Category:INSPECTION REPORT
MONTHYEARIR 05000456/19990131999-09-17017 September 1999 Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824. Violations Noted.Major Areas Inspected:C/As & Engineering Related Activities to Address Technical Concerns Identified During Design Insp Completed on 980424 IR 05000456/19990121999-09-0303 September 1999 Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000456/19990111999-07-29029 July 1999 Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990091999-07-20020 July 1999 Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program.Circumstances Surrounding 990428, Gatehouse Monitor Exiting Incident Were Also Reviewed IR 05000456/19990071999-06-18018 June 1999 Insp Repts 50-456/99-07 & 50-457/99-07 on 990414-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000457/19990081999-06-14014 June 1999 Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted. Major Areas Inspected:Isi & SG Insp Program IR 05000456/19990051999-05-20020 May 1999 Insp Repts 50-456/99-05 & 50-457/99-05 on 990405-23.Non- Cited Violations Identified.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000456/19990061999-05-11011 May 1999 Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.One non-cited Violation Re Configuration Control Error Occurred. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000456/19990021999-03-23023 March 1999 Insp Repts 50-456/99-02 & 50-457/99-02 on 990120-0301.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990041999-03-23023 March 1999 Insp Repts 50-456/99-04 & 50-457/99-04 on 990222-24 & 0303 Onsite & 0309 & 11 Region 3 Ofc.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000456/19980161999-02-11011 February 1999 Insp Rept 50-456/98-16 on 980916-990121.No Violations Noted. Major Areas Inspected:Containment Access Opening & Replacement Activities,Removal & Replacement of Sgs,Welding of SG Piping & Review of Quality Control Activities IR 05000456/19980201998-12-30030 December 1998 Insp Repts 50-456/98-20 & 50-457/98-20 on 981020-1207.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19980211998-12-10010 December 1998 Insp Repts 50-456/98-21 & 50-457/98-21 on 981110-24.No Violations Noted.Major Areas Inspected:Aspects of Corrective Actions & Engineering Involvement in Corrective Action Process IR 05000456/19980181998-12-0404 December 1998 Insp Rept 50-456/98-18 on 981015-23 & 1109-10.No Violations Noted.Major Areas Inspected:Four Areas Associated with Licensee SG Replacement Project IR 05000456/19980191998-11-25025 November 1998 Insp Repts 50-456/98-19 & 50-457/98-19 on 981027-30.No Violations Noted.Major Areas Inspected:Licensee Implementation of 10CFR50.65 Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants ML20195G3731998-11-17017 November 1998 Insp Repts 50-456/98-14 & 50-457/98-14 on 980909-1019. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000456/19980151998-11-13013 November 1998 Insp Repts 50-456/98-15 & 50-457/98-15 on 980915-1022. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Focusing on Radiological Controls for Unit 1 Outage Activities & SG Replacement Project IR 05000456/19980171998-11-10010 November 1998 Insp Repts 50-456/98-17 & 50-457/98-17 on 981013-19. Violations Noted.Major Areas Inspected:Security Measures Implemented to Support Steam Generator Replacement Project IR 05000456/19980121998-10-0505 October 1998 Insp Repts 50-456/98-12 & 50-457/98-12 on 980728-0908.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980111998-09-25025 September 1998 Insp Rept 50-456/98-11 on 980707-09,15-16,0805-06,10-13 & 26-28.No Violations Noted.Major Areas Inspected:Review of SG Replacement Program.Insp Focused on Welding of SG Feedwater Piping & Preparation Activities for Replacing SGs IR 05000456/19980131998-08-28028 August 1998 Insp Repts 50-456/98-13 & 50-457/98-13 on 980810-14.No Violations Noted.Major Areas Inspected:Review of Chemistry & Radiation Protection Programs IR 05000456/19980091998-08-25025 August 1998 Insp Repts 50-456/98-09 & 50-457/98-09 on 980609-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20236N0941998-07-0606 July 1998 Insp Repts 50-456/98-08 & 50-457/98-08 on 980421-0608. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980101998-07-0202 July 1998 Insp Repts 50-456/98-10 & 50-457/98-10 on 980615-19.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000456/19980071998-06-18018 June 1998 Insp Repts 50-456/98-07 & 50-457/98-07 on 980519-22.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000456/19982011998-06-0101 June 1998 Insp Rept 50-456/98-201 on 980316-20,0330-0410 & 0420-24. No Violations Noted.Major Areas Inspected.Team Selected & Reviewed Relevant Portions of Ufsar,Ts,Drawings, Calculations,Mod Packages & Procedures IR 05000456/19980051998-05-19019 May 1998 Insp Repts 50-456/98-05 & 50-457/98-05 on 980310-0420. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19980061998-04-21021 April 1998 Insp Repts 50-456/98-06 & 50-457/98-06 on 980331-0407. Violations Noted.Major Areas Inspected:Announced Review Protection Program.Insp Focused on Liquid & Gaseous Effluent Radiation Monitoring Programs ML20216B0761998-04-0808 April 1998 Insp Repts 50-456/98-02 & 50-457/98-02 on 980127-0309. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19980031998-03-16016 March 1998 Insp Repts 50-456/98-03 & 50-457/98-03 on 980128-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20203D9201998-02-20020 February 1998 Insp Repts 50-456/97-22 & 50-457/97-22 on 971216-980126. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000457/19970211998-02-11011 February 1998 Insp Rept 50-457/97-21 on 971112-21 & 980115.Violations Noted.Major Areas Inspected:Operations & Engineering ML20198G1231998-01-0707 January 1998 Partially Withheld Insp Repts 50-456/97-20 & 50-457/97-20 on 971117-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Performance Involving Evaluation of Effectiveness of Physical Protection Program ML20202F1951998-01-0202 January 1998 Insp Repts 50-456/97-19 & 50-457/97-19 on 971104-1215. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20199A5781997-12-17017 December 1997 Insp Repts 50-456/97-16 & 50-457/97-16 on 970923-1103. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970151997-11-26026 November 1997 Insp Repts 50-456/97-15 & 50-457/97-15 on 970812-0922. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19970171997-11-17017 November 1997 Insp Repts 50-456/97-17 & 50-457/97-17 on 971006-22. Violations Noted.Major Areas Inspected:Plant Support & Radiation Protection Program IR 05000456/19970121997-10-17017 October 1997 Insp Repts 50-456/97-12 & 50-457/97-12 on 970414-0815. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000456/19970131997-09-17017 September 1997 Insp Repts 50-456/97-13 & 50-457/97-13 on 970701-0811. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970141997-09-12012 September 1997 Insp Repts 50-456/97-14 & 50-457/97-14 on 970811-15.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Training Programs IR 05000456/19970091997-08-26026 August 1997 Insp Repts 50-456/97-09 & 50-457/97-09 on 970520-0630. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149J7051997-07-24024 July 1997 Insp Repts 50-456/97-11 & 50-457/97-11 on 970618-24.No Violations Noted.Major Areas Inspected:Plant Support Performance & Evaluation of Effectiveness of Radiation Protection Program IR 05000456/19970101997-06-26026 June 1997 Insp Rept 50-456/97-10 on 970403-0602.No Violations Noted. Major Areas Inspected:Maint ML20141E8371997-06-17017 June 1997 Insp Repts 50-456/97-07 & 50-457/97-07 on 970408-0520. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141H4431997-05-19019 May 1997 Enforcement Conference Repts 50-456/96-16 & 50-457/96-16 on 970514 in Lisle,Il.Major Areas Discussed:Apparent Violations Identified During Inspection,Along W/Corrective Actions Taken or Planned by Licensee ML20141J9301997-05-19019 May 1997 Insp Repts 50-456/97-08 & 50-457/97-08 on 970417-30. Violations Noted.Major Areas Inspected:Plant Support Performance ML20141D7711997-05-0909 May 1997 Insp Repts 50-456/97-05 & 50-457/97-05 on 970222-0407. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19970061997-04-10010 April 1997 Partially Withheld Insp Repts 50-456/97-06 & 50-457/97-06 on 970310-14.No Violations Noted.Major Areas Inspected: Evaluation of Performance of Security Organization & Review of Previous Open Items IR 05000456/19970041997-04-0808 April 1997 Insp Repts 50-456/97-04 & 50-457/97-04 on 970303-07. Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program,Aspect of Plant Support 1999-09-03
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000456/19990131999-09-17017 September 1999 Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824. Violations Noted.Major Areas Inspected:C/As & Engineering Related Activities to Address Technical Concerns Identified During Design Insp Completed on 980424 IR 05000456/19990121999-09-0303 September 1999 Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000456/19990111999-07-29029 July 1999 Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990091999-07-20020 July 1999 Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program.Circumstances Surrounding 990428, Gatehouse Monitor Exiting Incident Were Also Reviewed IR 05000456/19990071999-06-18018 June 1999 Insp Repts 50-456/99-07 & 50-457/99-07 on 990414-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000457/19990081999-06-14014 June 1999 Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted. Major Areas Inspected:Isi & SG Insp Program IR 05000456/19990051999-05-20020 May 1999 Insp Repts 50-456/99-05 & 50-457/99-05 on 990405-23.Non- Cited Violations Identified.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000456/19990061999-05-11011 May 1999 Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.One non-cited Violation Re Configuration Control Error Occurred. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000456/19990021999-03-23023 March 1999 Insp Repts 50-456/99-02 & 50-457/99-02 on 990120-0301.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990041999-03-23023 March 1999 Insp Repts 50-456/99-04 & 50-457/99-04 on 990222-24 & 0303 Onsite & 0309 & 11 Region 3 Ofc.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000456/19980161999-02-11011 February 1999 Insp Rept 50-456/98-16 on 980916-990121.No Violations Noted. Major Areas Inspected:Containment Access Opening & Replacement Activities,Removal & Replacement of Sgs,Welding of SG Piping & Review of Quality Control Activities IR 05000456/19980201998-12-30030 December 1998 Insp Repts 50-456/98-20 & 50-457/98-20 on 981020-1207.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19980211998-12-10010 December 1998 Insp Repts 50-456/98-21 & 50-457/98-21 on 981110-24.No Violations Noted.Major Areas Inspected:Aspects of Corrective Actions & Engineering Involvement in Corrective Action Process IR 05000456/19980181998-12-0404 December 1998 Insp Rept 50-456/98-18 on 981015-23 & 1109-10.No Violations Noted.Major Areas Inspected:Four Areas Associated with Licensee SG Replacement Project IR 05000456/19980191998-11-25025 November 1998 Insp Repts 50-456/98-19 & 50-457/98-19 on 981027-30.No Violations Noted.Major Areas Inspected:Licensee Implementation of 10CFR50.65 Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants ML20195G3731998-11-17017 November 1998 Insp Repts 50-456/98-14 & 50-457/98-14 on 980909-1019. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000456/19980151998-11-13013 November 1998 Insp Repts 50-456/98-15 & 50-457/98-15 on 980915-1022. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Focusing on Radiological Controls for Unit 1 Outage Activities & SG Replacement Project IR 05000456/19980171998-11-10010 November 1998 Insp Repts 50-456/98-17 & 50-457/98-17 on 981013-19. Violations Noted.Major Areas Inspected:Security Measures Implemented to Support Steam Generator Replacement Project IR 05000456/19980121998-10-0505 October 1998 Insp Repts 50-456/98-12 & 50-457/98-12 on 980728-0908.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980111998-09-25025 September 1998 Insp Rept 50-456/98-11 on 980707-09,15-16,0805-06,10-13 & 26-28.No Violations Noted.Major Areas Inspected:Review of SG Replacement Program.Insp Focused on Welding of SG Feedwater Piping & Preparation Activities for Replacing SGs IR 05000456/19980131998-08-28028 August 1998 Insp Repts 50-456/98-13 & 50-457/98-13 on 980810-14.No Violations Noted.Major Areas Inspected:Review of Chemistry & Radiation Protection Programs IR 05000456/19980091998-08-25025 August 1998 Insp Repts 50-456/98-09 & 50-457/98-09 on 980609-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20236N0941998-07-0606 July 1998 Insp Repts 50-456/98-08 & 50-457/98-08 on 980421-0608. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980101998-07-0202 July 1998 Insp Repts 50-456/98-10 & 50-457/98-10 on 980615-19.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000456/19980071998-06-18018 June 1998 Insp Repts 50-456/98-07 & 50-457/98-07 on 980519-22.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000456/19982011998-06-0101 June 1998 Insp Rept 50-456/98-201 on 980316-20,0330-0410 & 0420-24. No Violations Noted.Major Areas Inspected.Team Selected & Reviewed Relevant Portions of Ufsar,Ts,Drawings, Calculations,Mod Packages & Procedures IR 05000456/19980051998-05-19019 May 1998 Insp Repts 50-456/98-05 & 50-457/98-05 on 980310-0420. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19980061998-04-21021 April 1998 Insp Repts 50-456/98-06 & 50-457/98-06 on 980331-0407. Violations Noted.Major Areas Inspected:Announced Review Protection Program.Insp Focused on Liquid & Gaseous Effluent Radiation Monitoring Programs ML20216B0761998-04-0808 April 1998 Insp Repts 50-456/98-02 & 50-457/98-02 on 980127-0309. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19980031998-03-16016 March 1998 Insp Repts 50-456/98-03 & 50-457/98-03 on 980128-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20203D9201998-02-20020 February 1998 Insp Repts 50-456/97-22 & 50-457/97-22 on 971216-980126. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000457/19970211998-02-11011 February 1998 Insp Rept 50-457/97-21 on 971112-21 & 980115.Violations Noted.Major Areas Inspected:Operations & Engineering ML20198G1231998-01-0707 January 1998 Partially Withheld Insp Repts 50-456/97-20 & 50-457/97-20 on 971117-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Performance Involving Evaluation of Effectiveness of Physical Protection Program ML20202F1951998-01-0202 January 1998 Insp Repts 50-456/97-19 & 50-457/97-19 on 971104-1215. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20199A5781997-12-17017 December 1997 Insp Repts 50-456/97-16 & 50-457/97-16 on 970923-1103. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970151997-11-26026 November 1997 Insp Repts 50-456/97-15 & 50-457/97-15 on 970812-0922. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19970171997-11-17017 November 1997 Insp Repts 50-456/97-17 & 50-457/97-17 on 971006-22. Violations Noted.Major Areas Inspected:Plant Support & Radiation Protection Program IR 05000456/19970121997-10-17017 October 1997 Insp Repts 50-456/97-12 & 50-457/97-12 on 970414-0815. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000456/19970131997-09-17017 September 1997 Insp Repts 50-456/97-13 & 50-457/97-13 on 970701-0811. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970141997-09-12012 September 1997 Insp Repts 50-456/97-14 & 50-457/97-14 on 970811-15.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Training Programs IR 05000456/19970091997-08-26026 August 1997 Insp Repts 50-456/97-09 & 50-457/97-09 on 970520-0630. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149J7051997-07-24024 July 1997 Insp Repts 50-456/97-11 & 50-457/97-11 on 970618-24.No Violations Noted.Major Areas Inspected:Plant Support Performance & Evaluation of Effectiveness of Radiation Protection Program IR 05000456/19970101997-06-26026 June 1997 Insp Rept 50-456/97-10 on 970403-0602.No Violations Noted. Major Areas Inspected:Maint ML20141E8371997-06-17017 June 1997 Insp Repts 50-456/97-07 & 50-457/97-07 on 970408-0520. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141H4431997-05-19019 May 1997 Enforcement Conference Repts 50-456/96-16 & 50-457/96-16 on 970514 in Lisle,Il.Major Areas Discussed:Apparent Violations Identified During Inspection,Along W/Corrective Actions Taken or Planned by Licensee ML20141J9301997-05-19019 May 1997 Insp Repts 50-456/97-08 & 50-457/97-08 on 970417-30. Violations Noted.Major Areas Inspected:Plant Support Performance ML20141D7711997-05-0909 May 1997 Insp Repts 50-456/97-05 & 50-457/97-05 on 970222-0407. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19970061997-04-10010 April 1997 Partially Withheld Insp Repts 50-456/97-06 & 50-457/97-06 on 970310-14.No Violations Noted.Major Areas Inspected: Evaluation of Performance of Security Organization & Review of Previous Open Items IR 05000456/19970041997-04-0808 April 1997 Insp Repts 50-456/97-04 & 50-457/97-04 on 970303-07. Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program,Aspect of Plant Support 1999-09-03
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000456/19990131999-09-17017 September 1999 Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824. Violations Noted.Major Areas Inspected:C/As & Engineering Related Activities to Address Technical Concerns Identified During Design Insp Completed on 980424 IR 05000456/19990121999-09-0303 September 1999 Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000456/19990111999-07-29029 July 1999 Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990091999-07-20020 July 1999 Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program.Circumstances Surrounding 990428, Gatehouse Monitor Exiting Incident Were Also Reviewed IR 05000456/19990071999-06-18018 June 1999 Insp Repts 50-456/99-07 & 50-457/99-07 on 990414-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000457/19990081999-06-14014 June 1999 Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted. Major Areas Inspected:Isi & SG Insp Program IR 05000456/19990051999-05-20020 May 1999 Insp Repts 50-456/99-05 & 50-457/99-05 on 990405-23.Non- Cited Violations Identified.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000456/19990061999-05-11011 May 1999 Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.One non-cited Violation Re Configuration Control Error Occurred. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000456/19990021999-03-23023 March 1999 Insp Repts 50-456/99-02 & 50-457/99-02 on 990120-0301.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990041999-03-23023 March 1999 Insp Repts 50-456/99-04 & 50-457/99-04 on 990222-24 & 0303 Onsite & 0309 & 11 Region 3 Ofc.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000456/19980161999-02-11011 February 1999 Insp Rept 50-456/98-16 on 980916-990121.No Violations Noted. Major Areas Inspected:Containment Access Opening & Replacement Activities,Removal & Replacement of Sgs,Welding of SG Piping & Review of Quality Control Activities IR 05000456/19980201998-12-30030 December 1998 Insp Repts 50-456/98-20 & 50-457/98-20 on 981020-1207.