Text

- , ,,

')

i ENCLOSURE 2.

IN-SERVICE IliSPECTION PROGRAM AMENDMENT #92-01 f'

)

t 9302220268 930211

.PDR. ADOCK- 03000293:

G' PDR.

BEHQVE INSERT -l Amendment-ISI 92-01 in. Table'of Contents -

Old Page 1-1 New Page 1-1_ i-

~

Old Section 3 (Component Tables) New Section 3-Old Page-4-2 New Page 4-2 (ISI 92-01)

'4-12 4-12 (ISI 92-01)'

4-13 4-13 (ISI 92-01) 4-26 4-26 (ISI 90-01) 4-27 (ISI 92-01) 4-28 (ISI 92-01) 4-29 (ISI'92-01) 4-30 (ISI 92-01) .

4-31 (ISI 92-01) 4-32 (ISI 92-01)

Old Section 5 New Section 5

_ 'l

. ~ - - - _ - .. - . - - -

Amendment 92 01 March, 1992 1.0 GENERAL INFORMATION 1.1 JFTRODUCTION-

- The Inservice Inspection Program for Pilgrim Nuclear Power-Station, Unit 1,-has been ' developed in compliance with the rules and regulations of 10CFR50.55a and Section XI of the ASME-Boiler and Pressure Vessel Code, 1980 Edition-through and including the Winter 1980 Addenda. Where these-rules have been determined to be

. impractical, specific requests for relief have been written.

This Inser ice Inspection Program for Class'1, 2 and 3 components and component supports is applicable-for the 120 month interval beginning December, 1982. This is the second' inspection interval.

for Pilgrim Nuclear Power Station. Reference BEco Letter 91-016 for interval end date.

l.2 APPLICABLE CODES -

The Inservice Inspection Program meets the requirements of the ASME Boiler and Pressure Vessel Code,Section XI, 1980 Edition-through the winter 1980 Addenda. The following Code Cases are invoked:

N-424 7/18/1985 N-307-1 12/5/1984 92-01 N-498 5/13/91 1.3 INSERVICE INSPECTION BOUNDARIES The Inservice Inspection boundaries.. identify those systems or portions of systems to which the examination requirements of ASME Section XI apply. These Class 1, 2 and 3 boundaries are documented on Piping and Instrumentation Diagrams (P&ID's)_that form part of the_ Inservice Inspection Program. The system classifications are based on the requirements-of- 10CFR50.2 (v) for Class I systems and Regulatory Guide 1.26 for Class'2 and 3 systems. The ISI classifications are limited to those-systems-important to safety _that contain water, steam-or radioactive materials.

1-1

-+-n-

Amendment 92-01 March, 1992 Reauest No. DESCRIPTION Eagt PRR- 1 Rev. 3 Drywell Penetrations 4-3 PRR- 2 Rev, O Recirc Pumps 4-6 PRR- 3 Rev. 1 Class 1 valves 4-8 PRR- 4 Rev. 2 Hithdrawn 4-12 92 PRR- 5 Rev. I Hithdrawn 4-13 PRR- 6 Hithdrawn PRR- 7 Rev. 1 Containment Atmosphere Control Helds 4-14 PRR- 8 Rev. 1 RHR Heat Exchanger Nozzles 4-15 PRR- 9 Rev. 1 Reactor Vessel Nozzles 4-17 PRR-10 Rev. 1 RBCCH Ten Liter Shielded Sample Chambers 4-18 PRR-11 Rev. O Salt Service Hater Pumps 4-19 PRR-12 Hithdrawn 4-20l87-01 PRR-13 Rev. O Containment Atmosphere Control Piping 4-21 PRR-14 Hithdrawn 4-22l87 PRR-15 Rev, O HPCI Turbine Exhaust Orain Line 4-23 PRR-16 Rev. O HPCI Pump Suction Piping 4-25 PRR-17 Rev. O Inaccessible Helds 4-26 PRR-18 Rev. O Inaccessible Supports 4-28 PRR-19 Rev. O Pipe Support On Held 4-30 92-01 PRR-20 Rev. O Level III Certification 4-31 PRR-21 Rev. O Class 1 Pressure Test 4-32 PRR Index Revision 2 4-2

y ,

=

Amendment 92-01..

March,_1992_

RELIEF REQUEST NO. PRR-4, Rev. 1

HITH0RAHN l

i f'

4 l'

4-12 .

Amendment 92-01 March,:1992

. RELIEF REQUEST NO. PRR-5 HITHDRAWN 4

y l-l-

4-13

_ _ _ . .=

AmendmentL92-01' .

March, 1992

'REllEr REQUEST NO. PRR-17,-Rev. O I. -IDENTIFICATION OF COMPONENTS AND IMPRACTICAL' CODE REQUIREMENT-The ASME_ Boiler and Pressure Vessel Code,: Section XI,1980 Edition through and including the Winter 1980 Addenda requires all class-1 and' 2 welds _be inspected in accordance with. Tables IWB-2500-1, category B-J and IWC-2500-1,-category C-F.

Relief is requested from performing surface :and volumetric examinations; for components listed on Table PRR-17.1 based-on inaccessability.

II. BASIS FOR RELIEF For plants whose construction permits were issued prior to January 1, 1971, components shall meet Section XI- requirements to the extent-practical, see 100FR50.55a(g)(1).

Accessibility for the examination of the welds listed on Table PRR-17.-l was not provided for in.the original plant design which occurred. prior:

to the issuance of Section XI Inservice Inspection requirements.

Boston Edison feels that this constitutes a basis for relief from the-volumetric and- surface examination requirements of Section XI.

III ALTERNATE PROVISIONS For examinations scheduled during the second ten year interval, an-

, alternate weld has been scheduled as shown on Table PRR-17.1.

,0 T-L l

l L

PRR-17 Revision 0 Page 1 of 2 4-26

Amendment 92-01 March, 1992-PRR-17. Rev. O Table PRR-17.1 ISI Isometric- Alternate Held 10 No. Interference (ISI-I-) Exam HB-10-F65 Blockwall 63.1.2&3 10-lC HB-10-F63-HB-10-F96 Blockwall-77.1&2 10-1C N/A HB-10-2-1B Blockwall 77.1&2 10-1C N/A-HB-10-2-1C Blockwall 77.1&2 10-1C N/A HB-10-2-lD Blockwall 77.1&2 10-lC N/A 12-I-20 Structural steel for whip 12-2 N/A restraint PR-12-1-1 12-I-22 Structural steel for whip- 12-2 N/A restraint'PR-12-1-2 GB-10-F241 Inadequate clearance from 10-4B N/A adjacent piping GB-10-20-5F-B Inadequate clearance'from 10-4B N/A adjacent pipt ,

GB-10-F242 Inadequate citarance from 10-48 N/A adjacent piping GB-10-F243 Inadequate clearance-from 10-4B N/A adjacent piping GB-10-F244 Inadequate clearance from 10-4B- GB-10-F239 adjacent piping PRR-17 Revision 0 Page 1 of 2 4-27 j

, .~ . - . . .. - ..

Amendment 92-017 March,c199?

RELIEF REQUEST NO. PRR-IsJkey,:-0

1. I'DENTIFIC'ATION Of COMPONENTS AND-IMPRACTICAL' CODE REQUIREMENT-The ASME Boiler and Pressure Vessel Code,Section XI,c1980' Edition-through and including.the Winter 1980 Addenda requires-all class 1,.2 and 3 component supports be inspected in accordance with Subsection-IWF, Table IWF-2500-2.

Relief is requested from performing visual examination forithose component supports listed on Table PRR-18.1- based. on inaccessibility. .

II. BASIS FOR RELIEF for_ plants whose construction permits were issued prior to January 1, 1971, components shall meet Section XI requirements to the extent practical, see 10CFR50.55a(g)(1). .

Accessibility for the examination of the component supports:listedicn-Table PRR-18.1 was not provided for in the original plant _ design.which-occurred prior to the issuance of Section XI: Inservice Inspection .

requirements. Boston Edison believes _ that this constitutes a basis for relief-from the visual examination requirements of Section XI.

III. ALTERNATE PROVISIONS No alternate examinations are'necessary in this case..

t PRR-18 Revision 0 Page 1 of 2 4-28 f -

Amendment 92-01

-March,.1992 PRR-18 Rev. O Table PRR-18.1 Sucoort ID No. Interference ISI Isometric (ISI-I-)-

H-4-1-6' Undervessel/CRD 12-1 H-10-1-13SA 81ockwall 63.1.2&3 10-1C PRR-18 Revision 0 Page_2 of 2 4-29 -

' Amendment 92-01:

March, 1992 RELIEF REQUEST N0; PRR-19,-Rev. O I. IDENTIFICATION OF COMPONENTS AND IMPRACTICAL CODE. REQUIREMENT-The 20" diameter class 1 RHR piping is-manufactured from ASME SA-353, Grade TP316 seam welded stainless steel. The piping was installed during RF0#6 recirculation pipe replacement-project.

The ASME Boiler and Pressure Vessel Code,Section XI,-1980 Edition-through the Winter 1980- Addenda, Table IWB-2500 requires the volumetric -

and surface examinations of Category B-J circumferential welds include the adjacent longitudinal welds.

Relief is requested from performing the volumetric and surface examinations on longitudinal weld 10R-0-9LD on the basis:of ALARA.

II. BASIS FOR RELIEF In order to obtain accessibility to examine the required-12" longitudinal seam (per Table IWB-2500-1, Category B-J,-Note 4), pipe support H-10-1-177 would be required to be disassembled and a temporary-support installed, An estimated 70 man-hours would be required to assemble staging,.

install a temporary support, disassemble = H-10-1-177 then remove / reassemble upon completion of the exam. -The-general- area ~'dose-rate is 60 Mr/hr with contact hot spots of 200Mr/hr on'an adjacent--

Reactor Water Clean-Up pipe.

Boston Edison believes that this constitutes a-basis for relief from the volumetric-and surface examination requirements-of ASME Section XI.

~

III. ALTERNATE PROVISIONS The first accessible 12" of longitudina'l weld 10R-0-9tD will be examined in accordance with ASME Section XI.

PRR Revision 0 Page 1 of 1 4-30

Amendment 92-01 March,-1992-RELIEF REQUEST'NO.;PRR-20, Rev. I. IDENTIFICATION 0F_ COMP 0NENTS_AND IMPRACTICAL CODE REQUIREMENT Section XI of the ASME Boiler and Pressure Vessel-Code,1980 Edition  ;

through the Winter of 1980 Addenda, Subarticle IWA 2300(a)(1) requires that level III NDE personnel be recertified'every.three years.

Relief is requested from recertifying NDE level III- personnel every three years as required by-the above mentioned subarticle.

II. BASIS FOR RELIEF ,

Code Case N-356, 7-16-82 extends the-certification period of Level-III' personnel from three to five years. This requirement is consistent-with the guidelines of the American Society for Nondestructive Testing, practice SNT-TC-1A, 1984 Edition. Boston Edison believes that this consitutes a-basis for relief from the requirements ofiASME Section XI.

III. ALTERNATE PROVISIONS-All Level III NDE personnel will be recertified every five years.

i PRR-20--

Revision 0 Page 1 of-1 4-31

A endwnt 92-01 March, ;992-RELIEF REQUEST NO. PRR-21, Rev. O I. IDENTIFICATION OF COMPONENTS AND IMPRACTICAL CODE REQUIREMENTS The ASME Boiler and Pressure Vessel (B&PV) Code Section XI 1980 Edition through Hinter 1980 Addenda, Table IHB-2500-1 Item B15.50 requires a system leakage test of the Class 1 boundary at each refueling outage.

It is sometimes necessary to rework and examine mechanical connections after the Class 1 system leakage / hydrostatic test has been completed.

Examples are: 1) safety relief valve flanged connections _which were blanked off for the system pressure test; 2) leaking mechanical connections which were discovered during the system leakage / hydrostatic test and reworked following depressurization and 3) control rod drive mechanism repair or change out.

Relief is requested from the full pressure requirement of the leakage test (IHB-5521(a)) for the cited example cases based on impracticality.

II. BASIS FOR RELIEF The leakage acceptability of reworked mechanical joints is presently determined at the nominal pressure associated with 5% power just prior to drywell inerting. This translates to a reactor pressure of 930 psig rather than the 1035 psig nominal operating pressure at 100% reactor power. Inspection inside the drywell is not feasible above 5% power because of adverse radiation and temperature levels combined with an inert atmosphere. Full pressure testing at 1035 psig would require an alternate method of_ pressurization which potentially would have only a marginal increase in leakage rates and a disproportionate impact on outage schedules.

III. ALTERNATE TESTING Perform the system leakage test for the special situation mechanica' joints at 930 psig. Dispositions of observed leakage will consider the marginal increase in leakage rates that would occur at the nominal operating pressure associated with 1001 rated reactor power.

PRR-21 Revision 0 Page 1 of 1 4-32

A

< 1 PILGr.'M NUCLEAR 80wER STAVI0t C09PONENTS SCHE 00 LEO FOR EXAMINATION OURIMG THE SECONO TEN TEAR IN5PECTION INTERdAL CJMF01ENTS IN THE RPV SWSTEM "

.......... COMP 3NENT 10 N0.. COMPONENT............

DESCRIPTION ISOMETRIC NO. MAT't CL.. CAT... ITEM NO. RELIEF. STSTEM

~

REJJEST RPV-C-1-133 CIRC WELD Blo]

RPV-C-1-300 ISI-I-54-1 CS 1 6-A 51.11 CIRC WELO 630] RPV RPV-C-1 oD 15I-1-54-1 CS 1 s-A 31.11

^

CIRC dELO 9605 151-1-54-1 CS RPV RPV-L-1 LONG SHELL WELO 1 S-A 51.11 RPV RPV-L-j 151-1-54-1 CS 1 S-A B1.12 RPV LONG S1 ELL WELD ISI-I-54-1 CS 01 RPV t-5 LONG SHELL WELO 1 B-A $1.12 RPV RPV-sH-C1 ISI-I-54-1 CS 1 B-A $1.12 HEAD CIRCUMF WELO RPV RPV-TH-C 151-I-54-3 CS 1 8-A $1.21 RPV HEAD CIRCUMF WELO ISI-I-54-2 CS RPV-dH-11 MERIO MEAD WELO 43 1 8-A 81.21 RPV RPV-TH-M1 ISI-I-54-3 CS 1 B-A 31.22 HERIO HEAD WELO O RPV 92-01 RPV-TH-92 ISI-I-54-2 CS 1 3-A c1.22 MERIO MEAD WELO 45 ISI-I-54-2 RPW RPV-TH-93 CS 1 B-A S1.22 MERIO MEAD wELO 90 RPV RPV-SF-0-120 151-1-54-2 CS 1 B-A 31.22 RPV SHELL TO FLANGE ISI-I-54-1 CS B-A RPV-SF-120-240 S1 ELL TO FLANJE 151 .'-54-1 1 31.3J RPV WPV-5F-240-360 CS 1 8-A B1.30 RPW SHELL TO FLANGE 151-I-54-1 RPV-HF-3-120 HEAD TO FLANGE CS 1 B-A 31.3J RPV RPV nF-120-240 151-1-54-2 CS 1 B-A 31.40 RPV HEAD TO FLANGE ISI-I-54-2 CS B-4 RPV NF-240-3oO HEAD TO FLANGE 151-1-54-2 1 31.43 RPV RPV INTERIOR CS 1 B-A $1.40 VESSEL INTERIOR N/A RPi RPV INT ATTACH CS 1 B*N-1 S13.10 INTERIOR ATTACHMENTS N/A RPV Rev CSS CORE' SUPPORT STRUCT N/A CS 1 B-N-2 313.2U RPV RPV-NIO-NIR CS 1 B-N-2 $13.21 N0ZZLE INNER RADIUS RPV RPV-N1A-NIR ISI-I-54-1 CS 1 B-0 83.100 N3ZILE INNER RADIUS RPV RPV-NIS-MIW 151-I-54-1 CS 1 B-0 83.100 N0ZZLE INNER RADIUS RPV RPV-12A-11R I$I-1-54-1 CS 1 S-D S3.100 N0ZZLE INNER RADIUS RPV RPV-N2d-NIR ISI-I-54-1 CS 1 8-0 d3.100 N0ZZLE INNER RADIUS ISI-I-54-1 RPV RPV-42C-NIR CS 1 B-0 S3.100 N0ZZLE INNER RAOIUS ISI-I-54-1 RPV RPV-N20*NIR CS 1 B-0 83.100 N0ZILE INNER RADIUS 151-I-54-1 RPV RPV-N2E-NIR CS 1 6-0 83.100 N0ZZL5 INNER RADIUS ISI-I-54-1 RPV RPV-12F-9IR CS 1 B-0 33.100 N3ZZLE INNER RADIUS 151-I-54-1 RPV RPV-N2G-4IR' CS 1 B-0 B3.luo N3ZILE INNER RADIUS ISI-1-54-1 RPV CS B-D $3.100 RPV-N2H-NIR' N0ZZLE INNER RADIUS 1

RPV RPV-N2J-NIR ISI-I-54-1 CS 1 S-0 33.100 N0ZZLE INNER RADIUS ISI-I-54-1 RPV CS B-D B3.100 RPV-N2K-NIR N32fLE INNER RADIUS 1

RPV RPV-N3A-NIR 151-I-54-1 C5 1 S-D B3.100 NJZZLE INNER RADIUS ISI-I-54-1 RPV RPV-N33-NIR CS 1 B-D S3.100 N0ZZLE INNER RADIUS ISI-1-54-1 RPV RPV v3C-NIR CS 1 B-0 33.100 N0ZZLE INNER RADIOS ISI-I-54-1 CS RPW RPV-h30-NIR NJZZLE INNER RADIUS 1 3-0 33.100 RPV RPV 444-Nik ISI-I-54-1 CS 1 8-0 83.100 N0ZZLE INNER RADIU5$ 151-I-54-1 RPG CS 1 8-0 B3.a30 m3RE RPV RPV-N43-NIR 43ZZLE INNER RADIUSE ISI-I-54-1 CS 1 B-D $3.100 30RE RPV RPV-N4C-NIR N0ZZLE INNER RADIUSS ISI-I-54-1 CS 1 B-0 B3.100 SOPE RPV Page 1 of 44 k_iL es . _ .% M. m. j L aws _

  1. A

y'

=1: .

(-c. sp gx -

t

(

'p p * #

t

?

'?

Q; . . .

cf ; -!

ik

sg- . 1; Nt t

-h'y' 1

- g ..

L-t J

  • et t
w. tu er t- -

tu M 3e

>- > CL > > > > > > > > > > > > > > > 3m > > > >

Gr M N er e & & 4 er er & W ce tar er>tr> w 1ma >tu>aJetu>m > So > >N>&>W 3mW >>>>>>>>

2 M CK M

e>

W fr (L 1W EL tr &A,tu eg a M M4 EL tL C (k4L 2 tL to cr et tr er er a C WJ u8 he *49 96 t>8 (> S & & f5 & 4 f> t> (> !> f> f> S & e'> &

t= J T 8 4 6 4 e e a 4.9 8 4 5 4 4 4 4 4 S&1 V

'M tu tu .

MW MtEWMT9ffat& Wtram M og 4 W W FE tg I

NN t-K Cf EK M EK OC 4 EE Of T e W W W M M M CC M EL (L 4 4 (L 4 (L EL (L 4, EL tL (k (L - & Cr '

. e/t e- (L tL 4 4 (L 4 (L c.

2-- O

=4 Z t O O .OO0000O O

N I e-4 tu e ==

e o,Ce ~3

===e= O e e e,O=OS,O

= va

& t>"3 >Ot>OSOo O <>et&*'s a oO>O t>'3t>t")

t> O SO & <>c't + O&OSOGO O O O O O O O O *t O ** c. .,= e= c *= N .- -

W m k

M CD eeeeoeeeeeeeeeeeeeeeeee 1eO o<>essoe e!> e a= e. e= c= e= e= e=

e.e e e o e:

m m m m m e% m m m m maelm m m m m m m m m m m m m m m m m 44444wq mmmmmme w

2 e e

m 13 m en 40 en e att en e ett en e e en m m m era en e crt e art ett art trl m 15 a) m e m era D se e O k O HG - et k2-4O U

0 in OeO iiO EO 4 4O 4O8O8O4O6 O4 O e tOI O I eOI Of IOeO8 Q 8O 8 IOeOeOi l'8 O O8 O OOOOO 8 8 8 4 0 $

r tuO auO O O O ud us te ut tu

>W.

M tu e

e to in as e m 1D ED ED tua e e eri en e m al ett sQ ten en m eri e en 80I-0-4 m83M43i ID m

e ett - e 80 in m 8'l e m ett s t/5 J N u e=

tu us em em ce v= e= en om e= e= ** ,= ,e e= em e= e .

1TT .4 e. e= e= e= e= e= **, ** ** e= ** ** em em e= em ,= e= cm=*****= o= e . ..

,=e=

O > us e

  1. 1 h, ==

(9 to W M fr F w F W 4 De M M M to in vi to M M t/* M to ut en to M vt M vs M M M =A M to M vt M 44 M MMtoMto to toeM -

esa er o u e 3 O I,,J u u u u LJ u LA W W 6,3 L3 U O t 3 W W W t.3 O O L3 U L-) W 4J U M U att U t 3teVanL) e&WWW4iOt3

.A t > O

.uQ4 3

Z ,

N e .M

42 3P to ** ** N N N em ee *= e= e= e= ** ** e= ee ** ** va . . ,

EM I O us M 4 e

t 8e a e a et t t I t 4 3 e e a e e=

a ee* t-4

    • c= 6 v= 8** 6e* 0** ** 4 *=

8 **

t e=4-t N N N e= *= e= ca += en == e*

t t 4-e t-t 3 a:I 444W44444444444dwddd4dW44Wd44dWWdWdN QC en t..

n to en trl toe'.

64 k > k e*4444 3

8 trt art vt in in en in Vt to tri M vt in to tr4 en en to en vt in in to in to VI an m tPtM Mtr% inva

- fr 48 UZ2

-. tu 2

me M

8 6 I1 I t I 4 4 t i I l 4 4 4 8 8 4 0 0 4 4 I 8 I 3 6 4 4'4-t<0=0 i Vt e=

t40 Iw NI' 4me I ML mett M M sw t Mt >4 i p>e3 Me >< t M t be t 0Mi>ee4>t 4M Oe48M M >e M M >4 me >4 **ogH MMMbe I

. .J M t=e 'O M 4 tt M M M he M -

- MT.

EL et M M

be M

M M M >e H ke be M M be M >e >4 M me >< H H M M eie he he M og I-O M hei >* 4 **4e44*et>44>45644 I t I e $'s t w >= be 04 ke M ke M M M e-o M >4 M >4 M me he M M M e-e M M he M M t e ** Mvt M M in =  %- M M M vt en M wt vt M n tu 2 - e M e4 M M M M >4 M M M >4 >e e4 2 '

tu e ee

'xy a ut OO -e -3 an M en vt sin v1 vt EL e, e >e *33333*3"3 M >4 >< *eeoet M 2 o O - .

O O O O O CJ O .i J J J .J J J .,$ J e3 .J .3 J .J J =h J J J mi OO e- 4 - 4 si ,

tu w us tu tu tu .

et at et 4 e ut ud ua w na as it tu au us su nu ou w tes in, tu WV e M =E J e,b J =b d =5 aJ .6 .3 .J .J J .J J' e N & tr CC Cr er Cr M M 4A M IA t#1 tM en to M vt 44 t/5 M 4A to en v'u *u ,4J Au tu w us ou us ou au N N N N N ka -

3 e. M q#9et M en vt4#5vttotAno6444 M M 4 O

CE e t M to 4A Vt GA 4/t M 4/t 4A to N N N >& N N W-e2 M. 'eO 2 CE & tE Or CC tr (W tu W ua ua W tu us taa ua tu tut us su w w us 'u us tu W ut w us3 W tu w tu t9 M M 4A M M Vt W1 M 7 . nu 2222222 tu tu eu ut 84J taJ > > > > > 1m 3m D > > > 3m > > > > > > 3m > > u3m >2.2 y R u

I >+** > Je > >R >.spt. ..

2 >= M M >4 me ** >e M M e= >. k t= t= k k > >= t- > >= t- >= t- k k t= >= 4R Z 2>*2 >= t- >*

2 kO >=Otaa en .- 22 J Du tu au OOOOOOOOOOO

.J M

mA 7 he - tu O tK 137 tt) W qat W w uJ aaJ *g3 W u# lu ut up us tu tg3 tag gas uJ tgk Lu ht 24 44 94J tt4 tu

= k > > > > > >= b 2 2 2 2 2 2 N J taJ . u 44 tsJ eu tal ese J .3 J J J .8 J .h.J J J J .) J k

2 CL Q EM' 2.8 J J J .,8.J J J .ien=& J Jtu W 14J ua t#A su 191 (L fL

.8-J .E J .6 J J G,, #L ek & O-

- taJ -~

E:

. O *S3 Q *3

.N N uk N N N N N N N N N N eo N N N N N N N be N NNNN 2@M N N N be N N N N e i N N N >4 N N M N N N N N N N N N s e H N

N N N N N N N N 2N N N N N k > 6= >

N N N N N g a gggerg.

O O O O tt O O O O O O O O O O O O O O O O O O O O O O O O #=s O OOOOOO O et et e 4 et agno.'

a R

e a

Z22272Z222222222223%C722222%2Z222%3 (L tLCLiktLELe= .

O O

.U R O

  • 4 & int & M (g et fr be k 2 . hehe>e M N M e-e > 3e % > 1m 3m 3m 3m > > > > 3mDe > > > > 3m .

, > > ?m > t/*

2 P 7 2. 2 >4 277 >D*>>>>

P > 3m 2 2>2' 3m 2 9> 202820s'. us 4 E R 4 24 -l 6 e 2 452 O 4 #9 et M 4 *t T! O et2 e 2 t2I 7t P* s e2 t2 2 6.I 7 2_2 e t 2 0 2 6 P0 24 7 8 29 'E 4 4 M4T6F 2 .)

'> r> a= e= e. N d'4 N N N N N N N as at M U O 4 Af1 W G *t til at O4 "1 tri e. #et 4't 2 1 4 e e EamN 2 = 4 O$N 93 et 851 U Q uJ 11 E9 Y "') ,

O 2 7 2 7. f% s) to en ?j nL -8 3 0 0 -l I N m rrb m M 4 4 4 4 El O N N nei O *'> e= e= e= *= e@= *C N:

=0'- i 27 3m.'> F > >4*2222222 3m > > "Je > 3mW2727 i 8 4 I tt 4 4 6 222222222 72777 Jt 7 2 2 2 Jt 2 4:

T  %- 4 4 8 8 I-t

>- > > 3= > > > 3=>>> > > 3m >i 6 3m 5 4 0 4 4 5 6 4 1 1 4 9 9 B I.4-

. t O 4 W: >>O ftf EL W MEL M Cr iL tw sk'EtLNEL w &CLtr M4&(L T frtLy EL er Cr CL N er CL4 &sLNtsOCa.&cL (LNtL#ifEL N Cf M trtLM(L fu EL Cf a-EL ek (L CLCLCL (L (L ELEL CL 4 a EL 4 th' CL m EL> o > > > 3m > 1> > 3> >

e l t 4 re er *r at rir 4g u o

e e-a  ;

.q'. ;l-e

. ,e . .

