ATTACHMENT 1 TO BOSTON EDISON BECO LETTER 87-185 ji I

PILGRIM NUCLEAR POWER STATION PLANT-SPECIFIC TECHNICAL. GUIDELINES FOR EMERGENCY OPERATING PROCEDURES l

l i

70RINFOR!AIIl0N DNi.Y

.l pu iB8M Bl!!jjp F

j o_ ___ _ _ _ _ _ _

List of Effective Pages si EASA ERY EASA ERX EASA EtX i

3 4-6 3

11-2 3

ii 3

4-7 3

11-3 3

iii 3

4-8 3

11-4 3

iv

-3 5-1 3

11-5 3

1-1 3

5-2 3

12-1 3

1-2 3

5-3 3

12-2 3

1-3 3

5-4 3

A-1

~3 1-4 3

5-5 3

A-2 3 5 3

5-6 3

A-3 3

2-1 3

5-7 3

A-4 3

2-2 3

5-8 3

A-5 3

2-3 3

5-9 3

A-6 3

'3 3 6-1 3

A-7 3

3-2 3

7-1 3

A-8 3

.3-3 3

7-2 3

A-9 3

3-4 3

7-3 3

A-10 3

3-5 3

8-1 3

A-11 3

3-6 3

8-2 3

A-12 3

3-7 3

9-1 3

A-13 3

3-8 3

10-1 3

A-14 3

4-1 3

10-2 3

A-15 3

4-2 3

10-3 3

A-16 3

4-3 3

10-4 3

4-4 3

10-5 3

'4-5,

3 11-1 3

I l

ii

' Revision 3 1

.1

1 TABLE OF CONTENTS' SICTION1:

Introduction

.SECTION 2:

Operator Precautions SECTION 3:

RPV Control SECTION 4:

Primary Containment Control SECTION 5:

. Secondary. Containment Control SECTION 6:

Radioactidty Release Control SECTION 7:

. Contingency #1 - Alternate Level Control SECTION 8:

~ Contingency #2 - Emergency RPV Depressurization SECTION 9:

Contingency #3 - Steam Cooling SECTION-10:

Contingency #4 - RPV. flooding i

SECTION 11:

Contingency #5 - Level / Power: Control SECTION 12:

Contingency #6 - Primary Containment Flooding

. TABLE 1-1:

PSTG Abbreviations TABLE 5-1:

Secondary Containment Area Maximum Temperatures TABLE 5-2:

Secondary Containment H&V Cooler Maximum Temperatures TABLE.5-3:

Secondary Containment Area Maximum Radiation Levels TABLE 5-4:

Secondary Containment Sump / Area Maximum Water Levels FIGURE 1:

RPV Saturation Temperature F1GURE 2:

Maximum Primary Containment Water Level Limit l

l FIGURE 3:

CS Pump NPSH Limits

.j g.-

Revision 3 l

o

' TABLE OF CONTENTS

,j (Continued) l

. FIGURE 4:

CS Vortex Limit

{

FIGURE'Sa:

RHR Pump A and C NPSH Limits

-FIGURE Sb:'

RHRL Pump B' and D NPSH Limits-FIGURE 6:

- RHR Vortex Limits

. I FIGURE 7:

Heat Capacity Temperature Limit i

FIGURE 8:

SRV Tail ' Pipe Level Limit FIGURE'9:

Boron Injection Initiation Temperature FIGURE 10:

Drywell Spray Initiation Limit

< FIGURE 11:

Pressure Suppression Pressure FIGURE-12:;

Primary Containment Pressure Limit FIGURE 13:

Heat Capacity Level Limit FIGURE 14:-

Maximum Core Uncovery Time Limit iv

~

de' vision 3 1

w_______._____.___.____.__

)

i 1

SECTION 1

{

t '.

i

/

INTRODUCTION

(

These Plant-Specific Technical Guidelines (PSTGs) have been developed based on

]

Draft Revision 4AF of the generic BHR Owners' Group Emergency Procedure Guidelines and the design of structures and systems at the Pilgrim Nuclear Power Station (PNPS). The PSTGs are compresed of the following:

Operator Precautions (Section 2) 4 RPV Control Guideline (Section 3) i Primary Containment Control Guideline (Section 4)

Secondary Containment Control Guideline (Section 5)

Radioactivity Release Control Guideline (Section 6) l Contingency #1 - Alternate Level Control (Section 7)

Contingency #2 - Emergency RPV Depressurization (Section 8)

Contingency #3 - Steam Cooling (Section 9)

Contingency #4 - RPV Flooding (Section 10)

I Contingency #5 - Level / Power Control (Section 11)

Contingency #6 - Primary Containment Flooding (Section 12)

Drywell-temperature is determined by a plant-specific prodedure for determining bulk drywell atmosphere average temperature.

Torus water i

temperature is also a bulk antage temperature, but it is indicated directly.

Unless specified otherwise, torus water level values are referenced to the instrument zero of the wide range torus water level instrument and primary i

containment water level values are referenced to plant elevation.

Table 1-1 is a list of the abbreviations used in the PSTGs.

Brackets [ ] enclose plant-specific procedure references and step numbers which are determined coincident with the development of the plant-specific E0Ps.

Parentheses ( ) enclose statements identifying the source of a plant-specific numerical value. Where multiple sources apply, that which corresponds to (and thus ultimately defines) the value shown is highlighted by boldface _ print.

1-1 I

Revision 3 i

At various points throughout these PSTGs, operator precautions are noted by the,sumbol:

l#l The number within the box refers to a numbered " Caution" which is contained in Section 2.

These " Cautions" are brief and succinct red flags for the operator.

j i

At '/arious points within these PSTGs, limits are specified beyond which certain actions are required. While conservative, these limits are derived from engineering analyses utilizing best-estimate (as opposed to licensing) models. Consequently, these limits are generally not as conservative as the limits specified in the PNPS Technical Specifications. This is not to imply that operation beyond the Technical Specifications is recommended in any emergency.

Rather, such operation is required and is now permitted under certain degraded conditions in order to safely mitigate the consequences of those degraded conditions.

The limits specified in the PSTGs establish the boundaries within whi s continued safe operation of the plant can be assured.

Therefore, conformance with procedures developed from the PSTGs does not ensure strict conformance with' Technical Specifications or other licensing bases.

At other points within these PSTGs, defeating safety system interlocks and initiaion logic is specified.

This is also required in order to safely mitigate the consequences of degraded conditions, and it is generally

)

specified only when conditions exist for which the interlock or logic was not designed.

Bypassing other interlocks may also be required due to instrument failure, etc., but these interlocks cannot be identified in advance and are therefo,re not specified in the PSTGs.

The entry canditions for these PSTGs are symptomatic of both emergencies and events which may degrade into emergencies.

The PSTGs specify actions appropriate for both. Therefore, entry into procedures developed from these PSTGs is not conclusive that an emergency has occurred.

Each procedure developed from these PSTGs is entered whenever any of its entry conditions occurs, irrespective of whether that procedure has already been entered or is presently being executed.

The procedure is exited and the operator returns to non-emergency procedures when one of the exit conditions specified in the procedure is satisfied, or when it is determined that an emergency no longer exists.

For example, the procedure developed from the RPV Control Guideline specifies cooldown to cold shutdown conditions by various methods and exit after the shutdown cooling interlocks have cleared. but entry into this procedure does not require any cooldown if it can be determined that an emergency no longer exists prior to establishing the conditions required to commence the cooldown as specified in the procedure. After a procedure developed from these PSTGs has been entered, subsequent clearing of all entry conditions for that procedure is not, by itself, conclusive that an emergency no longer exists.

g:

Revision 3

I I

l Procedures developed from these PSTGs specify symptomatic operator actions j

which will maintain the reactor plant in a safe condition and optimize plant response and margin to safety irrespective of the initiating event.

However, for certain specific events (e.g., earthquake, tornado, blackout, or fire),

emergency response'and recovery can be further enhanced by additional auxiliary event-specific operator actions which may be provided in-supplemental event-specific procedures intended or use in conjunction with the symptomatic procedures. As with actions specified in any other. procedure

)

intended for use with-the symptomatic procedures, these event-specific

{

operator actions must not contradict or subvert the symptomatic operator j

actions specified in the symptomatic procedures and must not result in loss or unavailability of equipment the operation of which is specified in these

-procedures.

l e

l l

i l

i i

1 l

1-3 Revision 3

TABLE 1-1 PSTG ABBREVIATIONS ADS-Automatic Depressurization System AdkH Average Power Range Monitor

'ARI' Alternate Rod Insertion Counts Per Second cps CRD Control Rod Drive CS Core Spray

' CST Condensate Storage Tank DH Drywell ECCS Emergency Core Cooling System Elev Elevation

'F Degrees Fahrenheit ft Feet Gallons Per Minute gpm HPCI High Pressure Coolant Injection Hx Heat Exchanger H&V Heating and Ventilation hr Hour in.

Inch LC0 Limiting Condition for Operation LI-Level Indicator LPCI Low Pressure Coolant Injection LR Level Recorder Min Minimum-mR Mil 11 roentgen / Millirem MSIV Main Steamline Isolation Valve NA Not Applicable NPSH Net Positive Suction Head 1-4 Revision 3

TABLE 1-1 PSTG ABBREVIATIONS (Continued)'

't N.H.

Northwest

' psi (g)- -

Pounds Per Square Inch (Gauge) j RB Reactor. Building RBCCH Reactor Building Closed Cooling Hater.

RCIC Reactor Core Isolation Cooling RHR Residual Heat Removal 4

RPM Revolutions Per Minute RPS Reactor Protection System RPV' Reactor Pressure Vessel RHCU Reactor Hater Cleanup RHH Rod Horth Minimizer SBGT Standby Gas Treatment

-SBLC-Standby Liquid Control S.E.

Southeast SRV Safety Relief Valve S.H.

Southwest SSH Salt Service Hater TBCCH Turbine Building Closed Cooling Hater TIP Transversing In-Core Probe Ampersand (used instead of the word "and")

Feet (units of elevation)

Inches (units of elevation) 1[

Less than-or equal to Percent g;

l-5 Revision 3

SECTION 2.

3

/

75RATORPRECAUTIONS CAUTION #1 An RPV water level instrument may be used to determine RPV water level only when all the following conditions are satisfied for that i

instrument:

1.

The. temperatures near all the instrument runs are'below the RPV Saturation Temperature (Figure 1).

2.

For each of the instruments in the following table, the instrument reads above the Minimum Indicated Level or the temperatures near all the instrument reference leg vertical runs are below the Maximum Run Temperature.

Instrument Maximum Run Minimum (Number)

Temperature (*F)

Indicated

[Ranae (in.)]

DH Runs RB Runs Level (in.)

Feedwater Control A NA

'NA 0.0 (LI 640-29A),

[0 to +60]

l

.)