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19980211998-12-10010 December 1998 Insp Repts 50-456/98-21 & 50-457/98-21 on 981110-24.No Violations Noted.Major Areas Inspected:Aspects of Corrective Actions & Engineering Involvement in Corrective Action Process IR 05000456/19980181998-12-0404 December 1998 Insp Rept 50-456/98-18 on 981015-23 & 1109-10.No Violations Noted.Major Areas Inspected:Four Areas Associated with Licensee SG Replacement Project IR 05000456/19980191998-11-25025 November 1998 Insp Repts 50-456/98-19 & 50-457/98-19 on 981027-30.No Violations Noted.Major Areas Inspected:Licensee Implementation of 10CFR50.65 Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants ML20195G3731998-11-17017 November 1998 Insp Repts 50-456/98-14 & 50-457/98-14 on 980909-1019. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20195G3681998-11-17017 November 1998 Notice of Violation from Insp on 980909-1019.Violation Noted:As of 980818,licensee Failed to Initiate Measures to Determine Cause or Take Action to Preclude Recurrence of Loose Bolts on Two EDG Lubricating Oil Heat Exchanger Bells ML20195G3031998-11-13013 November 1998 Notice of Violation from Insp on 980915-1022.Violation Noted:On 981022,two Individuals Working Under RWP 984014 Removed Outer Rubber Gloves While Replacing Insulation in Containment IR 05000456/19980151998-11-13013 November 1998 Insp Repts 50-456/98-15 & 50-457/98-15 on 980915-1022. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Focusing on Radiological Controls for Unit 1 Outage Activities & SG Replacement Project IR 05000456/19980171998-11-10010 November 1998 Insp Repts 50-456/98-17 & 50-457/98-17 on 981013-19. Violations Noted.Major Areas Inspected:Security Measures Implemented to Support Steam Generator Replacement Project ML20196D9201998-11-10010 November 1998 Notice of Violation from Insp on 981013-19.Violation Noted: Licensee Security Staff Discovered That on Three Occasions Between 980826 & 1002,security Officers Were Found Asleep on Post IR 05000456/19983051998-11-0202 November 1998 Exam Repts 50-456/98-305 & 50-457/98-305 on 980914 with Telephoned Exam Results 981020.No Violations Noted.Exam Results:Applicant Passed Retake Exam & Was Issued Reactor Operator License IR 05000456/19980121998-10-0505 October 1998 Insp Repts 50-456/98-12 & 50-457/98-12 on 980728-0908.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980111998-09-25025 September 1998 Insp Rept 50-456/98-11 on 980707-09,15-16,0805-06,10-13 & 26-28.No Violations Noted.Major Areas Inspected:Review of SG Replacement Program.Insp Focused on Welding of SG Feedwater Piping & Preparation Activities for Replacing SGs IR 05000456/19980131998-08-28028 August 1998 Insp Repts 50-456/98-13 & 50-457/98-13 on 980810-14.No Violations Noted.Major Areas Inspected:Review of Chemistry & Radiation Protection Programs IR 05000456/19980091998-08-25025 August 1998 Insp Repts 50-456/98-09 & 50-457/98-09 on 980609-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20236N0911998-07-0606 July 1998 Notice of Violations from Insp on 980421-0608.Violations Noted:On 980424,licensee Failed to Implement Specific Fire Protection Program Requirements in That Welding Machine Was Left Unattended & Energized in Fuel Handling Bldg ML20236N0941998-07-0606 July 1998 Insp Repts 50-456/98-08 & 50-457/98-08 on 980421-0608. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980101998-07-0202 July 1998 Insp Repts 50-456/98-10 & 50-457/98-10 on 980615-19.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000456/19980071998-06-18018 June 1998 Insp Repts 50-456/98-07 & 50-457/98-07 on 980519-22.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000456/19982011998-06-0101 June 1998 Insp Rept 50-456/98-201 on 980316-20,0330-0410 & 0420-24. No Violations Noted.Major Areas Inspected.Team Selected & Reviewed Relevant Portions of Ufsar,Ts,Drawings, Calculations,Mod Packages & Procedures IR 05000456/19980051998-05-19019 May 1998 Insp Repts 50-456/98-05 & 50-457/98-05 on 980310-0420. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20248D0821998-05-19019 May 1998 Notice of Violation from Insp on 980310-0420.Violation Noted:On 980303,licensee Failed to Implement Braidwood Administrative Procedure 2321-18T11,Step E.1,for Sf Pool Skimmer Strainer Level Control IR 05000456/19983041998-04-29029 April 1998 NRC Operator Licensing Exam Repts 50-456/98-304OL & 50-457/98-304OL (Including Completed & Graded Tests) Administered During Wk of 980413 ML20217F5281998-04-21021 April 1998 Notice of Violation from Insp on 980331-0407.Violation Noted:Licensee Failed to Check That SG Worker Dosimetry Was Present & Correctly Worn IR 05000456/19980061998-04-21021 April 1998 Insp Repts 50-456/98-06 & 50-457/98-06 on 980331-0407. Violations Noted.Major Areas Inspected:Announced Review Protection Program.Insp Focused on Liquid & Gaseous Effluent Radiation Monitoring Programs ML20216B0611998-04-0808 April 1998 Notice of Violation from Insp on 980127-0309.Violation Noted:On 971010,21,1219 & 980105,licensee Failed to Require Independent Verification of Proper Sys Alignment for safety-related Valves Repositioned in Steps F.1.4 & F.1.7 ML20216B0761998-04-0808 April 1998 Insp Repts 50-456/98-02 & 50-457/98-02 on 980127-0309. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19980031998-03-16016 March 1998 Insp Repts 50-456/98-03 & 50-457/98-03 on 980128-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20203D9201998-02-20020 February 1998 Insp Repts 50-456/97-22 & 50-457/97-22 on 971216-980126. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20203D9151998-02-20020 February 1998 Notice of Violation from Insp on 971216-980126.Violation Noted:In Nov 1989,licensee Failed to Initiate Deviation Rept & Take Corrective Measures to Preclude Repetition of Mechanical Failure to All 4 Main Feedwater Check Valves ML20202F2321998-02-11011 February 1998 Notice of Violations from Insp on 971112-21 & 980115. Violations Noted:Licensee Failed to Follow NSWP-A-15 & Bwap 330-10 Requirements to Issue PIF for Tempering Line Snubber Considered Inoperable on 971110 IR 05000457/19970211998-02-11011 February 1998 Insp Rept 50-457/97-21 on 971112-21 & 980115.Violations Noted.Major Areas Inspected:Operations & Engineering PNO-III-98-013, on 980126,turbine Tripped Causing Subsequent Reactor Trip.Cause of Turbine Trip Remains Under Investigation.Appears Replacement Circuit Board Had Incorrect Electronic Configuration1998-01-29029 January 1998 PNO-III-98-013:on 980126,turbine Tripped Causing Subsequent Reactor Trip.Cause of Turbine Trip Remains Under Investigation.Appears Replacement Circuit Board Had Incorrect Electronic Configuration ML20198G1231998-01-0707 January 1998 Partially Withheld Insp Repts 50-456/97-20 & 50-457/97-20 on 971117-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Performance Involving Evaluation of Effectiveness of Physical Protection Program ML20202F1951998-01-0202 January 1998 Insp Repts 50-456/97-19 & 50-457/97-19 on 971104-1215. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 07100104/20120151998-01-0202 January 1998 Notice of Violation from Insp on 971104-1215.Violation Noted:On 971102,inspectors Identified That Licensee Had Failed to Fasten Covers on Incore Neutron Detector Drive Mechanism IR 05000456/19973101997-12-29029 December 1997 NRC Operator Licensing Exam Repts 50-456/97-310OL & 50-457/97-310OL for Tests Administered on 971006-1107.Three Senior Reactor Operators & One Reactor Operator Passed Exam. One Senior Reactor & One Reactor Operator Failed ML20199A5681997-12-17017 December 1997 Notice of Violation from Insp on 970923-1103.Violation Noted:On 971014,licensee Instrument Technician Made Error When Changing Setpoints on Unit 2 Containment Area Radiation Monitor 2AR11J.Error Resulted in High Radiation Alarm 1999-09-03
[Table view] |
Text
{{#Wiki_filter:. . _ I
< l l
.
~
U.S. NUCLEAR REGULATORY COMMISSION
,
'
REGION HI
l Docket Nos: 50-456; 50-457 l Licenses No: NPF-72; NPF-77 1 Reports No: 50-456/97004(DRS); 50-457/97004(DRS)
Licensee: Commonwealth Edison (Comed)
Facility: Braidwood Nuclear Plant, Units 1 and 2 Location: RR #1, Box 79 Braceville,IL 60407 Dates: March 3-7,1997 Inspectors: R. Jickling, Emergency Preparedness Analyst J. Foster, Sr. Emergency Preparedness Analyst Approved by: J. Creed, Chief, Plant Support Branch 1 Division of Reactor Safety
*
9704150317 970408 PDR ADOCK 05000456 G PDR #
-- - . - .. .. . . . - _ . - - - . - - - .- .- -
#
l
' ~
EXECUTIVE SUMMARY Braidwood Nuclear Plant, Units 1 and 2
- NRC Inspection Reports 50-456/97004; 50-457/97004 j This inspection included a review of the Emergency Preparedness (EP) program, an aspect
, of Plant Support. This was an announced inspection conducted by two regional emergency preparedness analysts.
.
The emergency preparedness program was effective in maintaining and improving operational readiness of your emergency response facilities, equipment, and personne Emergency response facilities, equipmsnt, and supplies were in excellent material
'
condition. Interviews with emergency response personnel demonstrated excellent I
knowledge of emergency implementing procedures and responsibilities. Management . ,
j support was clearly a factor in the program's improvement over the last two years.
-
However, a problem was identified with the 1996 Site Quality Verification audit report of the emergency preparedness program.
4-
,
* Licensee personnel performed proper classifications and timely notifications during i an actual activation of the Emergency Plan. (Section P1.1)
* The overall effectiveness of the licensee's emergency preparedness training and organization was excellent. (Sections P5 and P6)
* Emergency response facilities and equipment were well maintained and in an excellent state of operational readiness. (Section P2.1)
* Interviews with key emergency response organization personnel demonstrated
, excellent knowledge of the emergency implementing procedures and responsibilities. (Section PS)
* A violation was identified concerning the failure of the auditing team to evaluate and document the adequacy of offsite interface with the State of Illinois. (Section
,
P7)
* The inspectors completed Temporary Instruction 2515/134, " Licensee Onshift Dose Assessment Capabilities,' and verified the licensee's capabilities met the requirements. (Section P9)
J i
J
- - , -- - ~ v
- . . . - -- . - - - . - - - . _ _ . - . .. -.-.. - - - .-.- -
#
,
,.
. !
! Report Detalls l
;
IV. Mant Suncort !
!
! P1 Conduct of Emergency Preparedness (EP) Activities l
P1,1 Actual Emergemy Plan Activations ;
! Insnection Scone (82701) ,
i i
'
The inspectors reviewed records and documentation packages regarding plant :
response for emergency plan activations that occurred during 1996. Also, the i inspectors reviewed the procedure for the EP staff's assessment of plant response i for actual emergency plan activation Observations and Findings ,
t An Unusual Event was declared at 12:50 p.m. on January 18,1996, due to a loss of both Unit 2 Station Auxiliary Transformers, lasting greeter than 15 minutes. The event was terminated at 3:22 a.m. on January 20,1996, after offsite power was restored from a System Auxiliary Transforme In accordance with procedure Bw2S 100-1, " Review of Actual Emergency Events."
The licensee's EP staff conducted an assessment of plant personnel's emergency response for the January 18,1996 Unusual Event. Documents and records related to the event had been organized into a complete, detailed package. The EP group's summary report of the event had been provided to corporate EP staff to complete the procedure. Documents reviewed indicated that the event classification and related notifications to offsite authorities and the NRC were made properly and in a tiraely manne Also, the inspectors reviewed a new Nuclear Station Work Procedure (NSWP) A-07,
" Event Response Guidelines," dated February 12,1997, developed to provide guidance on the event response process. The prc,a 'uro provided for decisions to be made regarding the need for establishing an Event Hosponse Team (ERT) based on the significance of an event, guidance for ERT activities, and resulting report Conclusions The Unusual Event was properly classified and notifications to offsite authorities and the NRC Operations Officer were made in a timely manner. Plant EP staff had J performed an excellent review of the event in a timely manner, using the applicable procedur l l
l
i i
l
. . - . - -. -- - - - . . . - - - . _ - - - - - _ - - - -
.