I

. ~ - . . . .- .

ti A

PILGRIM NUCLEAR P0wER SV4 TION COMP 3NENTs'SCHEOULE3 C0=PONENTS'IN THE RPV'FORSYSTEM EXAMINATION!OURING THE SECONJ TEN YEAR INSPECTIO -'*

.'.....'....' COMPONENT ID NO.. COMPONENT............

3ESCRIPTION ISOMETRIO NO. 94T'L CL.. CAT... ITEM No.' RELIEF. S YS TF 1 REaJEST E^

INST N0ZZLES :42 N0!!LES N/A 1-A-1  ;$ 1 8-E 10ZZLE'TO SAFt ENO B4.15 RPV 1-e-1 N0ZZLE TO SAFE END ISI-s-1-1 CS 1 6-F 95.13 RPV 1-C-1 ISI-I-1-1 CS 1 8-F

>N0ZILE TO SAFE EN3 85.10 RPY ISI-I-1-1 CS 0-1 h3:ZLE TO SAFE END ISI-I-1-1 1 S-F '65.10 .RPV 14-4-1 S 't e-F 35.10 _.^..

14-3*1 SAFE END TO N0ZZLE ISI-T-14-1 SS/CS 1 6-F RPV SAFE END TO N32ZLE ISI-I-14-1 55.10 RPV 2R-NIA-1 N3ZILE TO SAFE EN3 SS/CS_1 e-F B5.1J RPV 2R-N18-1. ISI-I-24-8 CS/SS 1 3-F 55.10

'2R-42A-1 .N3ZILE TO SAFE EN3 ISI-I-2R-A CS/SS 1 9-F RPV SAFE END TO N0ZZLE B5.13 PRN-9 RPW 24-425-1 ISI-I-2R-A SS/CS 1 B-F SAFE END TO N0ZZLE  !$I-I-2R-A 85.10 : RPV 2R-42C-1 SS#CS 1 '8-F $5.13 2R-N20-1 SAFE'END TO N3ZZLE ISI-I-2R-A SS/CS 1 R?V SAFE END-TO N3ZZLE 151-1-22-4 B-F $5.13 RPV 2R-N2E-1 SS/CS 1 'S-F 35.10 JR-42F-1 SAFE EN3 TO N0ZZLE ISI-I-24-4 SSICS 1 RPV SAFE END TO N3ZZLE ISI-I-2R-B B-F 35.10 R#V 2R-42G-1 SS/CS 1 6-F 85.10 2R-424-1 SAFE END To N3ZILE 151-1-22-B SS/CS 1 RPV SAFE.EN3 70 N3ZZLE 151-I-22-6 B-F $5.10 RPV 2R-42J-1 $$/C5 1 8-F 95.1J 2R-N2A-1 . SAFE EN3 70 40ZZLE ISI-I-2R-B $5/C5 1. RPV S A FE ..!ND TO N0ZZLE B-F $5.13 RPV 3-1-1 N0ZILE TO CAP ISI-I-2R-5 551C5 1 B-F 85.10 RPV s-N44-1 ISI-I-3-1 CS/IN 1 B-F $5.10 o-N4o-1 SAFE END TO N0ZZLE ISI-I o-1 CS CPV 1 6-F $5.1J 6-NGC-1 SAFE END TO N3ZZLE ISI-I-6-1 CS 1 S-F RPV SAFE EN3 TO N02ILE 55.10- RPV

's-h40-1 ISI-I-6-1. CS 1 S-F

' SAFE EN3 TO N322LE ISI-I-6-1 65.10 -RPV a

RPV-N7A*1 CS 1 5-F $5.10

.N32ZLE TO FLANSE ISI-I-54-4. 05 RPV RPV-N78-1 H011LE T3 FLAL'E 1. B-F. 'S5.10 RPV-N3-1 .ISI-I-54-4 . :S 1 e-F- 65.1D RPV RPV-49A-1 'H0ZZLE TO FLANSE ISI-I-54-4 CS RPV ,

f431ZLE TO SAFE END l' S-F 55.10 R P V .-

RPV-NJB-1 N0ZZLE TO SAFE EN]

.ISI-I-54-4'- C5/55 1 S-F. 35.10 4-N11-1 ISI-I-54-4 CS/55 1 5-F R P V - 92WD1 N0ZILE.TO PIPE' JISI-I-12-1 'CS-Bi.13 R P V - 92s01 RPV-N164-R-1 N3ZZLE TO SAFE EN5' 1 9-F 35.11 .RPV-RPV-4133-4-1 ISI-I.54-4 INC 8-F N0ZZLE TO SAFE EN3 151-I-54 1 85.11 RPV RPV*N16A-A-2 SS/IN 1 .- 6-F. $5.11 5AFE E43'TG RS3UCER -

151-I-54-4 IN/SS 1 RPV RAV-1103-R .54FE END TO REDUCER- B-F B5.51- RPV-RPd-CnN-1-18 ISI-I-54-4 IN/SS'l- B-F

CLOSURE HEAD NUTS- -ISI-I-54-2 3$a51. RPV RPV-CdN-17-36 CLOSURE MEAD-NJTS

~ CS ~ 1 5-G-1 $6.13 RPV RPv-CHN-37-50 ,ISI-I-54-2, CS 0-G-1

~ CLOSURE HEAD NUTS-1

'86.10 RPV-RSV-05-1-18 CLOSURE' STUDS

'ISI-I-54-2u CS '1- B-G-1 .S6.10 RPV- S-19-36 CL3SURE STUDS:

ISI-I-54-2 CS 1 6-G-1 'S6.23 RPV

!$I-1-54-2 RPV RPV-CS-37-56 . CLOSURE'STU35 CS 1 6-G-1 '56.23 RPV RPV-1s-41_ ISI-I-54-2 CS 1 8-G Ss.2J

.CLOSJRE STUDS. .ISI-I-54-2 R PV '

kPV nS-42' CLOSURE $7u05 CS- 1 '8-G-1 S6a33 RPV no-43 CLOSURE STucs ISI-I-54-R- 5 1 5-3-1 56.3J

RPV RPV-18-44. Closure STUDS

'ISI-1-54-2: CS 1 S-G-1 36.33 .RPV RPV:

ISI-I-54-2; CS 1. 5-G 26.33 RPV' Page ~3 of:4d:

  • i

, . _ . . . . - + - - " ^ - ^ ' ' ' '

,w.

n i. r '

e v

O 4

03 C

A J

4 7

> w M M h  %

>= >

2 w

e 144E&EA44&A4%E44 N2MN M4G W2WWWMMWW 4

9 s

ek

- wM j O w iu w w9

> J7 u wW W NT M e 7 0 w z N 7 M *3 O O M S & O O O O M O M M O W

4 ou W

44 o e 4M@

a e e e-o D+++www Dwww eeeeoeeeo

> w C40Cooc4CNNNNeem e m 40 m M m m m e m m m m m m e y 2 e W e WW e y=pwwweveeNNNN O k S S l l i 4 0 t 8 e i e t WO-

.k2 4

u OOdOO00Od0dOdiTI 8 8 4 I i l t i l l I I I t I '

40 hu m m m m m m m m m m m m m m m e(

e MW e M a L N u su.

- t W. J wwwwwwwwwwwwwwww N Obw

  • n k 6 (9 M M

= u* r MMMMMMMMMMMM WMM z

owM 84J N uvutsuuuuuuuu in u u

-7 e

e -T ,

J35 O UQ& 2 4 3 &

y F NNNNNNNNN444 MMM

--i Ow is w al456890888I 444444444444 e t 4 ,

twr a 444 wkk wg

> Mnnecmemmece t i t i l l 9 e mme d Q2F us T wwwwwwwww$ www4 9 4 6-l l www g I 4 I i t t i t 4 0 t I 1 Jww M F M O

wwwwwwwwwwwwgwww t i I Age w MMMMMMMMMMMM WW wwwwwwwwwwww%MMM Zwww MZ e w e M 2 e 00 e .

L a e tu w w Y e GOt3MMM OO e MQ e F 2 .7 v 5 ' 4 8 9 44 M M J e 44 4 277KMN@QW . ,' -

3 O

e JJJwwwwmmzzz awartrrt rwww i er \

W eO MMMMMMWkwo u

I kw 7>

ran322-4.JJJzOOO wwwmmm 341000wJJJ 4 4

a/1 M M W M 6 d e W 48 JJ mmmWGW%

t4 au Q.

7w J3 11 e Ow O O M W W W N W 4 m w 'ts o .

k R

&y et 4 et 3 3 3 3 3 3 8 9 0 0 m b > >

tai tu faJ W M AA M M M F 2 2 FM

  • s t O tte NNTOOOOOO44 qOwww tir & e"t O

2' uO TTTJJJJJJJJJWW h k k u u u u u u 4 E E u to *A W wW A e Y e O O u 2 00 0 @@ @e 4 0 w fl O ONM MMM OMcMMM N l l h e9 I4Nl te mN e lIe Af 8 Mm OwOQ 7 wwMe N N e.Uner e N tu 3 0 4 a w M e w M 2 F F u O w N't 2

O >>>mmm333 e t 5 t t mumm t a 3 e a2e i es. R 4 1 1

& W 4,3 u o u V u. 64, et u. # MV 7

O 8 >0 >>

Q&

0 I>t >>%>>

tti9 9 9>>I I>I >>>

43 u annER4AnaAAA44 wWMMENwmww&mMNTT e

e o

e e

e e

o e

e

id d

n PILG41H McCLEat Pou!4 STAT 13v

.7 4

. COMP 04E415 $CMEDULED FOR Eta =INATIOS DutI4G TME SEC340 TEM TEAR INSPtCTICM INTERVAL COMPONEMTS IN THE M5 SYSTEM

.......... ~0MPONENT 13 MO.. COMP 0 MENT............ 150METAIC NO. M4T*L CL.. CAT... ITEM kG. aELIEF. Sf5 TEM '"

DESCRIPTIO4 dEaJEST f 1-A-10ML1(4) MakGE2 LUG 5 151-I-1-1 C5 1 s-a-1 s10.1G MS -

1-A-CML1(4) Suppati LUG ISI-I-1-1 C5 1 5-4-1 810.10 MS 1-A-d*L'(5) 5UPP02T LUGS 151-1-1 05 1 8 -<. - 1 610.19 MS 1-s-10MLtik) SUPPORT LUG ISI-I-1-1 C5 1 6-E-1 610.10 M5 e

1-5-*ML1(4) SUPPORT LUG 151-1-1-1 C5 1. S-t-1 410.10 MS L,.

1-b-SML1(5) SUPPORT LUG 15I-I-1-1 C5 1 6-s-1 510.10 45 4 1-9-3ML2(8) $UPP34T LUG - ISI-I-1-1 C5 1 5-E-1 310.13 M5 1-C-10ML1(4) ,$UPPO4T LUG 151-I-1-1 .C$ 1 8-t-1 S10.10 M5 "V 1-C-4MLi(4) 1 SUPPORT LUG 151-I-1-1 CS 1 8-t-1 910.10 45 1 -C- B M L1 ( 5 ) SUPP327 LUG ISI-I-1-1 C5 1 $-<-1 S10.10 MS 1-D-10ML1(4) ,3VPPG2T LUG ISI-I-1-1 05 1 5-<-1 510.10 M5 d

1-0-aML1(4) SUPPD4T. LUG 151-1-1-1 C5 1 5-K-1 $10.10 MS 1-0-$wt1($) SUPP0af LUS . ISI-I-1-1 C5 1 3-K-1 310.10 MS 1-v3-203-1A- WALVE 30LTING <2" ISI-I-1-1 C$ 1 6-G-2 $7.73 #5 1-va-203-1a- watvE soLTIMG <2" -I5I-I-1-1 5. 1 8-G-2 37.70 M5 i

1-v3-203-1C: VALVE.$0LTING-<2" 15I-I-1 C$ 1 5-G-2 57.73 *S 1-v5-203-13 VALVE 30LTIkG <2" 151-I-1-1 CS 1 6-G-2 87.73 M5 1-vs-203-2A valve BOLTIMG <2* ISI-I-1 C5 1 5-G-2 -37.73 d5

, 1-v3-203-2e ..vatvE BOLTING <2" 151-1-1-1 CS 1 s-G-2 57.70 ns 1-vs-203-2C VALVE e0LTING <2" 151-I-1-1 C5 1 6-G-2 87.70 M5 1-v$-205-20' valve SOLTING <2* ~ ISI-I-1-1 C5 1 B-G-2 57.70 *s 1-vs-203-3A VALVE.BOLTIkG <2" - ISI-I-1-1 C1 1 5-G-2 57.73 *5 1-58-203-33 v1LVE 50LTImG <2" ISI-I-1-1 CS 1 S-G-2 S7.70 MS 1-ve-2J3-30 VALVE BotTING (2" I S I-I- -1 CS 1 B-G-2 37.73 M5 t 1-va-203-30 vsLVE SOLTIMG (2". ISI-I-1-1 C$ 1 6-G-2 s7.73 M5 1-v3-203-4A VALVE dOLTING'<2" 151-1-1-1. C5 1 8-G-2 57.73 MS 1-v5-203-43 WALVE SOLTING <2* ISI-I-t .  ?! I e-G-2 87.70 15 1-vs-220-1 .vatvE.50LTING <2" ISI-I-1-3 C5 1 5-G-2 57.73 M5

+

1-va-220-2. v&Lve SQLTING <2" 151-1-1-1 CS 1 8-G-2 57.73 *$

1-A-14 VALVE TO PIPE: III-I-1-1 LS 1 8-J SJ.11 M5 1-A-15 PLUE3 4EAD TO' PIPE' IsI-I-1-1 C5 1- B-J . 59.11 PRR-1 M5 1-a-7 -ELS0d TO EL90d- ~ISI-1-1-1 C5 1 6-J 59.11 MS 1-A-b .ELBod TO PIPE. 15I-I-1-1 'C5 1 B-J $9.11 *S

, 1-A v PIPE T3 ELs0w ISI-I-1 C$ .1 - 8-J S9.11 ms 1-AR hiLD' T4 PIPE ISI-I-1-1 C1 -1 5-J S0.11 M$

J . 1-14 cPIPE'TD FLANGE - ISI-I-1-1 C5 .1 8-J. 89.11 M5 l

. 1-3-?Ol ele 0W TO PIPEJ 15I-I-1-1 C5 1 .8-J 89.11 M5 h 1-s-14; 'watvE 70 PI*E - ISI-I-1-1 C5 1 B-J 89.11 MS 'l 4 e-15 FLJE3 MEAD TO.)IPE' ISI-I-1 'CS 1- S-J 89.11 Pad MS 1-S o. ~ELs0W TO PIPE I$1-I-1-1 C5 1- 8-J 59.11 MS li .1-s-9' . PIPE'70 Eteod . I51-1-1-1. C1 1 6-J sv.11 MS

.i 1-64-2 kELDOLET'TO PIPE ISI-I-1-1 'C5 1 S-J 39.") MS 1-54 . PIPE TO FLANGEL ISI-I-1-1 'CS 1 5-J $9.11 . MS 1

1-C-14' valve ETO PIPE- ISI-I-1-11 'CS 1 8-J 39.11- MS-4 Page.5 of 44 r

h b

, , ,, e _a , J . ,, . -# a ..m. _ , , _ . - . , , , _ ,..J._._,,. . . _ , . . _ m,i . _ . ,, . - . m. _ . _ .__m,_ . . .

PILG4IM MUCLIAA POWER STATIO4 COMPONENTS SCdEDULED FOR EXAMINATIO4 004143 THE SEC343 TE4 TEAR IMSPtCTIC4 INTERVAL -

COMPO4ENTS IN_THE MS Sv5 TEM

-~

. 4....... C04#3NEMT I3 NO.. COMPOMENT............ IS0*ETRIC h3. MAT *L CL.. CAT... ITEM 40. RELIEF. afw)EST SfSTEM DESCRIPTION FLUED *EAD TO PIPE 151-1-1-1 CS 1 S-J 89.11 PRa-1 MS 1-C-15 1-C-$ ELBOW TO PIPE 151-I-1-1 CS 1 6-J $9.11 MS 151-1-1-1 CS 5-J av.11 *S 1-C-9 PIPE T3 EL50w 1 M%

~ v&LVE'TO PIPE ISI-I-1-1 CS 1 6-J 59.11-1-0-14 59.11 PAR-1 ma

' 1-0-15 - FLUE 0 SEAD TO PIPE ISI-1-1-1 CS 1 S-J 1-0-7 EL30d TO PIPE- ISI-I-1-1 CS 1 5-J 59.11 MS 151-1-1-1 CS 1 6-J 67.11 ms 1-0-5 PIPE T3 PIPE

  • 1-0-V PIPE T3 ELs0w ISI-I-1-1 CS 1 6-J 39.12 .MS 1-0R1-2 wfLDOLET TO PIPE 151-1-1-1 CS 1 S-J 87.11 MS 1-041-3 PIPE T3 FLANGE. 151-1-1-1 CS- 1 8-J 59.11- MS 3R2-2' w!LDOLET 70 PIPE ISI-I-1-1 . CS 1 8-J 89.11 MS PIPE To FLANGE ISI-I-1-1 CS 1 S-J 69.11 #$

1-JR2-3 MS PIPE T3 VALVE ISI-I-1-1 CS 1 5-J 89.21 1-53-10 1-53-8A WALVE TO PIPE ISI-I-1-1 CS 1 S-J $9.21 *S 1-53-9 FLUED ME43 70 PIPE ISI-I-1-1 CS 1 5-J 59.21 924-1 MS 1-AR-1 PIPE TO WELDOLET ISI-I-1-1 ' CS 1 S-J $9.31 MS 1-04-1 PIPE T3 WELDOLET ISI-I-1-1 CS 1 3-J 59.31 *S -[

95  :

1-091-1 . PIPE T3 WELD 0LET. ISI-I-1-1 CS 1 5-J S9.31 4-1-1-22 RIGID-444GER I11-1-1-1 m/A 1 F-C FC1-3) MS AIGIO MAMGER ISI-I-1-1 4/4 1 F-C *(1-3) MS 4-1-1-29 MS 9-1-1-36 RIGID N443ER ISI-I-1-1 uta 1 F-C *(S-3)

ISI-I-1-1 m/A 1 F-C F(1-3) MS 4-1-1-46 AIGID 4 ANGER p-1-1-x7A AMCgGR' 151-1-1*1 m/A 1 F-9 F(1-3) 45 g/A F-S F(1-3) 45  ;

n-1-1-x73 a4CHca 151-1-1-1 1 *

.I51-I-1-1 m/A 1 F-8 FC1-3) MS

  • -1-1-x7C ANCMOR i AwCMOR ' I11-I-1-1 - 4/ A . 1- F-8 F(1-3). MS
  • -1-1-x70 MS i 4-1-1-13 ..ANC"02 . ISI-I-1-1 w/4 1 . F-8 F(1-3) 4-1-1-103 RIGID SUPPORT ISI-I-1-1 . 4/A 4 F-3 FC1-3) M S.$b41 "

4-1-1-HA1 SPRIM1 MA4GER . 151-1-1-1 -4t A - - ' F-C- Ft1-6) 'MS

.9-1-1-HA2. . $#RIN1 *AMGER ISI-I-1-1'  ; g/A 1' F-C F(1-4) ms

. ISI-I-1-1 1/A- tj F-C F(1-6) MS 4-1-1-HA5 SPRI43 HANGER SpaIs3 MAMGER ISI-I-1-1 4/A- ' 1'. F-C F(1-6) MS 4-1-1-Ma4 MS SPRIMi MAMGE4 ISI-I-1-1 4/4 1' F-C F(1-4) 4-1-1-MB1- F -C F(1-4) MS 4-1-1-d32 SPAIN 3'MA43ER ISI-I-1-l' 4/A l' 4-1-1-ns5 SPRIMG MAMGER 'ISI-I-1-1 m/A - 1 F-C F(1 *) 95 4-1-1-nC1 - SPRING MAMGER I$1-1-1-1 - N/A .1 ) F-C F(1-6)L MS

'*-1-1-HC2 SPRI4%. DANGER ISI-I-1-1 m/A 1 F-C F(1 *) MS g/A - F-C .F(1-4) gS-4-1-1-wC3 .SPRI13 MANGER' 'ISI-I-1-1 1

-ISI-I-1-1 ' g/A 1: F-C' F(1-4) MS-4-1-1-nJ1- ..SPRIsa MANGER 131-1-1-1 w/A F-C- - F(1-4) 45 4-1-t-MD2- SPRIs1 HamGER' 1 4-1-1-NJ3 SP4XM3 MANGER ISI-I*1-1; 4/A '1l F-C FC1 6) 45

  • 3221m; MAMGER ISI-I-1-1 m/A 1 - F-C F(1-4) MS J 4 1 -H3 4 4-1-1-SA1 $4uB6ER . ISI-I-1 . =/4 -1 7-C F(1-43' MS.

$$usssa' ISI-I-1-1 ira 1 7-C- F(1-6) a5 4-1-1-SA2 .

Page 6' of 44 -

' ~ . v g gr-- p g pw y' g,evh -

=F-- 4 Ter-** usp==y s-w 4r p. Int- W v'

  • gegp M- etwii

-=qrpg--g-W qmmg mme r1 i.g--- w"ww$ iv Jemfy gggua -gru- Tfy--$+wmw-sei.ei> --

aw a.a-

.Il I;

@ lMl.I-;

E

. 4 4

f _

o .

7 u

e g

a _ .

P .

L _

A 4 .

W E .

R T E S .

T f S$S55S5S5S .

N S M*MM4MMMMM . .

I

.T ._

1 FS -

O fE I iJ .

T LJ -

C EE E MA P .

5 . ,.

4 a ,

I h ) ) ) ) ) ) ) ) ) ) .

4444444444 -

R M - - - - - - - - - -

A E 1111111111 E T ( ( ( ( ( ( ( (tC -

Y I FFFFFFFFFP _

M E -

1T .

3 T CCCCCCCCCC .

I3 A - - - - - - - - - -

T4 C FFFFFFFFFF ,

A0 1 TC .

SE . .

S L R C 1 111111111 ,

EE

dH L 0T M '

P E T a48s4444a4 a7 a t/1/////// _

d m5 m w44m41m1n4 ,

aI1 it1 .

Lu o .

CO5 h i U a .

M4 C 1111111111

^ OE I - - - - - - - - - -

MI H R 1111111111 _

.ITT T ' - - - - - - - - - -

RA E II1IIIIIII GN4 M - - - - - - - - - - .

L1I 0 I11IIII1II I 9 S S55SSSS5SS .-

PAS I I1IIIII1II X T

.EN .

E .

41 .

33 .

FP M .

DO . -

,EC . .

.L U~

D .N E .O H YI ,

.C 4T

$ EP R444RRRRRR MI E5EEEEE5EE ,

. 5 OR $9d33933BB T PC 5S9315B$3B W mS daU0JJJ0uu.

E oE %4N44mN444

, 4 ' C3 55555SS555

. 0 4'

-, 0" O '

C' M D

I ,

i 3123123123 . -

h A893CC:330 E 5555SS5555 N

O 1 1 11 1 11111 . C 7 P - - - - - - - - - -

F M 11 11111111 O' - - - - - - - - - -

C " d444441 MM*

i

=

c t

i  :}',1jj i

  • lij ii :3ii: L~  :[i ;i i :4:1, 1i ;, i;
  • l' 4 F

+

I e

+

W V

+

b O

i 0 '

m A

J q E uuuuuuuuuuuuuuuuuuuuuuuuuuuttuuuuuuuuuuuuuuud w:

> w wNmauN 1mwuNwwaEuNunumNNwunwwwawwwuwmunwNwmaN ,

g > MwHMMMwwMMMMMMMMMwwMwMMwwwwMMMMHHHMMHMMMHWNH w M u v u u u u u u u u u u u u uu u u u u u u u u u u u tt u u u u v u v u u u u u u u u u

> > us as w tu au us w w w w w su eu us w w w w iu w ua tu us W su w w w w uk tu ud su us uJ w w w su w w es W W

  • 2 M w w a q u u n n u w w w w w st a w u N w u w w w a n u a w w a tr a w n u u N u u n w w w '

ek ,

2 EM O wo a M M 9 g

& J7 .,

V WW

'u NM M e 2 O M 2 33000000000007 eweeNNNNNNemO90DO9COOOOSeppepeeeeeeeeeeeeene #

N 7 e e e e e e 0 * * *eeNNPAMONNkkkheeeeeeeeeeweweveeewN G W 0000000000 e e e o e e e e e e e e e o e e e o e o e e e e e a e e o e e e o e w k weneeeeeeeeeeeAANNNNNANA&&& tame &&&&&&&msaon>

D w ammmemmammeeemmeemAmmmemmemmDMmemmeeammenmmM i 2 e o d' w

9%

e e

wwwwweeeeeeppeNNNNNNNNNN e a 6 4 e 1 4 8 4 4 0 0 8 1 0 t 0 0 t 0 0 0 4 8 l' O k W W w d W W W W W v t9 0 t9 0 09 L9 @ L9 d I9 d d d t9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 M9 W G I et 6 6 0 0 0 0 i l 8 9 1 8 0 0 0 8 4 I l e i l 4 t i l 4 4 0 0 0 0 1 4 0 0 8 9 4 I h2 WO U mammmmmmmmmemommmmmmmmmmmmmmmmmmmmmmmmmmmmme ku e ss Mw e J MT J

  • t w u eevepeweeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeen WWW 1KM J OkD e

_.g .

& M k g L9 g MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM 59 N Fu T MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM 4HO e44 N M e Jhu O uOw 2 3 & emaggagemesmemmemagegegegemememageggegeggemW PD LA G 8 4 I l 4 5 0 0 0 0 8 8 0 0 0 0 8 8 8 0 I l 0 0 4 0 0 S I e 8 4 0 0 t 0 0 t i 9 4 0 0 I OM M NNNNNmuNWNNNNNNNNNNNWNhwNNNNeNNNNNNNNumNNNWW TM T Mkk E

NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN 0 I l 8 8 8 l i t l e i l 4 l e I l 8 8 I i 8 4 I e a 8 9 0 0 4 I l 4 4 0 0 t G l i 0 4 NW =as MMwwwwMwMMMMMMMMMMMMMwMMMwHMwwwwMMwwMMwwMMMM ~

d22 T I $ $ $ $ $ $ 0 0 0 0 0 0 0 0 0 I 4 0 I l l $ l i I I e s t I eI t-1 0 0 i l 0 0 e i 4 }

-JMM a MMMwwMwwM MHwMMMMwwMMHwwHMwMMwMMwwwMMHuwwMwwM +

MS M MMM@MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM i

&qM M HMMMMMMwwMMMMMMMMMwHMMMMMMMMHHHHHHMMHHMMMwMM MM ' g' W2 e W1 q, 5 us e & q.