Feedwater Control B NA NA 0.0 1

(LI 640-298)

[0 to +60]

q Hide Range A NA 314'

-263.3 (LI 106A)

(LR 1001-650A)

[-277.5'to +22.5)

Hide Range B NA 324

-267.9 (LI 1068)

(LR 1001-650B)

[-277.5 to +22.5) l

.i 1

l 2-1 Revision 3 I

fj3.

For each of the following instruments, the instrument reads l

above the Minimum Indicated Level associated with the highest temperature near an instrument reference leg vertical run:

1 a.

Narrow Range A [-50 to +50 in.)

(LI 263-100A)

(LR 1001-604A)

Highest Reactor Building Minimum Run Temperature (*F) Between Indicated inM Bish Level (in.)

~

186

-50 187 200

-49.2 201 250

-45.5 251 300

-41.3

+

301 350

-36.4 l

b.

Narrow Ra'nge B [-50 to +50 in.]

(LI 263-100b)

(LR 1001-604B)

Highest Reactor Building Minimum Run Temperature (*F) Between Indicated

'inx Rish Level (in.)

181

-50 182 200

-48.8 201 250

-44.9 251 300

-40.4 301 350

-35.3 CAUTION #2 Operating the HPCI turbine below 715 rpm (minimum turbine speed limit per turbine vendor manual) or the RCIC turbine below 1000 rpm (minimum turbine speed limit per turbine vendor manual) may result in unstable system operation and equipment damage.

CAUTION #3 Elevated torus pressure may trip the RCIC turbine on high exhaust pressure.

2-2 Revision 3

CAUTION #4 A rapid increase in injection into the RPV may induce a large power excursion and result in substantial core damage.

1 A

swoa*;

2-3 Revision 3

SECTION 3 RPV CONTROL GUIDELINE

'i

PURPOSE i

The purpose of this guideline is to:

Maintain adequate core cooling, o.

o' Shut down the reactor, and o

Cool down the RPV to cold shutdown conditions (RPV water temperature 1 212*F (cold shutdown conditions)).

ENTRY CONDITIONS The entry conditions for this guideline are any of the following:

RPV water level below +9 in. (low RPV water level scram setpoint) c RPV pressure above 1085 psig (high RPV pressure scram setpoint) o Drywell pressure above 2.5 psig (high drywell pressure scram setpoint) o o

A condition which requires reactor scram, and reactor power above 3% (APRM downstale trip setpoint) or cannot be determined OPERATOR ACTIONS RC-1 If reactor scram has not been initiated, initiate reactor scram.

. Irrespective of the entry conditions, execute [ Steps RC/L, RC/P, and RC/Q] concurrently.

RC/L Monitor and control RPV water level.

l"#1"l RC/L-1 Initiate each of the following which should have initiated but did not:

Isolation ECCS Emergency diesel generator

  • J'

~

3-1 Revision 3

)

--___--______L

If while executing the following step:

Any control rod cannot be determined to be inserted to or

'/.

beyond position 02 (Maximum Subcritical Banked Hithdrawal i

Position) and it has not.been determined that the reactor will remain shutdown under all conditions without boron, enter

[ procedure developed from Contingency #5].

RPV water level cannot be determined, enter (procedure developed from Contingency #4].

1 l

Primary containment water level and torus pressure cannot l

be maintained below the Maximum Primary Containment Water Level Limit (Figure 2), then irrespective of whether adequate core cooling is assured terminate injection into the RPV from sources external to the primary containment until primary containment water level and torus pressure can be maintained below the Maximum Primary Containment Hater Level Limit.

RC/L-2 Restore and maintain RPV water level between +9 in.

(low RPV water level scram setpoint or shutdown cooling low RPV water level interlock, whichever is higher) and

+48 in. (high RPV water level trip setpoint) with one or more of the following systems:

Condensate /feedwater CRD RCIC with suction from the CST, defeating low RPV pressure isolation interlocks if necessary.

  1. 2 #3 HPCI with suction from the CST, defeating high torus water level suction transfer logic if necessary.
  1. 2 CS; control and maintain pump flow less than the CS Pump NPSH Limit (Figure 3) and the CS Vortex Limit (Figure 4).

LPCI, with injection through the heat exchangers as soon as possible; control and maintain pump flow less than the RHR Pump NPSH Limit (Figures 5a and 5b) and the RHR Vortex Limit (Figure 6).

If RPV water level cannot be restored and maintained above +9 in. (low RPV water level scram setpoint or shutdown cooling low RPV water level interlock, whichever is higher), maintain RPV water level above

-126.3 in. (top of active fuel).

3-2 Revision 3

{E

RPV water level control may be augmented by one or more of the following systems:

SSH crosstied to RHR City Hater crosstied to RHR Fire Water crosstied to RHR ECCS Keep-Full Demineralized Hater Transfer crosstied to SBLC i

(test tank or boron tank)

Condensate Transfer crosstied to ECCS fill line If RPV water level can be maintained above -126.3 in.

(top of active fuel) and the ADS timer has initiated, prevent automatic RPV depressurization by resetting the ADS timer.

If RPV water level cannot be maintained above -126.3 in. (top of active fuel), enter [ procedure developed l

from Contingency #1) l l

RC/L-3 When Procedure 2.1.5, " Controlled Shutdown from Power",

is entered from [ Step RC/P-5), proceed to cold shutdown in accordance with the appropriate section of Procedure l

2.1.5, " Controlled Shutdown from Power".

RC/P Monitor and control RPV pressure.

If while executing the following steps:

A high drywell pressure ECCS initiation signal (2.5 psig (drywell pressure which initiates ECCS)) exsists, prevent injection from those CS and LPCI pumps not required to assure adequate core cooling prior to depressurizing below their maximum injection pressures.

Emergency RPV Depressurization is anticipated and either all control rods are inserted to or beyond position 02 (Maximum Subtritical Banked Withdrawal Position) or it has been determined

~

l l

that the reactor will remain shutdown under all - -

i conditions without boron, then irrespective of I

the resulting RPV cooldown rate, rapidly depressurize the RPV with the main turbine l

bypass valves.

3-3 Revision 3

Emergency RPV Depressurization is required and less than 4 (number of SRVs dedicated to ADS)

SRVs are open, enter [ procedure developed from

//

Contingency #2].

RPV water level cannot be determined and less than 4 (number of SRVs dedicated to ADS) SRVs are open, enter [ procedure developed from Contingency #2].

RPV water level cannot be determined and 4 (number of SRVs dedicated to ADS) SRVs are open, enter [ procedure developed from Contingency #4].

RC/P-1 If any SRV is cycling, manually open SRVs until RPV pressure drops to 940 psig (RPV pressure at which all turbine bypass valves are fully open).

If while executing the following steps:

forus water temperature cannot be maintained below the Heat Capacity Temperature Limit (Figure 7), then irrespective of the l

resulting RPV cooldown rate maintain RPV pressure below the Limit.

Suppression pool water level cannot be maintained below the SRV Tail Pipe Level Limit (Figure 8), then irrespective of the resulting RPV cooldown rate maintain RPV l

l pressure below the Limit.

Steam Cooling is required, enter [ procedure developed from Contingency #3].

If while er.ecuting the following steps:

Boron Injection is required, and i

The main condenser is available, and There has been no indication of gross fuel failure or steam line break, open MSIVs, bypassing low RPV water level isolatjon interlocks if necessary, to re-establish the main i

condenser as a heat sink.

l 3-4 Revision 3

l RC/P-2 Stabilize RPV pressure at a pressure below 1085 psig (high RPV pressure scram setpoint) with the main

,/

turbine bypass valves.

RPV pressure control may be augmented by one or more of the following systems:

SRVs only when torus water level is above 46 in. (top of the SRV discharge device);

open SRVs in the following sequence if possible:

B, C, D, A (SRV opening sequence); if the continuous SRV pneumatic supply is or becomes unavailable, place the control switch for each SRV in the AUTO position.

HPCI with suction from the CST, defeating e

high torus water level suction transfer logic if necessary, l#2 l

RCIC with suction from the CST.

l #2 #3 l RHCU (recirculation mode), bypassing filter /

demineralizers and if necessary, defeating SBLC and other isolation, interlocks.

Main steam line drains, RHCU (blowdown mode) if no boron has been injected e

into the RPV; refer to procedure 5.7.3.1, " Primary Coolant Sampling, Transport and Analyses Under Emergency Conditions" prior to initiating blowdown.

If while executing the following steps the reactor is not shutdown, return to [ Step RC/P-2].

RC/P-3 When either:

All control rods are inserted to or beyond position 02 (Maximum Subtritical Banked Withdrawal Position),

or It has been determined that the reactor will remain shutdown under all conditions without boron, or 538.9 pounds (Cold Shutdown Boron Height) of boron a

that is enriched to at least 54.5 atom-percent boron-10 have been injected into the RPV, or 3.;

3-5 Revision 3

c I

i i

The reactor is shutdown and no boron has been injected

)

e into the RPV, l

depressurize the RPV and maintain cooldown rate below 100*F/hr (RPV cooldown rate LCO).

If one or more SRVs are being used to depressurized the RPV and l

the continuous SRV pneumatic supply is or becomes unavailable, depressurize with sustained SRV opening.

f RC/P-4 When the shutdown cooling RPV pressure interlock clears, initiate l

shutdown cooling using only those RHR pumps not required to l

maintain RPV water level above +9 in. (shutdown cooling low RPV water level interlock) by operation in the LPCI mode.

If shutdown cooling cannot be established and further RPV l

cooldown is required, continue to cool down using one or more of the systems used for depressurization.

j RC/P-5 When either:

All control rods are inserted to or beyond position 02 l

i (Maximum Subtritical Banked Withdrawal Position), or l

f It has been determined that the reactor will remain shutdown under all conditions without' boron, or 538.9 pounds (Cold Shutdown Boron Height) of boron that is enriched to at least 54.5 atom percent boron-10 have been injected into the RPV,

]

l proceed to cold shutdown in accordance with the appropriate i

section of Procedure 2.1.5, " Controlled Shutdown from Power".

I RC/Q Honitor and control reactor power.

l If while executing the following steps:

All control rods are inserted to or beyond position 02 I

(Maximum Suberitical Banked Hithdrawal Position),

terminate boron injection and enter Procedure 2.1.6,

" Reactor Scram".

It has been determined that the reactor will remain i

shutdown under all conditions without boron, terminate boron injection and enter Procedure 2.1.6,

" Reactor Scram".

The reactor is shutdown and no boron has been injected into the RPV, enter Procedure 2.1.6, " Reactor Scram'r.

I

-. +

1 3-6 Revision 3

i

/ RC/Q-1 Confirm or place the reactor mode switch in SHUTDOWN.

RC/Q-2 If ARI has not initiated, initiate ARI.

RC/Q-3 If the main turbine-generator is on-line and the HSIVs are open, confirm or initiate recirculation flow runback to I

minimum.

