Rev 3 to Procedure 8.7.1.10, Pressure Test Automatic Depressurization Sys Accumulator Sys Integrity
ML20077F944
Person / Time
Site: Pilgrim
Issue date: 05/13/1983
From:
BOSTON EDISON CO.
To:
Shared Package
ML20077F939 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.28, TASK-TM 8.7.1.10, NUDOCS 8308030226
Download: ML20077F944 (5)


Text

.

. I e

i s BOS"QN L' 11 ') ISOn COV?ANY NDC:.IAE OPERJTIONS DE? Alt:ENT ,

FILGtIM NUCLEAR POGER STATION Procedars No. 8.7.1.10 PRESSURE TEST ADS ACCUMULATOR SYSTEM INTEGRITY

. List of Effective Pages 8.7.1.10-1 '

8.7.1.10-2 8.7. 1.10-3 Attachments 8.7.1.10A-1 8.7.1.10B-1 i ,,,,,ee #4 4 # 4 #

ORC C(air =an

, n.:. duf/ 3 #6

/

U N.C OMT ROLiE.G0-1 Rec 0 P Y 8308030226 0307E9 DR ADOCK 05000

'I. PURPOSE The purpose of this procedure is to provide detailed instructions for the perfocmance of a Pressure Test of the ADS Accumulator Systems to assure emergency pneumatic supply for the FSAR required number and duration of valve operations.

II. DISCUSSION j As required by BECo letter #80-11, dated January 18, 1980 " Response to I&E Bulletin 80-01". Ergineering evaluation for Peach Bottom 2 and 3 disclosed that the Autr,matic Depressurization System (AES) pneumatic supply (either nitrogan or air) may not be operable for all possible events because of a combination of misapplication of check valve, a lack of pressure testing of the accumulator system backing up each ADS l valve operator and questions about the continued operability of the l , pneumatic supply in a seismic event. The test frequency is to be during

) refueling outage not to exceed every two years.

III. REFERENCE MATERIAL A. P&ID M-252 B. P&ID M-220, Sheet 2 C. Design Specification 6498-M-18 D. Kl8AC - 28.1 - Ingersoll - Rar1 Co. Vertical Air Receiver E. M.18-41-2BC - Certificate of Shop Inspection IV. PETREQUISITES 1

A. Obtain Watch Engineers permission to start test.

f B. Instrument Air System Operaole.

C. All modifications to Air Lines / Check Valves Completed.

D. Radiarion Work Permit and Maintenance Request approved.

E. Communications established as required.

F. Insure the Accumulators including any fittings attached to them are leak tight against normal system air pressure when " snooped".

V. APPARATUS

! A. Four (4) Calibrated Temperature Indicators B. Four (4) Pressure Gauges (0-160 psig)

C. Timing Device D. Esta Sheets E. Four (4) new Flange Gaskets F. St oop

  • 8.7.1.1 2 e 3

F

, VI . PRECAUTIONS A. Be aware that radiological and personal safety hazards exist with all work performed in the drywell no matter how minor.

B. Allow accumulator pressure and temperature to stabilize before starting this rest.

VI

I. PROCEDURE

A. Tag the accumulators out of service securing air to each and draining them down.

NOTE: An M.R. should be written for the test to include Green (Testing)

Tags for drains and air supply valves to t?,e accumulators.

B. Issue an MR to have a calibrated pressure gage (0-100 psig or equivalent) and a temperature indicator installed on each accumulator (typical accumulator arrangement shown on page 8.7.1.10B-1).

C. Repressurize the accumulators with Station Instrument Air System, to 84 psig.

D. Close RV 9084, SV 203A and drain valve (typical for all four accumulators).

E. Close the one-inch manual air supply valves from the instrument air header.

F. Uncouple the bolted flanges located at each accumulator check valve inlet.

G. Read and record accumulator pressures and temperatures on Data Sheet (Attachment A 1) ct the beginning of the test.

H. Read and record accumulator pressures and temperatures on Data Sheet (Attachment A-1) at the end of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test, I. Recouple bolted flanges installing new flange gaskets.

J. Open the one-inch esnual air supply valves from the instrument air header and snoop bolted flanges for leaks.

K. Compare results of Step G to Acceptance Criteria and notify Watch Engineer of any discrepancies.

VIII. ACCEPTANCE CRITERIA

A. Seat leakage shall not drop each at .umulator's pressure below 70 PSI, in four

.) hours.

B. NED shall be advised of a failure of a valve test to meet their criteria.

IX. ATTACHMENTS A. ADS Accumulator System Pressure Test Data B. Relief Valve Accumulators Diagram.

U N.C ONT ROLLED COPY 8.7.1.10-3 Rev. 3

p ADS ACCUMULATOR SYSTEM PRESSURE TEST DATA

-w I. Obtain Data and Record in Table Parameter T-221-A T-221-B T-221-C T-221-D Exact Time Initials Beginning of Test Data Pressure Temperature End of Test Data Pressure Temperature II. Results compared to Acceptance Criteria of Section VIII and discrepancies identified in accordance with Station Procedure 1.3.24, FAILURE and MALFUNCTION REPORTS.

s Verified By:

Performance Engineer /STA l

l l

U N. CONT ROLLED COPY 8.7.1.10A-1 Rev. 3

/ .

l ..

^

R e Lie r \/ALVE A c c vu vuros s

, _ ~ ,.A A. M

f c. r. Aos RJiiLiCf VALVG ADS A

, ,, .aem & ssenten aceun'AM vaw:

!~..R I.,'y--<

p g.ss.

,- ~ ,..

l o- ~.-g na,,,, n- - see ~

t T X '~~ ,',-

l l

s/ 2

,am-sur n iT I. 9' TYPIC A L DF fava.

l l

l l

l U N.C ONT ROi i_ETf' BC dYY l

,