i

Mar-97 CL i G  !

Apr-97

  • sums .

l May-97 '

O W

N r

mmu a  :

{Jun-97 a -

O l Jul-97

!r gg .u9-97 C l

  • e.

g.

- .s .

1 (Q h Sep-97 N f u <a

$:s N' ,

e

l Maintenance Rule AWO Backlog Unit 2  !

1000 4

g

! 8' i

) 3  !

5 i 500-s 5

i i l

2 i

1 I

0 i

+--------+ - - + - i- - i  !

i  !

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec gTotalMaintenance Rule AWO Backlog I Northeast Restart Assessment Utilities System ,,

Panel Meeting 3/18/97

O I

i 1

I

= i b.

  • l C l ON MM i M 1 R'mm<'Am< o , a;g n ,

7

,i kg .3

.g l

-1

. w. 4 N r ,

a; > me c u,e m Q >: W: s g p %a ,,mg;$ cj'2-4 a w'. O

(

+ DQ #

.M $ .N .,. f C dy (,)

'% @ g e ffh y,-

,j.9 gjy w W, m ? m a m. a c, . ,

m a.p~.:

jp&} j.%N "r g..:G-r V 4,C  ;,j3 ~-Q, :%"y

% n(2 ;g: >;:y3:y;;gy;ge

.M

  • w! % % cg::J J :- W -4 :- Uf :

@, my 4ad4x

. a . gn.e@,g ygg;.gg,y. 29 g, ~- M(3g:; w~; mph m

w g

+ c .

Unx nu L":S W- O.

g g s

4;&

i e uso m.p ' ' 1,e. 3.i7.ief[3

. omow w,

M.

a. . m;f m

7:4 py y$ u, cd egwR H-

  • .d:q"agnA%v p~l mngn'g 4 -e4+dl

w W

,y, i gwh rm n - an , m;g a, pwr m p~ a

,, gm3 pm g w N m O ww gg .wn ~..)n da ; o ns: spy %mc  ; ;y , ~).y W,1 9% d gg y:1 n.

o.- ~
. o 4 -e,a 5 .;,um t

n .,.,w,y,;g::.p.x

.,- e ., y 4.W m#j -

q q'ir. .p:. ,,

w;*  ;

gwa 3(p;&q ) p:.pn., y m-l h ;g 4 e's

+

l w;/ f.f, W ll kk. Y ,D. . jE < W. mlTW:#YOm *% '. e>

m we r m t  !

, r

'; 5  ? ,s D

I

.a QM w w

.?,w~.w m

., ~44>;

. g' m e o A.n -

n ~ ~has , ~w@d , ..

< g < ,Y rVV f,'T.-e %s we v% f 4a F *-* w nJ y;;c,q, y ,s,;.;*.,eg' t n wy -

y. a '

O

_ ,;ww.. c v.ym g::e:m , npc a,,.u.-,

v.ym - , p;a, e . <~

w

,5

-e,,

% . #q, 3y; r x..,;,, . ve r #**e,

~ 9 ;~ .
..e0 g
Wo
, O

~ n .p.m.3 Q (thd k sch')p&y, a

' af.

v+ tf7 n- W &Q'UW . ' ,%S: :m , 2 .

r w a o,

m ngass ;d.Rgr6M gk @s ; , yY ~W~/8,,#ggv&w f g-A Q ,%p-

@M 's cn e

f  ;

s%gu@am wa ben c gay dm e o3 l <

sa-s a a '

hYhf q y; w%;n.bhNh $w r? f ?g: Ow. Y,xw %p g l

e,%u a% ', b Je m w p e

ad Aw;%slh:u:.

w m m3e. n; vA ke m i

QW n,; 4 ,  ;.t hi yn yY =>

O *mmam "uman Vq 4 h5 ^$ ' k.%ph h kb W

=

h o

? ' k @N Mn%:Y'% [MQN WuMe M-r,uNk.c [P Q ,M:#WM3 r, mma jhh.k n kf4,h,n/ WM 4

' 3, a $

13 4m+ay%2y?%%.

' jf%.fh mw,"gn%@V%o mm  % { ml %g Qg 2

Q a

&& y Mk?w w y gU "*g Mqap,K';QQ?Q sata W $ p% @m s QfRRy%Q Qg a eo y%pm+

6, ===

Q .a , T .g h -9 g p M, Maw y mJE .p@yhmm@e A k 9gM @

o O- e#ngau nulyml

%gw+

m

' s w

  • a?fd*a}lY ansa.%a w7 s enamum n e m.y: :mmhus3a,emw.

g n.g.

i n,. . &.. .