RC/Q-4 If reactor power is above 3% (APRM downscale trip setpoint) or cannot be determined, trip the recirculation pumps.

l Execute [SteosRC/0-5andRC/O-61concurrentiv.

l RC/Q-5 Before torus water temperature. reaches the Boron

~

Injection Initiation Temperature (Figure 9) but only if the reactor cannot be shut down, BORON INJECTION IS REQUIRED; inject boron into the RPV with SBLC and prevent ~ automatic initiation of ADS.

If boron cannot be injected with SBLC, inject boron into the RPV with RHCU.

If wh'ile executing the following steps SBLC tank water level drops to an indicated value of 2% (minimum SBLC tank water level for continued SBLC pump operation),

manually trip the SBLC pumps.

RC/Q-5.1 If boron is not being injected into the RPV by RHCU and RHCU is not isolated, bypass the RHCU filter /demineralizers.

RC/Q-5.2 Continue to inject boron until 538.9 pounds (Cold Shutdown Boron Height) of boron that is enriched to at least 54.5 atom-percent boron-10 have been injected into the RPV.

RC/Q-5.3 Enter Procedure 2.1.6, " Reactor Scram".

RC/Q-6 Insert control rods as follows:

l RC/Q-6.1 Reset ARI, defeating ARI logic trips if necessary.

3-7 Revision 3 L_-_____________

F

//

RC/Q-6.2 Insert control rods with one or more of the following methods:

De-energize scram solenoids Vent the scram air header i

Reset the scram, defeating RPS logic trips if necessary, drain the scram discharge volume, and initiate a manual scram Open individual. scram test switches Increase CRD cooling water differential pressure Drive control rods, defeating RHM interlocks if necessary l

Vent control rod drive overpiston volumes l

L i

l l

3-8 Revision 3 l


_-__.__-___-x__._______n-_

SECTION 4 PRIMARY CONTAINMENT CONTROL GUIDELINE j

PURPOSE The purpse of this guideline is to:

Maintain primary containment integrity, and Protect equipment in the primary containment.

e ENTRY CONDITIONS The entry conditions for this guideline are any of the following:

Torus water temperature above 80*F (most limiting torus water temperature LCO)

Drywell temperature above 152*F (drywell temperature LCO or e

maximum normal operating temperature, whichever is higher)

Drywell pressure above 2.5 psig (high drywell pressure scram setpoint) e Torus water level above 130 in. (maximum torus water level LCO) e Torus water level below 127 in. (maximum torus water level LCO) e Primary containment hydrogen concentration above 47, (high primary e

containment hydrogen concentration alarm setpoint)

OPERATOR ACTIONS Irrespective of the entry condition, execute [ Steps SP/T, DW/T, PC/P, SP/L, and PC/H] concurrently.

SP/T Monitor and control torus water temperature below 80*F (most limiting torus water temperature LCO) using available suppression pool cooling.

When torus water temperature cannot be maintained below 80*F (most limiting torus water temperature LCO):

SP/T-1 Operate all available torus cooling using only those RHR pumps not required to assure adequate core cooling by continuous operation in the_LPCI mode.

4-1 Revision 3

SP/T-2 Before torus water temperature reaches the Boron Injection Initiation Temperature (Figure 9), enter f /

[ procedure developed from the RPV Control Guideline) at

[ Step RC-1] anC execute it concurrently with this procedure.

SP/T-3 When' torus water temperature and RPV pressure cannot be maintained below the Heat Capacity Temperature Limit

~

(Figure 7), EMERGENCY RPV DEPRESSURIZATION IS REQUIRED.

DH/T Monitor and control drywell temperature below 152*F (drywell temperature LC0 or maximum normal operating temperature, whichever is higher) using available drywell cooling.

When drywell temperature cannot be maintained below 152*F (drywell temperature LC0 or maximum normal I #1 I operating temperature, whichever is higher):

DH/T-1 Operate all available drywell cooling.

If while executing the following steps drywell sprays have been initiated and drywell pressure drops below 2.5 psig (high drvwell oressure scram setooint). terminate drvwell soravs.

DH/T-2 Before drywell temperature reaches 281*F (maximum temperature at which ADS is qualified or drywell design temperature, whichevet is lower) but only if torus water level is below 183 in. (bottom of internal torus to drywell vacuum breakers less vacuum breaker opening pressure in feet of water) and drywell temperature and pressure are within the Drywell Spray Initiation Limit (Figure 10), shut down recirculation pumps and drywell cooling fans and initiate drywell sprays using only those RHR pumps not required to assure adequate core cooling by continuous operation in the LPCI mode.

DH/T-3 When drywell temperature cannot be maintained below 281*F (maximum temperature at which ADS is qualified or drywell design temperature, whichever is lower), EMERGENCY RPV DEPRESSURIZATION IS REQUIRED; enter [ procedure developed from the RPV Control Guideline) at [ Step RC-1) and execute it concurrently with this procedure.

PC/P Monitor and control primary containment pressure below 2.5 psig (high drywell pressure scram setpoint) using the Primary Containment Atmosphere Control System.

When primary containment pressure cannot be maintained below 2.5 psig (high drywell pressure scram setpoint):

If while ' executing the following steps suppression chamber sprays have been initiated and torus pressure drops below 2.5 psig-fhigh drywell pressure scram stepoint) terminate suppression chamber soravs.

4-2 Revision 3

3g

/(

N

)

q, y

t PC/P-1 Before torus pressure reaches 11.0 psig (Supression Chamber Spray Initlation Pressure), but only if torus f

/

water level is,below 105 in. (:Uppression chamber spray nozzles /, initiate suppression chamber spray's using.

only those RHR pumps not required to assure adequate core I

cooling by dontinuous operation in the LPCI mode, t

a f;

U If while executing the following steps drywell sprays have been initiated and drywell pressure drops below 2.5 psig (high drywell

_nressure scram setooint). terminate drvwell saravs.

}

PC/P-2 When torus pressure exceeds 11.0 psig (Suppression Chamber Spray Initiation Pressure) but only if torus water lever

"h is below 183 in. (bottom of internal torus to drywell vacuum breakers less vacuum breaker opening pressure in feet of water) and drywell temperature and pressure are within the Drywell Spray Initfation M.hi/t (Figure 10), 9 shbt down recirculation pumps and drywell cooling fans and irntiate drywell sprays using only those RHRt

_ (" '

pumpsnotrequiredtoassureadequatecorecoolids.by contihuous operation in the LPCI mode.

PC/P-3 When torus. pressure cannot be maintained,bElo he Pressure

?

Suppression Pressure (Figure 11), EMERGENCY 'RPV DEPRESSURIZA7 ION IS REQUIRED.

pf, -(

PC/P-4 Before torus pressure reaches the Primary Containment Pressure Limit (Figure 12), then irrespective of the offsite radioactivity release rate, vent the primary tentainment, defeating isolation interlocks if necessary, to reduce and maintain pressure below the Primary Containment Pressure Limit as follows:

If torus water level is below 310 in s

(bottom of the torus vent), vent the torus in accordance with Procedure 5.4.6, " Primary Containment Venting and Purging Under Emergency Conditions".

j J

If torus water level is et or above 310 in.

9-N (bottom of the torus vent) or if the torus cannot be vented, vent the drywell in accordance with Procedure 5.4.6, " Primary Containment Venting and Purging Under r,

Emergency Conditions".

PC/P-5 When torus pressure cannot be maintained be. low the Primary Containment Pressure Limit (Figure 12), then irrespective of whether adequate core cooling is assured:

.x; If torus water level is below 305 in.

(suppression chamber spray nozzles), initiate suppression chamber sprays.

.n 4-3 Revision 3 3l

r

.i.

l If torus water level is below 183 in. (bottom of internal torus to drywell vacuum breakers h#

less vacuum breaker opening pressure in feet of water) 6 /

and drywell temperature and pressure are within the j

qj'L Drywell Spray Initiation Limit (Figure 10), shut down J

recirculation pumps and drywell cooling fans and q'l initiate drywell sprays.

7..

c Ac SP/L' Monitor and control torus water level.

g lP r

If while executing the following steps Primary Containment Flooding is required, enter [ procedure developed from 4

Contingency #61.

SP/L-1 Maintain torus water level between 130 in.

(maximum torus water level LCO) and 127 in.

r (minimum torus water level LCO); refer to sampling procedures prior to discharging water.

If torus water level cannot be maintained above 127 in. (minimum torus water level LCO), execute

[ Step SP/L-2].

If torus water level cannot be maintained below 130 in. (maximum torus water lever LCO), execute (Step SP/L-3].

SP/L-2 TORUS HATER LEVEL BELOW 127 in. (minimum torus water level LCO)

SP/L-2.1 Maintain torus water level above the Heat Capacity Level Limit (Figure 13).

If torus water level cannot be maintained above the Heat Capacity 1.evel Limit (Figure 13). EMERGENCY RPV DEPRESSURIZATION IS

,o REQUIRED; enter [ procedure developed from the RPV 1

i Guideline) at [ Step RC-1] and execute it i

concurrently with this procedure.

k.,

SP/L-2.2 Maintain torus water level above 82 in.

t (top of the HPCI exhaust).

0>

If torus water level cannot be maintained above 82 in. (top of the HPCI exhaust), secure HPCI irrespective s

-V/

of whether adequate core cooling is assured.

a,

,a SP/L-3 TORUS HATER LEVEL ABOVE 130 in. (maximum torus water level LCO)

ExecuteStepsSP/L-3.1,SP/L-3.2,andSP/L-3.33 v

concurrentiv.

s 4-4 Revision 3

SP/L-3.1 Maintain torus water level below the SRV Tail Pipe Level Limit (Figure 8).

/

If torus water level cannot be maintained below the SRV Tail Pipe Level Limit (Figure 8), enter (procedure developed from the RPV Control Guideline) at [ Step RC-1) and execute it concurrently with this procedure.

If torus water level and RPV pressure cannot be maintained below the SRV Tail Pipe Level Limit (Figure 8), but only if adequate core cooling is assured, terminate injection into the RPV from sources external to the primary containment except from boron injection systems and CRD.

If torus water level and RPV pressure cannot be restored and maintained belok the SRV Tail Pipe Level Limit (Figure 8), EMERGENCY RPV DEPRESSURIZATION IS REQUIRED.

SP/L-3.2 Maintain torus water level below 183 in. (bottom of internal torus to drywell vacuum breakers less vacuum breaker opening pressure in feet of water).

If torus water level cannot be maintained below 183 in. (bottom of internal torus to drywell vacuum breakers less vacuum breaker opening pressure in feet of water):

Terminate drywell sprays If adequate core cooling is assured, terminate injection into the RPV from sources external to the primary containment except from boron injection systems and CRD.

