Forwards Insp Repts 50-456/97-04 & 50-457/97-04 on 970307 & Nov.Violations Concerns Failure to Evaluate,Document & Rept to Corporate & Plant Mgt Adequacy of Interface W/State Govt
ML20137T066
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/08/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stanley H
COMMONWEALTH EDISON CO.
Shared Package
ML20137T070 List:
References
NUDOCS 9704150306
Download: ML20137T066 (2)


See also: IR 05000456/1997004

Text

. . - _ _ _ _ _. ._ _ _ . . _ _ __ _ . _ _ . - _ _ _ _ . ____

1

J , Ot0 ]

.

-

I

April 8, 1997

.

F Mr. H. G. Stanley .

. Site Vice President

Braidwood Nuclear Power Station

Commonwealth Edison Company .

R.R. #1, Box 84

Brecoville,IL 60407 ,

F

' SUBJECT: NRC BRAIDWOOD EMERGENCY PREPAREDNESS INSPECTION REPORTS i

50-456/97004 (DRS); 50-457/97004(DRS) AND NOTICE OF VIOLATION l

1

. Dear Mr. Stanley:

, ' On March 7,1997, the NRC completed an inspection at your Braidwood Generating ,

Station, Units 1 and 2. The enclosed report presents the results of that inspection.

.,.

Areas examined during the inspection are identified in the report. Within these areas, the

inspection consisted of a selective examination of procedures and representative records,

'

- interviews with personnel, and observation of activities in progress.  ;

l '

! This inspection was to perform the emergency preparedness core inspection in NRC

inspection Procedure 82701 and review the status of previous open inspection findings.

'

The report's Executive Summary provides an overview of our assessment of your

i performance in Emergency Properedness, an aspect of Plant Support. At the conclusion of ,

the inspection the findings were discussed with those members of your staff identified in  :

the report. l

4

,

'

The emergency ' preparedness program was effective in maintaining and improving

operational readiness of your emergency response facilities, equipment, and personnel. i

,

Emergency response facilities, equipment, and supplies were in excellent material ,

"

condition. Interviews with emergency response personnel demonstrated excellent 1

[; ' knowledge of emergency implementing procedures and responsibilities. Management

support was clearly a factor in the program's improvement over the last two years.  !

'

i However, a problem was identified with the 1996 Site Quality Verification' audit of the

emergency preparedness program. ,

j

.

. Based on the results of this inspection, certain of your activities appeared to be in violation '

of NRC requirements, as specified in the enclosed Notice of Violation (Notice). The .

' violation concems the failure to evaluate, document, and report to corporate and plant

management the adequacy of interface with the State govemment, i

)

.You are required to respond to this letter and should follow the instructions specified in the

7 enclosed Notice when propering your response, in your response, you should document .

the specific actions taken and any additional actions you plan to prevent recurrence. After i

j

i reviewing

results of futureyour response

inspections, to determine

the NRC will this Notice, whetherincluding your proposed

further NRC enforcement corr '

action is necessary to ensure compliance with NRC regulatory requirements. i  ;

9704150306 970408 9

'PDR ADOCK 05000456 <

G PDR "

appupppppp

>f

!

.1. , . _ _ . . . _ , . . _ . . _ _

- ...-.,_.-...._a_'

.

.

"'

H. G. Star $ ley -2- April 8, 1997

in accordance with 10 CFR 2.790 of the NRC'S " Rules of Practice," a copy of this letter

and the enclosures will be placed in the NRC Public Document Room (PDR).

Sincerely,

/s/MelvynLeach(for)

Geoffrey E. Grant, Director

Division of Reactor Safety

y Docket Nos. 50 456; 50 457

4 Licenses No. NPF-72; NPF-77

i

Enclosures: 1. Notice of Violation -

t 2. Inspection Reports 50-456/97004(DRS); 50-457/97004(DRS)

i

b cc w/encis: T. J. Maiman, Senior Vice President,

'

Nuclear Operations Division

D. A. Sager, Vice President, *

Generation Support .

'

H. W. Keiser, Chief Nuclear l

Operating Officer >

T. Tulon, Station Manager i

T. Simpken, Regulatory Assurance i

Supervisor )

4 1. Johnson, Acting Nuclear l

< Regulatory Services Manager >

'

4

Document Control Desk - Licensing

Richard Hubbard  !

4

Nathan Schloss, Economist,  !

Office of the Attorney General i

State Liaison Officer

Chairman, Illinois Commerce Commission

l

Distribution: -

Docket File w/encls Rill PRR w/encls C. D. Pederson, Rlli w/encls l

4

, PUBLIC IE-35 w/encls SRis, Braidwood, Byron, Rlli Enf. Coordinator w/encls j

OC/LFDCB w/encls Zion w/enci s R. A. Capra, NRR w/encls

i DRP w/encls LPM, NRR w/encls TSS w/encls i

DRS w/encls CAA1 w/encls A. B. Beach, Rlll w/encls j

i

DOCUMENT NAME: G:DRS\ BRA 97004.DRS .

'

To receive a copy of this document, Indicate in the box: "C" = Copy without l

attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy l

.=

OFFICE RIII lE RIRjf l RIII lo'RIII l+ l

NAME- RJickling:jpfl JCr(IS- RLanksburyWM4 MLeach/GGrant/me  !

DATE c3tL44/n /97 O OQ M /97 $#3h/ /97 04/ o 8 /97 ,

0FFICIAL MCORD COPS l