TP e M 00- 0 3 4

w. e M N*

r e M O n O 00 e O k  ? F *u wu e 49 19 '9 49 -

OO *u .

m us tu us us & J J e MMM 2 F 2

  • t9 9 d e d d 2 2 w wa a u Onun W H '

D e t9 d t9 M M veM M M d O M w M M 2 2 2 2 2 2 ses us > J K ua T ud % 2-& M su IL uA 4 .;

O 42 M333dddedd22 >>kkMMMMMMmmJufW 84 3 4 3 4 W W W A H 4 E M E w .r q to dJJJaascopMM JJJakkkkkk w ou a > s w k M w w m a- eseO Y kM D JJJJJJh>MMOOOOJJJJJJOOb>M 6 %kk O OM Mk &

v Ik JuNa -

JJkkememOOOOOOkk A00 0 -OMOk O M eu & iu ess u k k k k k k O O 7 M mommes 00 >>OMODO2 > Okm2 7H tr O t9 49 e N & N & M m m M F 48 ul utui N45>O > > > to 94 m t= >2 M OW *u 2 2 JE O O O O O O d O * $ 0 us us w tu tu us tu us >1 1 "3 O tas M us - M -O e= 4u (9 g et a 4 lb 4 & IL h &4A&222E>D>

g e e >

g > J>J OJ JO Jwe us d 4 4 4 d4 m O O & O 4. ut ul & O M O tt m F m T A h T g o g g' M P 7 m PTTTA4A4 && FFT3 DE' O ud W O us es a33333333"4 J J .A ,A e es e g a e ussta M M su J .a S a 3 M M O us & w M e w m F UO T .$ 4 4MMMMMM6444&E%&>D DDDD 7 1 4 4 > 4ti w & *u t h a u r u t h u & n 0

a e W e O O a a Me v 2 4ada 0 4 w ,J w d WW g ~!

O NwNw mm- N g H Jede gek&gmge 1 T J T J e* N M e N M et 8 8 44MM u I '+

k NT4TJJJJJJ1 mWm8 gemt B $ $ OM4 DeM 'm P e4eM t t 4 I 6 4 prech4eeNNNNem eewomTwew4MMMMNMNS au l l 4 I ggamemOOOOmm22OOOOMe eJ I 4 3 4 8 0 = 8 4 6 4 4 8 8 ( t i l

.T e( mecepeweNNNN i l l l NNNNeos eeqqqagmmmmemunN T9m o eeee 303u00 0 $ $ e M U DP i l 4 0 8 1 4 geeeeeeeeeeNNNNNNNe a 2222NNNNNNMe21%%LL MMmmmDtT 22227227722P9727MT E 4 4 4 1 4E4444444A l l i S DDDDD >f I l i I I I $ $ 8 4 6 4 0 0 4 I l t e i O NMWW 0 8 0 0 0 1 8 8 0 0 MMMM l l i I l 4 M WWmW& NNMWOWNWNMNkWN O NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN e

e e

e e

4-0 4 '

e

.e, + ,, , -. - a . . - , - ,,

l .

- ~

4 4

f -

o 9

e g

a P

l a M CCCCCCCCCCC0CcCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC r E RE aaaaR4 R aa4anRaRRR naR RR R RaaaaaaRa44R RRaaRAR ,

a T IIIlIlI IIII1IIIlII IIIIIIIIIIIll lIl1I IIIlIIII ,

E 5 CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC c T f EEEEEeEEE2EEEEEEtEEEEEEEEEEEEEEEEEEEEEtEEEEE N S aR RaRn4 RRaaaaR#aa*RA aaa4aRaaaaa*RaaRaRaRR RaR .

I

.T ..

g FS L O EE I I J T LJ C EE E RR P

5 .

M O I M ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )

11 J35 4 4 44 644444 * +4 = 44

  • 544 . Se444 + 6444444 6 . 6 6 6 a

a E

9 i

T 534.1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

111 11111111 11111 11 1 11111111 111 11 11111 11 1 49a( ( ( ( ( ( ( ( ( ( ( ( ( ( C ( ( ( t ( ( ( ( C ( ( ( ( ( ( ( C ( ( ( ( ( ( ( ( (

Y I e$0FFFFF** FFFFFFFFFE FFFFFFF s*FFFFFE F FFFFF FFF h k

M .

E . -

4T .

O f JJJ63CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC ,

I3 a - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

T4 C Bs5FFFFFFFF FFFF5 FFFFFFFFF FF FFFF FFFFFFFFFFFFF A3 L TC .

L SE . .

SM L 4 E C 1 1 1111 1 1 11111 111 11 1 1 111111 1 1111 111111 1111 111 ,

EET d MS L CTY

  • 4 P S T sa44a4 aaaa4aaaaa4 a4aaaaaaa4a4aaaaaaanaaaa
a 555t t# 1 i/it it/ i t tii/ t /tt / t /t i / t / ii/t tir/rt i t

+

a4C AIR 9 555g4=4v4MSgs4gsNvm4 s4 s44NmSg1s1mvMssMt1t 4ms -

2RI .

LUC O CDE N U a a4 aa8aa8a3asa!49SaSasa5$5aa53a58aaaa190E4 8a5 Nm C - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - h OE I 44 ae4aa224a2a4224aa4a44a4 a4244244 7a244442 Ga2 MI M R ITT I 22ZZ2ZZ222Z222222Z22222Z222222222222222222Z2

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - s aa E IIII1IIIII1IIIIIII1I IIIIIII II11 IIIIIII1IIIII GNM 4 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

LII 0 11II1IIIIIII1' II1IIIIIIII111I1IIII1IIII111I1 I M 5 55SS5SSSS5S55SS55SSS5S5SS555S55S5S5SSS5555S5

' aS 1 11II1IIII1I11II11III1IIII111II1I1I1III11I1I1 xT EN . .

E .

a4 .

OO FP M . uw s&

OO . G3 EC . a9 L LLE aaRa4 anaRRaanaRaRR -

0 EEv EEEEEEEtEEEEEEE EEE 0 N l GGGGGS;;G;JG;GGGGG ,E E O OOa NMN4NNsmNw%NNMMNMN -

H TI TT v aaaaA asaaaaA aaaaaa [

C NT M mMwMmewnmM HNM M Md a S I P NNo aaana4E4 aRl 44a2 aR24R a Nl N1T 3II;IIs;1;;I;I33;I EEEE E2EEEEEEEi5EEEEEE S 0a OO EE9NNNNNnmNNMNN MMNmNB3Ss83S33$5$3ss3d3333 T 0 C CCEDJ1IIIIIIlIIIIIIIIlI 53B933 ES sSs53sd5B5395 N 4$ 7II4aaaaRaaaaaRRRRaaR dJUJJUJueOu0uod0JJJJJ E 0E 2sI JJp p p p p P8 p Ppp P PPP p p P N4NNM4N4NNv5 v4%NN444N N CD 2ap i- GSSSSSS$5iSSSSSSSSSS5SS55S1 S5S5S55SS5555 0

8 .

9 .

0 O C N 0 1 23 1 - - -

CCc 01 2345o7 0123456 T 5 so )1 25 e5 3734 11 11 11 11 1222222223 453 N 7?R 1 211 1 1 1 l1 1 1 11 23 .67s3555555555555555555555 E - - - 6GnM MH6e9eHM

  • 1HHH MnM555555555555555555555 N o8s- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

O 1 1 i 1 1 11 1 1 1 111 11 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 11 11 1 1 1 1 1 1 1 1 1 P 4

  • N - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

M - - - 22222222222222222222222222242222222222222 O 444 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

C 222 4 mH1441 11 41 11 M1 M41 4ii1 " 1 1 M14 nM1 M4 nM44 1111

I j 4 i j l

I, I

f f

I i

  • f 0 ef 1 1

% i O l O l e4  :

0 01 to I

h i

.J es f UUU m I

> w wWw tg W

be M

>s M H uUU 4

..e'I i

I 6= em op w w j i

= w =a e. W i' e-a s o.

M LA I O w tu w w%

j

    • J7 U su au '

ms a'u t

a H e F 2 O N 2 =aa 440 f w K 8 4 0 \

as w v e= ea ' I w 6, www I

> M s. a et j ;

2 e w- e j

p6 ,

e O f 6 u ts o HO at i e i D* af O 4 L th [

4o  ;,

t- O aw-e e

. ,,J '

en E .a ar u u e e= e= '

su un e~

1 YA J O >= > e

  1. L e 6 as et e
  • 4% 4  %%%

at !u v 799 n H tt t MJ W H e '

.43O O u Q uJ Z

  • 3 w  !

ai u at e s.i es O au w or a er

  • EHT rr

- e. - N. N. N. , .t w as en wwM Le K 2 R 8 6 4 '

a M e4 O Hww l wE us e an en i

a. et m w HHH M D* $4 we e m . 4, t nW e s oO e

-d i E 8L e i K e QO e wu e

.s e 2

n e

om "4 a

tu eo

  • T >- M u T >.

W as A fr h rt FM us un ese

@ n ne su m 21

  • = es u r, e t m 2 T e 7 *) 3 sss - n nu $27 2 uO A V1 A O

A e 1 e O O u 7 O

H em A art #9 2 @Y#

4 M@A 2 1 0 i t

a wee fa 9 1 9 E NNN O 8 8 8 a* TT T' e

e e

e e

e e

e s I wn...-- -....*.-._.----.---- - ~ ~ ~ - - ~ ~ - - - - - - - - - - - - ~ ~ ~ - - ~ ~ ~ ~ ~ ~ ~ ~ - ~ ~ - - - - - '- - - '

. e

^C 9

4 PILGRIM 4UCLE44 P0dEE STATI31 .

C04PosEwf5 SCMECULED F04 EXAMINATIO4 DU414G THE SECOND tem FEAR INSPkCTIO4-IN1ERVAL COMPO4ENTS IM THE CR0 STSTEM j o......... COMpGmENT I D kO. . ; C347 34 E NT . . . . . . . . . . . . 1509ETRI~ h0. 9AT*L CL.. CAT... ITE= MQ. RELIEF. 575759 i; DESCRIPTION REJJEST 3-E53-16 .'EL50d TO PIPE ISI-I-3-1 C5 2 C-F C5.11 Ca3

, 3-ESD-17 PIPE T3 PIP! 15I-I-3-1 C5 2 C-F C5.11 CR0 3-E53-21 FIPE T3 EL60d 151-I-3-1 CS 2 C-F C5.11 Ca3

^3-E53-22 2Leow TO PIPE ISI-I-3-1 C5 2 C-F C5.11 C#3

~3 e50-3 PIPE TO EL30W -ISI-I-3-1 C5 2 C-F CS.11 Cao 3-E50-4 PIPE TO PIPE ISI-I-3-1 C5 2 C-F C5.11 Cao

i. 3-wSD-11 CAP T3 PIPE ISI-I-3-1 C$ 2, -C-5 C$.11 C23 r 3-wS0-16 ELB0wETO PIPE 15I-I-3 C5 2 C-F C5.11 C43 b

3-WSJ-17 PIPE'TQ PIPE ISI-I-3-1 C$ 2' C-F C5.11 CE3 4

'3-453-21 JIPE T3 REcuCIMa'EL50 151-I-3-1 C5 2- C-F C5.11 Cao K

~5-kS3-4 PIPE T3 PIPE- ISI-I-3-1 CS 2- C-F C5.11 CR3 3-W53-5 ELS0w TO PI8E ISI-I-3-1 C5 2 C-F C5.11 CR3 L-tsa-25; PIPE.73 CAP ISI-I-3-1' C5 2 C -F C 5. 21 - C40 i CED

! -- 1-3-1-12U LaIGIO damGEa 151-I-3-1 g/4' 2 F-C F(1-3) 8-3-1-13 aIsto das;En IsI-I-3-1 g/4 2 F-C F(1-3) Ca0 4-3-1-14 4IGIO $UPPORT ISI-1-3-1 4/4 2 F-C F(1-3) Ct3 j- 4-3-1-15 AI313 SUP P OR T .- ISI-I-3-1 g/4 2 F-C F(1-3) CEO

- i d-3-1-16' WIGIO SUPPO#T 151-I-3-1 M/A 2 F-C F(1-3) Cac 4 1-3-1-17 AIGID SUPPORT I*I-I-3-1 M/a 2 F-C F(1-3) Ca0 1-3-1-1$. RIGIO MSNGER 15I-I-3-1 1/4 -2 F-C *(1-3) CR3 4-3-1 RIGIJ-SUPPORT ISI-I-3-1 4/ 4' 2 F-C F(1-3) Ca3

.M-3-1-23 aESTaAINT ISI-I-3-1 gra 2 F-C F(1-3) C23 M-3-1-22 4ESTaaINT ISI-I-3-1 m/a 2 F-C FC1-3) CR3

< 1-3-1-26 REstaaI4T ISI-I-3-1 4/4 2 F-C FC1-3) C43

,n-3-1-27. a1CM02 ISI-I-3-1 1/& 2 F-C F(1-3) CES 4-3-1-2S - RESTRAINT' ISI-I-3-1 4/A 2 F-C FC1-5) CR3

'4-3-1-27. STRUT ISI-I-3-1 N/A 2 . F-C . F(1-3) C40 1-3-1-30 RESTasIni ISI-I-3-1 m/t 2 F-C FC1-3) CAD 4-3-1-31 4ESTRAINT' ISI-I-3-1 1/4 2 F-C Ft1-3) Cao

, '4-3-1-32: AgCH3a ISI-I-3 m/4 2 F-C 'F(1 Ch3 1-3-1-33' "5 faut . .

ISI-I-3-1 N/A 2 F-C FC1-3) CR3 4-3-1-34. aIGID'$UPPonT' 151-I-3-1 4/4 -2 F-C FC1-3) CR0

  • -3-1-35" RIGIO MANGER ISI-I-3 N/a 2 F-C *(1-3) CAS 1-3-1-30' :41GIO SUPPORT ISI-I-3 4/4 2 F-C F(1-3) CR0 RIGID SUPPORT' ;ISI-I-3 -M/4 2 P-C 'F(1-3). CR3

.. d 1 -3 5 -

2- F-C F(1 . CAD

'd-3-1-39 RIGIO $UPP3af- -ISI-I-3-1 -w/a f

d-3-1-40' RIGIO SUPPOET ISI-I-3-1' '1/4. 2 F-C- Ft1-3) CED eM-3-1-41: . STRUT" . .ISI-I-3-1 1/4 2 F-C F(1 Cd3-M-3-1-42 RESTR1 INT ISI-I-3-1 g/a 2 F-C F(1-3) Cao 4-3-1-46 ANCH3a LISI-I-3-1 N/A 2 F-C F(1-31' Ca0 4-3-1-57' -' R E st a a IMT. 15I-I-3-1 4/4- 2 F-C F(1-3) CEO 4-3-1-45 .dEstaaINT. ~ISI-I-3-1' '. 4/ 4 2 F-C F(1-3), C23

  • -3-1 RESTeaINT ISI-I-3-1 1/A L2c F-C. F(1-3) Cw3

- Page:11 of 44 ]

q a.~- - ... . . . -a - - . . - . . ...-_.-,: . - - , , - - . - - , . .. _ a ,_ . . _ + ,,, . . . - - _ _ - _ . -

a PILGaIM 1UCLEAR POWER STaTIQt '

'~ COMP 0MENTS SCHEDULED FOR EXAMINATIO4 Dualm; THE SEC3NJ TEM TEAR INSPECTION INTGUAL COMPONENTS IN THE CR3 515fE4 ITim h0. RELIEF, 5f5TE9 *I

. . . . . . . . . . ; 0 9 P ON E N T 10 N 3 . . C S MP O N E M T . . . . . . . . . . . . ISOMETRIC NO. *AT't CL.. CAT...

' REkJE$T DESCR17 TION ISI-I-3-1 N/A 2 F-C F(1-3) CRC 4-3-1-23 2ESTRAINT Cao ANC*3a 151-I-3-1 N/A 2 F-C F(1-3)

.d-3-1-51 F-C F(1-3) Cao N-3-1-52 - R$57a4 INT ISI-I-3-1 N/A 2 ISI-I-3-1 mia 2- F-C Ft1-6) CaC

- *-3-1-21 ' 5PRIN3 MANGER

!- -1

i
3. ,

i'

.c 4

t :.  :' ";

9 .. --+ ,

T L:

i 4

1 Page'.12 of 44

f a-f
,

, . .. .pt. , , yr .W KF e I we e- g e g mv6 e g 1 % i- -= rv 7< '-'& *-  % v -w' -r1e- a& e g= , y' . m ge-e- W- "

gew.* u -w-e- W -

[ Q- - t  ! 4 ~ i1 ,

+

- b

.i u

r

-i ,

r

  • s g

-to e I

Q. e

'M *

  1. A (U

~ CM I m

C. ,

.J al 9

> as a >= ,

i w e

e. p. 342 Y 1e 1 2 11131 * *r B 1 1 '1 's # 2 1 Y 2 'S 'S 1 '8 4 .5 'S"B 't li 1 "3 1 .10 2 1 ** 1 % W ' 'i 3 e & sL u 4 4 eL E 4 & E 4 4 E E & IL E E E ab E E E 4 E 4 E 4. (A E 4L tL E tb 80 W tA 46 ab 4 & el. 4 &

M e $* i P L to o us su e- *=

M w ai e 4

>= .J t2 at te tu u su eu - et 4 4 su tr sg ik to e -i N O maaa==

e4 3 0 e= ,3 0 e Se- O p 3 0 *e0 3 e '3.eg e= e O r"? O O c3see=e.omene o= c e***om =e=e 7

e e e ene, eemearten-

    • o= e= c= ,= e= ** e+ e* e= e case e= ,=e e,=.ee a a a,l.we.w,iw,e.,.,

g g I dr - F e e e e e a e e e e N Net.eP.e Ae ** e= em c. e= e= e O eO. O O O Oy=e=o=e= N e. NoNf* e e e e Ae &e 3aAe&e* ep 9e ee@e m em ee e #e.eS ee> e> e

.?

e o O ,O.e. e= O >S && w w w- '

a.s e ww iu.

e we m e e e m e art art ist e art e sti #6 m e 'ft #O sta e m trl m gl to art e art 41 m e art crt si e e act e W & 4 tL E lo .

4 E e tu e ea e e e* *= e= e* e* e* e= N N N N N N

  • P> e 3 3 3 1 e e e s 4 6'e e B t i t f O

wa e.

e W W er w at as W W W at 49 e g g e e 8 0-4 8 4 0 4$ 9549 0 0 0 Oe1L3 8 *l4 *l1*l0*90*l4*14*l0*90 "9 0 "9 4 *lI *4 e8*91 *% 4 g *l *% *t *t *1 "g9eeeGWW

  • 1i*t g-4 I g i e e 4  :

py 'y e art e e art e e art e e art en a e art e at e si e e en e en a si e e era e e e en sua so e m e W 4 4 4 E & -- r -i 4O .

>* O e ,t

- e us e to J _i m (J om e= w ea r= ** ** e= ,* ** ** ** o" e" F* * ** ** e" ** e= ** ** ** ** ** * *" e" ** ** * ** em #* **

  • em ** e= ** ** 4 4 - .

w iu *

.3Y ml .>

OM E e et d W W W 4 .

1

& au >= .

e4 & er W9 e tA e to en tA e ta eA eA eA en 44 e4 4A e en aA en en e en e e 6A e en e (A to eA en 4A to e ga e w % % % % % .

M Ne T LJ & # u u t t 4J 63 La t# 6 8 6 8 W 4 3 tJ LJ 43 6$ 48 6 5 L8 LJ t B 4 A 4 G L I O LJ u tJ t e U W L3 4 318 tJ u u F F F F W F j as we >, ,

. us W sn e t

.J 3 0 4A O 1 2 Il th -

4 - yy g3 e em en om em se en e* e+ ** e= e= e* e ** **** ** **e=em e= e*e= em see= es es e= em e= e= e= en e. em em e om eo e= em se o tu I e 0 0 00 4 4 I $ t t 8 I e 4 0 0 04 8 4 0 g i e I t t t I e 8 4 3 e g 4-t t 3 4 i e t og I . >e er eoeoeoe@ O e e @ 4 e @ e @ O ett 4 'O @ c e C -0 =O e e o e D e e e e e a e e a e e $__ e

- - - M to a= ->=- 8 4 I i 4 4 6 8 8 8 8 8 4 0 0 0 8 8 80 4 4t 40 01 0 0 0 0 8 004 0 0 4 4 9 i 8 $ $

_ w er u# H H H H +4 H +4 M M H H e4 H re H H M *4 H H H H >d +4 H H H we be H e4 *e H 1. w me H w N0Hg.g HHH ww-i;t.9-r s322 r D-3 3 0 3 0 1 6-4 0 0 0 t I l 4 5 1-1 I t i 0 0-l 0 0I l-I $ l- 0 w M H e.e M we H H e4 H H H H H +4 H H H M M M H H M M 64 w e4 M H H H H H w w w $4 M we we M pe w 6 - g 6-4

.J M w O M r e e en e to to e to to e to 44 4A tA e tA to en to (A 4A en ta e to en +9 en 4A 4A e e e to no e w9 e eA .

I fL af e M SApeera

  • 4 H e4e ed e tAe ee ed M e4 *4 M >4 H ** M e4 H H H H H H H H H H H H H ed H H M M M H H H me H H e4 H H w.4 W2 e tu e- -

w2 -e 'l

-OO e O O r et gL e as - 'W T -e tai to OO e T- E. ~-14 tu dir -

. us b) .e 4 dr - 4L tu '(

'J e 4.9 4 9 O O L9 A9 O -ad W (*. 3 ' ' +4 ua 3 '3 w 'A saa '3 - we v 3 ma 3 e 2 2 2 X X X us > > eu O tu (L U O tu us O EL O dL o us au (L 3 O (L w er e er e3 og 43 t3 49 O 69 (9 0 (9 +4 H H H M +4 3 J J 3 m dL 3 si th (L su M en *4 et a h O e M w tu . su us :C O e elf ut eO . p 3 3 3 3 3 3 D 3 *3 >= > > >= H H J et et =J .J H O O .A e4 ke .J h 4 h J M M O ud =# EL L9 O - 19 49 -

r =J .J =J .a .J J .J J .J J J .A .J .J =J .A 44 1* > W ue & > w us ib EL ud tu ud tk aL to tr tu - WF' ^FW-La -

e=

2p M. : OOOOOO tE O O- - O ** es de as -

en *se 4 e= >= to b= om a= to t* t= >= sti ft M 80 et so O O O O O O ef O e4 O O k O .erOO>ff ty em p= >=Q e+ O pO.se.# p. e. . ' tg w -

3P M - fr ty & M M fr fr & -ft & .

6e t= >= >= >= g a ue su O. b= H pe De 3.

'e- O fr O O O O O O O O O O us ut eef ist to tu .

i _v . as O O O ce c O '

> av h a sk ik (L & & 4 tb dL > > > > > 1e uJ au Ut ua us g4 3 - tu w us 5as O su O us eu u.6 3 us 144 O M H t T H H -

  • W Ke dL & dh 24 (L & Ch. EL EL d4 J J J J pf J db f4 ik & lb Ob O #8 IL & 4 f4 8P 'k @ 4 (b 4 O A. IL m (3 L9 4.J u 49 e

' =

us - O e64 ' *% 3 3 3 3 *3 *3 3 *3 3 et of 48 *E *8 *E *4 H be e4 M M n4J 461 M ** +4 W .J e4 J M we ad eu M M .J ed M 2 y N N '

&* ' QO e 3A y1 lA LA to to to e 4/l D D D > > D 4 CL (b in 4 & EE e= 4 % lb 4 tulbtu 4 4 4 Eg 4.{Lela W fg of 4 Y ff -

O _.

& . e v' e

-O O u 3x m aaaaeam-

=$ @

D.e

e. .en m . ' w =$w$ w adw4 em W w w 9 +f 4 e* e= e= e. J e= e*

= ' ass sl w

,= w w w ee J7 JT .4 'TJ%,TATJTJ st-

>= - .

7 m M m v8 m .t"t *= N ert .