SP/L-3.3 Maintain primary containment water level below the Maximum Primary Containment Hater Level Limit (Figure 2).

If primary containment water level cannot be maintained below the Maximum Primary Containment Water Level Limit (Figure 2), terminate injection into the RPV from sources external to the primary containment irrespective of whether adequate core cooling is assured.

PC/H Monitor and control primary containment hydrogen and oxygen concentrations.

If while executing the following steps:

'/

The hydrogen or oxygen monitoring system is or becomes unavailable, sample the drywell and torus for hydrogen and oxygen.

Drywell or torus hydrogen concentration cannot be e

determined to be below 6% and drywell or torus oxygen concentration cannot be determined to be below 5%,

EMERGENCY RPV DEPRESSURIZATION IS REQUIRED: enter

[ procedure developed from the RPV Control Guideline]

at [ Step RC-1] and execute it concurrently with this procedure; irrespective of the offiste radioactivity release rate, vent and purge the primary containment in accordance with [ Steps PC/H-2.1 through 2.4] until drywell and torus hydrogen concentrations can be determined to be below 6% or drywell and torus oxygen concentrations can be determined to be below 5%.

PC/H-1 When drywell or torus hydrogen concentration reaches 1.0%

(minimum detectable hydrogen concentration), but only if the offiste radioactivity release rate is expected to remain below the offsite release rate LCO, vent and purge the primary containment, defeating isolation interlocks if necessary, to restore and maintain drywell and torus hydrogen concentrations below 1.0% (minimum detectable hydrogen concentration) as follows:

If while executing the following steps the offsite radioactivity release rate reaches the offsite release rate LCO. isolate the crimary containment vent and ourae.

PC/H-1.1 Sample and analyze the primary containment atmosphere for radioactivity in accordance with procedure 5.7.3.2, "Drywell Atmosphere Sampling, Transport and Analyses Under Emergency Conditions".

PC/H-1.2 If torus water level is below 310 in. (bottom of the torus vent), vent the torus in accordance with procedure 5.4.6, " Primary Containment Venting and Purging Under Emergency Conditions".

If torus water level is at or above 310 in.

(bottom of the torus vent) or if the torus cannot be vented, vent the drywell in accordance with procedure 5.4.6, " Primary Containment Venting and Purging Under Emergency Conditions".

PC/H-1.3 If the torus or drywell can be vented:"

If drywell oxygen concentration is b'elow 5%

initiate and maximize the drywell nitrogen purge flow.

4-6 Revision 3

If drywell oxygen concentration is not below 5% initiate and maximize the drywell air purge flow.

I PC/H-2 When drywell or torus hydrogen concentration reaches 6% and

/

dr p.'l or torus oxygen concentration is above 5% EMEP.GENCY RPI % PRESSURIZATION IS REQUIRED; enter [ procedure, f

developed from the RPV Control Guideline) at [ Step RC-1]

and execute it concurrently with this procedure; irrespective of the offsite radioactivity release rate, vent and purge the primary containment, defeating isolation interlocks if necessary, to restore and maintain drywell and torus hydrogen concentrations below 6% or drywell and torus oxygen concentrations below 5% as follows:

If while executing the following steps suppression chamber or drywell spray have been initiated and:

Torus pressure drops below 2.5 psig (high drywell pressure scram setpoint), terminate suppression chamber sprays.

Drywell pressure drops below 2.5 psig (high drywell oressure scram setooint). terminate drvwell sotavs.

PC/H-2.1 If torus water level is below 305 in.

(suppression chamber spray nozzles), initiate suppression chamber sprays using only those RHR pumps not required to assure adequate core cooling by continuous operation in the LPCI mode.

PC/H-2.2 If torus water level is below 310 in.

(bottom of the torus vent), vent the torus in accordance with Procedure 5.4.6, " Primary Containment Venting and Purging Under Emergency Conditions".

If torus water level is at or above 310 in. (bottom of the torus vent) or if the torus cannot be vented, vent the drywell in accordance with Procedure 5.4.6,

" Primary Containment Venting and Purging Under Emergency Conditions".

PC/H-2.3 If the torus or drywell can be vented, initiate and maximize the drywell purge' flow.

PC/H-2.4 If torus water level is below 183 in.

(bottom of internal torus to drywell vacuum breakers less vacuum breaker opening pressure in feet of water) and drywell temperature and pressure are within the Drywell Spray Initiation Limit (Figure 10), shut down reciri:ulation pumps and drywell cooling fans and initiate drywell sprays using only thoss RHR pumps not requi. red to assure adequate core cooling by continuous operation in the LPCI mode.

4-7 Revision 3

PC/H-3 When drywell or torus hudrogen concentration cannot be resto:ed and maintained below 6% and drywell or torus oxygen concentration cannot be restored and maintained below 5%, then irrespective of whether adequate core cooling is assured:

l If while executing the following steps suppression chamber or drywell sprays have been initiated and:

Torus pressure drops below 2.5 psig (high drywell pressure scram setpoint), terminate suppression chamber sprays.

Drywell pressure drops below 2.5 psig (high drywell oressure scram setooint). terminate drvwell soravs.

PC/H-3.1 If torus water level is below 305 in.

(suppression chamber spray nozzles), initiate suppression chamber sprays.

PC/H.3.2 If torus water level is below 183 in.

(bottom of internal torus to drywell vacuum breakers less vacuum breaker opening pressure in feet of water) and drywell temperature and pressure are within the Drywell Spray Initiation Limit (Figure 10), shut down recirculation pumps and drywell cooling fans and initiate drywell sprays.

4-8

._. Revision 3

i SECTION 5

.lll SECONDARY. CONTAINMENT CONTROL GUIDELINE

. PURPOSE The purpose of this guideline is to:

.o Protect equipment in the secondary containment.

Limit radioactivity release to the secondary containment, and~either:

o Maintain secondary containment integrity, or o

Limit radioactivity release from the secondary containment.

o

' ENTRY CONDITIONS The entry' conditions'for this guideline are any of the following secondary containment conditions:

o.

Differential' pressure at or above 0 in.'of water An area temperature above the maximum normal operating temperature o

(Table 5-1)-

A H&V cooler temperature above the maximum normal operating temperature

.o (Table 5-2) e Reactor building exhaust radiation level above 710 cps (maximum normal operating H&V exhaust radiation level) o-An area radiation level above the maximum normal operating radiation level (Table 5-3) o Reactor' building floor drain sump water level above 1 in. on HPCI pump room floor (maximum normal operating floor drain sump water level) o An area water level above the maximum normal operating water level (Table 5-4) l 1

1 I

i

)

g; l

5-1 Revision 3 J

l l

l

-- J

l QM RATOR ACTIONS i

/.

l If while executing the following steps refuel floor exhaust radiation level exceeds 16 mR/hr (reactor building H&V high radiation level secondary containment isolation setpoint):

Confirm or manually initiate reactor building H&V secondary containment isolation, and Confirm or manually initiate SBGT operation.

If while executing the following steps:

l Reactor building H&V isolates, and Refuel floor exhaust radiation level is below 16 mR/hr (reactor building H&V radiation level secondary containment isolation setpoint.)

reset the secondary containment isolation and restart reactor building H&V, defeat *ng high drywell pressure and low RPV water level isolation interlocks if necessary.

Irrespective of the entry condition, execute [ Steps SC/T, SC/R, and SC/L] ' concurrently.

i l

1

  • p V*-,

5-2 Revision 3 l

l

l SC/T Monitor and control secondary containment temperatures.

SC/T-1 Control secondary containment area temperatures below maximum normal operating values (Table 5-1) using available area coolers.

SC/T-2 If refuel floor exhaust radiation level is below 16 mR/hr (reactor building H&V high radiation level secondary containment isolation setpoint), operate available reactor building H&V.

SC/T-3 When an area temperature exceeds it maximum normal operating temperature (Table 5-1),

isolate all systems that are discharging into the area except

  1. 1 systems required to shut down the reactor, assure adequate core cooling, or suppress a fire.

Execute Steps [SC/T-4 and SC/T-5) concurrently.

SC/T-4 If a primary system is discharging into secondary containment:

SC/T-4.1 Before any area temperature reaches its maximum safe operating temperature (Table 5-1), enter [ procedure developed from the RPV Control Guideline) at [ Step RC-1] and execute it concurrently with this procedure.

SC/T-4.2 When an area temperature exceeds its maximum l

safe operating ten.perature (Table 5-1) in more than one area, EMERGENCY RPV DEPRESSURIZATION IS REQUIRED.

SC/T-5 When an area temperature exceeds its maximum safe operating temperature (Table 5-1) in more than one area, shut down the reactor.

SC/R Honitor and control secondary containment radiation levels.

1 SC/R-1 When an area radiation level exceeds its maximum normal operating radiation level (Table 5-3), isolate all systems that are discharging into the area except systems required to shut down the reactor, assure adequate core cooling, or suppress a fire.

~

5-3 Revision 3 l

i

~

i Execute [ Steps SC/R-2 and SC/R-3] concurrently.

s SC/R-2 If a primary system is discharging into secondary containment:

SC/R-2,1 Before any area radiation level reaches its maximum safe operating radiation level (Table 5-3), enter [ procedure developed from the RPV Control Guideline) at [ Step RC-1] and execute it concurrently with this procedure.

SC/R-2.2 When an area radiation level exceeds its maximum safe operating radiation level (Table 5-3) in more than one area, EMERGENCY RPV DEPRESSURIZATION IS REQUIRED.

SC/R-3 Nhen an area radiation level exceeds its maximum safe operating radiation level (Table 5-3) in more than one area, shut down the reactor.

SC/L Monitor and control secondary containment water levels.

SC/L-1 When the reactor building floor drain sump or an area water level is above its maximum normal operating water level (Table 5-4), operate available sump pumps to restore and maintain it below its maximum normal operating water level.

If the reactor building floor drain sump or any area l-water level cannot be restored and maintained below its maximum normal operating water level (Table 5-4), isolate all systems that are discharging water into the sump or area except systems required to shut down the reactor, assure adequate core cooling, or suppress a fire.

Execute [ Steps SC/L-2 and SC/L-3] concurrently.

SC/L-2 If a primary system is discharging into secondary containment:

SC/L-2.1 Before any area water level reaches its maximum safe operating water level (Table 5-4), enter (procedure developed from the RPV Control Guideline] at [ Step RC-1]'hnd execute it concurrently'with this proceduce.;

5-4 Revision 3

SC/L-2.2-When an area water level: exceeds its maximum safe operating water level:(Table 5-4) in

/.

more than one area EMERGENCY RPV DEPRESSURIZATION IS REQUIRED.

SC/L-3 When an area water level' exceeds its maximum safe operating water level (Table 5-4) in more than one area,.

shut down the reactor.