.QX

, Q;- ~ n:

. lWQym a ;~n -

mm?(,& ,E6
  • ~n:<>. g -S c \t s . .v n c p ag s s np ;i ..nc. , %' t c - ginn. . ..
  • ,&sKtllN i

Nr+-

.e WUo pN$' -- %e- M
'O O m~hqp;.-

ve ww

e& ^Wh.?/s'? NENu&' '_,Alm{Om..

e m x -av av. -a v:w ~

,w o as

. v

.4.

Q m

y

.ws a y 4

o LL.

l. h f9.4 ; d,, a.- ,g , ,

m i N@

, ,;$= ci-1 ' [ p@M(;A jp- v ('+&

g. ,_ y #. t W p r t i

m m- -

,:l 0 M

@ .c-

, ,' g - m.

g w, .M.

s

,. p > t ,

0 .,m 1 "b.3N%.

, . p Cp , g ; j.?r1Ffgf4M o o o o

@ T (N suoneampoWX ;eJodtual i.

j Operator Work Arounds - Unit 2 l

i l 45 40 .

35 .

f30 .

e

< 25 .

3 20 -

E p 15 -

10 .

5 -

0 i l i i i i i

] I Jan Feb Mar Apr May Jun Jul Aug Sep Oct g OperatorWork Arounds Northeast Restart Assessment Utilities System 71 PanelMeeting 3/18/97

Control Room and Annunciator Deficiencies - Unit 2 l 50 40 -

E y 30 .

2 8

O 20 -

e 10 _

0 t i i i i i i; l l 4 Jan Feb Mar Apr May Jun Jul Aug Sep Oct

~

{ dTotal Deficiencies Northeast Restart Assessment Utilities System ,,

Panel Meeting 3/18/97

. a MP2 Restart Modifications

!

  • 86 modifications required for l

I readiness

  • 81 modifications remaining
  • Engineering issued on 14 of 81 remaining packages
  • Project Management organization f has been formed i

Northeast Restart Assessment Utilities System PanelMeeting 3/18/97 l

l

-l

! NRC Open items - Unit 2 140 ,

120 100 E

=

2 80 5

8 60 l

3

40 l i 20 1

0 i i I +

l i i

i  !

l Jan Feb Mar Apr May Jun Jul Aug Sep l

'l g NRC Open items Northeast Restart Assessment Utilities System 74 Panel Meeting 3/18/97

..,..---._l

License Amendments Requests s

(LARs) - Unit 2 _.

20 15 E

5 10 j g 5 ,

l i

0 i i - i- I i Jan Feb Mar Apr May '

! ELARs to be Submitted gLARs Submitted-Awaiting Approval OLARs issued by NRC I

l Northeast Restart Assessment Utilities System 75 Panel Meeting 3/18/97 I

i 4

l Procedure Revision Backlog j l Required for Startup - Unit 2 '

i i

120 I

l 100

. 8' t

! C

! ~s

! e

.9 60 i 5 y  ;

o 40 ,

I 20 i

I O > > > - - - - ' -

I Jan Feb Mar Apr May Jun Jul Aug Sep Oct 1 i ETechnical Procedure Revisions Remaining Northeast Restart Assessment Utilities System 76 Panel Meeting 3/18/97

l . .

i j

l i

i Restart List - Unit 2 l [

j 1600 i

i i

! 1400 l

! 1200 _

i i-1000 vs 2 .o i d; 1 e O 600 l

i 400 200_ Restart Goal = 0 l

1 O.._ _+- -i  :  : + t Feb Mar Apr May Jun Jul Aug Sep l

l .

'i Restart items .-e_ Goal l'

Northeast Restart Assessment Utilitics System n Panel Meeting 3/18/97 a

e i

_e _%. _ -, _-

--.,..--,y--,-me r , ,. , , - - . . , ,-.- e*-,e-.-...w . -s

LERs issued i

o a ro ca 4 m m

f. ,

h Jan-97 e  !

l =a I

3$ --

3  !

@@ Feb-97 @ l co?L e  :

't i @  ?

Mar-97 l Apr-97 @ f 3  :

x 8"'k  :

8 May-97 I Jun-97 V  !

E . O  !

I

$ Jul-97 m

Aug-97 f N

! Sep-97 0 --

v

} :e

$M

-a Oct-97 I it A --

C

$h e

Nov-97 3

-=

=. m$

OM Dec-97 l

co e g '3 N

1 -

i e

Employee Concerns Dave Goebel Vice President l Nuclear Oversight 1

Northeast Restart Assessment Utilities System ,,

Panel Meeting 3/18/97 1

4

Employee Concerns Program Status

  • Program enhancements i

!