. n e N e6 .a e O # o's Oe 5

- eu - .J ,,e ,J e S qAp.e=4Af> N p at e N N e= e* ee e* h 31 r> A cc M1 O e= e= e+ w ee x0 # e e ist uoD

2. J. IE$ 3 4 l i 8 3 enemvsen.o D D 3 i a $ 0_g 3 4 3 g g g a g g g g=3 3 g 3 g 3 g r 0- e o as 4 41rt u' O n f3 a a a 4-4 8 4e . '$n A e se' e 4 as 4 4 4 di e u 4 3 O O O c5 O O o s= c w w e. e -

1 4 3 e4 4..e 4 4 4 # 51 m e m 45 m e 4 4444444 9 4 -f ,7 4 4 .s J e4 4 4 4 8 I I t '

8' - 44eR32E???>>D >'J* D 4 n DLI12 M 2 2 2 D? E 2 2 E 2 E .3 2 2 2 2 2 4 ODDDQy p' s I e-B e I I O t I I i 4 4-0 0 4 0 4 0 00 $ 6 4 I I e I l-0 8 0 0 0 4 4 4.8 I a I g 9 O _ D D D D D c e ' D D D e D D u D D e M D D D e e 41 0 D D 419 D D 0 9 D e e D 41 T T T YTT

'. .(

e e

._y_ *

.,.. t e

e

" Ie '

~

fe' _

4 ! [ Q= " s ifi .-

e -, , ~ . - - . ~ . _ , . - - _ - - . . - . . - - - . , . - - - , . , - . - . _ . .. - ,. - .- 4

PILGtIM MUCLEaR POdER STATIO4

  • C0470Nf1TS SCHEDULEO FON EXAMINATIO4 DURING THE SECOND IEN TEAR INSPECTIQM INTERWAL COMPONENTS IN THE Fu ST$ TEM CAT... ITE9 NO. RELIEF. ST5 FEM

. ' . . . . . . . . . ' CCMP3NENT ID NO.. C3*P01ENT............ ISONETRIC NO. 9&T*L CL.. *EJJEST DESCRIPTION I$1-I-e-1 4/4 1 F-C F(1-4) Fd 4-6-1-131 SPRIN} HANGER Fw

-sp4IN; MAN;ER ISI-I-6-1 N/a 1 F-C F(1-4) o-1-132 N/4 F-C F(1-4) Fw H o-1-133 SPRIN1. MANGER ISI-I-6-1 1 N/4 F-C F(1-6) Fw H-e-1-104 S7RIN; HANGER ISI-I-6-1 1 N/4 1' F-C F(1-6) FW 6-1-105 SPRINI MANGER I$1-I-6-1 gia 1 F-C F(1-4) Fw 4-6-1-136 $PRING MANGER I51-1-6-1 Nta F-C F(1-6) Fw M-o-1-107 SPRIN; ham %ER ISI-I-6-1 1 1/4 1 F-C FC1-4) FW H-s-1-10$ 3PRING MANGER ISI-I-6-1 1/4 F-C F(1-4) Fd 1-s-1-107 $PRIN3 MANGER ISI-I-6-1 1 g/A 7-C F(1-4) Fw M-6-1-110 5841N; HANGER 151-I-6-1 1 SPRINS MAN;ER 151-I-6-1 sta 1 F-C F(1 =) Fw 4-6-1-111 g/4 1 F-C F(1-4) 'Fd 4-o-1-112 $PRIN3 MANGER I$1=I-6*1 F-C F(1-6) Fw 4-s-1-113 $7 Rime MANGER I SI-I-6 4/4 i Fw SPRIN; MANGER I51-I-s-1 N/A 1 F-C F(1-4)

  • -6-1-114 Fw 1-6-1-55-1 540932R ISI-I-6-1 via 1- .F-C F(1-4)

N/A F-C F(1-6) Fa 4-6-1-55-10 'SNuS5ER' ISI-I-e-1 1 Nta 1 F-C F(1-c) Fa 4-6-1-ss-z $50esER Ist-I-o-1 via 1 F-C Ft1-6) ed 4 o-t-ss-s- ssessER - IsI-I-6-1 ISI-I-6-1 N#4 1 F-C F(1-6) Fd M-e-1-55-4 5406SER Fw SMJBSER 151-I-6-1 g/A' 1 F-C F(1-4) 4-6-1-55-5 F(1-6) FW 4-o-1-ss-6 skuBSER 151-I-$-1 Nta. 1 .F-C FW 5%u3592 ISI-I-6-1 Nta 1- F-C F(1-4) 4-e-1-55-7 Fu 4 e-t-55-3 $NUSBER 'ISI-I-6-1 N/A 1 F-C F(1-4)

Ist-I-s-t . Nia 1 F-C FC1-s) Fd

. 4-o-1-ss-9 ssuasER Page 14 of 44 I

s T grg a w

6 e i 44 O

in.t e-01 (3

f'J 4.

i er 3*

D '40 tr >

  • us M t<

m > T er T Ter Tfr er T Ter Trr T rr er1 T er TT tr rrTfsT.or er TT tyT fr 'T T T T T T T I f T T T T T T TTT TT TT T T T T T t er ts er tu e er tw rs v tr tr te tv fv av u fu rr er er tr rr ru fr tv #F y

e4 to

<v ta ir rr ta a tu tu to tr in tr tr tr te fr tu cu fr er er er er es tr er fr fr rr w tr tu et ti ft a tw tu u tv cr er it tu e> \

a P 6L M tu us f

)

e- c e= +=

end 64 *4 $ I e 0 he .J r0 4% Gr *1t ft u taJ us es y 1r et u er ta 4 EL 4 A

.% 's e T O

+4 2 3O O O.

e= e c. e+ e=

O ~3 e= Oe= 9 O n r") O *1 o n **l n O O 7 m e- e- e. e- c. e. ee e= e- e. e. e e= e- e= . e. e- e*

  • e e= e er T e o e e e o e M Meses6. A N N N ew N N N N e. e+ e c. ,. e e. e= e. e= c e= c= e- e e. c. e e= em e ,+*=c=

.s as su

> ,n=eO.e 3 O

e e=O Oe O e in tw ee oN P*e eN ef4eA oN eP.e.P.e e eN eN e eeeeeeeeeeeeeeeeeeeeeoe p > >>(> > > & 7 & D ap & tm + 4 & tt & &9 w w f> r> >&

m T1 gi m ff) *rt WI fl Tl f1 m M 8n 41 en er) 9 8r5 m m TI ri m ett S fO 'El m m m M1 m in m 8D m m eft dfi fft 'El e) T1 au F e e Io e.

um e *= e- ea+ e= ** e= e*

0 0 4 8 0 0 6 NNNNNNNNNNNNN 'g 4 0 $ e f 6 6 4 0 0 0 t 0 e

O H wwgWW gr V LL 0 4 9 (9 9 9 a.S 5 9 t.9 ( 9

  • S O O t.9 (S *t "i *1 "I *'t *0 *4 *1 *1 *1 *4 *"a 3 *4 *1 1 *1 i *9 *1 "'I "I *4
  • 6.e 8"1 es i t 0 0 6 I I 3 0 0 0 4 4 5 0 0 0 0 0 0 0 0 0 0 0 t 4 0 1 0 0 t "a a 3 0 6 0 0 4 4 4 0 6- .E u aJ rn s) a) til to en to e m in m sel era e a) en en m to al ett en en to su fD m ari .0 c sn s e e an ers e en 9 se en m so tri

=0 0 D* u e M so e M J tw t8 *= e* em e**=** en om em em em ,= e.* om em e. en e- em e. ,. e. c. ,. e. ,w 4e 4 4AS em e. e. e. v. en em eu. em e= e. em se em e. re we em 1 T F .J M O e. w t *^

k +

49 144 et r"r v w F M 4A M M EM M eM M M to M M M 4A M M M M M LA 4A 63 54 M M M M 4A 4A t/% M 4M M M M M M M 4A M 44 M M M et e4 M t 3 *A M M M M M LJ *S M M M M M $4 M M M to to A M M e to t J L J M en M t.J M M M to M M en M M M *^ to to is t V e

.J 3 N O V LJ I E =E *a et at as et as 45 et e es 4g at 4e *s as .4 ed eq =$ f 1 tr e+ e+ e= *= ** e= e- to tri *= *= F" e* e* e= e= tri M M e= e= en en to M to en en in ,= e= e* e* e e- ** em ea e= e* ** ** v= e=

77 tl 0 t 0 0 0 0 0 # 8 4 0 0 0 8 0 0 0 0 0 4 0 0 e i I e e e e 0 0 4 0 4 0 t t 4 0 4 4 0 0 0 ,

e r3 u p 6e Fw T te O. n O f*4 M O O M O *O=M* N v *=e=e=e-e=eae+e+e=ea

  • O e= Oo=O**O9- nM ** n e=n e=

n n,=

e= n et7 p.

O.c O.c eeM f3 O,=e- O e-OM e= Ne-Oe O o=M e=O. e O*= O n O.*e**e=

e e O r1 O u e e- e te 0 e, et au 64 0 HM 0wH 60 e 6 e *.e i 4 0 0 0 8 0 0 0 0 0 4 4 0 0 0 0 0 0 $ e e e i t 0 0 0 0 0 0 4 0 0 i t i OFF M w M M H ** wHH ** H e.4 w e4 HH H wHHwwMNMM e4 M M M M N *.e e.4 M **

J e4 w O F 0 8 4 0 0 8 0 4 00880000004000006t0tefI4400000004000 w H ** 6 4 H w w w ** +4 he w w w w M M >4 e4 HHwwMww+-wwHH w H w w w we c4 w M H e4 w +4 H T M to M M M M M M M M M M M SM M M M to 4A to O M M M M M M M to M t/4 tiet M M M t/i M M se EA LA M 49 M M fL M w

=0 W 9*

M M M M N e.4 6-4 H H ** H >4 wb.eH w M64HbeHv4H H H H H >4 64 6 4 H H H H M M me H H t e H e4 M M W .7 e w e 1 2 er w e su 7 O OO e O

o

& O O uJ W1 fli O 4 4'k us e-e H et (L .J es *IS

  • r

.3O e

e is r

a >=

4 wa 7 tk w

.J w su T

W t) e LS 4 1 O tt O MM 1 O

.J e M '9 $4 1 2 19 9 19 ' 9 8 9 M d 19 ' *l t i 19 4 9 J 4 uJ O F e- le tu O O b pa ~B O tu tas sis 3 O tu a a

'" t e e2 t 9 ($ t ? M tS 441 o ** 7 '2 R 7 / af 77 P3 7 Y n o n eri w O 4 eas t.

it s to 4 O en > A .D un i.b O H m o e J p p n >4 to .O i933 aaJaa 3 0J 3. w>= a - . -.M

_J * +H- M we.>e 4-3 M .w.e.>4.w- r .H H- - O .J u u. O w J a J O w uJ Z e4 set J a O* wa OJw 3M cQ s aJ _Jw J .O 2 $

T >>4 .J w 0 .J.J.J.8 .J J J J A.4.J.J6 tu 6-e & w IL *E > >4 had D D >= +4 4 uf z t. ar rr aa mOoooouoooooO OOs o us o O O

. e,el v.

v (a s 4 > us un iu *= a e 'is O

  • . O re Te <ti al m m en m Et m re ni dy O > e el n *) H O T O =0 H O >= O > ti m as O e O P 6.e fy 4% 4 9 t '* (g i S a. 3 >+ E & A igg De M

fy 6 H ). Da fa be 6a $* > fr b. W o at O7 FF0? 7 t 4 au taJ 48 tu us ut tu uJ tas us aae su u 1m6 1 O t s he tu e= 1 W & u h =E 80 es CL *E 7 F *A 4 T T I (L E TetEktas*E2 .J Ja e > > > 3 > > > >>> > ut O > u e u e 4.s O u s tu it s ta s O tas > 'u > su tu ta> ees O su

.J .J J .J .J .J .J .J .J .J J O (L e .J 2 n (L e fL "3 (L 2 el (L .A a .J tk 84 i= & m 4.

to O su *t *b #4 .J e1 at *E *E et me se et at of as og us M .4 as u s H H .3 H .J H uJ .J >4 et ** es H H su 64 J **

af t,J O M4 ,8 $ iA 'ti N 4 10 'Ja 4 D D D D D > > .sp >4 ra' 4 ueJ 4 (( (L (L ga (L u (k 4 ga (L p & D 4 4 (L ek us 4 O

a e Y e O Pt a u 7 m m a a e es e4 m *E 80 as as

  • % J J ,$ J W N  % "> M e i N O e=* N M -t n e)

ITJ e4 JW W W w ** N W e' W e= PJ 0 v*

N N N M -$ M in O 41 O O O 1 0 0 8 4 0 4 0 t i ( 3 v J .J .J 6 .J 1 N e~ *= e~ *= e= e- e= t= w= e~ e~ 9 W JT T T TT .J e* *4 O ") t") m n 7 n n *) -") n N N J 1,

T % m m m e"f"t Y *" 4 9 9nOnOMMnnnnn n es i 4 ~3 eim 4 e. >= N **% m/t o P- m e= v e- PJ e8S us .#% 4 3 0 0 9N T e* ** ** e= ea e.*

J N *4 *f m m 0 't 4 i t 4 6 8 9 e= e* e= e* e= e= em ea c= e= N N t O. e== P. 8 0 I t 0 4 5 4 0 0 $ $ $

n a w -4 e u O '1 s i ti o .ti T-0 0 0 8 0 0 t 0 0 0 0 6 8 6 0 0 ma *E *t is *E et ** et *8 80 m f0 m 'P t1 i U t W D e a n M M M M M e9 A M et i H .4 >4 u *4 w e6-e ** H .4 w 64 Q

T O I I I t i i T 44 > > 4 % % D % 3m > b % > T T T T T T T TwO $ 5 0 $ t 0 $ $ 0 $ f 0 4 4 rr *r 'h O Y rr to 1 0 0 0 0 l 0 0 t 0 4 0 1 0 4 4 6 4 4 6 6 0 t i er es rr tv < r v tr M tr er ' t & tr u OO e~ e eO*= O emOD e~ Dv O e~ ,O "eO O e=Oe~Oe-OeOe ne~Oe~ O e~

OO e O.

e eO.e eO. e-n ,-

O e.

  • %e O.e e=O O O ne-Q ea e.

e e. Q eO n O O. O O O O O O e- e- e r~ e~ e= v e~ er e

o e

e e

e e

e e

o

I .1 Ll' t. . $= 'i >r 4

1 l' .

T

9-
  • t -  ;

. tw '

.O

- 4D '

e-4 43

.m (J E

--(k t

a

.M -l e4 t

=0 4 T w -@ ,

.D . e nu vt a er W fr er tr er N tr er av er er w a er & se w er er er w et m er k W w er er er er w w or 4 W fr & M e er e '

h > TT1.TtYtTI ET1YrYTEEETrtYZTT4ITTTTtYrETrTt rTTt

  1. M w Er fu & it w tr er er a tv (J m W tr Er er tu fr er fr er N ta a fa er fr er rr a w ar 4 dr fr er er (r M 'Ir tu fr a N

e $=

F E em .-Oi -7 O

M ue W M "1 8"1 . to e3 e3 80 .}

e t

>* J CD N 49 M tt N 'f U w aaf a Cf er w or i MJ CE M & (L 4 EL iL i iA' e p 2 O 5 wwwwweewwwwwwCOOOOOOOOOOOOOSMO7DOOSOS9Onewed I 9r T ,= e=*=e= c e=e=e=e=e=e=e=em e= e N N ve ,= e= e- += c= *= c' 444444 4 4 4 4 4 4 4 4 4 e=e ,=*=

4 SA e e e o e o e e e e e a e e e e e e e e e e e e e e e o e e e e e o e e e a e e e e-e-e x E8 > & S. *> O > S 9 tb & & & S fe em e* ,= e= en M eq M M M art M M e6 M M e% M M M M M M M sq M aq en in e tr) 1

> M er) El M GFl El 4 dD M N1 m O e art U U U U 4J U U LJ U 4A U U 4J La u U U LJ U U t A O U U th U (J 48 4.J U 4J_ ~i a e hA e P 6= e O $* l "I =9 =D *'t =9 *1 *l *'t =5 *9 ag *9 at et as er U V U V t,) U U U tg U U U U SJ U U U La U u U U L3 4 LL 4 4-HO *t 0 0 $ $ 8 0 0 0 0 8 9 0 $ 4 4 8 9 0 0 $ $ $ 0 9 $ s 4 4 0 4 $ 0 0 4 4 0 0 4 0 4 4 4 5 4 to 2 U O e a 80 80 ED en so el e en et) tiluyUUUUUUUUUUUUUUUUUUUUUUVUUUUUU 4 r1 kU e IA w e ,

49 =J -

-g w

U e= e= += e= e e= e= e= e= ,= e= c N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N <-

WW 1 Y 5" =J <A --

~

O M da e U 4 t= +=  % ,

it th : at en ge eA M en M M M no en eA eA M M M en sa M M M to en M en en M to M M en M M 64 M M M 64 44 eA to se en M sq ' '. i fr W > F eh M 4A to M 64 e vt to M to M tA 4 3 U (J t I a 3 4) && 4 8 U 4) 4 4 44 4 4 4 8 LJ 09 (J 4J Le La 4 8 4J U U 4J (J LI tJ e a tJ t 3 4MW .

r eas fr o -

.J D er O f MOY g 'El 80 ut e 4 to e a) Si m e si se e m sti #p as I D tr e= en e= e= e=4ae-,t

  • fe4 et e= et ea4*= at e=

4 4==4ert et es en an M #e) M M 4M #De9 M ale6 ettMart M MartM i4M 4 N N e= e= e= ,* e= ** M 4 en iA en en f*'t .

FF at 8 8 9 0 e a $ e e e e 4 4 0 g i e 4 e i 4 0 0 0-l E 8 0 0 4 9 0 0 0 4 4 4 4 6 0 0 6 0 0- .

fl ua M s1

- FHI er - .Me= Me= Nw eOe Oe=O c=Ow O e= O e= O e-O c=Oe=Oe=O,= Oe=O e= O e=O e=O (*)

e= *= t'3e=Oe=O c= O e=

O e= OO e= O *= O ** f*1

    • e=f*ae=Oe=O*=O e= O e=O e= O f"5
  • = e= O e=O e=O cO e=O eO.'

M M *= - b= I e 4 4 8 8-8 0 t i e4 5 8 8 8 6 6 I I I e t 6 I i 8 8 8 8 8 4 I l' 4 1 4 0 1 4 4 I e 0 er et au M w w e4 w H w m w H w M w H M w w w w we w H H a.4 H w M M M w M M e4 ed H H H w H w s.e H >e' w -

LO 2 I I 0 $ 51 I 1 0 $ $ $ $ $ .4 0 $ $ $ $0 0 I.O O 9 0 $ $ 0 0 0 0 0 0 $ I $ $ $=I 4 I $ 8 0 '-1

- J pe H O M M M M M M M w H w H w w e4 H M w H H H H H H H H ed H' H H H H H >e H H H H H H w H H H e4 '5

  • e F M 'W eA to M M e4 M to so e M to 44 M M to WI 44 e4 M M A 4A e4 M M M M M to e M to M M M M M M M 4A te M M "

- E 4 to H H M be H H H M H H H M M M H H H H H H H H M H H H M N N 64 N M M M M M M M M H H H H M M '

m> 'r' un 4 e us e +

  • t 9 ~e OO e uk uJ 'g=~ ij e ua p uA De au tL tL
  • F e ua -

>= at De et att f O& e 1 ' sk nu ud e4 .J 4 ,J 4 $

u8 U e 2 O uJ H 3. tg 43 us O J ik og gL 27 y . - we O .-

.3 e O e d tu us us en > kJ tL tu O uJ M E st J IL 4. MM O O *M O 4 4 3 e O 'n h > ik =8 J EL us > c tb 4 et 2 tu LL te. . 44 M tA W tA M (9 LD ed M M (9 M e M A -

01 O ey J .4 w .J w esa og H g O .J .J w .J .J eg 3 gg. 3 4L y .

t$LM19(9(9(9 3 p (9 Y t Q4949 g O w Q .J.

W eO. eu es a og a  ;> (L M > es su & Ik 4 J - E H 2 M H k k De 3 D D 3 3 D =4 4 3 U U .J @ O U s1 EL M us .

I t= ed D > 4A db su u. U M tu H tu er er tw fr =A .J .J .J =l .a eJ F 2 .J J 7 J w Jr

  • U 2 e* O O 3 OOOO areuer utrs O O O O - su er -as
  • N es us a >=

M 48 lb to O 6= 0 6= O 4 Oe=O0 O O O t= se M De O *e cr er 4% (L 4 db > to to 6= b to tu w >= p to eu 6- e= > . ua o i 7N 6= e= ft e= e e. 6= 45 ue 'ua 4 h IL A. fit fr M fr 4 fr t.% L9 fr en M (9 & fr M O tal .J p .

W9 O fr - tu *tJ 1 to 'S nu J -tu 1 ,J.J .J .J J J *3 3 3 3 O O O O O O W P O FOO - t= em O M rk U > tu Je 48 O O > us w us > O .J .J O O =J N J N M M IA 44 dL dL CL Ik ik IL 88 el E4 ud uf as fA 4 644 0 454 -

2 F sq =J (L .J gh en nu cp .J ek (L .J Gu w w 4 as ud N iss ed Ek 4L CL Eb 4 IL f T 84 Eb 4 % #4 A a att teJ .4 S - ,

ut : ft tu ee M 4 H J us J et u tri M es J T Y us us T r3 Y O as w tr tid at 3 3 *) 33 - 3MM 3 3 H esa us tu H. -)

2 L) r) ' 3D & D Ib uJ $* uf D 4 4 EL D 94J e4 M $ $ to R M K r. T T T do v4 en to to M N 9 M 4 dk # M to 4 6= s.= 't .4 .

g

-4 e '

T e O O pub den am en pg . hub aun U F 4 M N m 4 4 e er) a : sm N 4 '

n

. NMNM. w J w 4 w w N w -8 4ww 0-i 0 0'.-. - e= w e= w *= e= w ee w ' w e= e

.I M. so M 4 4 e= N M 4 =J e* J ** .J J ** J c= - e= J J ' u tai t) 4 e= M 4 en # E 2 F 4A M to M I =J 1; .J T T =J I =J 4A in =J T T iA N N tia 4 1 8= .

t 4 0 8 0 $ $ 6 0 0 4 i em I 4 i r3 g) T4 E #L(L T N O 4 e a e e.. +

3* at add **)

>= at p =as>=

Ti >=

sei A eriNenNers anN#1>= Mtf=f=e'=N t=

M M t 8rt (E - N e6 4 er) 819 43 . 4 $ 1 O 4 ,= e= ** ,4= 4 N 13 %

>= NN e= ,ft= e= f= N N .8) OM f>**O Nt,m

= N e4O ,oO e='"hn e N. M e-F N1 m 33 8D 43 1-9 $ $ $ 4 $ $QQ000DOOOOOO9 l I i $ $ $ $ 1 0 5. 4 0 1 4 4 $ 5 9

-O H H e4 ** M O O O O O O O (2 N N N N N N N N N N N N O O' O O C4 *3 O O O O **% O 73 f*16 ) *J M N O "

(L 8 9 4 4 4 0 1 8 9 0 $ $ 4 su ett w ,4J uJ uJ 164 au us uJ tu us w= e= e= e= c= e= e= e= e=

  • e= ,= *= e= em *= ee **e=

7 W fr fr eg' or et M (g fr w ;r er at 4 9 ( 0 g 6-g 4 I i 1 $ 1 0 9 0 8 6 0 0 $ $ I i j $ 9 6 8-1 4 0 O O O O O O O O O O O O O O O O O O O C O O O O O m9 at si m er2 at an at a en si e J J J aft an si es - ;4

-L J e=** * *=e=e=+= c +=e=e=e= e e=e=e=e=ce*=e= e e=e=e=e= 49 8919 a.9 T T t T Y T T 5.T r I $9 4 9 dr _v -

4 e

e e

e. ~-

e

' e.

e' n -

Ar * ,n,- s - ~, u n .,n, ,.-n w,,., , ...n,- c. - - . +,,.e 6,-- . , , - c,.,,.4 , , e r - e c

-O 'i; L i- 4 ,t. <

4 A-m og ssa O

t%

e at

- CL

.J 9 W

> 447 it se us to & Er fr fr 8F W 'E er et M # M tr & tr dr 8V fr ft & W W 8f & fe 8r #r W fr M fr W fT tr Er W dr & W Go W #F W W

. se be ttttttt ttttttttttttttt t T K t t t K T T t T T 3* K t t T T t t t t 3 to eg w eg er m er er tr er y at es w tr er su er er er e at 8r fr et ft dE W tt er fr a er er es er er w er er er W te er fg og e l'*

3 af & 64

'O p 4 u.J

. tea e *1 he .J ft h i

La iu ud

  • 4d tt 84 i fk M e

$ O <

en 2

?

em en e. e= e= es es e= e= e'* += e= en e* ca e ce e= e e* ** se ce e* e= e= em e* ** en en es em se se em om e en e em e e +=

rg C es e= 4= em e* e* cm e

  • e* e* c8 em e* em e* em es e* e* se e* e* ** ** ** e8 e= ,= e* e* em em e= em ew es en se ePDes e* e* ** ~~

q .gj e e o e e e e e"e e e e J 4 e e e e e e e e e e a e e e o e e e 4 4 0-e e o e 0- e e e e e' #

d3 be M Vt M tA 86 W4 #14A ( 48% th 4A ift th #1 tft 4N tM trn M tft th in Wil tft W4 Ift GA e/n en en tf4 tri qrt 4r4 eft tri Wt in tM tre th trl Ift

a. H 4J 64 W W LA 4 3 6& tJ u u 4.1 kJ %J LS 4 4 kJ U tJ W W W W W W U kJ U U 44 4 8 LJ U W 4J 4J 46 SJ U (J LJ 4J LJ W LJ P e ud e F be e Q $. 4L E 4L4L & 4L & 4L141L16 B tL k & & u 4 4 EL & 4 GL 4 E ilILGL & E & 4 il 4 & E 4LLL E & 4 4 (LGL r M eg et i a 0 0 0 t 0 0 0 0 0 6 e et 0 0 9 8 e i 0 4 0 0 0 0 0 4 ee i eieiies eI eie  !

>2 U U U U U U4J V U U VtfU U Q U U V U U V U U U U U U U V U VtJ V U U V U U U V U U U U U. 5 4O  !

M LA e e su e p ,J . . .

er W NNNNNNNNNNAlMNNNNNNNNNNNNNN,NNNNNNNNNNNNNNNNNN ui W i 1 t" K J O M us e Wh em t= - -

)

tt M es e 1A 43 M 4A 44 e in M M 64 to 4A M in IA 64 4A to M 49 M M M M M M M M 4A M M 64 M M M M M M M sa 4A (A LA '.

er F t- Y 4 8 ta 4 8 6J W 4 9 4 4 8 4 4 3 W W W 4J 6 8 W E 3 6 5 8 4 U ta 4 8 W (J 4J e 9 W LJ 4J 4J W 4 9 4) ti ti a 3 4 J U W 4J 4 5 e s t.p tJ W - l se M M ^

UI 8W 4

.J 3 fr O yot g ret un a m e se et as 4 ed og es e ta ett ee #dt et so et si W1 at 414 4 4 art se eE 4 et e at at e art e are e e art e irt ( >

3 fr een M M M 4 4 -# 4 M M Min 4 4 4 J 4 4 4 4 4 4 *4 4 M M M wt M M M M 4 M Min M M M ertM M M *f PP' 43 0 0 0 8 8 e 0 $ 0 0 0 4 0 4 8 4 0 0 0 0 4 4 0 0 0 0 0 0 0 4 0 9 8 8 4 0 0 4 4 0 0 8 8 $-

at W ' M O l'1 O O f3 O O O,"Oe"**& f7 f*n O f*5 fi O O O O O O Cl fi O O O O O O O O f1 O fi E7 O (*3 O O f") O O O f"D -

y .IT fr h ee $m 6 e*

I e* e 4c= cm 8-0o*0**4e" . 6 0 t c= t 0e= '8'0e"0e*0# 0 * **4 **4 **0**0**0**0** 1e*0*" 4e*8c' 9e* ** e" 0 **0 **0 c'4 e=

4 e'* ** ,"4-0 e+Ie*4 **0 **

0-gc*0c= ea -

fr as tu e4 H e4 H H M M M M M M H H e4 M w e.e M e4 M H H e.e H H H e4 w .4.e H H H H w .I.e w$ wMMMwHHM - e LS 2 N S* 1 1 1 4 6 9 0 $ $ $ $ $ $ 0 $ $ $ $ 4 4 0 $ $ $ $ $ $~4 0 0 $ $ $ $ 5 4 $ $ $ 0 0 0 0. 0

.J w H rs es M M e4 M M H H M M H M M*

M M ta en en 69 W H 43 M 4A M se M to to"tAMeMMMLAe-e MH 4AHeHtoHeHMH46HeHMH64 H 4AMM M**4AHM HM H ta HM He MotoMMM4A NM M 4Ae4 to e4toH *

  • gge .F e M M M e4 e4 e4 ed H H ed e.e H e4 H H H M e4 H M M M M M M H H e4 M M M M M M M M H H e.e H H H H pe og ' r

,4, p - -

r uA a'1f a' tu o

  • Pr P e O t"5 e 4 eL e r e $*

O f1 e ul W 448 -- _ .