4 i

f l

. +y; 5-5 Revision 3 4

3, Al _

TABLE 5-1 SECONDARY CONTAINMENT AREA MAXIMUM TEMPERATURES MAX NORMAL

-MAX SAFE AREA OPERATING ~

OPERATING VALUE VALUE Of of RHCU filter area - 74' Elev.

105.

120 RHCU holding' pump area - 74' Elev.

105 120 RHCU backwash tank area - 51'.Elev.

105 214 RHCU "A" pump area - 51' Elev.

105 213 t

RHCU "B" pump area - 51' Elev.

105 213 RWCU heat exchanger area - 51' Elev.

105 215 RHCU piping mezzanine area 105 238 36' Elev.

RCIC torus piping area 105 258 RCIC turbine area 105 130 RCIC' piping area - 23' Elev.

105 224 (TIP room)'

Main steam tunnel area Main steam tunnel area 105 289 HPCI torus piping area 105 258 HPCI turbine area 105 130 L

HPCI piping area - 23' Elev.

105 309

("B" RHR valve room)

RHR "B" and "D" pump area 105 130 RHR'"A" and "C" pump area 105 130 RHCU & RHR piping area - 23' Elev.

105 251

("A" RHR valve room)

RHR S.E. pipewell area 105 224 RHR piping area - 80' Elev.

105 120 (Fuel pool heat exchanger area) y; 5-6 Revision 3

)

TABLE 5-2 SECONDARY CONTAINMENT H&V COOLER MAXIMUM TEMPERATURES.

MAX NORMAL COOLER OPERATING VALUE (Panel C-61) l OF i

HPCI-compartment 100 RHR quadrant 100 CRD quadrant 100 RCIC quadrant 100 i

i 1

\\

l i

I l-j j

j i

5-7 Revision 3 i

l l

1 l'

1

TABLE 5-3 ll-SECONDARY CONTAINMENT AREA HAXIMUM RADIATION LEVELS,

MAX NORMAL MAX SAFE AREA

-OPERATING OPERATING VALUE VALUE H&V EXHAUST RADIATION LEVEL Reactor building 710 cps NA Refuel floor 16 mR/hr NA mR/hr mR/hr N.H. equipment space /HPCI pump room 20 1000 17'6" Elev.

CRD pump room - 17'6" Elev.

20 1000-RCIC pump room - 17'6" Elev.

22 1000 S.E. equipment space - 17'6" Elev.

350

-1000 CRD HCU west area - 23' Elev.

300 1000 CRD HCU east area - 23' Elev.

300 1000 RB west area 51' Elev.

5 1000 RB east area 51' Elev.

8 1000 North, storage and laydown area 28 1000 74'3" Elev.

Fuel pool' cooling pump /hx area 60 1000 74'3" Elev.

SBLC pump area - 91'3" Elev.

5 1000 Skimmer surge tank area 40 1000 91'3" Elev.

5-8 Revision 3 i

L

TABLE 5-4

/

SECONDARY CONTAINMENT SUMP / AREA MAXIMUM WATER LEVELS MAX NORMAL MAX SAFE AREA OPERATING OPERATING VALUE VALUE SUMP Reactor building floor drain 1 inch on HPCI pump room floor NA AREA INCHES

. INCHES (ABOVE FLOOR)

(AB0VE FLOOR)

N.H. quadrant 1

6 S.E. quadrant 1

6 HPCI compartment 1

6 l

S.H. quadrant 1

6 l

CRD quadrant i

6 l

l l

l l

1 5-9 Revision 3 I.

l l

SECTION 6

/

RADI0 ACTIVITY RELEASE CONTROL-GUIDELINE q

q PURPOSE The purpose of this guideline is to limit radioactivity release into areas outside the primary and secondary containments.

ENTRY CONDITIONS The entry condition for this guideline is:

Offsite radioactivity release rate above the offsite release rate which requires an Alert.

OPERATOR ACTIONS If while executing the following steps turbine building H&V is i

shutdown, restart turbine building H&V.

f J

l RR-1,

Isolate all primary systems that are discharging into areas outside j

the primary and secondary containments except systems required to assure adequate core cooling or shut down the reactor.

d RR-2 When offsite radioactivity release rate approaches or exceeds the l

offsite release rate which requires.a General Emergency but only if a primary system is discharging into an area outside the primary and

~

l secondary containments', EHERGENCY RPV DEPRESSURIZATION IS REQUIRED; l

enter [ procedure developed from the RPV Control Guideline) at [ Step RC-ll and execute it concurrently with this procedure.

l l

\\

g; 6-1 Revision 3 i

SECTION 7 CONTINGENCY #1 - ALTERNATE LEVEL CONTROL

.If while executing the following steps:

Any control rod cannot be determined to be inserted to or beyond position 02 (Maximum Subtritical Banked Hithdrawal Position) and it has not been determined that the reactor will remain shutdown under all conditions without boron, enter (procedure developed from Contingency #5].

RPV water level cannot be determined, enter [ procedure developed from Contingency #4].

l RPV water level is increasing, enter [ procedure developed from the RPV Control Guideline] at [ Step RC/L).

RPV water level drops below -49 in. (ADS low RPV water level initiation setpoint), prevent automatic initiation of ADS.

Primary containment water level and torus pressure cannot be maintained below the Maximum Primary Containment Water Level. Limit (Figure 2), then irrespective of whether adequate core cooling is assured terminate injection into the'RPV from sources external to the primary containment until primary containment water level and torus pressure can be maintained below the Maximum Primary Containment Water Level Limit.

Cl-1 Line up for injection, start pumps, and irrespective of pump NPSH and vortex limits, increase injection flow to the maximum with 2 or more-

. of the following injection subsystems:

Condensate LPCI-A, with injection through the heat exchanger as soon as possible.

LPCI-B, with injection through the heat exchanger as soon as possible.

CS-A CS-B I

7-1 Revision 3 b

)

If less than 2 of the injection subsystems can be lined up, commence lining up;as many of the following alternate injection :absystems as-f..

/

possible:

SSH crosstied to RHR City Water crosstied to RHR Fire Water crosstied-to RHR ECCS Keep-Full Demineralized Hater Transfer crosstied to SBLC (test tank or L

boron tank) l l

Condensate Transfer crosstied to ECCS fill line C1-2 If RPV pressure is above 125 psig (highest RPV pressure.at which the shutoff head of a low-water-quality alternate injection subsystem

-(excluding SBLC) is reached):

11 If while' executing the following steps RPV pressure drops below 125 psig (highest RPV pressure at which the shutoff head of a low-water-quality alternate injection subsystem (excluding SBLC is reached), continue in this procedure at [ Step C1-3].

C1-2.1 If no injection subsystem is lined up for injection with at least one pump running, start pumps in alternate injection subsystems which are lined up for injection.

C1-2.2 When RPV water level drops to -126.3 in. (top of active fuel):

If any system, injection subsystem or alternate injection subsystem is lined up with at least one pump running, EMERGENCY RPV DEPRESSURIZATION IS REQUIRED.

If no system, injection subsystem or alternate injection subsystem is lined up with at least one pump running, STEAM COOLING IS REQUIRED.

q:

7-2 Revision 3 L

d Cl-3 When RPV pressure drops below 125 psig (highest RPV pressure at which the shutoff head of a low-water-quality alternate injection subsystem

/

(excluding SBLC) is reached):

C1-3.1 Line up for injection, start pumps, and irrespective of pump NPSH and vortex limits, increase injection flow to the maximum with all systems and injection subsystems.

C1-3.2 When RPV water level drops to -126.3. in. (top of active fuel), EMERGENCY RPV DEPRESSURIZATION IS REQUIRED; line up for injection, start pumps, and increase injection flow to the maximum with as many alternate injection subsystems as possible.

If RPV water level cannot be restored and maintained above

-126.3 in. (top of active fuel), PRIMARY CONTAINMENT l

FLOODING IS REQUIRED; enter [ procedure developed from Contingency #6).

1 l

.g 7-3 Revision 3 w_____--_____-_.

1 SECTION 8 CONTINGENCY #2 - EMERGENCY RPV DEPRESSURIZATION C2-1 When either:

Any control' rod cannot be determined to be inserted to or beyond position 02 (Maximum Subtritical Banked Hithdrawal Position) and it has not been determined that the reactor will remain shutdown under all conditions without boron and all injection into the -

RPV except from boron injection systems, CRD, and RCIC has been terminated and prevented, or All control rods are inserted to or beyond position 02 (Maximum Subtritical Banked Hithdrawal Position) or it has been determined that the reactor will remain shutdown under all conditions without boron, C2-1.1 If a high drywell pressure ECCS initiation signal (2.5 psig (drywell pressure which initiates ECCS)) exists, prevent injection from those CS and LPCI pumps not required to assure adequate core cooling.

C2-1.2 If suppression pool water level is above 46 in. (top of the SRV discharge device), then irrespective of the resulting RPV cooldown rate, open all ADS valves.

C2-1.3 If less than 3 (Minimum Number of SRVs Required for Emergency Depressurization) SRVs are open and RPV pressure is at least 50 psig (Minimum SRV Reopening Pressure) above torus pressure, rapidly depressurize the RPV, defeating isolation interlocks if necessary, using one or more of the following:

Main turbine bypass valves-Main steam line drains HPCI steam line RCIC steam line RPV head vent l

If RPV water level cannot be determined, either [ procedure developed from Contingency #4].

r-4:

8-1 Revision 3 i

i

l C2-2 When either:

  1. /

All control rods are inserted to or beyond position 02 (Maximum t ubtritical Banked Hithdrawal Position), or

~

It has been determined that the reactor will remain shutdown under all conditions without boron, or 538.9 pounds (Cold Shutdown Boron Height) of boron that is I

enriched to at least 54.5 atom-percent boron-10 have been injected into the RPV, or The reactor is shutdown and no boron has been injected into the

RPV, enter [ procedure developed from the RPV Control Guideline) at [ Step i.

RC/P-4).

l l

l

(

l

~

l-f; 8-2 Revision 3

I SECTION 9-I CONTINGENCY #3 - STEAM COOLING f

)

3

)

If while executing this step Emergency RPV Depressurization'is required, RPV water level cannot be determined, or any system, injection subsystem, or alternate injection subsystem is lined up'for.

injection with at least one pump running, enter [ procedure developed from Contingency #23.

l

'C3-1 When RPV water level drops to -168.3 in. (Minimum Zero-Injection RPV Hater Level) enter (procedure developed from Contingency #2].

{

1 i

h 1

9-1 Revision 3 l^

l l

I

SECTION 10 CONTINGENCY #4 - RPV FLOODING

./

t r,

If while executing the following steps RPV water level can be determined:

If any control rod cannot be determined to be inserted to or beyond position 02 (Maximum Subtritical Banked Withdrawal Position) and it has been determined that the reactor will remain shutdown under all conditions without boron, enter

[ procedure developed from Contingency #5] and [ procedure developed from RPV Control Guideline) at (Step RC/P-4) and execute these procedures concurrently.