.
.
'
- P2' Status of EP FacWties, Equipment, and Resources
! P Matarial Coruhtian of Emergency Rannonna Facihtas
,
' Inanection Scans (82701)
L The inspectors evaluated the material condition of the Control Room, Technical Support Center (TSC), Operations Support Center (OSC), Emergency Operations i Facility (EOF), and the Generating Stations Emer9ency Plan (GSEP) van. Field
- monitoring kits were also inspected. The hcensee demonstrated the operability of
'
numerous pieces of equipment, including radiological survey instruments, dose assessment and plant data computers, and communications equipment.
I Observations and Findings i The control room was in excellent material condition with current EP procedures
! availe.le. The FTS 2000 phone system was verified operable.
The TSC's material condition was excellent. Numerous facility enhancements and
'
upgrades were discussed and demonstrated. Computers and monitors in the TSC have been upgraded, a speaker phone had been installed for TSC briefings and updates so the OSC, Corporate EOF and Mazon EOF could listen, and the HMI
-
(Human Management interface) Operator interface which provided control room plant data information in the TSC had been installed. A TSC priorities status board
with definitions of the priority levels had also been added.
i
'
The OSC was in excellent material condition. An innovative OSC benchmarldng
] rnoeting was conducted last Fall. The benchmarking included all six Comed sites, and initiated standardization of the site's OSCs and procedures. This resulted in three new status boards in Braidwood's OSC for status updates, facility staffing,
'
and response team tracking. Improved three way loop phones connected the OSC, TSC, and control room for communicating data and as a command and control line for facility director The GSEP van was in excellent material condition. Supplies were available in
' appropriate quantities. Procedures reviewed by the inspectors were current and !
available. Instruments and equipment were verified functional and calibration dates were current. The van and portable generators were run to verify they were functional. Numerous upgrades to the van were identifie The EOF was in excellent material condition. Telephones, computer terminals, and other equipment were demonstrated to be functional. Current procedures were available and the facility was in an excellent state of readiness. The licensee provided an offective demonstration of the dose assessment co nputer system Records for the prompt alert and notification sirens for 1996 and 1995 were reviewed by the inspectors. Annual operability for 1996 was 97.5 percent with 95 percent for the lowest month's average. The 1995 annual operability average was
.
.___ _ _,_- - -. - __ . . . - - . . - _ - - - - . - . - - - -
!
.
i
. !
'
~
97.1 percent with 95.9 percent for the lowest month's average. Siren operability j exceeded the ecceptability limit of greater then or equal to 90 percen t
' Conclusions !
l Overall, emergency response facilities were in excellent material condetion. Several l facility enhancements were noted in each facility. Prompt Alert and Notification l System (PANS) airons were well maintaine ;
;
P3 EP Procedures and Deoumentation l
l Inanection Scons (B2701)
i
'
! The inspectors reviewed a selection of licensee emergency plan implement'mg
'
- procedures (EPIPs) and emergency plan sections. Also, the Nuclear Tracking
! System (NTS) issues assigned to the Emergency Preparedness Group were l
reviewe j 4 !
! b. Obmarvations and Findanns 'l a
!
i Bw2P 200-1, "Braidwood Emergency Action Levels," Revision 7, October 22, :
!
1996, was reviewed by the inspectors. TNs revision added a 15 minute limitation
,
for the Emergency Director to evaluate conditions and determine the correct '
i classification level for the emergency. This was an enhancement to the procedure.
l The 15 minute limit was allowed by NRC guldsnce (NRR's Position Paper, EPPOS l l #2). This limitation did not allow delay of classification for up to 15 minutes, but i i
allowed up to 15 minutes to make a proper emergency classification. This I procedure clearly identified timeliness limitations for emergency classificatio I
,
l l Also, this procedure noted if an event momentarily satisfied one Emergency Action l Level (EAL) and stabilized at an EAL for a lower classification, the declaration was
- to be made according to the highest initiating conditions reached. Discussions with l
corporate and site EP staff indicated that with the use of the Nuclear Management i- and Resources Council (NUMARC) EALs, the opportunity to transit through a higher l classification and stabilize at a lower classification would be minimized.
- SwZP 1000-2, "Offsite Notifications," Revision 6, October 22,1996, was reviewed by the inspectors. A recent change was that the " Additional Information" section of the Nuclear Accident Reporting System (NARS) form should only be used to i explain why a NARS form is being issued, D01 for a change in the classificatio Discussion with the licensee indicated that the offsite agencies that receive the i NARS form had an EAL manual that explained each of the EALs and the potential ,
impact on the public, and agreed additional information would not be neede !
'
I The inspectors reviewed two NTS lasues that had been assigned to the EP group: j ltem 456-103 96-01900, " Failure of Tone Alert Radios to Activate When Receiving a Shortened Activation Signal," and item 456-200-96-04303, "TSC Operability."
!
- 5
,
, . . _ _
. .
.
'
I
'
l L-i Both items were required to be addressed within one month. They clearly identified 1 persons responsible, and were appropriately cloeo ]
i
, Conclusions )
I
. The EPlPS reviewed were clear and easy to use. The NTS was effective relative to l l EP issues and the method to track and close these issues. No problems were I i identified in the procedures or documents reviewe '
'P5 Staff Training and QueBfication in EP l
. Innoection Scone (82701) l
! l 1 The inspectors reviewed various aspects of the licensee's training program. The j reviews included interviews with selected key emergency response organization ;
j (ERO) personnel (Acting Station Director and a Unit Supervisor who performs as a i communicator in the control _ room), course critique forms, attendance records, :
p examinations, and the Staff Augmentation Call List dated February 26,1997. In l j addition to the key ERO personnel interviews, the inspectors observed performance 1
- of approximately 20 facility personnel during a TSC table-top training sessio i
- Also, selected training instructor modules were reviewed, including S-2, " Generic l GSEP," dated July 29,1996, S-4, " Communications Systems," dated October 21, j
1996, and S-5, " Assessment, Classification, and Notification," dated August 5, j i 199 j Obmarvations and Findinas j interviews with two key emergency response personnel indicated excellent !
knowledge of procedures and emergency responsibilities. A TSC table top training ;
l session observed by the inspectors provided an adequate scenario and provided >
more than two thirds of the class " hands on" training with the procedures for answering response type question '
i -
l Records indicated that drills and training were formally critiqued. The training L critique forms indicated that the training had been of very good quality and the performance based table-top training and drills were considered effective by the i participant Files from the training records tracking program were compared with the Staff I
,
Augmentation Call List to verify ERO personnel listed on the call list were qualified.
l All ERO personnel reviewed were currently qualified for their emergency response positions. Training modules reviewed were of outline format with convenient l
- references, notes, and questions included in the margin l
!
