ML20137T066
| ML20137T066 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 04/08/1997 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Stanley H COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20137T070 | List: |
| References | |
| NUDOCS 9704150306 | |
| Download: ML20137T066 (2) | |
See also: IR 05000456/1997004
Text
.
. -
_ _ _ _ _.
._
_
_
. . _ _ __ _ . _ _ . - _ _ _
_
.
____
J
Ot0
]
,
.
-
I
April 8, 1997
.
F
Mr. H. G. Stanley .
. Site Vice President
Braidwood Nuclear Power Station
Commonwealth Edison Company .
R.R. #1, Box 84
Brecoville,IL 60407
,
F
' SUBJECT:
NRC BRAIDWOOD EMERGENCY PREPAREDNESS INSPECTION REPORTS
i
50-456/97004 (DRS); 50-457/97004(DRS) AND NOTICE OF VIOLATION
l
1
Dear Mr. Stanley:
.
' On March 7,1997, the NRC completed an inspection at your Braidwood Generating
,
,
Station, Units 1 and 2. The enclosed report presents the results of that inspection.
. , .
Areas examined during the inspection are identified in the report. Within these areas, the
inspection consisted of a selective examination of procedures and representative records,
'
- interviews with personnel, and observation of activities in progress.
l
!
This inspection was to perform the emergency preparedness core inspection in NRC
'
inspection Procedure 82701 and review the status of previous open inspection findings.
The report's Executive Summary provides an overview of our assessment of your
'
i
performance in Emergency Properedness, an aspect of Plant Support. At the conclusion of
,
the inspection the findings were discussed with those members of your staff identified in
the report.
4
,
The emergency ' preparedness program was effective in maintaining and improving
'
operational readiness of your emergency response facilities, equipment, and personnel.
i
Emergency response facilities, equipment, and supplies were in excellent material
,
,
condition. Interviews with emergency response personnel demonstrated excellent
1
"
[
' knowledge of emergency implementing procedures and responsibilities. Management
support was clearly a factor in the program's improvement over the last two years.
!
'
i
However, a problem was identified with the 1996 Site Quality Verification' audit of the
emergency preparedness program.
,
. Based on the results of this inspection, certain of your activities appeared to be in violation
j
'
.
of NRC requirements, as specified in the enclosed Notice of Violation (Notice). The
.
' violation concems the failure to evaluate, document, and report to corporate and plant
management the adequacy of interface with the State govemment,
i
)
.You are required to respond to this letter and should follow the instructions specified in the
7
enclosed Notice when propering your response, in your response, you should document
.
the specific actions taken and any additional actions you plan to prevent recurrence. After
i
j
reviewing your response to this Notice, including your proposed corr
results of future inspections, the NRC will determine whether further NRC enforcement
i
'
action is necessary to ensure compliance with NRC regulatory requirements.
i
9704150306 970408
9
'PDR
ADOCK 05000456
appupppppp >f
<
G
"
!
-
..
.1.
, . _ _ .
- .
~ .
.
-
.
.
. . _ , . . _ . . _ _
,.,
...-.,_.-...._a_'
-
.
.
H. G. Star $ ley
-2-
April 8, 1997
"'
in accordance with 10 CFR 2.790 of the NRC'S " Rules of Practice," a copy of this letter
and the enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
/s/MelvynLeach(for)
Geoffrey E. Grant, Director
Division of Reactor Safety
Docket Nos. 50 456; 50 457
y
4
i
Enclosures:
1. Notice of Violation -
t
2. Inspection Reports 50-456/97004(DRS); 50-457/97004(DRS)
i
b
cc w/encis:
T. J. Maiman, Senior Vice President,
'
Nuclear Operations Division
D. A. Sager, Vice President,
Generation Support
.
'
H. W. Keiser, Chief Nuclear
l
Operating Officer
>
T. Tulon, Station Manager
i
T. Simpken, Regulatory Assurance
i
Supervisor
)
1. Johnson, Acting Nuclear
l
4
Regulatory Services Manager
>
<
Document Control Desk - Licensing
'
4
Richard Hubbard
!
Nathan Schloss, Economist,
!
4
Office of the Attorney General
i
State Liaison Officer
Chairman, Illinois Commerce Commission
l
Distribution:
-
Docket File w/encls
Rill PRR w/encls
C. D. Pederson, Rlli w/encls
l
4
PUBLIC IE-35 w/encls
SRis, Braidwood, Byron,
Rlli Enf. Coordinator w/encls
j
,
OC/LFDCB w/encls
Zion w/enci s
R. A. Capra, NRR w/encls
i
DRP w/encls
LPM, NRR w/encls
TSS w/encls
i
DRS w/encls
CAA1 w/encls
A. B. Beach, Rlll w/encls
j
i
DOCUMENT NAME: G:DRS\\ BRA 97004.DRS
.
To receive a copy of this document, Indicate in the box: "C" = Copy without
l
'
attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy
l
.=
OFFICE
RIII
lE RIRjf
l
RIII
lo'RIII
l+
l
NAME-
RJickling:jpfl
JCr(IS-
RLanksburyWM4
MLeach/GGrant/me
!
DATE c3tL44/n /97
O
OQ M /97
$#3h/ /97
04/ o 8 /97
,
0FFICIAL MCORD COPS
l
l
--
. - - - . . -
.
-
-
.-