If all control rods are inserted to or beyond position 02 (Maximum Subtritical Banked Hithdrawal Position) or it has been determined that the reactor will remain shutdown under all conditions without boron, enter [ procedure developed from the RPV Control Guideline] at [ Steps RC/L and RC/P-4) and execute I

these steps concurrently.

l If while executing the following steps primary containment water level and torus pressure cannot be maintained below the Maximum Primary Containment Hater Level Limit (Figure 2), then irrespective of whether adequate core cooling is assured terminate injection into the RPV from sources external to the primary containment until primary containment water level and torus pressure can be maintained below the Maximum Primary Containment Hater Level Limit.

C4-1 If any control rod cannot be determined to be inserted to or beyond position 02 (Maximum Subtritical Banked Hithdrawal Position) and it has not been determined that the reactor will remain shutdown under all conditions without boron, flood the RPV as follows:

If while executing the following steps either all control rods are inserted to or beyond position 02 (Maximum Subtritical Banked Hithdrawal Position) or it has been determined that the reactor will remain shutdown under all conditions without boron but RPV water level cannot be determined, continue in this procedure at

[ Step C4-2].

10-1 Revision 3

I f,

C4-1.1 Terminate and prevent all injection into the RPV except a

from boron injection systems and CRD until RPV pressure is

.l below the Minimum Alternate RPV Flooding Pressure.

1 Number of Minimum Alternate RPV Open SRVs Flooding Pressure (psig) 4 180.6 3

245.8 2

376.0 1

766.7 If less than 1 (minimum number of SRVs for which the Minimum Alternate RPV Flooding Pressure is below the lowest SRV lifting pressure) SRV can be opened, continue in this procedure.

l C4-1.2 If at least 3 (Minimum Number of SRVs Required for Emergency Depressurization) SRVs c'an be opened, close the MSIVs, main steam line drain valves and RCIC steam line isolation valves.

C4-1.3 Commence and, irrespective of pump NPSH and vortex limits, slowly increase injection into the RPV with the following systems until at least 1 (minimum number of SRVs for which the Minimum Alternate

  1. 4 RPV Flooding Pressure is below the lowest SRV lifting pressure) SRV is open and RPV pressure is above the Minimum Alternate RPV Flooding Pressure:

Feedwater pumps, defeating high RPV water level pump trip logic if necessary.

Condensate pumps CRD LPCI, with injection through the heat exchangers as e

soon as possible.

10-2

' Revision 3 1

l

I i

If.less than 1.(minimum number of SRVs for which the y

f, Minimum Alternate.RPV Flooding Pressure.is below the lowest

/

SRV lifting pressure) SRV is open or RPV pressure cannot be increased-to above then Minimum Alternate-RPV Flooding Pressure, commence and, irrespective of pump NPSH and.

vortex limits,~ slowly increase injection.into the RPV with.

the following systems until at least l'(minimum number of SRVs for.which the Minimum Alternate RPV Flooding Pressure is below.the-lowest SRV lifting pressure) SRV is open and RPV pressure is above the Minimum Alternate RPV Flooding Pressure:'

CS SSH crosstied to'RHR City Water-crosstied to RHR Fire Hater crosstied to RHR l

ECCS Keep-Full Condensate Transfer crosstied to ECCS If less than-1 (minimum number of SRVs for which the Minimum Alternate RPV Flooding Pressure is below the lowest SRV lifting pressure) SRV is open or RPV pressure.cannot be increased to above the Minimum Alternate RPV Flooding L

Pressure, PRIMARY CONTAINMENT FLOODING IS REQUIRED: enter l

[ procedure developed from Contingency #6] and [ procedure developed from the RPV-Control Guideline]-at [ Step RC/P-4) and execute these procedures concurrently.

C4-1.4 When at least 1 (minimum number of SRVs fron,which the Minimum Alternate RPV Flooding Pressure is below the lowest SRV lifting pressure) SRY is open and RPV pressure is above

.the Minimum Alternate RPV Flooding Pressure, control injection to maintain at least 1 (minimum number of SRVs for which the Minimum Alternate RPV Flooding Pressure is below the lowest SRV lifting pressure) SRV open and RPV pressure above the Minimum Alternate Flooding Pressure but as low as practicable.

1 10-3 Revision 3

C4-1.5-When all control rods are inserted to or beyond' position 02 jy' (Maximum Subtritical Banked Hithdrawal Position) or.it has been determined that the reactor will remain shutdown under

'-i'i all conditions without boron, continue in this procedure.

C4-2 Yf at least 3 (Minimum ~ Number of SRVs Required for Emergency Depressurization) SRVs can be opened or if a feedwater pump is available for injection, close the MSIVs, main steam line drain valves, and RCIC steam line isolation valves.

C4-3 Flood the RPV as,follows:

.C4-3.1 Commence and, irrespective of pump NPSH and vortex limits, increase injection into the RPV.with the following systems j

until at least 3 (Minimum Number of SRVs Required for I

Emergency Depressurization) SRVs are open and RPV pressure-

.is not decreasing and is 52 psig (Minimum RPV. Flooding.

l Pressure) or more above torus pressure:-

Feedwater pumps, defeating high RPV water level pump trip logic if necessary.

CS LPCI, with injection through the heat exchangers as soon as possible.

Condensate pumps CRD SSH crosstied to RHR City Hater crosstied to RHR Fire Ater ;resst'ed to RHR Demineralized Hater Transfer crosstied to SBLC ECCS Keep-Full-Condensate Transfer crosstied to ECCS

,y, 10-4 Revision 3 I

g If less than 3 (Minin;um Number of SRVs Required for Emergency Depressurization) SRVs are open cr RPV Pressure cannot be maintained at least 52 psig (Minimum RPV Flooding Pressure) above torus pressure PRIMARY CONTAINMENT FLOODING IS REQUIRED; enter [ procedure developed from Contingency #6]

aig! [ procedure developed from the RPV Control Guideline) at [ Step RC/P-4) and execute these procedures concurrently.

C4-3.2 When at least 3 (Minimum Number of SRVs Required for Emergency Depressurization) SRVs are open and RPV pressure can be maintained at least 52 psig (Minimum RPV Flooding l

Pressure) above torus pressure, control injection to l

maintain at least 3 (Minimum Number of SRVs Required for 2

Emergency Depressurization) SRVs open and RPV pressure at 1e,ast 52 psig (Minimum RPV Flooding Pressure) above torus l

l pressure but as low as practicable.

L l

C4-4 When:

RPV water level instrumentation is available, and e

Temperatures near the'RPV water level instrument reference leg vertical runs are below 2120F, and RPV pressure has remained at least 52 psig (Minimum RPV Flooding e

Pressure) above torus pressure for at least the Minimum Core Flooding Interval Number of Minimum Core Flooding Open SRVs Interval (minutes) 4 62.9 1

3 107.6 l

Terminate all injection into the RPV and reduce RPV water level until RPV water level indication is restored.

If RPV water level indication is not restored within the Maximum Core Uncovery Time Limit (Figure 14) after commencing termination of injection into the RPV, return to [ Step C4-3.1].

C4-5 Enter (procedure developed from the RPV Control GuidelineT~at [ Steps RC/L and RC/P-4) and execute these steps concurrently..

l 10-5 Revision 3

k SECTION 11 CONTINGENCY #5 - LEVEL /P0HER CONTROL f,

If while executing the following steps:

RPV water level cannot be determined, enter (procedure developed from Contingency #4].

All control rods are inserted to or beyond position 02 (Maximum Subtritical Banked Withdrawal Position) or it has been determined that the reactor will remain shutdown under all conditions without boron, enter [ procedure developed from the RPV Control Guideline) at [ Step RC/L).

Primary containment water level and torus. pressure cannot be maintained below the Maximum Primary Containment Water Level Limit (Figure 2), then irrespective of whether adequate core cooling is assured terminate injection into the RPV from sources external to the primary containment until primary containment water level and torus pressure can be maintained below the Maximum Primary Containment i

Hater Level Limit.

C5-1 Prevent automatic initiation of ADS.

~

C5-2 If:

Reactor power is above 3% (APRM downscale trip setpoint) or cannot be determined, and Torus temperature is above the Boron Injection Initiation

~

Temperature (Figure 9), and Either an SRV is open or opens or drywell pressure is above 2.5 l

psig (high drywell pressure scram setpoint),

Then:

If any MSIV is open, bypass low RPV water level MSIV isolation interlocks, and Lower RPV water level, irrespective of any consequent reactor power or RPV water level oscillations, by terminating and preventing all injection into the RPV except from boron injection systems and CRD until either:

Reactor power drops below 3% (APRM downscale tri) l setpoint), or 11-1 Revision 3 l

4 l

RPV water level reaches -126.3 in. (top of active fuel), or i

'/

All SRVs remain closed and drywell pressure remains below 2.5 psig (high drywell pressure scram setpoint)'.

i If while executing the following steps Emergency RPV Depressurization is required, continue in this procedure at [ Step C5-3.1].

If while executing the following step:

Reactor power is above 37. (APRH downstale trip setpoint) or cannot 1

.w determined, and j

  • RPV water level is above -126.3 in. (top of active fuel), and i

e Torus temperature is above the Boron Injection Initiation l

Temperature (Figure 9), and

  • Either an SRV is open or opens or drywell pressure is above 2.5 psig i

l (high drywell pressure scram setpoint),

l j

return to [ Step C5-2].

l l

l l

C5-3 Maintain RPV water level either:

]

  1. 4 If RPV water level was deliberately lowered in [ Step C5-2],

between -156.3 in. (Minimum Steam Cooling RPV Hater Level) and 1

the level to which it was lowered, or l

If RPV water level was not deliberately lowered in [ Step C5-2],

between -126.3 in. (top of active fuel) and +48 in. (reactor feedwater pump high RPV water level trip setpoint),

l with the following systems:

1 Condensate /feedwater 1

CRD 11-2 Revision 3

l l

I RCIC with suction from the CST, defeating low RPV e

'/.

pressure isolation interlocks if necessary.

  1. 2 #3 HPCI with suction from the CST, defeating high e

torus water level suction transfer logic if necessary.

  1. 2 i

LPCI, with injection through the heat exchangers as soon a:

e possible; control and maintain pump flow less than RHR Pump NPSH Limit (Figure Sa and 5b) and the RHR Vortex Limit (Figure 6)

If RPV water level was not deliberately lowered in [ Step C5-?)

l and RPV water level cannot be maintained above -126.3 in. (top

{

of active fuel), maintain RPV water level between -156.3 in.

(Minimum Steam Cooling RPV Hater Level) and +48 in. (high RPV water level trip setpoint).

If RPV water level cannot be maintained above -156.3 in.