14 6 U e- SL 440 ed EE J' 3 af 1 -

I

.J e M W tu 8 tak O ua O E 1 u 1 s.A T t us us su a , us ua , "E ' 3 us taa .O eu'>444 's --

  • p e 4 3 p. O u O EL m) O O 4 0 4 O O tJ dL - ik O us ik IL ua' O O EL tu se tu <sa (L .J 444 tad O O e2 O us siui3 u.JM J m e M e MfftO 3 H ' M m' uf44H H L e e og (L .8 & .J uJ M et EL 4L e cg we EL 448 .J & O 41 W dh W .J .J & .4 & .J =f O (L 4 J De Se Je M M =J '

t a.eHO O.

6 sgWe O M us W H us >= 3 m nu se eu su us -

tu t - 4 % b H4.Justr .J M t (LW H gL *E>MgLus tu. 6 (L 4L sk us-u . ir a. -

it M ik sv 4 OO O O - OnOO -0 O OO

'M O ss 6O.id+=aO 0 O M f4. p.o e= O.

iu #L er O 4 *=

M e= O (1 k O>=Ok M O>p 6 e= ' > eO. O O. :

    • M ut 6,ouOO>=r'tOOM si k e D>-C Mk r1 >-- M E5HbO. O .J > > = O -a=. .p M O cy gj u 4* De e* D= k . 'S 't 1 1 $= 3 f3 1 us to 1 ua 1 uJ . na 3

>=. &V p us *4 uA -

ui O O ue tu O W O tu us O O O u4 tu y O b dL su us au O ud E8 ua > eu > 0 86 IL 438 '

F- - r to r_s ek O ud ut (L uJ the tu 8L e 31 ik (L e D. fft (L 4 su es) .J $ EL & .d its oft A Y sk 4 & e & EL ft .J 8L J IQ F F Eb - 'I su' .- O fat *'t H e.4 M .J M og M as w et J *3 3 M .

7- _ 63 3 w 6EM% tu Pgtal toWkM 4 844 ta & 4A >= tu& M ud .JN .J

& M M .J

& %J (L M tuJ tb MM 4 6u,J tuJ *B tu Jtue44 M es>=usus3 es

& D > GL tL ik IL tu 4 4 4 > et > 'As (L 4 % .

O -

n- e k eF e r

f1 ~ O U R e*-

it e4 ee. 0 .

O' i 4 4< -l 43 N e tJ i H sts & r') O us t) W D =4 15 dr1 l - t 4 0 dr 4 4 **4 #d4 e+ ** N N M 4 to et *ft U W N e U (9 tu u ID *N tJ 4 0 85 '. O 4 e' w 4 ~- O nn M m O e= M 4 Ps'ri

6. - 8 6 6 I 8 4 0 4 4 4 6 c=grttoiAr1 N O ** 6ee* N 4 4 e= ** ** N N N N N M vt >'t Wt trl O M a *O ft WB be t

' ?* - ett M 4 4 art c e c 6 art en 0 0-e a O4 3 0 g-t i 8 4 ** a= e= em e* e= en e= e= e. em c. em e e= e= en a= e= e= ,

  • Aad e"* f* c' e* ** ** ** ** c' es em %j er'1 "r% M M 4 4 p, Tl % } ('> -T QL 64 ek, 4 4L 4 E 4 4 4 $ LL 4 & ti, 4 & 1 (L 4 L 2 8 8 8 9 88 8 8 i $ $ $ $ $ $ { 4 I $ 4 O $ $ 0 0 $ $ $ 4 4 0 0 t i l i I I O 60 e i e i o O .= r*nw O O.e*O**3 e"3p O

& ,= c ,= e= f1 O ,O =e O. esOe=f3e=C2es.o wOe 13 ,= eO O. ** e=**Oe=Oe=Oce J'1*=Oe*t"I** ne=Oe'7 3 Oe=Oc ne=Oe=

e e= r aa=Oe=Oe= O e=O *)e- menne*O-r I I I I 4-0 0 4 5 6 9 0 I t 8 9 4 4 4-4 8-8 4 4 0 0 0 9 4 0 t t 4 g 8 0 0 0 1 4 I I I 9-O 4 m M Mn en a1 aft si e M tr: e1 e'su es e v0 *'1 m 'rt e at 80 fri si e m 51 m to art an en Tt gn 13 sai e m m an 15 si e gJ ( *L ti f % (9 49199 d d 4 9 d L9 4 % @ 1919 ( A 49 0 49 t% 4 9 4 9 4 9 4 9 0 4 9 4% 19 8 9 6919 d 49 s 9 019 3 d 5% L$ L9 e t t% 4 -

e ,

e

-e: si e

e-

-e .y

.e -

ze- , .

-e:

, m

2l.. $ l k,' $- t jf F i' < .*

i'l I

O' ,

+ i 5 .

0 (4, .

ene O

.j th T a taJ ' 6 4

.D >=

u, en . . t, . er .r . . tr . . . .r - tr .r . 9e .,, .r.. .....r..r.. .. fr .r ,r

> n= TT TTETT TTT TTT TCTTTTTT TTTTTt-F H

M = sr fr tu et er er .T 86 te er er er is .T Er er T erT ert .tert ett tert er TT fr er er es er er er fr er .T dr T er er as er er 's e>

t lL A *m

.O ui u8 e-H H *1 0 6e J '1 tr U W us tr

H 4JLJ U LJ44tJLJ(J V U LJ 4J U LA 4J V 4.3 4J LJ V U tJ V U U (J U L7 43 (J U U U La 4J & & A J L4 U U LJ F e tu e P 6= 0 O 6= &4 E IL E E IL E AL E IL E & EL E 4L 4L E tL E E E tL 4L E' E E tL E IL E E tL E E - tL E E 44 4L E HO et 0 4 0 0 $ 8 9 4 0 0 t 0 0 0 0 0 0 8 9 4 6 9 4 4 0 $ $ $ 9t 4 6 0 4 0 t t 4 0 08 i e# L) UUUUUUUUUUU UUUUUUUUUUUUUU U U U U U U LA U U U U U U U U tJ

  • 1 f3 ,

D= LJ e M ud e M . .J er u NNNNNNNNNNN NNNNNNNNNNNNNN NNNNNNNNaWN , N N %d N N N ,

tu cas ^

1 TT J 8 o a= W e 4 e= k _ .. .

4A th 4A M M 4A M 4A M in M 19 in af M M 4A 4A M 4A 44 M in (A 4A 44 in 44 ~ _. 4#6 M 4A en 4A GA M 4A M in ' 4A ed N GA GA M E ir P em 3 U tk 14 tJ tJ t 8 ti e l V U 4 3 48 LJ LJ 8J $ $ 43 O e 4 LJ 13 LJ V sJ t 8 l 4 3 (J t J 4J LA (J s a 4J U L3 to LJ 4 A 4J LJ 44 -

et M M -}

tu sw 4 4A +t . J J 3 fr 'O  %  % -

UQT 2' W all 10 d WB si e et a m e e e e e e g3 de og e at e esi se og at e W me et as es an e et . at ed e1 e M1 m 3 #r m en m m' 4 4 4 e4 4 4 .e en en en en 444444444g .s en 4 4 4 4 4 4 4 sm ' in 4 A e= se e*

7 P W 6 6 6 0 0 0 0 0 I e 0 9 0 0 I e 0 0 $ $ $ 0 9 4 4 t 0 t 6 4 4 6 9 0 0 f8 4'l e e 8 O tu M O O O O C3 O O O O O O O f"J f1 (3 O f") r3 O fl O O C2 C t e'3 - O O (1 O ("9 ("i t's rJ ("t O O O C's FMT- eg v=e=e=e=**e=e=**e=**e= e= e= e= e= e= e= ce e e= em ,= e* e= ee - O e ri e O. e to e+ e= e= e= e= va e=e=**e=e=ea- ,.

M>6 > 4 0 0 8 8 6 5 4 9 5 0 4 $~l 8 0 4 4 4 l $ $ 4 0 0 4 4 4 l 9 $ l 4 0 0 4 4 4 fr W tse E

HHMHHHHHMHH 4 $ 9 I t t 4 9 9 6 8 HHHMHMMHHHHHMM M H H e4 M H M M M M $.l'1 . HHHMHH L9 E F 0 I t0 4 6 6 8 8 0 0 0 03 g a g 9 3 9.t a t-e t 4 e e t t . #

.g M H O HHMMHHHHHMH H H H H e.eM H H H H H H H H HMHHMHHHHM- H H ee H H H HF ta M in 4A 4A M M M en 44 4A en M IM M in M M M M LA LA en M M ta - LA 4A en AA M 4A M 4A M 4A ' M $4 en M M M -

f4 et sA M N N em M M M H H H e4 H *ft M M H H M M H M e4 H H H H eg 9 H H H H H H H H H H et M M H H H H .

1st &*

tu F e W e W rr y . O f3 0 . ~ e8 H f4 -

to 4, e .

6= er &*

  • e su to --3 ud et us us OO _ e IL . h4 O D-- fr f J uJ V e 3 MA 1 M .J . a3 ' UA .J >* O

.J e O > tu us Q saJ tu ud *t tai tu tu (L 1 tu ttJ tu g O ud J 48 D as t44 48 - 43 O O ha 1 %3 D e sta .J > tia 4L tu at EL ab & O Aaa o fA su ik dL tu O tu ut O > uf D .A > y tu ik W ' : 2 ue .J th O& ' y C3 - e2 .J e =A tb e4 D -J M M M e W M N O e M & M M sk e ik tk ua .J .J .J et .J W H ik - ad a tu M sp e4 uJ eO gu > et M & .J ha & 4 Ek J us et O at -4 =A 3 & .J & -

T p= H D (L *E us 16 db db $=tuJ skdLM tb f. M IL.JusH 4H4ta.s e 3 > en D D O. 6 Dse s= .(L th M - E - us -

-U N to O>OO00 OOOp O - -

0 00 'O OQ 01 M ua ok O.aO 6 O O e- >>>>0 >e=em us O > O O. >O 000O(4 O O fr O 4= Ar O > > O ' *= O > > O e= f FM >> O t= .J en to De ta em >= 6e t* Da as t= ut > ta to ' ' &*

en ' O tt ul 't u# Da tu 3 2 'S 133O *9 1 1 y . 3 LJ *t 1 uJ ~ 44 1 1-

. ea > 0 g4 W > > 0 0 O tt6 . O O O Q tu O tu o O us ut tu W ut est tu 3 us o "I us O O us w

  1. 1 U rM .A e a a s tu .J = = e s . si e m J n. v a e e a. a a a e. fL e6 o n m O n m e s >us>OutO-

.J a 4 m a m .l-at O un su .J H M 45 sta 84 ,J .J J H .4 .J =J tu H .J M .J =8 M M o e H M M M tu M .J ue M .J .J H as &4 es ,J H .A '

F g-QO 3 'u db 4 D De W tu I44 E4 & . tu us ud 3 tb up ab gs us g ik ik (b Ek & 4 eg & au Cr 4 ou ud ik ' . > & D uJ. 4 us - .

ft e *

  • ' e O n f U ' E O

M . .

- e O em GAA4NMe 'O O 88 et et - et el tr . . . N Cr O 80 M >

6* t. N h,e.em M % N89 M J- S f9 N N m e e e. qft O N m tr4 e O fD ** e= in fD' P e= e= e= e= e= e* ** N N N N N #6 m ort J 4 4 4 4 en m in en gm en%LAN eNoIAe $=

ft e cM>= O t=

    • Nem' ~ e= am o 4 6 -- t ut' tL u. 4L sL E ik it. IL E E tL . tL IL u. E aL AL LL tL u, n E EL E 4L u E 4 tL u. 4L E al LL E u. E .L e* e* *=

R~ l 0 0 0 9 8 i e I t t i l 8 4 8 4 4 6 l $ $ 4 8 0 $ $ $ $ $ 8 8 0 9 0 0 t 9 9 l-t-n O O Q O O h O '"I .3 O O OOnO OOOc CJ O (983f*tet O O O O- OOOOOO' ft e= v* e= *= += e= e= M e* ** ** v= e= e= e == O ** (*ta= O eO. e= e= e= e=t es v= O O e= ve c= e= ** e= a= em va en tw e* ** e= e= e=

F l 9 8 4 0 0 t 8 i I $ 8 8 4 $ 8 8 6 e e i t 4 I e eie i I e 0 8 4 4 ~ 4 0t t 4 8 O m e e e 8tt m att m al ett -c m m m e e e m m m .c m e e si e si ai e tra ret m m si ec . .J .8 .J s as m te (% 19 19 (9 49 4% 49 (9 19 19 49 59 4% d Li (9 4 9 (9 LS 49 49 US 4 9 L.9 t$ LS 4 9 t% 4 9 49 t.% L% LS 49 I,9.' 19 4% d T T T ' '

e.

e e' ,

e e

e e

g.

e:

,^^ -

~

,, . d.; L , ,+. - i . , .- - . , + .,i

4

~

PILG214 wuCLEma PCdE4 STaTI01 C01P3NENT S. 5C4630LEJ F34 EMaMI44TIO4 OutIma inE SEC343 TE4 TEse IssPECTIQ4 IMTEavat ~

'-1 l C39P34E475 It TME *N2 Sr$ fem --

s.........' COMP 0 MENT 13 43.. C09P01f4T............ 153*ETRIC 40. mat *L CL.. C.A T . . . Ifim 40. RELIEF. SYSTE9 ~!

DESCRIPTION A E a >E ST .l da-10-2-1tl ' PIPE T3 ELBom -ISI-I-13-1C C$ 2 C-F C5.11 RMR 15-13-3-1E TEE T3 REDUCE

  • ISI-I-13-15 .C5 2 C-F C).11 Rd*

15-10-3-15 REDUCER,TO ELS3W ISI-I-13-19 C5 2 C-F- C5.11 ane 1$-13-3-20 TEE T3 FLaksE ISI-I-13-2a C5 2 C-F C5.11 EMR Ms-10-3-2F . TEE TD PIPE- 151-I-13-2a ~1 2 C-* C5.11 ***

ns-13-3333-2-2 #IPE~TO ELB0w 151-I-13-1C *$ 2 C-F C5.11 asa 1$-13-33J3-2-31 Etead 10 PIPE 151-1-13-1C 05 2 C-F -C5.11 asa 15-13-5-1E TEi T3 AEDUCE2 ISI-I-10-18 C5 2 C-F- C5.11 RMe

  • $-1)-F110 Flaw;E 70 Pu=* 15I-I-10-2a CS 2 C-F C5.11 ana Me-13-F137 WaLVE TO PIPE ISI-I-13-2s C$ 2 C-F C5.11 RMR

- He-1J-F139 Flaw %E TO PIPE ISI-I-13-25 C5 2 C-F C5.11 CHR 45-10-7162 PIPE TO WaLVE 151-I-10-15 C5 2 C-F C5.11 a42

'M5-10-7145 Flam;E TO PIPE 15I-I-10*2d - ~5 2 C-F C5.11 Ene 43-1J-F139' FLa4LE TO PUMP ISI-I-13-Za C5 2 C-F C5.11 2M4 19-13-F232 .ELBod To PIPE 151-I-10-16 C5 2 C-F C5.11 AMR

'MS-10-F294 PIPE T3 TEE 15I-I-13-18 C5 2 C-F C5.11 RM2 4S-13-FS3 -EL60w TO PIPE ISI-1-13-1C C5 2 C-F C5.11 Paa-17 RM2 01 49-13-777 vatvf TO EL5cd ISI-1-13-1C C5 2 C-F- C5.11 R**

45-13-883 TEE T3 PIPE 15I-I-10-1B C5 2 C-F C5.11 444 M S-1 J-7 9 3 PIPE;T3 EL50d .151-I-10-16 C5 2 C-F C5.11 R*4

- M9-13-F92 PIPE T3 EL60s 15I-I-13-15 CS .2 C-F C5.11 #nt 43-10-F45 iL30d 70'TtE ISI-I-10-1C C5 2 C-F C5.11 ama ML-10-1-13 EL60d TO PIPE -ISI-I-10-58 C5 2 C-F C5.11 442 4L-10-10-16 ELeod TO PI*E 15I-I-13-26 C5 2 C-F C5.11 Rea 4L-13-2-1E PIPE TO ELSaw . ISI-I-13-55 C5 2 C-F C5.11 Aa#

ML-13-3-1E 'EL33d 70 FlamGE ISI-I-13-Za C5 2 C-F C5.11 ana ML 3-3 3 ELS0d'TO PIPE 151-I-13-2a- CS 2 C- F. C5.11 ane 4 L-13-6-2 5 Etsow.To-PIPE 151-I-13-2a- CS: 2 C-F C5.11 294 4

4L-1J-5-13 *I*E TO ELBod- ISI-I-13-4a C5 2 C-F C5.11 RMt

' 4 L-.10-6-1 $ PIPE.To EL50m ISI-I-13-4a 'C5- 2- C-F' C5.71 R62 4L-19-7-2C EL30d TO PIPE _ISI-I-10-26 C5 2 .- C-F  : C5.11 SMR

, *L-10-9-2C dELDOLET ISI-I-13-SS C5 -2 C-F C5.11 ant ML-13-F100 43ZILE-TO PIPE. .I51-1-13 C5 2 C-F' - "S.11 ene ML-1J-F102 ' ELa34. TD PIPE-

.ISI-1-10-4a C5 2. C-F' C5.11 E*4

, 4L-1J-F105 EL60d:TO PIPE ISI-I-13-6a. 45 2 . C-F C5.11 Ree 1L-10-7136- -ELica TO PIDE ISI-I-10-6a: 'C5 2 C-F C5.11 ene ML-13-F137- EL50w TO PI*i 151-I-10-4a' C5 2 C-F C5.11 'R*2

HL-13-F136 iLS3d 70 ValfE^ 15I-I-13-29 CS 2 C-F C5.11 ant nL-13-F1&T. PIPE T3 VALVE ISI-I-13-Ze- C5 2 C-F - ' C5.11 agt

'4L-13-F2304 'vaLWE T3 PIPt 151-1-13-4a- C5 2' C-F C5.11 ant 49L-1 G-F 232 ' h3ZILE TO PIPE I5I-I-13-Za CT '2 C-F C5.11 age

'4L-13-F233 PIPE T3 EL30d ISI-I-10-2a' C5 2- C-F C5.11  : ans-3 4L-1J-#2J4- N3ZILE TO PIPE ISI-I-13-2a- Cs 2 . C-F C5.11 Rg4 4L-10-F225' #IPE.73 ELs0's ISI-I-13-2a C5' 2 C-F. C5.11 ana Page .19 of 44" 4

1 w* _w-- 5 m-

  • ye . - c + 9 ,s-- -4 . -- o m t. , e- = =w,- - - - -vy- 4 -,uy. ,,m ei u m, m,-e.% ,, =w ,-we sm <w-,- - . , , - ,+w,,,~ ww w w * -. - - . -v-,ne.

9 4 , .

W b

O O .c N

W

( 71 M L

.A J

d t

> w E k w.

w M SI k k 4' M

e M wwnwaaaNEnwNuunNwuwNwNNNwwNwweWnwawwww64uwwNrrrrrrrrrrrrrrrrrtrrrrrrrrr wawwawwaawaanmaanamaunaanwwawawaannaeaumeann 1 ;.

e> f; R EM ., ,-

o w us r th M M 7 N2

> JO o-Q mm W E M M e

.1:

a o  %'

M g a E

= wwwwwww wwwwwwwNNmMM4 wnnnnnnnnnnonononnsononnononnenn wwwemmmmmmmmmmmmmmmmmMemmmmmmmmmmmmm g

w w

k e e e e e e e e e e e sweeweepww$

t i l 4 t i l t i l l 8 0 0 $ $ $ 1 0 $ $ 8 ww e=vwwwwwwwwwe *$ $ $ $ 1 4 4 0 w wwwwwww 9e AAOd@@

LJ AWMM@@WWW t8 s.) t 9 u LJ u %J LJ L$ U u E 4WE EWWWW el WWWW W WWWWWW WW WWW WW WWVWWW '

O e E E E E E E E E li. E E. E 4 44. E E E E 4 4 E GL E E E E E  ; :

us e .

Ch e -

o > t Mn k r u 4

EEEEEEEEEEEEmmumeuuumumueucueeucummumeummeuu 0 0 l e 8 0 0 0 0 e i l l e EEEEEE uuuuuuuuuuuu4EEE t 0 0 8 9 0 4 4 %EEEEEEEEEEEE444EEEEE t l 4 4 4 4 6 0 t 9 0 0 4 $ 4 4 8 9 9 0EE0 -h CO 4 Su e Mw- e 4 M J +,4 N u y WW

't rt J NNNNNNNNNNNNwwwwwNNNNNNNNNNNNNNNNNNNNNNNNNNN MA QWw e MM

& k k  %% 4 WWW QD>

GM e T

MMMMMMMMMMMM%%%% %%%%%%%%%%% WWW44WWWWWdeWWW  %%%% WWWWWWedGWWWW w eMM WW e Lb LJ 6 3 L a u u 18 u e J L 8 4.9 % $ F W9R9P9RR9RR999999997999%%%%%%%%%%%% 9y2y2R 9 9  %

JOR O ri .

out 2 mD%@ DmDD4044444 @@e&

o a memeNNN44mm4ew+eemmeme@eeMDmnemmmemO444mD#mme m 4 4 4 l e f 9 9 0 t t 4 8 0 4 4 4 4 4 4 4 6 4 4e444me4m44mMmm4NeN4<

pp u I OW H 410Iea6448eet0$et8800 EMr Mkk a

> nnnCOnnnnnnonnnonnonnnnnonnnnnnnnOnonnnooOnn eww-ewwweewewweewewewwvwwwwwwwwwwwwwwwewwwww 4

wd ora r su II4Il448tilil900400046lt9400448948il$$$8400$

HMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM JMM o s i n a i se s eeea e ei ee e i es e e e i eee: ee ee esee siis s i d.

MR

&MM M

M MMMMMMMMMMMMMMMMMMMMwMMMMMMMMMMMMMMMMMMMMMMM MMMMMMMMMMMMMMMMMMMMMMMt9MMMMAMMMMMMMMMMMMMMM -

's i

.MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M b 42 W1 e W e h ; j.

M 7 e 00 e i g4 e r e >= 6= b to on wwk 3 RR 2

6. p. - > t.>= >

e w Etm 32 7 Et 2 us u J

e e

w14 JONw 1 % ue HM J E%O' M

4 MM 44 M

g MM Wg M

4 wM e4 M . \ - {d %

g N %u 4 3 e NON4WOOEW Ow %E NN N N N N O e2 NJOMtb$1WH&OO.JW. WWNkkWknekkwem whom Whw , WHw 9

'4' su oO nE us F & M =J J E M 4+ to su O W vt us to M w M ui w in M asus w w 64 w us M to tu W M tes r kM kww & 32 # 9 w 69 au w 0 tu 6919 tu ut d (9 tot at us O to wa

  • KNEwwNN7MNW EE2 u su w (9 L9 tea (9 M

ak 000 o >> * * * ** PNX2

      • * - ** WWW PN 7 un %

7M OkkkOOOH OmwOT M rJT JJT JT TJJT1 T * * * .&,

HHH H J .J H NwWw

  • rJTT J J T- TJT 44 On W11 1 On 4A n ae n 4 4 M H

y uu gr M .w b O O w ut w o w o Q w OOnnOnWSMunmOOmh M errtMwMwwMw Q Q Q uf 0 4 O n ua w a n ys O M O EL J e m g 4 4 % a J J ik s 3 u u sJ u t o > # 9 H H 4 9 6 M M 9w t 9ua to M M M O M u e M M o u s w M O M 44 M

.45 O us

,kMb 4 JuME4b JMMM J M%utSw M M P P F 7 M M M 4 4 M 4 M M6 W 6=494.919 2

O QQ '49 4MMM MMMMMM3edH9HWM L9 > $9 @ M H *=tt M.e.9 k '9 -

h e em 3 E w 4 4 4 4 w J W J W W d 4 % 4 J 4 N M d w J M W L9 J J W Q w J W

?- e 4 0 Q O NM La 'f I t '

wN n 07 H m.

03uu e 4MMMMMM M 'MMM M

@@ MMMM mMO4AeN G t tmm440MNNee>NM4 meet-A k UO C O.

4 O d e e m 4 W O et O w N m 4 4 2

- w AANAnmSOOmmt EEEEEEEeeweCI neeemmnnnnnnnnnnnewwwwwwweeNNNNNN.

4wwwwpeeeweweepwwewewweeww+eewee 7

n 4 4 0 0 8 6 0 0 0 0 4 4 *ewep O ri n O 7 D O *J L2 O n n Itt44441till4444118800tt6880008 t 4 4 4 4 wepeeweveewwweweeweweeeewee n

E wwwwwww 4litilIttt4$$0il800444ff45i 3neewnnOOnOOnOndnnq$nnnnOmmOmnOnnOOnn 3 0 3 4 1 4 0 % % 8 9 4 O J J J J J J J 48 Pmme4weeperewwwwevemepecewepepewerewe TTT f f T r. 9 0 t9 49 t9 7 T?tTTfrT rTTTT rYttffrtTtritTt4 4rTT 458884Il409464g(l40448g0884 4i st e

e e

.e e

e-g .-

e:

.e

~ , , . _ >

- g ,

cf T

G H

N bm A

M J

W T D 'M N _

a > O w w .g h > n TrtttT u n N tt EITIIT N N ss w w N e 4NwuNNuwwwaNwNwwNwwanuNuwnaNwN&N ,

- m Nh EuwwWNw%mW 'T T IT rT rt T IT ET II TTT rt T trTrTrTTT E M M

en NNttaNNnwwwwaNNNNMWNNWNWwuwWNNWN

  • S T &
  • O w iu w H M

> J 't M V

w ww ww y  ;

h w p

+ e a

k F O H 2 mmoamememammmen enmeennmmoamo mm meommmammmoem M

4 T

n mmmmmmmmmmmmmmmememmmmmmmmememm^mmmmmmmmmmmmm l440044444484$$44tillitillllllt408400 $f440$M m w W e e n m e e e e e e e e e e ee e e e e e e e e e e w w w w w w e e e e e e e$ eeeven t

> N WW WWWWW W VwWVwwwwwwwW W WWWWwW W W W W WWW W WWWW WWWW W

, e ELEEEEE EEkEEEEEEEEEEEM EEE EEEEEEEEEEEEEU EEE EE W e .

Pk e O H 7 MO W U U U m e d W U l J U U U -U m s t e m u m u m m m m e m u m m m u m W U V O U U m S M U U m g #

k ?

