Monthly Operating Rept for Jan 1985
ML20112B429
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/31/1985
From: Leclair S, Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ANPP-31930-EEVB, NUDOCS 8503190173
Download: ML20112B429 (6)


Text

-

, NRC MONTHLY OPERATING REPORT DOCKET NO. 50-s28 UNIT NAME pvNcs.1 DATE 2/11/8s -

COMPLETED BY 1 1. teciair TELEPHONE An2-912-5300 OPERATING STATUS ove. 6593

1. Unit Name: Palo Verde Nuclear Generating Station, Unit 1
2. Reporting Period: January 1985
3. Licensed Thermal Power (MWt): 1800
4. Nameplate Rating (Gross MWe): 1304
5. Design Electrical Rating (Net MWe): 177n
6. Maximum Dependable Capacity (Gross MWe): rn 1, o ancorminna
7. Maximum Dependable Capacity (Net MWe): , r,, ,, o agrormenoa
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net Mde): 190 MWt (o MWe)
10. Reasons For Restrictions, If Any: Low Power Operating License This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744 744 744
12. Number Of Hours Reactor Was Critical o o o
13. Reactor Reserve Shutdown Hours o o n
14. Hours Generator On-Line o o n
15. Unit Reserve Shutdown Hours o n n
16. Gross Thermal Energy Generated (MWH) o n n

^

17. Gross Electrical Energy Generated (MWH) n n n
18. Net Electrical Energy Generated (KdH) n n n
19. Unit Service Factor N/A n/a v/4
20. Unit Availability Factor N/A N/A N/A
21. Unit Capacity Factor (Using MDC Net) N/A N/A N/A
22. Unit Capacity Factor (Using DER Net) N/A N/A M/A
23. Unit Forced Outage Rate N/A N/A 4 M/A
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

No sinnificant outane planned until after warranty run (11/RO

25. If Shutdown At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY 5/85 N/A INITIAL ELECTRICITY 6/85 N/A COMMERCIAL OPERATION __11/85 N/A 2940a 850319017'3 850131 ADOCK 0500 gDR 28 J[

g//

~

', , * ^ , .

~

~

$UMMARY OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-528 UNIT PVNGS-1 DATE 2/11/85 COMPLETED BY S. J. LeClair

~

, TELEPHONE 602-932-5300

~

Ext. 6591 December 31 3 1984 Granted an Operating License, limited to 5% power.

January 7 The unit entered Mode 6. January 12 the reactor was fully loaded with 241 fuel assemblies.

January 28 The unit entered Mode 5 C

2940u 6

g_ s =: e .

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-528 UNIT PVNCS-1 DATE 2/11/85 COMPLETED BY S. J. LeClair

, TELEPHONE 602-932-5300 Ext. 6593 MONTH: January 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

'(MWe-Net) (Kde-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 o 21 '

__ o 6 o 22 0 7 o 23 o 8 n 24 o .

9 n 25 n 10 n 26 n 11 0 27 0 12 o 28 o i

13 o 29 o '

14 n 30 o  !

15' n 31 o )

16 n i

2940u r ., . ~ . - .--.,.--m

,,,_, ,--s--,-- , . , - - c-- ------#-...--.-- --

,,4 - , - , - , -

C3 + .

, t DOCKET 110. 9n 99R ,,

UNIT SHUTDOWNS AND POWER REDUCTIONS *

  • UNIT NAMC PVNCN-1 DATE 2/11/85 .

COMPLETED BY d. J. LeClair TELEPHONE 917-5300 Fve ARQ3 Method or Shutting Down System Component Cause & Corrective 2 3 LER 4 $ Action to 1 Duration Prevent Recurrence Type (Hours) Reason Reactor No. Code Code No, Date Not applicable - reactor N/A '

has not achieved initial criticality.

3 is 1 2 Method: Exhibit F - Instructions F-Fo rced Reason: 1-Manual for Prnparation or Data S-Scheduled A-Equipment failuro (Explain) 2-Manual Scram, Entry Shoots for Licensee D-Maintenance or Test 3-Automatic Scram. Event Report (LER) File C-Rorueling to-Continuation from (NUREC 0161)

D-Rogula tory Restriction Previous Month E-Operator Trainintl lie License Examination F- Adm i n i s t ra t ive $= Reduction or 20% 5 C-Ope ra t i ona l Error (Explain) or Creator in the Exhibit H-Some Source N-Other (Expla in) Past 214 Hours s 6-other (Explain) 2940u l

l 1

' ..- r , ,

,,,'.' I

  • REFUELING INFORMATION DOCKET NO. 50-528 UNIT PVNGS-1 DATE 2/11/85 COMPLETED BY s. J. Leclair TELEPHONE 932-5300 Fve. 6591
1. Scheduled date for next refueling shutdown.

10/1/87

.. 2. Scheduled date for restart following refueling.

11/19/87

3. Will refueling or resumption of cperation thereafter require a Technical Specification change or other license amendment?

Not yet determined What will these be? .

Not yet dqtermined -

4. Scheduled date for submitting proposed licensing action and supporting "

information.

Not yet determined

5. Important Licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Not yet determined

6. The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. _0

7. Lice:, sed spent fuel storage capacity.1121 Intended change in spent fuel storage capacity. Hane .
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. 2002 (w/ annual reloads and full core discharge capability).

2940u

, s ,

e i ..

x Arizona Public Service Company ,

b ANPP-31930-EEVB/WFQ/GEC February 14, 1985 Learned W. Barry, Director l0ffice of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528, License No. NPF-34 January Monthly Operating Report File: 85-056-026: G.I.01.10

Dear Mr. Barry:

. Attached please find the January, 1985 Monthly Operating Report prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifi-cations) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License. By copy of this letter we_are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V Office.

Specification 6.9.1.6 requires the documentation of all challenges to the safety valves. No such challenges occurred during the reporting period.

If you have any questions or concerns, please contact me.

Very truly yours, 0

- . CC_.E X_\ d L E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/GEC/mb Attachments cc: 'J. B. Martin R. P. Zimmerman E. A. Licitra A. C. Gehr

+