- . Numerous training enhancements and upgrades were discussed with EP personne !
' '
Two highlights included the use of performance-based training which included tab'.e I top training and quarterly drills. Positive feedback was noted on most training i i feedback forms. Secondly, an effective, professional ten minute video tape of basic !
- !
'
;
;
B
-
!
I
.-
* i
,
'
onsite and offsite EP response was to be used for all Nuclear General Employee Training and was to be distributed to all the Comed site ) Conclusions Training files were organized and complete. Modules reviewed were recently revised and rietailed. Improvements in EP training were indicated by the use of )
performance-based training and erthancements made to the progra P6 EP Organization and Administration No significant changes have been made to the EP organization since the last ,
inspection. Discussions with site and corporate EP staff indicated excellent I management support. Upgrades and enhancements, plus the EP Coordinator's and Trainer's proactive approach to the program have produced significant improvement in the overall program. Management support was clearly a factor in the program's improvement over the last two years. Additionally, the EP Coordinator and Trainer ;
have had direct involvement in public relations by facilitating Braidwood tours for i various Federal, State, and local agency emergency response staff P7 Quality Amaurence in EP Activities a. Insoection Scone (82701)
l The inspectors reviewed the Emergency Preparedness Program Peer Review report, l lasued October 31,1996, conducted by corporate EP personnel. Also reviewed I was the Site Quality Verification (SOV) Audit Report QAA-#20-96-05, " Emergency Plan and Implementing Procedures," dated March 22,199 b. Observations and Findinas The corporate peer review, which used NRC inspection module 82701 as the outline for the review, concluded that the Braidwood EP program is in "very good to exce: lent condition," and noted that continuing EP program improvements had been mad The SOV staff's audit concluded that the station had been effectively maintaining the GSEP program, and that it was one of the best maintained programs of the Commonwealth sites. No findings or recommendations resulted from the audi The EP audit, conducted by SOV staff, contained an evaluation of the effectiveness I of offsite interfaces which was required by 10 CFR 50.54(t). The evaluation of the adequacy of offsite interface had been accomplished by SOV's review of training records, face to face and telephone interviews, review of communications drill records, and observation of a communications drill. Also, a detailed standardized list of questions had been used during the interview ;
i l
'
)
,
- ____ _ ___ _ . _ _ _ . _ . _ . _ . _ . _ _ _ _ _ _ __ _ . _ . _ . .
;
L
*
l l
! :
. - 1 l J
"
The inspectors identified that the offsite agencies evaluated involved local and
- county personnel only; contacts with state representatives were not performed.
!~ The corporate EP staff had provided the names and numbers for the State contacts to the SOV staff, the SOV staff attempted to contact State personnel for the
. evaluation but were initially unsuccessful in evaluating the interface. There was no followup action to identify whether the evaluation was completed. Discussion with ;
SOV audit staff indicated that other contacts had been made with state representatives from the lilinois Emergency Management Agency (IEMA) and the lilinois Department of Nuclear Safety (IDNS). However, the evaluation of the adequacy of State interface had not been formally evaluated or documente During discussions with corporate and site EP staff, the licensee considered actions
. to correct and prevent this from recurring which included that interface with the :
- State of Illinois would be more efficient if conducted by the corporate office staf l l
10 CFR 50.54(t) states in part, that the review of the EP program shall include an 1
- evaluation for adequacy of interfaces with State and local govomments and of l licensee drills, exercises, capabilities, and procedures, and that the results of the i r'aview shall be documented, reported to corporate and plant management. The j 1%ure of SOV to perform and document an evaluation for State interface adequacy
; !s a violation of 10 CFR 50.54(t) (Violation Nos. 50-456/97004-01 and 50-i 457/97004-01).
i
! . Conclualons The licensee's audits of the EP program, including the corporate peer review provided adequate evaluation of the program. However, a violation was identified
, for failure to complete the evaluation of State interface during the 1996 annusi i review of the Emergency Preparedness program.
- P9 Temporary instruction 2515/134 Onshift Dose Assessment Inanection Scona (Tl 2515/134)
The inspectors discussed onshift dose assessment capabilities and provisions with licensee personnel, reviewed the EPIPs, and inspected the equipment and programs
used for dose assessment.
i Observations and Findings I
[
'
The Generating Stations Emergency Plan (GSEP), Section 7.3.3, "Offsite Dose Calculations," addressed dose assessment capabilities. The plan 'mdicated that control room personnel would rely on the Class A computer model (A-model) for
;
dose sasessment
,
l
. ,_ _ _ _ . - . , , _ _
.. - - - - .- - -- .-- - - . .-. . - . . - - -- - _-
.
'
,
*
'
, Braidwood and other Comed sites utilized three dose assessment models: .
A-model: run continuously with control room printout i B-model: "MESOREM," primary accident offaite does model C-model: back calculated releases from field team measurements l' Procedure Bw2P 1000-7, "A-Model Operation," described the A-model, the
; conditions which would cause the system to alarm, and it's interface with control room personnel. The system was designed to run continuously; assess containment radiation levels, vent stack release rates, and meteorological conditions
- and compare them with appropriate Emergency Action Level (EAL) values. The
'
program would then provide an event classification, downwind dose and dose rate j projections at predetermined distances. The system would automatically print out
- alarm messages, informational messages, and reports in the control roo Corporate Emergency Plan implementing Procedure (CEPIP) 3220-01, " Dose i Assessment B Model (MESOREM96, Revision 21," Revision 3, dated October 1996,
- was reviewed. No concems were identifie !