WM U l l i 4EEEEEEEEEEEEE EE i l 4 8 0 0 0 $ $ 8 e 0EEEEE 0 0 0 0 8AEEEEEE 0 0 e l I t 1 EEEEEEEEEEEEEEEEE 9 9 4 i l 4 0 t 1 0 $ 8 0 0 0 8 a6 Nu s M 6u e m:

+ ob e '

W u ww i T F J NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN ONw e E > w

~ --

t.9 m = 4 dew%%%%

% %% 4WWeWg4weWWwag4eW

%%%% W w e%e 's W weWewWWeWWdewWWW4 4 T earrra- se%%%%%%%%%%%%aasurraearrw,%%%%%%%  %%%%% %%%% %%%%% }

WMm us # e uvuareevarrr2avvresea . . ,

i JDW D UQT 2 ~

3 er N mmW 4WU44 mmmmUJeW 44 44 Wd 4 4 4 W e m m m m m m m W 4 m m e ne e m m e 4MNNM*44MMM4ee4NNNNNNNNNNN4NNNNNN la 444444mmene Ywr O tu w N

08484054eeeatttttttt445668444911894II4e3e08GU M9MOOMMOOOOOOOOMMOMMOMMOOOOOMOMOOMOMODOOMMOO # 1

->- - e. .w e. .w e.w . e.e.. p e. e. e. e. e. e. e. e.e. e. e. e. e. e. e. e. w e. r. e. e.

p N4 us wwwHMMMHHwwMMwMwMwwMHuMwMMMM . e. w

. e. e. e. e. e. e.e. e e. e. -e. d 0

OTU JMH ma T

O 4010010lilllllt9 MwMHHMMwwHMMwwwwMMww i l l 4 4 4 l i l l 4 0 0MHHHMwMMMwMwHww%

0 4 l i t e 0 0 I I #81 0 t I "

&We m

w mmemmm+mmmmmememmmm+wwwwMHHHMMMMHwMHwMHHHwMHd mem+memmmmmmmmem.,emammme m n>

w2 e HHMMwHHHHHHwHMHMHHHwMMMMwwHHwHwHwHHHHHHwMHMHw ,,

w e f v .* e )

00 e 4 Es e r e

> > > kw kw>> > > > I 2 g 8 00 e 2 fa 2EEC 2 2 2 uf U e H M w H- -HM- - - M J e 4 4 W 4 4 4 4 44 4 4 a un 4 un 3 e N & WM &WWmMW NanNmww 1 u u Q e2 W tu w tu kJ WWHNkMWKNM WHkM WHHH WM M FNb M h&

w eO o o .9 a us un m tu m O w tu e O us e W uknuousn u, s w a n o w a o w w a m ui us w n w us o .us9oooo + O + m m M us e e us + us w us T HH 2 222 o w ns w o n9 ]

U m

re W WWM 22222E>r2N 3NA PEdE2MNENNNN W egeegzwg g 3g 4 3e 3 EN 4 EN2N 2 2N ,y Oh r t rT 4 4 W 4 W TT TT rtw rrJTJetTJmTJJmJJJJTJ

'r w 4 e e tJrJ r rT m ON e qq q 4 4W em e 4 h W

D 40 Fm O su n O O nt o n O O O O w O o m o m O O O m O O m a n N N n w O a O O N O n 'u n w d O O '

us M 4 9O MM t.9Mt.9HawO OMaM 9 0M4 M M tw$ m 9 49 kH w kwt w O (9 g Hes 49 w4w9 Mt i >w0w 0M t- >w4 w 4 HM>W 4= w ww

> 19 t= H U $w9r>Hd w hMHOusMO 4 9H(9OUMg H ik e

O ut UO wSHMw3MwwwMwwyM M@ N gMgMwwqwMgqM W g gqMg 2wg Hg 9M SHM r O

n e NNOKNNWNNNWNJWJN M N J Q W d J N J J J J .T 444 JW J *O W '? W 4 d O e M O U E O

H m 9 km W N T m &W EMNT rN4 rN r M O 459 T T 4 e m f m N m m S O e N -t e m O m m m m emNemmmmmmmmmmmmmmmm h

e mMmM44MM OO nomN W e0 eI -I- I- -%- le i- -tw% el el wi m4 m e e-e~~~NN~~~~N~~mmmmmmmmm4-m M n e e N m m 4 m o e. m d e N J m o s m S 9 e. N44 M 2%

Z 9 weeeweveeeeeee) eeeeeeeeeeeeewereweeweveewewee

$ l i l l 4 0 8 t i l 4 4 $ l i f i l l f i l l 4 I l l 0 Og 4 e s 0 1 3 i e t I e g g e g g g g g 3 3 3 3 3 3 a g 3 3 g g 3 g g 3 0 g g e e a e e e tw ' s E MeOOOMOOOOOOOOOOMOMOOMOOOMOMMMOOMOOOMOMM7 NOM' O

U e

rrrrrrrrrrre.

e e e. ei e. e. e. e. e. r. v.

i w

rt e

e. e. e. e. e. e. e. e. e. e. e. e e.el el e. e. e. e. l T e r r r r r r r r r r r r e.r r r r r r r r r .r .r. e.

l w wwe r e.

e w eO r re.ri e. ir?=

e e

8 +

e e

e

.e e

e

,,n . , - - - - - - - - - - _ . - - - - - - . - - - _ - - - - - - - - - . - - - - - - - - -- -

f( (( ig (. t ,(

44.= -

O<

g-

.y Cn fu 4.-

i

=f 4 1

  • D uJ er M w . wt er er er er er & tr er er e er dr er er er er er a er is er er w N fr er a er er u & ar er er er er tat er a er w er er w

>= > tt tttttttttt t t T 2 % % t T t t t -t t t t t t T t t t t t t T t T T T t t K.

R M su er a er er er er er er er ft & ar er er er er er N 2 fu fut a tr er er 88 & tr er er W rs er tu tr er tu er er et er er er M -

e>

-T 4 wt O uJ us M M *i u'

e=

u ed ft tu tu ar er A

ek M e g o mammeammemmmet ammmmmmmmmmeamenmea mammema me ma mm .

M 2 n m e m m e art vi m art m m m m m m m e m m e M e am en m e e m M ert m m wi m en m e e m en m to e e -.

4 f i 8 9 $ $ $ 1 1 0 40 $ $ $ $ $ 0 $ $ 0 0 I $ 0 0 $ I 0 0 4 0 4 0 0 8 4 0 0 4 I t I t'l-e w e= em en e e= e= e= e= w e e im e= v= e= e= c em v= e= e= e+ ** va == *= e= ** ** e= ** e= en e= e= s= e+ e= e= e. p ce en em nu

> wwwwwwwwwwwwwwwwwwwwwe=w*ww**wwwwwwwwwwwwwwww es E .L tL 6L IL E eL 4 L 4L E E eL ek E E to E E E E AL E eL tL E 4L E E E E E tL tL E E 4 E E eL E E tL E I

  • w e [.$

F e= o .

O k en e as e u u u u u u e y si u u u s'n u e e u e u u eD u e u u u y u e si u e en e O O en U m e MO 4 0 8 9 1 0 8 0 0 4 4 0 0 4 0 0 0 ee t 0 0 t l 8 4 8 8 0 0 4 4 6 0 0 08t i ei0 8 0 I' e= 2 u E E E IL E nL IL E E IL E E E E E IL IL E E IL E E IL IL m. tL 4L 4 4 E E E E E E E E E E E E E E th at O

,>u e in tu e M .J fr uJ uJ u NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN' 1E t t 4 o>w e

& e= e. - er d e e as at er e e at 4 as as er g as as e es e as e as e e as W er e as as en 4 4 g w e e 4 as g e e at at an as '  % % % % -% % %%%%%%%%%%%%%%%%%%%%%%%%%%% %%%%%%%%%%% -

- er 2 e- ^t 77tE9 99E9E92W9&222299231EF EEEEFt 979997EER99E

. ut =4 w9 us re - e

=J D er O -

UOE 2 e ep S3 et as en et ra 4 e am e3 e ett en si m en e es ar* e en m e e en 40 m en so su e en e e sti eri set en et g 4 as ' '

'D

'FF fr

- u e= e= e= m 4 e=

4 4 0 8 0 0 4 c= 4 ** N **4-0

$3 0 9 4 0 N e- N e= N ** N s= 4 ** 4 4 s* 4 4 4 4 4 4 4 4 tm em tri aA in 444444 -'

O uJ M 0 0 4 4 8 9 8 0 0 0 0 8 4 5 0 0 0 4 8 e I I e I i 8 0 09' f tt M T er O e= ,O O e=

= e= OO e=Oe=Oe=Oe=OcO==Oe=Qe r1 c= Oe =OcaOe O +=O e=t's e=O e=Oe=O**C8e= Ov= O t') e*

    • *= O e=n n*=Os=M**ne=s=1 O +=

e= e- O cn g=

N emn O. e s)

e= Oe= Oe Oe= c O

M e- > > 0 4 8 8 8 6 0 4 0 0-4 I 40 t i I I4 8 4 8 ! I 1 4 3 0 8 1 4-0 i t I 4 8 0 0 414-4 0 0 :

w se us M M M M e e M M M ee M M o.e H ee M e4 M M M M M M M M M M M M M M M e4 M M M M M M M M M M M e.e O2I I .

0 $ $ $ 0 0 $ 8 8 $ $ $ $ t 0 % 9 $ $ $ 00 0 $ $ $ $ 0I $ 0'$ I I 4 0'I $ $ 0 $ $ $ $

=s M M ~ O M M M M M M M M M e=e ese M M M M M M M M M M M M M M M M M M es M M M M M M M

  • e M M M M M M -

ME e . M to e to en M e en M M M M e 69 in en M se en en M M M in en M M M e to M M M w9 og tA M e en M ta 4e e v4 .

J & *t 64 M M M M M M M M M Mo.ieM M M M M M M M M M M M M M on M M M M we M M M es M M M M M M M M M M Mk

tu 2 e uJ e-cr ;* e OO e E c5 . .e to k -

1 e et 2-

^

f"t O e- M >e J-uJ u - .e er at .

?

, j a e k er > .= fr . -

e' er as er er er - er er er er es es er l eu . er t-3- - er >= m er a : dr er er W tr a or er er er - er O eR O 44 us tu uJ tu uJ uJ ua us O = 0 us us us uJ tu w tu au to . us uJ us eu au tu us r su -

tu . oO - ew uJ 4.9 L9 O (9 (9 O t9 tS EL EL o LS de. O O O s* L3 O au 19 (5 O Lt O O t,9 49 t 6= M  : e- er R E F h 2 h R R R F b t= (L R ll! . 2 222W gy3ypyy: E u 2 e- *s g as au 2 at 3 as at at as D R D es as .. as as as as as 2 ' . 2 er ^

as - - e : as og og we as 4; er - se -

.q-e us ik en I t T T ke t M t T T T M *e e T T T TTtT T T =0 t T K T T.T T E T..

es . av

'wM es . et .

n . er w as er fr. - .

eg - 4 19

'> O Gr - tu f) au er f1 O O er Q er O O Q O ti er O O O O ri tu Q Q O O O O O O fr O O f"3 f1 O Q n O O O fi ul O sk u- O M O uJ M M M > H > M M pe M M >= H M M tMOMMMMtM t M tu t t M M M M M M M T H (1 Y W

  • to M t.9 M > 13 o O sa O M a.3 o O LS O to o O g3 u at M O O d O u O O (A 6. O u 49 t.9 43 (9 43 (4 to 4.J tg M u tas O est *3 M D est M M M au M w M M pe M M tu M M M F M "3 M M M De F M P es og p p M M M p e M M >q y M 3 3 ,
F ~uO O 'r O I (W M M Gr fr ft 4r.tr & fr er fr W fr fE 4 M.d W W tr fr =t it.94 fr e=0 ell et du fE. fr 8'r ef gr Er e( tV 19 af -

o _

fh e er e-

-O f'$

u -2 O.

. M tr T O t er or t Y er - t at er I et as ; sr er as . . er nr er 4 h

eiA na sa et M M to to to na ' -M - M to M - M -M tre 'MMM_ =. .. e e M ta

- F em N Tk e r") M e= *= N N M M 4 4 tr% #t 4 O N A= #1 M S ") f"3 e e. N N e #9 4 e eA ON M#b ne=*eart41N-

. 4 4 4 4 (M tm ef4 tm 484 m tA la e M in to 46 ft to e trt en tm e O 4 aft 1h e 41 gi O f N P= fw A P M1 *O m 90 It? irt '

tu . 9 I I a 4 4 8 I t I:I 4 0 4 4 4 0 8 I I I I $ 8 4 I i 4-8-4 9 I 8 4 e 1 4 y e= e= c. e 4= e= e= e= e= e= en e= e= e= *= ea ,6 :=,.8= e= .

4 av e=e e *=s=+=e=e=e=e=e=e=e=em v= ,e. c. ,4. e= e= e= e= e=.c=I -

-O 4 4 4 4 8 9 4 8 8 I 9 8 4 0 8 4 4 4 5 8t I $ 4 8 8 8 5 0 4 4 4 $ 6 I s 1 0 t I e 8 I e fL O

' t -.

-- O :-

-'c=e=e=e=

OOCOO O O aO*=e=*=e*v=va c *=e= O D n O O*=Oe=Oe=Oe=n e= On g= O==O e*Oe=8"l e= Oe Oe- O*= O e* O==O e=O e=ns= nO c eOe= Oe n.e=oe n e O O ==

    • e= O e=

O e=-

O I e 4 6 8 I i 0 8 8 8 0 8 9 $ $ 8 8 I f 8 9 t i O't 1 I I 8 0 01 i 4 e i l 1 0 6 0 t i.-

'u' T t t t T X T .T T T T t T _ T T t T T T % T T T T 1* T .T T T T T_ T T T T T t - t _T T' T T T t

-e e

.e e

e-e-

lQ *

..'.A . e

o .t'

4 o r m

N W

m M

J

  • W D W m M W 8 p

M NwwNmNwwNNNNwwN NwNNeNwNNNuNNNNNNNNNNNNNNwNNN ,,j y M ITTT IETTTTTI TTI ww%N T TI TTT ttT TT TETTEE TT rtTTIrtTZ r ,

w u u % N w N w N w N n N a N N N N N N w N N u N a N N ev a N N u u w N u N in a K e-a EM t O tu W '

M M v

> JO U WW ,

W 4N 4

e o N O w a nonnonnenon.sannemannanonnnennnonnnenenennenn mmmmmmmmmmm+memmmmmmmmm444 w

g W

T W

W 0 0 4 6 3 8 1 4 0 8 8 4 9 A l l i l l l l l l l l l l 044 eweeeeeeeeew=ceeeeeeeeeeeeeeeeeeeeeeeeeeeeen l l l 44444444 l l l I G I S444 I t i4l 4i l04l D w WW WW W WWWWW WWW WWWWW WWWWWW WWWWW WW WWW WWW WWWWWW W ,

I e EEEEEEEEEEEEEEEEEEEEEEEEEE EEEEEEEEEEEEEEEEEE m' W e 9M e O >

wn e m m W V U U m e m V U m m u m V U m m V U m m V U U U u tt u u u u u u u u u u u u u u u

>2 en u I i l 0 0 0 l l i 4 i l 4EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE EEEEEEEEEEE 44iLll*lllllll44444000000I4Il94 .3 .:

ku e is MW e M J d' N

WW

$ 1T th J

NNNNNNNNNNNNNNNNNNNNNNNeeeeeeeeeeeeeeeeeNNNN OMW e a w w OM e egedWegewese44deg weweweedageewemedWewegeseWe ,

NDw ewM v  %%%%%%%%%%%%

99 7PWP97E229RP929  %%%%%%%%%%%%

E9 9999 9999RvPP  %%%%%%%% E99 999E  %%%%%%%%%%%%

EgttPP WC e j JDW O 9 War 3 4 e amammmmemeemencemen==*m

  • a mene Y '

4 m 4 4 4 4 m m m 4 m m M e N N e m m m m m m e e e e e e e e* e e e e e e< e< e* e* e e 4 M -

77 n us (3

w 4 0 0 4 0 0 0 $ l e i t i OOOnnnnnonnnonnnnOOnnnnOOOnnnonnonnnnnnonnon l 4 t i l l l l l l l l l l l l l t 8 8 8 8 4 I I 4 0 0 8 84 4-Est ww>

Ne a

> weeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee 144$100814littliittilllllllettilllllellII1Il 4

1 OZE to 7

O wwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwww 1991$$30$000till984Oli44091908il08914il4il46 Jws MS 4ge M

w wwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwww MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM NW W2 e wwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwww a W e N ? e 00 e

&E e H H kk >>>>

T 3 2 ER REYZ no ,e w w ww wwww  ?

4U 0 e 4 4 44 4WWM *,

J e N N NN NNNN 3 e NW & W4 P Wah N N N N M it N W W NN O eX WW WA W W M W +u M WH >>>> W W W W ue W W W ui us tu 8

eA W M M 4A M iS 8 9 O 45 49 O (9 43 O f.

uJ eO M (9 6 49 O ua 6 % t.S W WW tu us W su GO - I I kw FR X22HN 2F222 yFPp 7g MEN NNkkNNNg W4 deWW WW 4 U z- =< ==*r == . zu M4 E

M su e TT TTTwJ TTJ JJwwJJJJ rzTTrrrT r Tr-Pw N e4 e av 4 e e g as e es e gNwwuNNN NN M ON N O M E 9 4619 t 9 si e t ti to us tu W to W us u n e 9 (A to us e

2 AU FM w GOOOOONN uaO O M O B N N N NNNNWDK2227MMZfmmm2mmom27mm LS w(5 It. w49190tAbwOMk43h>MMe w w h W O w w ga r ua W k k au W> et W O y w w w w w w w w w m m m m m m m e w w m m -

un 0 4u e 6 H (J N N 4 N & rr a w N 3 3 3 3 1 3 ."I"3 m N 3 3 2

O UO w J &w W Fw (1wNm N ueN JW') 3NMWwJ4 eR a wNW J.J4 W e e d W 774444&& na& M27NFF2P4 4 MF JJJJO4MMMMM4MMMMMMMMMMMMMMM

% e W e O O V F O 4 w A 4

-M M MMM A DAODO*NM4 Nm3OeNM4' MM

6. 9N 3eM4-4 mon %$ MMnJeeceNNNNN40eNm4m-mN eeweNNNNN 4 9 t g $ 4 t 919 e g 13 4 9 rg M N % N ri. N A e. N A M M M M e na M e N4 2 MHm40 N O D SMM O em e=

[

W PWMMMMMMMMMmeeeeeeeeeMMMMMMMMeece l 4 t i l l l l l l l llllllllllllilllllite891800048430

[

l e eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeewwwww 1

l 2 we n

n T

14iIltiIeeIelIllitiIleaei1644880eel84eIl40 MMOOOOOn9mOOnOnnnOOOOOenOnnOnOOOOnnonOOnnnOO O

U weeeeeeeeeeeevereneeveNeeeeeeeenweeeeeeeeewe 888tillil4488441491481440908150eieiet*444lig o

TTTT TT LT Ttt TTTTT T T TTTTTTtt TTTTT T TT TTTTT T TTTT e

l e

1 e

e e.

e e

e e

A PILGRIM WUCLEAR 70 DER STATIO1 CO9PONENTS SCHE 00LE3 FOR ExaNINATIO4 0U414G THE SECON3 IE4 TEAR INSPECTION IMTERV4L -

CO*PONENTS IN THE Rnt SYSTEM

.......... C0480NENT 10 N3.. COMP 0 MENT............ ISOMETRIC h0. 44T*L CL.. CAT... ITEM 40. RELIEF. SYSTEM ~

DESCRIDTION REaJEST 4 1 -11 e $ PRIM; Ham;ER 151-I-13-38 4/4 2 F-C F(1 6) RMR -

1-10-1-117 $PRIN; MA4GER ISI-I-10-36 g/a 2 F-C F(1-4) RMR 1-13-1-1175 54ud6FR 151-I-13-54 4#4 2 F-C F(1-4) RNR 4-13-1-119 SPRIN; NANGER 151-1-10-18 m/A 2 F-C F(1 4) RMR 1-13-1-12 572I4; waNGER ISI-I-13-55 1/A 2 F-C F(1-4) Rna 4-10-1-120 SPRING MANGER ISI-I-13-1s g/a 2 F-C FC1-4) RnR 4-13-1-154 SPRIMS MAM;ER ISI-I-13-18 1/4 2 F-C F(1-4) RMR 4-10-1-135 $PRIN; HANGER I$I-I-10-16 4/4 2 F-C F(1*4) RMR 1-13-1-14 57414% MANGER ISI-I-13-58 N/A 2 F-C F(1-4) RH4 4-13-1-144 $ PRIMO MANGEk ISI-I*13-3A 4/4 2 F-C F (1-4) RHR 4-13-1-14$ SPRIN3 HamGER ISI-I-10-34 gia 2 F-C F(1-4) RH4 1-13-1-150 SPRINI MakGER ISI-I-10-4A 1/4 2 F-C F(1 6) RNR 4-10-1-151' 5 PRIM; waNGER 15I-I-13-4A mia z F-t F(1-6) anR 4-13-1-152 Spu1N3 MANGER 151-I-13*44 t/4 2 F-C F(1-4) RNR m-10-1-155 SPRIN3 MANGER I$1-I-13-4A N/A 2 F-C F(1 4) RMR 4-13-1-10 SPRIM3 MAN 3ER ISI-I-13-55 1/a 2 F-C F(1-6) RHR M-13-1-17 SPRING MANGER 151-I-13-58 m/4 2 F-C F(1-6) RHR n-17-1-17J $PRIns MAMGER ISI-I-10-46 N/4 2 F-C F(1-6) RMR 1-13-1-15 SPRIMS MANGER ISI-I-10-58 N#4 2 F-C F(1-4) RNR M-10-1-182- SPRINI Mam;fe 151-I-10-10 4/4 2 F-C F(1-4) Rna n-1J-1-1$3' 5FRIN3 SUPPORT 151-I-13-1C 1/4 2 F-C F(1-4) Ed4 e-10-1-134 SPRImi SUPPORT ISI-I-10-1C N/A 2 F-C F(1-4) 2*4 1-13-1-1$5 SPRINS.$UPPORT ISI-I-10-1C 4/4 2 F-C F(1-6) 444

  • -10-1-1$6 $PRIN; M a N ;E R -- ISI-I-13-1C g/a 2 F-C F(1-6) 28R 6-10-1-157 $PRIN; MANGER ISI-I-10-1C 4/4 2 F-C P(1-6)

ReR 1-13-1-176 SPRIMI HANGER ISI-I-10-6A wra 2 F-C *t1-*) Eng '

1-10-1-197 SPRI4; '949GEa .ISI-1-13-4a gia 2 F-C F(1-4) RMR M-10 14 5 SPRI4; MANGER I$I-I-13-4a gia 2 F-C F(1-4) Ana 9-10-1-149 SPRING Mag;ER IsI-I-13-sa g/a 2 F-C F(1-4) AnR M-10-1-2 SPRIN3 HANGER ISI-I-13-1e _4/a 2 F-C. F(1-4) RMR 4-10-1-2J3 SPRIN; nas;ER I51-I-13-4A m/s 2 F-C F(1-4) Re#

4-13-1-212 SPRIN; man;ER 15I-I-13-SA sta 2 'F-C F(1-4) 1-13-1-214 Rna SPRIN3 HANGER ISI-I-13-5A mia 2 F-C F(1-6) Ree

'1-10-1-215 SPRING MANGER 15I-I-10-5A sia ~2 . F-C F(1-6) EqR 1-13-1-2254 5#RImi $UPPOa7 ISI-I-10-2A m/4 2 F-C F(1-4) RMR H-10-1-2551 SPRINS HANGER ISI-I-13-2a. 4/A' 2 7-C F(1-4) RMR M-13-1-2$1H SPRINI MA4;ER ISI-I-13-2s 5/a 2 F-C F(1-4) Rt' n-10-1-255 SPRIN3 $UPPORT ISI-I-13-34 M/4 2 F-C F(1-4) RME 4-13-1-3' SPRI11 MANGER ISI-I-13-15 N/A 2 F-C F(1-4) RHE

  • -10-1-3354 SP4I41 MavGER ISI-I-13-2E tra 2- F-C F(1-4) RnR M-10-1-555 SPRING waNGER .ISI-I-10-34 mit 2 F-C F(1-4)  %*R e-13-1-4555 SPRIN3 HANG"1- ISI-I-13 stA 2 F-C F(1-4) Rda 9-10-1-5 $PRIN3 9 ANGER I$I-I-13-18 4/4 2 F-C F(1-4) RHR 8-10-1-59$M $PRI43 M4NGER- I$1-I-13-18 Mts 2 F-C F(1-6) Ene Page 24 cf 44 s v .

e y e. A =am& A . ... . 'u, ,;'

e e :., . am

\Ls -- - -. - ----- ------

( a f W

n!

O m

N b

~

A

.8 W 7

> sd

% N =

w M WhWWMMWWWNM44&NWWW

> > 4 F M T T TTT T rt ttTTT TT T FT 4 M www456mNwuwannaNww 0 ok .

F E t1 O uJ us M M 7 M J 'E '

u WW W rg g 4

A e F O

% F m e e+ ammamammanammam 4 Y 4 -c 4 4 4 4 4444 0 44 444 94 0 0 8 4 4 0 $ $ 0 0 8 0 4 4 5 8 8 0 4 W wwwwwwwwweeeeeeeep W h wW W W- W W W WWWWWW W W VWW D M EEEEEEEEEEEEEEEEEE F e W e FM e o w  !-

MO e uvuumuvuuuuuuuuuuu e e e a e e e e e 4 e 6 e e e e a e MF u EEEEEEEEEEEEE EEEEE .

dO M tb e M J W

esJ uJ st NNNNNNNNNNNNNNNNNN 1 T T J O b ut e

n. w . meeWewweedememedde 49 M W '*

T F > F

=HM F F FR F F FFFFFFFFFFMF ,

WN e ml l JDW D udr F 4 9 d e 4 m m e ni e m m 4 m d e m 4 n a mawaasassammammMMM (

FF 44 6 8 0 0 0 8 I 8 0 0 s i e e I I e I .

O uf M 000000000000000000 l' TNT w weeeeeeeeeeeeeeece j M> k &

Nd us f 4 8 0 0 I i i 1 8 8 8 0 t f I e i r.

O eT F T MMMMMMMMMMMMMMMMMM JMM O $ $ 1 0 0 0 I $ $ 4 $ $ 3 0 $ $ f l MR

6. M M M M M M M M M M M M M M M M M E4 M 49 MMMMMM@MMMMMMMMMMM NW M MMMMMMMMMMMMM MMMMM WF e w e N P e  !

00 e

  • 4 O e i F e MO e us u e F f 1 J e WMNQ h& N WWMTMN p WMM , -

O e O uJ rae W us ue su u* tu ut tai uJ uJ tu asJ us eF & ($ @ 4.9 t 9 (9 s 9 93 LS t$ % 9 s.319 4 9 8 9 t$

w so A T *H ogFRFFFFFFFFFF

=weegweawon FFF 4 g a i U Zk M TTTTYTTTTTTX <

e us a TTL "**

m N FM t,9 t 4 a 9 e 4 e 4 < 4 19 19 19 4 9 4 9 4 9 4 9 p e 4 9 8 9 t o us so Ow W nu PF F.?F FF.TF FPFF mFF Fm

/ MMMeeMMHMMMMMM mMMMe uJ T' M O us NMGNG MWNNNWWMDWM M YS F QO An4A A % 44&& 4R & F& anF C

MMMMAMMMMMMMMMMMMM n e F e O O Y F O

M A

M MW WOeNN k

MM e *= vt N M P. 'n O N $n D m > H k A F

uJ ef% -b D D Denen v'n O n & O &O JJM 0 $ $ $ $ $ $ $ 4 I I G $ 1 4 0 4 0 F

O weewew eeeeneweeeee n a e e i t e f I e a I 4 e e i e e t T

OOOOO&2sO(*1OOOOO9OOO O

eeeeeeeeeeeweveeee u 9 0 t t I 8 8 1 0 0 1 8 0 4 1 0 t I tt PrTT TTTTFT TTTTTT e

e e

e e-e e

e e

e

Y Y 6

t ef te

0 W

N C)

Oi to Ch.