(Minimum Steam Cooling RPV Hater Level), EMERGENCY RPV DEPRESSURIZATION IS REQUIRED:

C5-3.1 Terminate and prevent all injection into the RPV except from boron injection systems, CRD, and RCIC until RPV pressure is below the Minimum Alternate RPV Flooding Pressure.

Number of Minimum Alternate RPV Open SRVs Flooding Pressure (psig)

{

l 4

180.6 3

245.8 2

376.0 1

766.7 I

If less than 1 (minimum number of SRVs for which the Minimum Alternate RPV Flooding Pressure is below the lowest SRV lifting pressure) SRV can be opened, continue in this procedure.

l i

1 3

i 11-3 Revision 3 l

C5-3.2 Commence and, irrespective of pump NPSH and vortex limits, slowly increase injection into the RPV i

'/

with the following systems to restore and

  1. 4

)

maintain RPV water level above -126.3 in. (top of

]

active fuel):

)

Condensate /feedwater CRD RCIC with suction from the CST, defeating low RPV e

pressure isolation interlocks if necessary.

HPCI with suction from the CST, defeating high torus water level suction transfer logic if necessary.

)

LPCI, with injection through the heat exchangers as soon as possible.

i If RPV water level cannot be restored and maintained above

-126.3 in. (top of active fuel), restore and maintain RPV water level above -156.3 in. (Minimum Steam Cooling RPV Hater Level).

If RPV water level cannot be restored and maintained above

-156.3 in. (Minimum Steam Cooling RPV Hater Level),

commence and, irrespective of pump NPSH and vortex limits, slowly increase injection into the RPV with the following systems to restore and maintain RPV water level above

-156.3 in. (Minimum Steam Cooling RPV Hater Level).

CS SSH crosstied to RHR l

City Hater crosstied to RHR Fire Hater crosstied to RHR ECCS Keep-Full i

e Condensate Transfer crosstied to ECCS i

l l

If RPV water level cannot be restored and l

l maintained above -156.3 in. (Minimum Steam Cooling RPV Hater Level), PRIMARY CONTAINMENT FLOODING IS REQUIRED; enter [ procedure developed from Contingency #6]

wp i

11-4 Revision 3 l

C5-3.3 When RPV water level ~can be maintained above -156.3 in.

. j /-

(Minimum Steam Cooling RPV Hater Level), return to [ Step C5-3).

.If'while executing the following step reactor power commences and continues to increase, return to [ Step C5-2].

C5-4 When 370.5 pounds (Hot Shutdown Boron Height) of boron that is enriched to at -least 54.4 atom-percent Boron-10 have been injected into the RPV, restore and maintain RPV water level between +9 in.

(low RPV water level scram setpoint) and +48 in. (high RPV. water level trip setpoint).

If RPV water level cannot be restored and maintained above +9 in.

(low RPV water level scram setpoint), maintain RPV water level above

-126.3 in. (top of active fuel).

If RPV water level 'cannot be maintained above -126.3 in. (top of active fuel), EMERGENCY RPV DEPRESSURIZATION IS REQUIRED; return to

[ Step C5-3.13.

C5-5 When Procedure 2.1.5, " Controlled Shutdown from Power" is entered from [ procedure developed from RPV Control Guideline) at [ Step RC/P-5), proceed to cold shutdown in accordance with the appropriate section of Procedure 2.1.5, " Controlled Shutdown from Power".

I

~

l 1

1 i

11-5 Revision 3 t.

SECTION 12 CONTINGENCY #6 - PRIMARY CONTAINMENT FLOODING fp.

If while executing the following steps:

Primary containment water level and torus pressure cannot be maintained below the Maximum Primary Containment Hater Level Limit (Figure 2), then irrespective of whether adequate core cooling is assured terminate injection into the RPV from sources external to the primary containment until primary containment water level and torus pressure can be maintained below the Maximum Primary Containment Hater Level Limit.

RPV water level can be restored and. maintained above -126.3 in. (top of active fuel), enter [ procedure developed from the RPV^ Control Guideline) at [ Step RC/L].

C6-1 Operate the following systems:

CS; operate one CS with suction from the CST only when the other CS is operating with suction from the torus.

l Condensate /feedwater CRD RCIC with suction from CST only, defeating low RPV pressure e

isolation interlocks if necessary.

LPCI with suction from sources external to the primary containment only.

SSH crosstied to RHR City Water crosstied to RHR Fire Water crosstied to RHR ECCS Keep-Full Condensate Transfer crosstieci to ECCS Gravity feed from CST to HPCI minimum flow line

)

L i

j i

12-1 Revision 3

' Execute [St3ps C6-2 and C6-3] concurrently.

C6-2 When primary containment water level reaches +11 ft (bottom of the lowest recirculation piping), then irrespective of the offsite radioactivity release rate vent the RPV, defeating isolation interlocks if necessary, until RPV water level reaches -126.3 in.

(top of active fuel) with one or more of the following:

L MSIVs l

Main steam line drains HPCI steam line RCIC steam line C6-3 When primary containment water level reaches 67.5 ft (top of active fuel), maintain primary containment water level between 67.5 ft (top of active fuel) and the Maximum Primary Containment Water Level Limit i

(Figure 2) with the following systems taking suction from sources external to the primary containment only when required:

CS Condensate /feedwater CRD e

LPCI SSH crosstied to RHR City Hater crosstied to RHR Fire Water crosstied to RHR ECCS Keep-Full Condensate Transfer crosstied to ECCS Gravity feed from CST to HPCI minimum flow line 1

1 12-2 Revision 3 j

1 l

1

.___-___-___L

r.

f f.

l ATTACHHENT A PSTG FIGURES 1

A-1 Revision 3

l l

1 l l..l 1

l

]

8 1

1 I

i 600 550-g300-ks ;

.........!.......!.......i......

4 450-

.h.

......{........}.......j.......{.......{........j.......

N

.)

N 400-

. +.... +.... 4..... +......)..... 4..... +......?.......

g c-i i

i i

i i

i i

g

\\p\\. &,.... &......l.......{........}.......}.......{...... &.......}.......

.w.350-\\

s$

N.......L......i.......i.......i.......5.......I.......i.......i........I.......

N M

l 300-E 250-

...{.......{.......{.......!.......{........}.......}......{.......{........j.......

200

~

~

~

~

~

~

~

0 2b0 400 6b0 800 1000 i

RPV PRESSURE (psig')

Figure 1:

RPV Saturation Temperature l

.a::-

n.

s A-2 Revision 3

f

//-

/

i ff 7Q g l

W l

..........i...........*..........3...........i......... [.

60 l

s3 1

e 4

1

-50

...........c............:...........>...........:......... f...

,/

3 3,

d

)

.40 m F

e l

..........i...........i...........i...........i.........

-30Q l

J

)

I l

4 1

l

...........:...........j.............................

<-20 J

g t,300-

.r----<----r--.---

i 1

I I

-.J e

W150-- - - - -! - - - i- - - - - - !- - - - -! -

[/-

<t 1

3

/

u) 3 e

0-----:----------:----:----

O F

0 1'0 2'0 3'0 4'0 5'0 6'0 70 80 i

=

TORUS PRESSURE (psig) l 1

l Figure 2: Maximum Primary Containment Water Level Limit s.-

e A-3 Revision 3

240 e

220-

~~"t.""""."""":"""""""r."""t.""

. %* *"1" " "s." " " ".: " " -

.p 200

........ :........ :........ :........:............... a.........h* 1 0 p sl........ :,.....

180- "" ":.."""":"""":"""".""""

"""t.""

r 160- " " e " " " " " ~ " : " " ".: " " " ".> " " " ".:" " " " t." " " " t. " " " " : ~ " ".: " " "

a:

< 140 g 120- " " " :" " " " :" " " ".: " " " " 2 " " " "r " " * " t. " " " t.-

" " t. " " " " :. " " " " : " " "

)

100

........(........g........:........>........>........:........<.....

.(........g........:......

g 80 500 1500 2500 3500 4500 5500 FLOWRAT (gpm) 240 220'" " " " :.

C

. " " " " :. " " " ". " " " t. " " " "; " " " :. " " ". w. " " " "," " " ".: " " " '

t.,

g 200- " " " "."" " ";." " " ";." ~ " ?. " " " ";" " " :."" " ". - -

10 psr " "".:"""

180 5 sl*

160< " " " e" " " " " " " > " " " ".> " " " ".> " " " :." " " " <." " " "<." " " ":" " " ":" " "

+

140 120-

.r**.

1 100 '""""(."""":"""".>"""":"""".>"""-(.""""<.""

  • ("""":"""""""

s 80 500 1500 2500 3500 4500 5500 FLOWRATE (gpm)

  • Indicates overpressure (i.e., airspace pressure plus hydrostatic head above suction strainer) t I

l l

Figure 3: CS Pump NPSH Limits l

r.

A-4 Revision 3

'. //

I

....... 7..................;............................;...........................

/

7,/

m C

o l'

J 31.5 -

>v 7

~-

E M

D

/

m 2>

O

/.

F 1

)

j 1

i i

i i

i i

i N

l 31 0 -

7

- y y j 7

1 s

4 A A 4 J!. A 4 A

1 O

0 1000 2000 3000 4000 5000 I

FLOWRATE (gpm) l l

1 I

Figure 4: CS Vortex Limit i

l 1.

m,.,: -

A-5 Revision 3 i

250-RHR (LPCI) A 240- """".

" " " ".: " " " ": " " " ".: ~ " ". ~ ~ ~ " " " " " :" - ".: - ~ ~ ".: " " " ": " " "

.// /w 220 4

g

............ 10 si.

210 1

" " " 4" " " " i" " " " i."_"_ " " :" " " ":. " " " "3 " " "

I 200

$190- " " " ~ i ~ " " j - " "j " " " ".? " " ~ i. ~ " ~ i." " " " i."" " " j " " " j " 5 psp " " "

3 i

.y)180- """".:"""".:""""2.""""~""+."""-(.""""."""":"""".:"""".2"""

l

-3 1 -

170- " " " ".:" " " ": " " " ".2 " " "

""t""""t."""".:""""."""".2"""

I i

,\\

160- """".

.""""."""".2""""~""+"""t.""""."""".:--

."0Mr"""

150-1 500 1500 2500 3500 4500 5500 FLOWRATE (gpm) t 250 RHR (LPCI)C 240-

"t. ~"at.""" :. "" ":."""":."""":"""":""" t.""" t."""":."""-

C 1

t. 230- " " ". ~ ". ~ ~ ". -

_4""""s:r """

w 220 l

(

" " " ~: ~ ~ " :" " " " :" " " " : " " " ".: ~ " " " :" " " ":" " " " ~.. ~ ~ ". 10 sr """

m 210 -

3 200-

-(

-(

+

190-" " " ".> ~ ~ ~ 4. " " " <. " " " : " " " " <." " " ~ t. " " " " : " " +....... <.. 5 psr......