,
The inspectora reviewed Training Module G3-EP-XL-S25, "ODCS Specialist,"
l
'
Revision 1, dated January 30,1997. The module appropriately described the three 1 dose calculation models, and advised the ODCS specialist to switch the A-model l
^
printout from the control room to the TSC. Training also properly cautioned that I the A-model is only accurate when the plant was operating with four fans in i l' operation. The training module also contained adequate information for logging )
onto the computer system and interacting with the dose assessment model ;
1 Conclusions )
l
'
Licensee capability, equipment, procedures, and training for onshift dose )j assessment were adequate. This Tl is closed. Documentation utilized for closing this Tl is attached as Attachment '
f
,
V. Management Meetinas ;
! l X1 Exit Meeting Summarv !
The inspectors presented the inspection results to members of licensee management at the conclusion of the inspection on March 7,1997. The licensee acknowledged the findings presented. No proprietary information was identifie ,
,
t l
,
Attachment: Form for Documentation of On-Shift Dose Assessment Capability l I f f
a n
'
'
.
?
I
. . _ _ ~
,
,
!
. '!
,
.. .;
-.
PARTIAL LIST OF PERSONS CONTACTED Licensee
,
T. Tulon,' Station Manager R. Wegner, Operations Manager l A. Haeger, Health Physics and Chemistry Supervisor i R. Flessner, Site Quality Verification Director !
M. Vonk, Emergency Preparedness Director i D. Stobaugh, Emergency Preparedness Onsite Programs Administrator K. Appel, Emergency Preparedness Coordinator
-{
,
- M. Ray, Emergency Prepared 1ess Trainer :
L. Rhoden, Training Superviscr T. Simpkin, Regulatory Assura1ce Supervisor l M. Caesidy, Regulatory Assurance M. Turbak, Site Quality Verification
:
J. Barr, Site Quality Verification ,
;
INSPECTION PROCEDURES USED ;
lP 82701 Operational Status of the Emergency Preparedness Program l
,
Ti 2515/134 Licensee Onshift Dose Assessment Capabilities i
ITEMS OPEN, CLOSED, AND DISCUSSED ;
Ooened
l i
50 456/457-9700 01 VIO Failure to evaluate and document the adequacy of ,
offsite interface with the State of Illinoi ;
,
-
,
- - -
,
- - - . . . . . . . - . - ~ . - - - - -
,
6 l
!
k j
-
, . ..
'
. .,
i LIST OF ACRONYMS USED .
l
)
'
CFR~. Code of Federal Regulations CEPIP Corporate Emergency Plan implementing Procedure i EAL Emergency Action Level {
EOF Emergency Operations Facility !
EP Emergency Preparedness j EPIP . Emergency Plan implementing Procedures 1 EPPOS NRC EP Position Paper from NRR l
ERT Event Response Team GSEP Generating Stations Emergency Plan l HMl Human Management Interface IFl inspection Follow-up ltem IDNS lilinois Department of Nuclear Safety ,
LEMA lilinois Emergency Management Agency ;
LER Licensee Event Report MESOREM Dose Assessment Program o
.NARS Nuclear Accident Reporting System ;
IJS W P Nuclear Station Work Procedure NUMARC Nuclear Management and Resources Council -
NTS Nuclear Tracking System
- ODCS' Offsite Dose Calculation System OSC Operations Support Center i PDR Public Document Room ;
STA Shift Technical Advisor '
SQV Site Quality Verification )
Tl Temporary Instruction i TSC Technical Support Center i UFSAR Updated Final Safety Analysis Report :
VIO Violation l
,
J F
f I q
l
!
!
-
i
_ _ - . _ , . .. ..
. .
'
ATTACPMENT A FORM FOR DOCUMENTATION OF ON-SHIFT DOSE ASSESSMENT CAPABILITY -* ~ *
_Braidood/ Units 1 & 2 /50-456. 50-457 Commonwealth Edison Comoany (Comed) 10/16/96 SITE / UNIT / DOCKET #s LICENSEE DATE l
'4.01 DOSE ASSESSMENT COMMITMENT IN EMERGENCY Pt.AN :
'
Acceptance Criteria Person (s) Contacted Position Title (s) Plan Section Revision N Meets acceptance (Refer to page 1 of this Appendix for containing and Date criteria?
further detail on the acceptance criteria) commitment Kevin Appel EP Coordinator GSEP 7. Rev.7F Ye Section 4.01 Item 1 01/95 Emergency Plan contains commitment for on-shift dose assessment capabilit Kevin Appel EP Coordinator GSEP 7.3.3, would Rev.71 Ye Section 4.01 Item 2 call personnel to use 02/96 Emergency Plan contains commitment for *B* model: GSEP backup dose assessment capabilit .3.1, PAR flowchar .02 ON-SHIFT DOSE ASSESSMENT EMERGENCY PLAN IMPLEMENTING PROCEDURE Person (s) contacted Position Title (s) Procedurelladication Revision N Meets acceptance and Date criteria?
Kevin Appel EP Coordinator EPIP BwZP 1000-7, Re Ye Section 4.02 Item 1 "A-model Operation *; 03/16/95 Procedure initiates dose assessment Kevin Appel EP Coordinator None "A model" N/A Ye Section 4.02 Item 2 operates Indications initiate dose assessment continuously, unless INOP. Effluent monitor Kevin Appel EP Coordinator EPIP BwZP 200-3, Rev.O, Ye Section 4.02 Item 3 " Station Release Rate 1/19/94 Procedure for performing dose assessment Determination * CEPIP Rev 2,4/9 availabl , " Dose Assessment B Model".
04.03 - ON-SHIFT DOSE ASSESSMENT TRAINING l Person (s) contacted Position Title (s) Personnel Trained Meets acceptance (Title /#1 criteria?
Kevin Appel EP Coordinator Unit Supervisors, Shift N/A Ye Section 4.03 Item 1 Engineers, STAS, On-shift Personnel trained for dose assessment approx.18 individuals 2515/134 A+12 issue Date: 09/26/96