.J W t'

% we (v s.

10 M b t-O $ t tJ W O 4 3 e i W W W O W W O O La O U U W W L 3 O L 9 W &3 O U U L8.J .J .J .J =b .J ,J J 6 .J .2 .4 .4 a6 J .J .J .J .J .4 J .4 .J .J .J .J .J .J 2

H M

mm to M MO4A ip M+t3 M eLA41 10 S T1 m 23 m tri M M M O 10 $ @ m m tel m TAJm.JT1 .A 6U Om

.4Ut8

.2Om m .JL3L3 e.Js0J U51 J U.JU.JO.JO.J UVU J .J e >* M M M M M M M M M &S M M 4A M M 4A M LA M M M 4A to M MM mM et1M4Q M m $ m M di C 2 %M M V1 M M M M M M O HJ L&J e" H e4 *'l 6- l

.J < p U .V tu uh ab N LK M (L tk M e F O e4 F O O O .*) i *") O ) f") O O f"3 *1 f"3 O em a n s m e e .sen A es n =%

f* T ** A. P* -9 4 *"l O *'i '") 9 r"i e% a *= m a ** sus e% sg og og .mg a% .=g aus e

as us ar) #1 m M M er% e4 "i *% *P1 M M M M 58't **'t 88't er) tu t.

>=

>e NeA.ePa4eCD o 4e 4 *>

  • f e e44 %&Oe44e 4o%4 efk4e'De 4 4 *f 4 4 A4 4 0 0 8 8 4 4 $ $ I i e e e e a e o e. *= e= e- *= e= == e= e* e= *i 1 0 i e i e g M3 Mg 881 g 0M "g't

@ *> @ m et ft "> w w w w w *se wwww * *~ ** e= e= e* e= e* e= ce ** e= em ye b=

E us 6

a M1 st) Tl M m m m m m @ O 11 ati e tD O FD e wtilw w851 NNN w v w w me' saf w w w tw8 m LL 4L tL u LL E IL G if. u u. t e t 8 4 O **

64 48 t *' O ti *1 "'t

  • 1 *4 9 *1 *4 M *'t "a
  • 1*i*1*1*1*i 7 "is)
6. O F u 4 fl bU e 4 O4e6si 1m ltol @

to 0 eD4 0s' $ s a1 t Imgm9al0er1 0 4 4 6 % B O4Ogar)i mGe t#19erii 40 O GJ 10 m o m u u 4 E 1 E IL 4 SL nk n LL 0 fri4E)0WIg 40$ E'll 4We8W1$ al$g3$5143 $ $rs0mO3 M %# e IL u w iL tL nt E a LL IL E M .J

-y gn 148 i4J F ,= e= e= ee e= e. e= e= *= o= e ,= e= c= ** e

$ T Lu e* em cm e= w v p ,= e e J e* e= e= e= e. e+ o= e ,= e= e* e= o= es. == o= e . em O>b o ft aA 6.

L9 t- oE 8W FM 9' e M M 4A 4A 44 4A eA W aC H M M M 4A to EA M M M 4A e 4A M M to e LA W es W et et at at ar( et 4 og es eE d W at W og sig at et d M EA M M M 444A M M M M MaAnA LA M%M a7%%% F F F %%% %%% %% % %%%% % % *% % %%

iu 8v i &

.J 'J .J t.J '"I O

e F FFF FF FF 277 7 F F FF F2Y el 2

") M em FF ta e=o=**e=e=e=**e=e=e=e=e=e=e=**e=e=**9 O us e4 l

0 0 9 $ I I e f e=r*e=*=e= e*e=e=p. e= e= e= e= e= #= ,

T, H T lY e= e- e- e- *= e= e o= e= *4

  • e e- e= e e= e e* em p= e e= p= ** >= em ** em e= e=

H P* O'" e"

    • em e p*
  • =e***c***9" *** pm *= e* t= 400064440t48000464688454II04500000 c= e= e. c.

e* e= e= e* ** e=* e= o= e* *c= e= e= e* e= e= e fW at O2 F sa $$ilI$$0$$I$ I l l H >< H H H *= H e.e H ke es n e 64 64 ee l.e >4 H vg H ee H +4 H H

  • ** #= v. - e= e* eme= e= e* e* e= e* ** ** ,= e= e-ca e=

e* ee= e-e= e* e= e* ** ** ** o

3H 64 E'

O H H o g H H H H >.e e4 H e4 H +4 iII$I$l$$$$$$$68IlkI8llll$0l e4 1 (L e1 M M

we li$I$5I300$0I$0$$f$$$$$j$4489$$$$0$$$$$$444$

M BA n.4 e4 64 n.4 e4 H HH H me H H H e4 e4 H H e4 he

  • W b H kg M 416-eMH M 6.e64 64 HLA e4 & M M M tA M M M M M M M M 4A e & M M M VtHHH H N e.e e.e H e4 mg H de og H H we 64 +4 H e4 e4 M M M M M to M @* M e+-e e o 64 MHMweHMHHLA keHo.e MH LAHOM*.e be H e4 H e 4 H H H we H H H H us F e en s e H H de e 6 e e4 e4 >< H H >4 H >4 H e.e H H Y .* e OO un a 9 e aO 4 mu e

\

J e uJ s= > -u w su

  • ) e O 4 % O hj I44 % 'eJ 4 til $L' in (4J % 44J B td J 1 hu 1 MJ 1 CJ e2 Z J" ED h OQ H W uf *=4 V +4 us Y

oO HH N H .JogH&rt).J>.4CL

> oie (L UQ f"5 O

& v [k H#hSO>e fL 51OOHOt CL 6g O m Cr 30 e

>+ H J J .J in O tk .J ft .J ft F t=

to OMMOOO u) .J & J 49

-Q OOO O O ew &*

hs us us 2 se t 4 m o att f 4 pe O6 b- 0 0 O O ar 2e H OO O OT

>= == e= k. >= be v. H F O b. O e f"g be O

> o.

T -

$6A '4.8 u' '4e T 4La k k h V H4 as 1 1

't 1 E F M .A.J > bJfh h3 **

J au er. f O tafaul'kuf kC les et to O 44 4 su (4J us tia w 4' Ltd f-) L& s at ag og H at H ,,,J CL U a u at O Rt O MS O ul O MJ O H O O O O O f"'t O O Odi Out til'"3ut ut su tLJ tu eu it s uJ iu ta t

? UO 4 as CL m n m a H t i e 64 H H e-4 *4 34 H e * >e **O Q O O O O O O Q C1 O 3> 1m > fi >Q O iu M 'L $4 ed O e.6 O .A b e .J H _J n e .,J >< *) e4

  • ) '*% *) ") *) *) *) *) *4 ") *4 +4 H H H be H m.e H *. e H 4 e & M CL M su (L ut ik us tk u s f4 e fr (4 34.'5 49 O '. S e et t.9 t,'S +'t

") D ~4 D ") 9 ) *") D "4 s' e

  • S O (_4 O O t 't O ti ti a4 O *'4 U  ?
  • ^ di O ew ** eo N

p= e= e-be

." O O Ci Et m e* *- e= ew mM m e+ e= el ">e N 4 A ar' 4 W

    • o= ** Yn " f') O b. E fie+ N M eT')e+ 4 f") ** N M ~$ 47) O6 "ft 4 7 ** f'J e#% sf Jg 41 Fw f1 4 O N N N N Asf 9 N N N N 8di 2 3 # f **w**** el O CO44 O *'1 m *=a
    • ) e- ** w NNNN & G $ $ 8 $ M M 8'i M M 80 se) M D'i s9 ft m 41 n4 4 5 6 9

> w % e- e* e e e-- e == c e e= w e= p=I I I N N m M M m m m m M e e-e-e e-e.e$ - em i e.

f e=

j e-$ eI 4 6 I l l $ 6 l 4 l $

e- ** ca c. e- e= p. c= w e e-T' O

$ $ $ ** e" e= e= e*

e et e t t 8 0 ==

e" e* e* em +=e'*c=9"* $ c-i ee ege I e'*c.I ae +-

e** e= o. ** eat e*

4 e0 eeae eee.ae=l lenw 4+- 8 9 . I 4 I i 1 I i 6 o==

5l e* e c* e= e* e= e* ee ** ****e"e=e'*e"' e= e e = ,== e* e= w e- === e-

    • v=+~ e'* e* e' es* e'* e'* c*

e e iIiliI448iil4099Itt80 W m 19 m Nn tr1 msv% 15 41 m 16 We m e er1 i 9' tTT t 9T0T 4T 6T 6TT6T8T9T1TtTT 144 TTT f f TI 8TT8 8 e

e e

e 4

4 e

e

~

r -

,q --

.}-

i h

J

  1. -.)
  • I et .

?

O N

es ,

th L to '

fA.

r L

ad as E

= W t k #= 4 9 (#

W M $

J .J 4

e. > ee 4 F M M sa e H
  • e to P LM O tse W e M - M%

ee JM er V WW W

-u EW  %

i GL M e 2 O Mi 2 ==

m4

- ts F f I se W **

  • W De wW Sm M E4 7 e W e C o. e O b= mO MO at 4 8 C* 2 W M. E O
4. v e AA stJ e N v e= ee +

- W U4 E 1 7 tU .4 O>> e

-4 en ta '- WW th > W  %%

N#M S' FF et M -

141 & 4 9 e J3J O UQW Z 3 64 ew FF o W. t.3

e. 6. 8 EHE N e= P W Da > >= $ $

NW ul MM

. LS F 2 Y I I

.J M M O MM MF en t#' 64 '

% of LM M MM M be

%I 7 e W' s NP e OO e' tL tv e V e an e WQ s

.A e & v D e - tu o e2 ts W eO F T >= M 48 U T 9= L sn - se n a. -.

YM 96 (A .

44 ' OW OF

'b G. LA EN

- 2 W

% en .. t2 N OW 2h M U CJ et M

.O.

A e D e O < - "3

%) - 2.

n.

H-N-

6 JA P. w em W t 4'

.W.. e e=

n- 8 3 .

FL ee w y v=+=-

O- t 4' 5 b* i TT

.- e -

e.

e-6 9

e.

.4 ie

'4.

- ,i' ,  ! .['  ! '

s 4

4 ,

f-o 8

2 e

g a

P I1I1 L DDD+0 H4 4 A

W 4

E 2222 9999 _

R T E S T ,

N I

S f

CCCCCtCCcCCCCCtCCCCCCCCCCCCCCCCCCCCCCCCCuJJJJuuuuJu3u d = muwwwwd =

  • 4 wd dddd wmd mdWwwwd . d tCtC 4

.T RRERRRARRRRRRRRRRRRE#RRRRRRRaRtRRRRaRRRwwmwwdwwwwd R#RRR wwd FS O EE I IJ 1 T L0 -

C EE R E RR R P P S .

N 0 I 4 R

A 9 32G0J0aJ331111111 111 11111111 1 1 0 3' ) 3 ) ) )

E i

T 557777.' /.7 7 1 1 1 1 1 1 1 1 1 1 1111111113444444443J0030J33333 T I 557777T7779999999999999999 v9999999997 99((*-11111 - - - -

N E

. 883958S9685555385$563$$8$985585988355 8S* FFFP( ( .

(

MT 22222222 D T - - - - - - - - .

TN ID A C FFGGGGGGGGJJJJJJJJJJJJJJJJJJJJJJJJJJJJJC

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -S66FFFFF - - S.- s - - - -

~

a3

?C SE 868ss558SSSS5S56BS6896SSS6S58S586BS6 S L R

  • EE M 11111111111111111111 11111111111111 d HE L' S$ 111111 1 11 1 CTT

.ST T '

4 t/'

SSSS5SSSSS3SSS5SSSSSSSSSSSSS' 5 S S $ S S S' SSSS/A R4S 9 A1 E4J L0C 3

. CCSC5CSCCS0 CSS 5SSSSSSSSSSSSS5SS$SSSS CCCm C0W #

U R k4 3E 211111222122222222211111111111111111 11122221 MIM ITT RA T

I R - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -2222222222 2222222222222222222222222222222222 1111111111111111111111111111111 ------------

111111 1111111

-- -- --- -- - -- -- -- - - - - - - - - - - - - - - - - - - - -I1IIIIIIIIIII ----------------

E GNN LII 3 M IIi11I1I1IIIIIIIII1I1IIIIIIII11 I M PAS S

I III11I1I1IIIIII1II1IIIIIIIIII1I - - - - - - - - - - - - -

SSS55S5S5SSSSSS5SS5SSSSSSSSSS55S5S5I1I11IIIIIIII R T EN E

III11I1I1IIIIII1II1IIIIIIIIII11I 1I11IIIIIIII 5SSSSSSSS R 1 O0 4 .N

.FP 3 T -

O d I -E' M . I 3 T

- DO . E .T 8 A L

i EC P A L

.L R R 0 IEGGGGGGGG EEdEwEwETEWEEE' E T -

D U

i"

,. w

.o PPNNNNNNNNEPPoP0P0PSPOPVPOCNVEEEPoF03E IIIIIIIIIPII w E 'E P " EdEd R

Y H R C

TI NT OPTTTTTTTTIPPlPtPLPEPLPAP.e T LLLLLLLLP E E EI eP I e I EN I d I LTEI T S AE L E P P I S I d N P G E '- E

'T O0O0000OO W L P.W S P PwIIPLPLEIEG S OO O O O G

.EP 0 o 0E O' O E ESPTN N S

4I 3R RT3S3533SS3TT3T3T3TO7OT37 E

CEEEEEEEEE T 1 T T T .T LOT 33OOT3T 73OSOM 0 4 A H

}

T e PC MS uVV Ew d d E - d .T E#3T 4 TTTT d d TTTT D. DEEED, E OE LLlLLLLLLPLBPSPBPLPdPvVVVVVvEVoSoECEVE0E0EvEE0EEEE0E0EE3EID 6PlEP O

N CJ EAAaaAAaAAIALILILIAILILIaWILIIIsPPPP3P9PP R WW vvVW vW ILILIIEII0JJI NPGIIIG DDI

~

P M

VPWEPEPEPVPEPEPvSPEPPPPiPEPPBPR0& G4

.O a

_ C h .

7 S]125

)

235Sd83$

I

- - - - - ~- - -

R1 1111111

. T 4 433330303 R i 3-122222222 A : . 0123 01235 1111 1 111 01423 01 111 N i289014564901 1 1112656711111

- - - - - - - - - - - - - 1112251 - - - - - 11 -1 - 111---

0 1 C - - - - - - - -

7 9

- bse3Beses-l111335532233 I -

- R- vvVvvvveIIIIIIIII3300-030DD33 - - - - -me9 - Ct0tCC-eS$111 - - --

. 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 11 22222 C

222222222222222222222222222222222wk4R4RRRRRRaNN11 111 11 1 111 1111111111111111111111111222- -------

111 114444M414

?

2

j , -

'?y PILG219 1UCLEAR P0wER STATIQ4 C09PONENTS SCHEDULE 3 F04 Ex*MINATIO4 DURING THE SECONO TEN TEad INSPtCTIO4 INTERVAL COMPO4ENTS IN THE RwCJ SYSTEM "

! . i . . . . . . .' . COMPONENI ID No.. C09804fMT............ ISOMETRIC h0. 14T*L CL.. CAT...

OE SC RI PTION ITEM MO. RELIEF. SYSTEM -

REJJEST

.1-12-1-1245 RESTRAINT -ISI-I-12-2 H-12-1-1255 N/4 1 F-C F(1-5)

RESTRAINT ISI-I-12-2 m/A RwCu

  • 4-12-1-1603. GJIDE 1 F-C F(1-3) RwCu 4-12-1-25R 151-I-12-1 1/4 1 F-8 F(1-3)

GUIDE ISI-I-12-2 RwCu 1-12-1-31G 4/A 1 F-8 F(1-3) 59IDE ISI-I-12-2 m/a RwCU 4-12-1-65G- RIGIO #ESTRAINT 1 F-3 F(1-3) RwCu n-12-1-5 ISI-I-12-2 N/A 1 F-s F(1-5) suIDE 151-I-12-2 1/4 RWCu 1-12-1-SSA aqCHOR 1 F-5 F(1-3) RwC3 4-12-1-96 ISI-I-12-2 N/A 1 Fat F(1-5)

GJICE RwCu RwCU 01

'4-12-1-05 ISI-I-12-1 N/A 1 F-8 F(1-3)

Gu 0E ISI-I-12-1 N/a 9-12-1-9s GUIDE.

1 .F-5 F(1-3) a=Cu 1-12-1-97 ISI-I-12-1 N/a 1 F-8 F(1-3)

GJIDE 151-1-12-1 N/4 R=Cu 1-12-1-97 GUIDE 1 F-4 F(1-5) RwCu 1-12-1-414. ISI-I-12-1 N/A 1 F-5 F(*-3)

' ANCHOR - ISI-I-12-1 RwCu 4 +-1-1 N/a 1 F-5 F(1-3)

GJIDE .ISI-I-12-1 1/A RwCJ 1-20-1-7 GJIDE ISI-I-12-1 1 F-5 F(1-3) RwCu M-12-1-11 N/A 4 F-8 F(1-3)

SPRING MANGER ISI-I-12-1 m/4 RwCO - 9 01 H-12-1-12 spain HANGER 1 F-C F(1-4) RwCJ 4-12-1-13 ISI-I-12-1 m/4 1 F-C F(1-4)

SPRIN3 MANGER ISI-I-12-1 RwCu 1-12-1-14 sta 1 F-C PCT-4)

$pRIN; HANGER .ISI-I-12-1 RwCu

'H-12-1-2 N/A 1 'F-C F(1-4)

SPRING SUPPORT ISI-t-12-2 RwCJ 1-12-1-23 N/n 1 F-C Ft1-6)

S#RIN$ MANGER ISI-I-12-1 RwCJ H-12-1-4 N/a 1 F-C F(1-4)

S*RIN3 MANGER ISI-I-12-2 RwCJ 4-12-1-7 N/A 1 F-C Ft1-4)

$* RIM 3 MANGER ISI-I-12-2 g/a RwCu 4-12-1-3 1 F-C F(1-43' RwCJ 4-6-1-97 58AINO MANGER SpaIMS HANGER

'ISI-I-12-2 1/A 1 F-C FC1-s) RwCu-ISI-I-12-2 1/4 1 F-C F(1-4) RwCJ Page 29 of 44 .

D

.k .

=-sA gq

'h

'- s, 4

- PILGRI9 NUCLEAR Po=ER STaTIO1 ,

'a COMPO4ENTS SCMEDULE3 F04 ERagIgaTI31 OuR!vG TMF SECON3 FEN TEAR INSPECTION INTEavat COMP 34ENTS IN THE RCIO ST5 TOM

. . . . . . . . ' COMPONENT.13 NO.. C09PONENT............ 150 METRIC'NO. 9&T*L CL.. cat... ITEM ho. RELIEF. STSTEM DESCRIPTION REJJEST 13-0-11ML1(d) SJPPORT LbG5 I S I-I-13 -1 t$ 1 9-E-1 $10.10 RCIC 13- v e-15 31 -16 valve 50LTING 151-I-13-1 C5 1 6-G-2 S7.7J RCIC

~ 13-ve-1301-17 VALVE SOLTING ISI-I-13-1 C5 1 B-G-2 37.73 RCIC -

13-vs-1301-44 VALVE 90LTING 15I-I-13-1 CS 1 6-G-2 57.73 RCIC 13-ve-1531-53 VALVE:~50LTING I5I-I-13-1 C1 1 3-G-2 ar.73 aCI 13-I-12 ELB0d TO PIPE ISI-I-13-1 05 1 B-J 59.11' RCIO 13-I-1, vatvE TO PIPE 151-1-13-1 05 1 6-J 69.11 RCIC 13-I-3 PIPE,TO VALVE 151-1-13-1 5 1 5-J 59.11 RCIO 13-I-T EL334'TO PIPE . I$1-1-13-1 05 1 S-J 59.11- RCIC 13-0-17 EL30W TO PIPE 151-I-13-1 C5 1 S-J 39.21 RCIC 13-3-15 PIPE TO PIPE ISI-I-13-1 05, 1 6-J $9.21 PRR-1 RCIC 13-0-19 PIPE TO VALVE ISI-I-11-1 05 1 8-J 59.21 RCIC 13-0-3 PIPE T3 ELBod ISI-I-13-1 CS 1 5-J 59.21 RCIC n 13-3-4 ELeow TO PIPE 15I-1-13-1 05 1 S-J 39.21. RCIC MS-13-F-ML1(2) ~ MANGER lug 5 ISI-I-13-3 05 2 C-C C3 43 RCIC He-13-2.1a FLANGE TO EL60d 15I-1-13-3 CS' 2 C-F C).11 RCIC H3-13-2-1C. TEE T3 PIPE I$1-I-13-3 OS 2 C-F C5.11 RCIC 46-13-2-1G- TEE T3 FLANGE 15I-1-13-3 C5- 2 C-F C5.11 RCIC

' *s-13-F30 ELB0W'To PIPE ~ISI-I-13-3 C5 2 C-F C5.11 RCIC 10-13-1-30' PIPE TO TEE 151-1-13-2 .CS 2 C-F C5.11 RCIC 13-1-3F' PIPE ~TO TEE- 151-1-13-2 C5 2 C-F C5.11 .RCIO 40-13-F 3 5 PIPE T3 valve' 'ISI-I-13-Z' CS 2 C-F C5.11 RCIC 4 0-13-F 3 3. VALVE TO PIPE 151-1-13-2 C5 .2 C-F C5.11 RCIC su-13-F37 TEE T3 valve ~ 131-1-13-2 C5 2 C-F C5.11 RCIC 10-13-F41 FLaMGE TO PUMP 151-1-13-2 C5 2 C-F C5.11 RCI ML-13-2-3C ;. EL60d TO PIPE 'ISI-1-13-3 C5 2 C-F- C5.11 RCIO THL-13-F27 N3IZLE TO PIPE- . 151-1-13-2 CS 2 C-F C5.11 'RCIC

1L-13-F33- PIPE T3 PIPE ~ ISI-I-13-3 C5 2: C-F C5.11 RCI:

4L-13-F$$1 ' PIPE TO ELB0m 151-I-13-3 05 2 ' C-F . C5.11 .RCI;

-4L-13-ros5 . FLANGE TC-PIPE 151-I-13-3 CS 2. C-F - C5.11 RCIC ML-13-F667 EL30n TO NOIILE .I51-I-13-3  ;$ - 2 C-F C5.11 RCIC ML-13-FF3 .. PIPE TO EL90W tISI-I-13-3 05 2. C-F . 05.11 RCIC 1-13-1-125a.. 44Cn0R ISI-I-13-1 .gta 1 F-8 F(1-3) RCIC' ,

4-13-1-42, 44CHOR ' ISI-I-13-1. sta 't. F-S F(1-3) R CIO.

9-13-1-43: ' RESTRAINT. ISI-I-13-1; wta -1 - F-C F(1-3). RCIO N-13-1-$$n RIGID MANGER ISI-I-13-1 .mta" 1 F-C F(1-3)- .RCIO H-13-1-755 RIGI3 MANGER ISI-I-13-1l .m/4 .1 .F-C FC1-3) RCIO

9-13-1-$5M RIGID MaMGER ISI-I-13-1 sta. 1_ - F-C F(1-3) R CIO..

1-13-1-153 asCHOR' .

.ISI-t-13-1 'mia 1 F-6: FC1-3)'- PRR 1 RCIC 4-13-1-1 RIGIO SuvPORT. 15I-I-13-2 t/s 2 - F-B '- F(1-3) RCIC-4-13-1-15G. GOIDE .

151-1-13-2 1ra 2, F-S F(1-3) RCIC -

M-13-1-2. ' dIGIO SUPPaRT . I5I-I-13-2 ,4/a 2 'F-$ F (1-3) . RCIO . -

4-13-1  : aISIO 5UPPORT- ISI-I-13-2; .uta 2 F-5 F(1-3)> RCIC

  • -13-t -2 6 AIGID:5UPPORT ISI-I-13-2 414.- fl- F-5 . F(1 RCIC

' 7 age 30 of 44 e

- w+3, w --

e,, l #

- m .y ,, - rw,,ye- i-w-*- m,e u.< v c- 3 . v ,,-,,we.

C' _

FILCRI4 4UCLEAR P0wE4 STATIO1 -

CO9PONENTS SCHEDULE 0 FOR EEAMINATION OURING THE $ ECON 0 TEM TEAR INSPECTION INTERwat _

COMP 0MENTS IN THE RCI SYSTEM _

..s....... Co*PONENT 10 No.. C0=80 MENT............ ISOMETRIC No. 4&T*L CL.. CAT... ITEM NO. RELIEF. 3YSTEM DE5CRIPTION REQJEST ,

~ '

  • -13-1-27' RIGID'5UPPORT 151-1-13-2 w/A 2 F-8 F(1-33 RCIC '

w-15-1-2) RIGIO MANGER 151-I-13-3 N/A '2 F-C F(1-3) RCIC i-15-1-252 LATERAL RESTRAINT ISI-I-13-2 g/A 2 F-C. F(1-3) RCIC 1-15-1-33 RIGIO SUPPORT 151-1-13-3 4 / 4 .. 2 F-C F(1-3) RCIC 1-13-1-31' RIGIO MANGER IsI-I-13-3 4/A -2 F-C F(1-3) RCIC

~ 4-13-1-33 SPRING HAkGER ISI-I-13-3 N/A 2 F-C F(1-3). RCIC -

M-13-1-35a ANCHOR ISI-I-13-3 N/A 2 F-A F(1-3) RCIC

'1-15-1-7 . GUIDE ISI-I-13-3 1/4 2 P-A 'F(1-3) RCIC ~

n-13-1-44 SPRIN1 MANGER 151-I-13-1 1/4 1 F-C F(1-4) ECIC 4-13-1-43 SPRING HANGER .ISI-I-13-1 . g/A 1 F-C F(1-s> RCIC

  • -15-1-4? SPRIN; MANGER ISI-I-13-1 .N/A 1 F-C F(1-4) RCIC l 4-13-1*$3 5PRIN; MANGER I51-I-13-1 N/A 1 F-C F(1-4) RCIC - -

1-13 $ 515 ' ' '54058ER 151-1-13-1 N/A 1 F-C F(1-6) RCIC 4-13-1-$$16 $4J5 DER IsI-I-13-1 4/4 1 F-C Ft1-4) RCIC 4 M-13-1-24 SPRIM1 MANGER I51-1-13-2 1/A 2 F-C F(1-4) RCIC 4-13-1-32 SPRINI MANGER I$1-1-13-3 g/A 2 F-C F(1-6) RCIC n-13-1-$ $PRIN3 MANGER ISI-I-13-3 Nta 2 F-C Ft1-43 RCIC

- M-13-1-A3571" 00uSLE SNU66ER ISI-I-13-3 N/A 2 F-C F(1-4) RCIC

?

t t

I Page 31 of.44 r

'~-

y . tem .-..sp. W..m_. S, .

wm_m____,___ _u_____ _ _ _ _ _ _ . ___ _m____ .__ ____.____

_ ,_m_ _ , , , _

- N * * "

4 4

f o .