1 I<I: 180 -

\\

"""+"""c."""".t""."r.""""<.""""r"""".:"""".>~~."<""""c.".""

l v>.

D I

1 160- " " " t. " " " t." " " ". " " " : " " " ". " " " " :. ~ " " : " " t. " -

." O psr """

150 l

500 1500 2500 3500 4500 5500 0

FLOWRATE (gpm)

  • Indicates overpressure (i.e.. airspace pressure plus hydrostatic head above suction strainer)

Figure Sa: RHR Pump A and C NPSH Limits

'e

. -n.*v, ;

A-6 Revision 3

1 250 RHR(LPCI)B 240- " " " : " " " : " " " ": " " " ".; " " " ".:" " " :. " " " :." " " " : " " " ":. " " - : " " -

/-

/

." 15 psr." < "

t 230- " " " "." " " ".". " " " " " " " ".-" " ". ~ ~ " "." " ".

w 220-

.f w 210 p.....

1 E

t

........:........3........>......

2 200

~ ~ " " :. " " " ".3 - " ".5 " " " "> " " " 4." " " " i." " " " :. " " " ". " " ".3 " S psr.""

j g

190-3 180- " " " " : " " " " 3. " " " " 2 " " " "> " " " ":" " " " < " " " " t. " " " " : " " " " 2 " " " ") " " "

m

->170-

.2

.2 2 ***

c O psi.

160- """":""""""".>"""".>"""":""""(."""~t."""":."""2"-

i 4

150 500 1500 2500 3500 4500 5500 FLOWRATE(gpm) 250 RHR(LPCI) D 240 C

"""--""".".""".)~~~~.~~~.""-.""-

-. 15 psi' ""-

? 230-w e 220-

". " " "S " " " "> " " " ":" " " " i" " " " t " " " " : " " " ".2 " " " ".S " " "

10 psl*

m 210- " " " ".

" ". - " " " ~ ~ ~ ~ ~. ~ " " ". " " " -. ~ ~ " ". "

w t

2

~ t" " " " :" " " "3 " " " ".S " " "

200-4

_...S psi.

i g

190 3 180-

" " " :. " " " " 3 " " " " S " " " "> " " " ": " " - (" " " " ( " " ' : " " " " 2 " " - > " " "

u) o c 170- " " " " :." " " ".2 " " " ".2 " " " ".? " " " " -

". " " " " : " " " " 2 " " " " 2 " " "

O w

.............O psi.

i t 16 i

150-I 500 1500 2500 3500 4500 5500 FLOWRATE (gprn)

  • Indicates overpressure (i.e., altspace pressure plus hydrostatic head above suction strainer) l t

Figure 5b: RHR Pump B and D NPSH Limits I

1

.w.

g.

A-7 Revision 3 i,

l 1

a

l 1

........g........g........ g........ !. RHR (LPCI) A 2nd C "! """ "? """ ?. """ / (,

,/.

t b

.E 25.a..........

v t

J W

s Q

.. - /

J g

f t

g.......

W

/

H

........;.................w..............:........:........:........;........:...

y)

........>........:....... <....... g.,...... g o u o u 3. u o ~ 3 o u o -> ~ u o n.. 4

/. <

-.)

l E

l 4..

l l

g

/.

4 ff

./

0 1000 2000 3000 4000 5000 FLOWRATE (gpm) l t

........ (........ g........g...... "' RHR (LPCI) B and D "? """ !""" "! * """

d

........ g........ g o. u n. 3. - u n o)... u n.>. o u n g. n u o.>. u n u t. o n o u g. u. o u

.G 3*/.0 -

t. *

.l 3

-)

-)

l-

- 4 J

........g.........g........g.........;.......y.......;........y.......g.........g.......

,,3 g

........ g........ g u n u n g u o n o; u n u ny o u n o;. u u n ny u u n. gnunogun. j

........r...................g........:.......

...............g.........g...

U)

/

~3

f. <

g

/...

O j

p r<

j' 31.0 y

j v

r
/

> > A. > > f>.> > > > '., > > > i > > > > > > > t: > > > > > > > e> > > />.> > > >. > > /v 0

1000 2000 3000 4000 5000 FLOWRATE (gpm)

Figure 6:

RHR Vortex Limits m,.

1 1

A-B Revision 3

//j i

250 240-1 g 230-e.,

m C

i 220-l l

W f210- """i""?""".

E l

t j

200- " " "i " " " ? " " " i"" " " i " " -

to D

190- """i"""

" " " i" " " " i " "-

" " ~ i" " ".

180- " " "i " " " t " " " i" " " " i" " " "i " " " i" " " "? " " ~ i " " " r

/"

/

i e

i i

i e

i e

i i

0 200 400 600 800 1000 RPV PRESSURE (psig)

Figure 7: Heat Capacity Temperature Limit m.

w,, c, A-9 Revision 3

i l

j

' (;

I 1

300- ~~i~~~. -.

275-

~~.:~~~) ~~<~~ >"-

y"'

e

l,,,

J 250-i i

~

~

~-

j E 225- "": - ~:: ~ ~ r: ~ ~:: ~ - :: ~ ~ ~:: ~ ~ r: " ~ ::~ ~ ~.

r-

-"4 en

/-

200-i

  • I I

i I

d 2

I i

i-UC O

F e

175-

- :: ~ ~ ~:: ~ ~ t ~ ~ : ~ ~ ~> ~ - > ~ ~ c~ ~ ~ t" ~ ~; ~ ~ t" - "> -

~~

I 1

~ ~::" ~ ~:- ~ r: ~ ~::- - :: ~ ~ ~:: ~ ~ r: ~ ~ :~ ~ ~:: ~ ~ ::~ ~ ~::- - :: -

150-i i

125 l

i i

i e

i i

i i

a i

i a

i 1

0 200 400 600 800 1000 1200 1400 RPV PRESSURE (psig) 1 l

1 Figure 8:

SRV Tail Pipe Level Limit 1

..-x,._

A-10 Revision 3 I

l

_ _ _ _ _ _ _ _ _ _ = _. _ _..

1 l

l l

1 l

2 i

i

\\

11 I

l l

j i

180,

170-C 160- ~ ~ ~ h. ~ ~ " i-D LU tt 150-

" " " ~ " " :" ", " : " " " : -

m l

W g

l N140-.--b-~~l.--i~~~i-~~4"~~.

m 130- ~~~e~~~c~~~:~~~4~~~4-~~e~~~c~~~-

m-D 120- ~ ~ ~ c:~ ~ ~ :~ ~ ~:: ~ ~ ~: ~ ~ ~ o: - ~ ~ c: ~ ~ ~ :~ ~ ~.::- ~ ~:: - -

c l

1

~ ~ ~ [ ~ ~ ~ ! ~ ~ ~!-- ~5 - ~ ~ 5 -~ ~ 5 - ~ ~ ! ~ ~ ~!< ~ ~ 5. ~ ~ 4 ~ ~

l 110-1 I

100 i

i i

e i

e i

i e

i i

0 2

4 6

8 10 12-+ 50 REACTOR POWER (%)

)

i l

l Figure 9: Boron Injection Initiation Temperature

)

1

..-...;~;

.n A-ll Revision 3

I i

' ll 600 k

(

500-

/

[

~

e.

w E.

a 4QQ-g

,w F

300-g

......<.........:.........:........<.........}........<........<........ 3........,

g

......2.......1........:.......1.................".......1........'.........

20Q-

........<.........y........:........<........3,.......<........<..........

3.........

100 0

10 20 30 40 50- 300 DRYWELL PRESSURE (psig)

Figure 10: Drywell Spray Initiation Limit

-m.. ;

A-12 Revision 3

l 1

ri.

/

3

(

i l

" V W V y/4' V7

^-

f 45-

/-

40-

-i-~~,.

j 1

35-.-

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ " ~ ~ * ~ ~.

1 i

9

/

i g

j l

G 30-

~ "i ~ ~ ~ l" ~ ~ ~i ~ ~ ~ E " ~ ~ E" ~ ~ "i" ~ <

j

~

at a

m-m 25-4i~iiii.

i W

ct n-m 2 20-

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~. - ~ ~ ~ ~ ~ ~ ~ ~ * ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <

x F

)

15

...........$.........;..................g..................g.........;..............-

i 10

..3........<.........:........3........<.........:........{........<.........:...4 1

5 0

100 150 200 250 300 TORUS WATER LEVEL (in.)

Figure 11:

Pressure Suppression Pressure

_+ 1 ;

A-13 Revision 3 l

i

\\

ij/_

)

1 i

I 80 70 l

60-j t

(

  • /

./

j is0.l..........l........

w I

m i

i am i

I

I m 40- l ~ ~ ~ ~ ~l
  • 1 w

i i

eo.

I I

I u)

I I

l J

n i

i e 30-

~~~~~i- ~"" ly~~~i ~~~~i"~~~i"~~~i ~~~~i-~~~!-

~

S-1 I

il i

i i

i i

I i

I I

il i

i i

i i

i 20-...........t..........i1......i.........i........i........i.........i........i.....

I i

I I

it i

i i

i i

i i

i 10- :~~~~~:i~~~~~iT"""i""""i""""i""""'*""""i""""i"*"

i e

ii i

iDRYWELL WATER LEVEL (ft)

I I

!I 2'O 3"O 40 50 60 70 I

.I 2'

I i

i i

i i

O b

1$0 3b0 TORUS WATER LEVEL (in.)

i Figure 12:

Primary Containment Pressure Li.mit rn

TA ;

A-14 Revision 3 l

1 1

]

ij,'

127-t 115-

"5" ""5""""5"""5 "" "5""""5""" 5" ~~!'""*"

o

.s J

i i

i i

i i

i oc W 103-

" !." " " " i." " " " !. " " " " i." " " " i. " " " " i." " " "

I u) o c:

c)

H i

i i

i 91-i

/

/)

b 79 0

5 10 15 20 25 30 35 40 45 50 HCTL MARGIN = HCTL-TORUS WATERTEMPERATURE ( F) i Figure 13: Heat Capacity Level Limit

Q+;

A-15 Revision 3

l i

i s

i 1

1 l

l.

j i

i i

i

//'

.\\

=

j I

i-i i

l I

i l

4 I

1 20

/

l

[

i j g.,

"i i i" 16-E
  • s" ~ c ~s ": <~ c" H

tr12-

"" :"~ r" r":": r r -

{

o

.z 3 10-

"""~r a"" :~ ~ r" r":": r r -

w 1

cc O

~

O 8-

":" "s:c" """" :~~":""

~c

": enc-i 6-2 " ": " " 2 " < ": " : - ) t c"" " ". " " (:" """2 "" <"" < ": " : c" c" i

4 1

10 100 TIME AFTER REACTOR SHUTDOWN (hr) l 1

i Figure 14: Maximum Core Uncovery Time Limit 4v.

J i

1 A-15 Revision 3 l

l l