  • ECP Concern status
  • Comprehensive Plan l
  • Employee Concerns Oversight Panel
  • Independent Third-Party Oversight Program (ITPOP) n Northeast Restart Assessment Utilities System ,

Panel Meeting 3/18/97

ECP Program Enhancements

  • New procedures and processes

-to implement multi-stage ECP process

  • Additional contractors hired

-to help reduce backlog of concerns l (highly experienced and specialized investigation skills)

  • MP ECP facilities upgrade ,

-to help facilitate concern resolution l

l Northeast Restart Assessment ,

Utilitics System Panel Meeting 3/18/97

e O ECP Concern Status i

l 40 35 i 30 NOTE: No Resolved /Owrdue During Dec. Jan. Fe_b.

I 25 _

20 l 15 _ .

10 _ _

5 _

! O j Dec Jan Feb Mar 1996 1997 l _ __ _

gRec'd gResolved(This hbnth) gTotalUnresolved E T R otalResolved/Pending Cosure E esolved/ Overdue i _

i

Northeast Restart Assessment Utilities System Panel Meeting 3/18/97

e 9 Comprehensive Plan Status

  • Nuclear CEO's Employee Concems l Expectations distributed to employees and contractors
  • Comprehensive Plan mission and goals

! promulgated

  • Developing formal training for ECP staff ,

Northeast Restart Assessment

Utilities System ,,

Panel Meeting 3/18/97

Comprehensive Plan Status

  • Developing permanent ECP positions l - finalizing formal position descriptions

- solicit and select candidates l

  • Peer Representative Program
  • Developing ECP operating procedure and Operations Handbook Northeast Restart Assessment Utilities System ,

Panel Meeting 3/18/97

Comprehensive Plan Action Plan Status  ;

  • First two Action Plans issued 2-28-97 and being implemented

- Communications 4

- Employee Concerns Program

  • Remaining eight Action Plans to be issued by 3-30-97
- Human Resources '

I 4

- Training

- Employee Concerns Oversight Panel

- Employee Concerns Program (5) i 85

Employee Concerns l

Oversight Panel i

l "Provides oversight of, and assesses, the Employee Concerns Program l and the Millstone Station employee concerns environment."

i Northeast Restart Assessment Utilities System ,,

Panel Meeting 3/18/97

- - _ _ ----.__-----._.-_...__.__.__.----r.__ _ - _ _ - - - - _ _ _ _ _ . _ - - _ - - --.-_-_-_-.--_..e . -s.-- a n- --

Oversight Panel Responsibilities

  • Reviews conduct of ECP Program
  • Identifies organizational "hotspots"

- reviews workplace for " chilling effect"

- assists in identification of harassment, discrimination, intimidation and retaliation

  • Reviews employee concern cases

- of individuals who may have been terminated while involved iri protected l activity

  • Evaluates concerned individual's requests l

for third-party review 87

_ _ . - - _ _ . - - . - - - - - ~.

1 l

PanelImplementation Activities l

  • Initial Actions - complete by 5/1/97 l
- develop and implement Panel Charter i

- establishing protocols

- determine time commitment

  • Ongoing Activities

- minimum five members present

- consensus approach

- voting as required Northeast Restart Assessment Utilities System ,,

Panel Meeting 3/18/97 l

Oversight Panel Staffing l
  • Solicit interested individuals

- approx.100 individuals expressed interest

  • Establish formal selection criteria
  • Assess candidates for interviews
  • Interview and select panel members  ;
  • Communicate panel selection

\

Northeast Restart Assessment  ;

Utilities System ,

Panel Meeting 3/18/97

i j Oversight Panel Composition

  • Three non-exempt employees l
  • Two non-supervisory, exempt l employees
  • Two management employees (one being a first-line supervisor)
  • Two outside members ,

i Northeast Restart Assessment Utilities System ,

Panel Meeting 3/18/97 l

. _ . . _ _ _ _ _ _ _ _ _ - _ _ . _ _ _ . . - _ _ _ _ _ . . _ _ _ _ . _ _ . _ . _ - - - . _ _ _ -__*___-________m_ _ _ _ _- -e e "e- e 6

< . .i

ITPOP* Status
  • Answered written questions NRC had on Little l Harbor Consultants (LHC)
  • LHC team members have been interviewed by the NRC (by telephone)
  • Exemptions requested for Ms. Garde and Dr.

Wood

  • One LHC team member has withdrawn for business reasons
  • Awaiting decision on LHC by NRC Independent Third-Party Oversight Program (formerlyIOTEC) 91

1 i

i I

l Concluding Remarks Buzz Carns Senior Vice President &

Chief Nuclear Officer - RNillstone Northeast Restart Assessment Utilities System ,,

Panel Meeting 3/18/97

l Nuclear Safety Philosophy

  • Profound Respect for the Reactor Core
  • Proactively Prevent Events by Maintaining Defense-in-Depth
  • Conservative Decision Making
  • Management Commitment to High Standards l

l Northeast Restart Assessment Utilities System ,,

Panel Meeting 3/18/97

. . ..- - _ _ _ _ _ - .