2 3

'eg a.

P L -

A n a V E R T S

E T Y SSS?SSSSSSSSSSS1SSSSSSSSSSSSSSSSSISSSSSSSSSS M

I S CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC

.T 4 FS 0 EE 1 1 1 IJ - -

T Ls R R C EE R' E E RM P P P

S .

N 0 I h 33030J3G331111111111111111113033311111111111 R

A M

E 5 5 5 5 7. T. 7. T. 7 71111111111111111114 4 4 6 411111111111 5$557T7T779999999999999v99993333553555555555 E T T I $$eB5e8S55$$5$$855$5$58s5355CCCCCCCCCCCCCCCC 4 .

E . 222222 4T . - - - - - - .

FFFFGGGGGGJJJJJJJJJJJJJJJJJJCCCCCFFFFFFFFFFF 0

13 TN T

A C

6BSBS888853S8885566B6658686 BCCCCCCCCCCCCC.CCC P3 TC .

SE .

S L -

R C 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2' 2 EE wH L S$S$

oT m

  • C$CS P

i T //I/

S $ S S S S S S' S' S S S S S S 5 S $ $ S S S S S S S S S S' SSSSSSSSSSSSSSS 3T A R 4S 4 S SCSSSSSSCSCCCCC$$SCCCCCCSSCCCCCCCCCCCCCCCC A1 Y E2S .

Lu O C0S N 8SA 8A88AA888A 4AA U C 11111111111111111111111111112222222222222222 NN C - - - - - - - - - - - - - - - - - - - - - - - = - - - - - - - - - - - - - - - - - - - -

OE I 44444444444444444444444444444444444444444444 MI M A 11111111111111 1111111111111111 11111111111111 ITT T - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

.III1III1IIIIIIIIIIIII11IIII RA GNM LII E

3 M r I 1 I 1 I I 1 1 I I I I 1 I 'c 1III1IIII1III1IIIII11III11IIIIIIIIIIII1IIIII Im S 5SSS5SS555SSS5SSSSS55SSS55SSSSSSSSSSSS55SSSS pas I 1III1II111III1IIIII11III11IIIIIIIIIIII11IIII xT EN .

E . WW R 4 N 4 O3 OO O O .BB' -

FP I I LL M T T' EE T 3O E E A A EE EC P P R R w O3 LP L . EIEIGiGGGGwT EdE dTn EdE0dTT EdW OIEEW6w U . PPPPNMNNNN0EEP0P0EoEEPaP80 sSSSS' P00EDPPP0vo D .N I I IIIIIIeNPI6IBNoPPIdILBNNaGSGGIB8PL - II eLB E .O POPOTTTTTTtEIPLPLELIIPLPELOOuUUUUPLLIE0PPlAL EEPW7 EVE H TI T TLLLLLLEPP E EPEPP E EIILLLLL C NT O O O0OOOO O O O o0 TT O 3O S EP TRTRB3BSSB3O3TOYO30OOTOT7OAATTTTTTOO3ORTTOO3 4I E' E TTT T TT7TT T TRRRRRRR TTTTE . TTT S 3R sCECEEEEEE W W W dd TTOOOOOd CWd T P C v0VUVVVVVvEEE0E0EEEEEOEo0EEEPP PPP0EEDEU00EPE; N *S L0LDLLLLLLPPP5P9PPPPPBPB3P MNPPPPP3D PMPD33P MP E 3E AEatAA A4a&IIILILIIIIILILLIEEJUJUULIIEIELLIJI N CD V R v E V V V v v v P P P E P E P P P P P E P E E P P P S S S S S E P P $ P R i E P P' ~P 0

8 .

9 .

3 3 C M A5 ) )

55A3A3 ) 44))

D 22t699 4( ( 44 -

I - - - - - - ( 12( ( -

000000- 1LL11C0000EGCP s T .

333030 L4 6LL111 24423375 N 4 A 444444 - 66M28H9 - - - - - - - - - 11 E 0 0' 11111137 0790 11122Z8112235444FF N 1313 - - - - - - 1145 o711124S6739 - - - - - - - - - - - - - - - - - -

3 - - - - ss38o3- - - - - - - - - - - - - - - - A944444444

  • 4 s4444 *
  • AA33vvVvdvA4A44A48s3Sss53s- - 1 11 11111111 11111 M - - - - - - - - - - - - - - - - - - - - - - - - - - R4 - - - - - - - - - - - - - - - -

O 44444444464444444444444444448S$'SB5S68BSBS3S0 E ' 111 1 111 11111111 1 1111 111 1 11113G$3GGG33GOOG0G1

^

w

y -

3 Gl N a PILGRIM NUCLEAR POWER iTATIO1 -

C01 DON 5NTS SCHEDULE 0 Fok EXAMINATION DURIwG THE SECOND TEN TEAR INSFECTION INTERVAL -

C3HP31ENTS IN THE CS SYSTEM

- ~. '. . . . . . . . . . C O M P O N E N T 10 No.. COMPONENT............ IS0METRI" NO. MAT't CL.. CAT... ITEM No. RELIEF. SfSTEM REJJ;if DESCRIPTION-G3-14-F2 EL30W TO PIPE *SI-I"14a!B CS 2 C-F C5.11 CS G6-14-F21 ELS0W TO PIPE ISI-I-14-23 CS 2 C-F C5.11 CS CS 2 C-F C5.11 C5 T GB-14-F27 PIPE TO PIPE ISI . 14-2A Gs-14-F27 PIPE TO VALVE ISI ' 14-2A CS 2 0-F C5.11 CS 33-16-F31 P!aE TO VALVE ISI-I-14-2A CS 2 C-F C5.11 CS 33-14-F54 PIPE TO VALWh "SI-I-14-26 ~S 2 C-F C5.11 CS SS-14-F39 wALVE TO PIPE SSI-I-14-28 CS 2 C-F C5.11 CS Go-14-F37 . PE T3 VALVE 'SI-I-14-2e CS 2 C-F C5.11 CS is-14-F3A PIPE T3 PIPE ,41-I-14-28 CS 2 C-F C5.11 CS

-$$-14-F40 PUMP T3 PIPE ISI-I-14-29 Cs 2 C-F C5.11 CS VALVE.TO PIPE ISI-I-14-2A CS 2 C-F C5.11 CS w 3S-16-74o C-F C5.11 C5 GS-14-F62 PIPE TO PIPE I S I-I 2 7. CS 2

h. EL20W TO VALVE ,ISI-I-14-EA CS 2 C-F C5.11 CS GS-14-F83 S9-14-F? ELs0W TO. PIPE ISI-I-14-2A CC 2 C-F C5.11 CS 60-14-1-1I PIPE TO FLANGE ISI-I-14-2A CS 2 C-F C5.11 CS nJ-14-2-1G PIPE T3 FLANGE 151-I-14-28 CS 2 C-F C$.11 CS 10-14-719 VALVE TO EL80W 15I-1-14-28 CS 2 C-F C5.11 CS '

HD-14-F20 FLANGE TO PUMP ISI-I-14-28 CS 2 C-F C5.11 C5 i 10-14-F23 PIPE TO PUMP ISI-I-14-2A IS 2- C-F C5.11 CS ISI-I-14-2A C5 2 C-F C5.11 CS

'HD-14-F91 TEE TO REQUCER 8L-14-2*4A FLANGE TO PIPE ISI-I-14-2B CS 2 C-F C5.11 CS PIPE TO WALVE ISI-I-14-28 05 -2 C-F C5.11 C37 nL-14-F11 4L-14-F14 NOIZLE TO ?I7E ISI-I-14-2s 05 2 C-F C5.11 CS'

  • NL-14-F4 NOIZLE TO FIPE ISI-I-14-2A CS 2- C-F C5.11 CS HL-14-F68 PIPE TO. PIPE ISI-I-14-2A CS 2 C-F C5.11 CS 2 C-F C5.11 CE
O' ML-14-F49 PIPE TO PIPE 'ISI-!-14-2A CS HL-14-F53; PIPE T3-VALVE ISI-I-14-2A CS' 2 C-F C5.11 CS

- ML-14-F51 PIPE TO FLANGE ~151-1-14-28 CS 2 C-F. C5.11 CS HL-14-F7 PIPE TO VAL'VE' .ISI-I-14-2A CS 2 C-F C5.11 CS 4Le-16-F14H PIPE To ELeow ISI-I-14-28 CS 2 C-F- C5.11 CS ,

HLS-14-748H PIPE To ELBOW- ISI-I-14-2A" 05 2 C-F: C5.11 CS 38/J0-14-3001-4-1 PIPE T3 PIPE ISI-I-1% SS/C5 2 C-FL C5.21 CS GS/3C-14-3002-5-1.Eleod TO PIPE -.ISI-I-14-2 A -CS/SS 2 C-F C5.21 CS CS 2L C-F- C5.31 C4 438-14-4-30 PIPE T3 dR CONN ISI-1-14-2A' ANCHOR ISI-I-14-1' N/A 11 F-B' F(1-02 CS

'4-14-1-1164 CS 9-14-1-uto3 A1CHOR . .

'ISI-I-14-1 N/A 1: F-B' F(1-3)-

' RIGID'14NGER ISI-I-14-2A' N/A - 2 'F-e- F(1-3) CS n-14-1-1 CS 9-14-1-10 RIGIO MANGER ISI-I-14-2s. NIA 2 F-8 'F(1-3)- '

ISI-I-14-2B N/A- f2 'F-S' 'F(1-3) C5 1-14-1-1154' GJI3E

.ISI-I-14-26' -M/A '.2' F-B 'Fti-3) CS H-14-1-12 RIGI3. HANGER .

ISI-I-14-28 N/A- 2. F-51 .F(1-3) CS H-14-1-1221 ~ LATERAL RESTRAINT N/A -2. F-S F(1-53 :CS H-14-1-125A -ISI-I-14-2B-AmCHOR-21:13 HANGER ISI-I-14-2s N/AT 2 F-6 ' 'F(1"$) CS

'H-14-1-13

.N/A ~2 F (1- 3 ) L 1151-1-14-23 M-14-1-135G. 'GJIDE' . Fee ..C S . m.

w

,d

~

Page 33;of .443

~

g .n a , , X ,, .n : - ,

. , - , . _ - ~,

,L '. ., a

~

~ . {Q r . . .

.L  :  : "N PILGRIM-  : ^/ '9dE4 STAT 134 k

COMPONENTS. SCHEDULED FOR EXANINATIr' SN T4E,SECOND TEN TEAR INSPECTION INTERVAL COMP 04ENTS IN Tdt iM IA......... COMPONENI 10 H0..JCOMPONENT............ ISomITRI; NO. 14T*L CL.. CAT... ITEM NO. RELIEF. ' STEM DESCRIPTION REwJESi 1-14-1-14 RIGID HANGER ISI-I-14-2S N/A 2- F-8 F(1-3) .5 M-14-1-1654 ANCMOR ISI-I-14-28 N/A 2 F-A' F(1-3) CS ISI-I-14-21 N/A 2 F-8 F(1-3) CS i-14-1-175 R I GI O .. H ANG E R RIGI3 4 ANGER ISI-1-14-2A N/A 2 F-A F(1-3) CS 4-14-1-152 RIGIO MANGER ISI-I-14-2A: 4/A 2 F-8 F(1-3) CS:

4-14-1-2 n-14-1-23 RIGIO HANGER ISI-I-14-2A N/A 2 F-B F(1-3) CS p CS H-14-1-2]S RESTRAINT. ISI-I-14-2A N/A 2 F-8 F(1-3)

ISI-I-14-2A N/A 2 F-8 F(1-3) CS

-- d- 14 21 RIGID 1 ANGER i-14-1-215 LATERAL RESTRAINT ISI-I-14-2A N/A 2 F-B F(1-3) 'C S RIGID. SUPPORT. ISI-I-14-2A 1/A 2 F-8 F(1-3) CS M-14-1 H-14-1-225 RIGID SUPPORT ISI-I-14-2A N/A 2  : F-5 F(1-3) CS LATERAL RESTRAINT ISI-I-14-2A 4/A 2 F-S F(1-3) CS d-14-1-235 CS; H-14-1-265 RIGID HANGEE ISI-I-14-29 N/A 2 F-8 F(1-3)

LATERALaRESTRAINT ISI-I-14 N/A 2 'F-S F(1-3) CS 4-14-1-275 1-14-1-255- LATERAL RESTRAINT ISI-I-14-28' N/A 2 F-B F(1-3) CS 151-1-14-28 N/A i F-B F(1-3) CS 1-14-1-20s LATERAL RESTRAINT d-14-1-ZsG GUIDE ISI-I-14-2A w/4 2 F-S F(1-3) CS LATERAL-RESTRAINT ISI-I-14-26 N/A 2 F-6 F(1-3) CS M-14-1-305 4-14-1-35 RIGID HANGER ISI-I-14-26 1/A 2 F-S F(1-3) CS RIGI3 M ANGER ISI-I-14-28 N/A 2 F-S' F(1-3) CS M-14-1-34 1-14-1-36 RIGID =HANGEE ISI-I-14-2A N/A 2 F .F(1-31 CS RIGID HANGER ISI-I-14-24 N/A 2 F-S F(1-3) CS 4-14-1-3b AIGID HANGER ISI-I-14-2A N/A' 2 F-B ' F(1-3) C$

H-14.1-37 ANCHOR ~ISI-I-14-2A N/ A- ,2 .F-B- F(1-5) CS H-14-1-35A RIGID MANGER ISI-I-14-2A N/A 2 F-B F(1-3): CS 1-14-1-4 RIGIO MANGER- 'ISI-I-14-2A 9/A 2 F-5 F(1-3)~ CS 1-14-1-4SN 4-14-1-5 RIGIO HANGER .ISI-I-14-24' N/A 2 r F-8 F(1-31' CS 1-14-1-54 RIi10 1 ANGER' 'ISI-I-14-2A N/A- ,2 F-S F(1-3) lCS H-14-1-55 RIGID MANGER 151-1-14-29 N/A 2 F-B- F(1-3) - CS CS H-14-1-SSR LATERAL RESTRAINT ISI-I-14-2A: N/A 2 F-B F(1-3) '

. 1-14-1-6 RIG 13 HANGER 'ISI-I-14-2A N/A 2 F-S .F(1-3)  !CS 1-14-1-652 LATERAL RE.STRAINT ISI-I-14-2A- N/A .2 P-S" F(1-3) , 45 1-14-1-7 RIGID HANGER ISI-I-14-26 N/A '2- 'F-B' FC1-3) CS' ISI-I-14-2A N/A 2 'F-4 JF(1-3) CS d-14-1-75G GUI3E

.CS 1-14-1-3 RIGID MANGER- 151-1-14-28 N/A 2 - F-8 F(1-3) 1-14-1-3 RIGIS HANGER' ISI-I-14 .N/A 2 F-S F(1-3) CS

. 14-1-155 SNUSSER 15I-1-14-1, N/A. 1 F-C i 'F(1-4). CS 1-14-1-105 S4JSSER I$1-1-14-1 1/A 1 F-C 'F(1-4) CS o-14-1-175 S109854 151-1-14 .. N / A 1: F-C F(1-43' 'CS -

ISI'I-14 w/A. ?1- F-C" F (1 -4 ) CS H-14-1-155 SNUSBER SPRING HANGER I51-I-14-1 N/A .1- F-C- FC1-6); CS-M *4-1-40 CS SPRI+4G HANGER ISI-I-14-1 N/1 "11 :F-C- F(1-4)

H-14-1-41 4-14-1-42 SPCING HANGER ISI-I-14-1 1/4 'l F-C' .F(1-4) ~ C, 4-14-1-43 SPRING MANGER 151-1-14*1- .N/A 'l F-C .F (1 CS

. PSge. 34 ~ of 44

- -%, m -A_ . a; a.. 1 . .

-+ .

g.g-W

c PILGtIM'1UCLEAR POWE4 STATIO4 ' '

C0 90NENTS SCHEDULED F0k E14MINAT134 DUTI1G THE SEC0t40 TEM YEAR INSPECTION INTERVAL CD*PO' DENTS IN THE CS SYSTEM

......... . COM43NENI 13 NO.. COMPONENT............ ISOMETRI; NO. MAT *L CL... CAT... ITE9 M3. AELIEF. REJJEST SYSTfM 0ESCRIPTION H-16-1-15 SPRIN- MANGER 151-1-14-25 . NI& 2 F-C F(1-6) CS '

151-1-14-25 1/4 2 F-C F(1-6) C5 ,

1-16-1-13 SPRIN3 HANGER 16-1-29 SPRIN3 HANGER 'ISI-I-14-2A N/A 2 P-C F(1-63 CS-ISI-1-14-2A 4/A 2 F-C' F(1-4) C5 1-16-1-3 SPRINT d&NGER 151-I-1&-28 4/A 2 F-C F(1-6) C5 1-1 31 SPRIN3 NAN 3ER I51-I-14-24 N/A 2 F-C FC1-6) C5

' H-14-1-37 SPRI43 HANGER m

a 5

9 4

) -g Page '. 36 .of : 44 :

+i, 3

1 ( Y d --'T 'Is  %' T W'W 4Y 'V @  % 3'

'T* '*W d. 'M

k

f PILGRIM NUCLEAR POWER STATIO4 -'"

COMPO4?NTS SCHEDULE 3 FOR EXAMINATIO4 OUTING THE -SEC3ND TEM YEAR INSPECTION INTERVAL COMPONENTS IN THE HPCI SYSTEM e

.......... COMPONENT 10 NO.. COM80N5NT............ ISOMETRIC NO. MAT *L CL..= CAT... ITEH NO. RELIEF. $75 FEM REQJEST DESCRIPTION ISI-I-23-1 CS 1 8-(-t 810.10 HPCI 23-I-12P5(2) PIPE STANCHION ISI-I-23-1 05' 1 3-t-1 910.10 HPCI 23-3-8HL1(3) SJPPORT LUGS ISI-I-23-1 CS s-G-2 B7.70 HPCI 23-V3-2331-4 VALVE SOLTING 1 HPCI 23-V3-2331-5 VALVE BOLTING ISI-I-23-1 CS 1 8-G-2 57.70 151-I-23-1 CS 1 8-G-2 $7.73 HPCI 23-Vs-2301-7 VALVE soLTING HPCI 23-Ve-2301-8 VALVE-50LTING 151-1-23*.1" CS 1 6-G-2 87.10 ISI-I-23-1 CS 6-J 69.11 HPCI

' 23-I PIPE TO ELS0w' 1 HPCI 23-I-12 PIPE T3 PIPE ISI-I-23-1 CS 1 8-J 59.11 CS 8-J 89.11 HPCI 23-I-lo PIPE TO ELeow .ISI-I-23-1' 1 HPCI-23-I-17 VALVE TO PIPE ISI-I-23-1 CS 1 S-J L89.11 151-I-23-1 CS 1 8-J 89.11 HPCI 23-0-10 VALVE TO ELBOW CS B-J 89.11 HPCI 23-0-14 . PIPE TO elbow ISI-I-23-1 l' HPCI 25-3-16 PIPE TO PENETRATION .ISI-I-23 CS 1 e-J 59.11 ISI-I-23-1 05 5-J 59.11 PRR-1 HPCI

'23-3-17: PENETRATION TO PIPE' 1 HPCI 23-3-7 . PIPE T3 ELaow ISI-I-23-1 ~S 1 s-J $9.11 ELa0W TO PIPE ISI-I-23-1 CS 1 6-J' 59.11 NPCI 23-3-3 HPCI PIPE TO VALVE ISI-I-23-1 CS 1 S-J' 59.11 23-D-0 HFCI C3.40 38-23-51HL1(4) SUPPORT LUGS ISI-I-23-5 *S 2 C-C ISI-I-23-5 CS 2 C-C C3.40- HPCI 08-23-53ML1(4) . SUPPORT LUG 5 HPCI DB-23-53PL ~ PLATE 151-I-23-5 CS 2 C-C C3.4J C-C .C3.40 HPCI

'ab-23-555!i2) PIPE STANCHION ISI-I-23-5 CS 2 2 C-C .C3.43 HPCI E6-23-136.*(4) .' SUPPORT LUGS. 'ISI-I-23-2 CS ISI-I-23'-2 C3.43 HPCI

~

E8-23-59HL1(4) SJPPORT LUGS- 05 '2 'C-C ITI-I-23-2 05' 2 C-C C3.43 HPCI ES-23-o0nL1(4) SUPPOPT LUGS HPCI EB-23-62HL1(=) SUPPORT LUGS- ISI-I-23-23 CS 2 C-C C3.40 HPCI Ha-23-75mL1(5) SUPPORT LUSS- .ISI-I-23-5 CS' 2 C-C . C 3.40 '

SUPPORT LUGS- :ISI-I-23-4 05 2' C-C C3.40' HPCI HE-26-175HL1(1) C3.40 HPCI.

HL-23-674L1(24) ' SUPPORT LUGST 15I-I-23-3 -CS 2 -C-C-N3ZZLE TO PIPE 151-I-23-3 CS 2 C-F' C5.11 - HPCI Md-23-2-1H .

HPCI 1B-23-2-2A-E- -TEE TO PIPEL ISI-I-23-3 -CS 2 C-F 'C5.11 16-23-2-2D-G- .Ela04'TO-PIPE' ~ISI-I-23-3 CS 2 C-F C5.11 HPCI VALVE TO PIPE ISI-I-23-3 CS 2 C-F C5.11 HPCI 99-23-F73 ' HPCI '

ns-23-F74 PIPE'T3 VALVE- 'ISI-I-23-3 CS .2 C-P. .C5.11 PIPE.TO TEE; ~ ISI-I-23-3 CS' :2 C-F 'C5,11 HPCI 23-F75 HPCI 43-23-FS7 REDUCER TO PIPE ISI-I-23 CS 2- C-F/ C5.11 PIPE.T3 FLANGE ISI-I-23-4 CS 2 .C-F- .C5.11 HPCI 40-23-3-60 'HPCI-HD-23-F12 . PIPE TO PUMP 'ISI-I-23-4 .CS c2- C-F CS.11 90-23-F15 VALVE TO PIPE .151-I-23-4 'CS- ~2- C-P C5.11- HPCI' VALVE To PIPE-- .!SI-I-23-4 C5 2 C-F C5.11 -HPCI 10-23-F17 PIPE TO TEE 'ISI-I-23-4 C5 '2 C-F C5.11:  : HPCI AD-23-F23 HPCI' 4E-20-F176 PIPE TO EL30W :ISI-I-23 CS '2 C-F. .C5.11-ME-2$-P333. PIPE'T3.ELsod- ISI-I-23-4 CS 12 'C-F' C5.11 'HPCI.

r CS- 2 C-P' C5.11. HPCI-

-4E-26-F334 EL30d T0/ PIPE LISI-I-23-4' f

P

' Page 36 ofL44: '

^~

~

- __. - L - _ _ .--

- __ - _ _ - _ _ _ - _ - - -.L .-

q PILGRIK NUCLEAR PodER STATIO1 -"

Ca1PONENTS SCHEDULE 0 F0W EX4HINATIO1 OURING TnE SECOND TEN TEAR. INSPECTION INTERVAL COMPONENTS IN THE HPCI SYSTEM

~

ITE9 No. RELIEF. SYSTEM

'.......... COMPONENT ID No.. COMPONENT............ ISOMETRICLNO. MAT *L CL.. CAT... REQJEST

'OESCRIPTION-151-I-23 CS 2 C-F C5.11 HPCI ML-23-1-2A- -FLANGE TQ PIPE HPCI, ELBOW'TO PIPE . ISI-I-23 CS 2 C-F' C5.11 4L-23-1-38 CS. 2 C-F - C5.11 HPCI HL-23-F20~ PIPE T3 VALVE -151-I*23-4 HPCI NOIILE TO PIPE ISI-I-23-4 CS 2 C-F C5.11 4L-23-F22 C5.11 HPCI 4L-23-F25 PIPE TO FLANGE . ISI-I-23-3 CS 2 C-F HPCI

' PIPE T3 N0ZILE 151-I-23-3 Ci 2 C-F C5.11 HL-23-F67 2 C-F C5.11 HPCI REDUCER TO PIPE ' ISI-I-23-3 CS 1L-23-F67 C-F C5.21 HPCI PIPE TO ELS0W 'ISI-I-23-5 CO 2 28-23-2-13 C-F C5.21 HPCI DB-23-2-1C ELS0W TO PIPE 151-1-23-5 CS 2 HPCI TEE TO PIPE 151-1-23 CS 2 C-F C5.21 DS-23-2-1H C-F C5.21 HPCI

' FLANGE TO PIPE' 151-I-23-5 CS- 2 08-23-F11$ [ CS 2 C-F C5.21 HPCI 35-23-F4 PIPE T3 VALVE ISI-I-23-5 CS 2 -C-F C5.21 HPCI

'38-23-F42 VALVE TO PIPE . ISI-I-23-5 HPCI PIPE TO VALVE 151-I-23-5 CS 2' C-F C5.21 D$-23-F44 C-F C5.21 HPCI EL33W TO. PIPE ISI-I-23-5 CS 2 30-23-F53 CS 2 C-F C5.21 HPCI iS-23-1-5C PIPE TO ELBOW ISI-I-23-2 CS 2 C-F C5.21 HPCI EB-23-2-1E- TEE'T3 PIPE ISI-I-23-2 C5.21 HPCI PIPE TO NOIILE 151-1-23-2 CS 2 C-F E8-23-2-2D CS 2 C-F C5.21 HPCI

.EB-23-3-18 EL30W TO *IPE ISI-I-23-5 ISI-I-23-2 CS 2 C-F C5.21 HPCI

.se-43-F13 VALVE TO PIPE HPCI

.PJMP To Ete0W ISI-I-23-5 CS 2 C-F C5.21 Es-23-F35 CS 2 C-F- C5.21 HPCI EB-23-F3$ ELBOW-TO PIPE' ISI-I-23-5

'ISI-I-23-5 C5. 2 C-F C5.21 HPCI (8-23-F3T EL30W TO PIPE HPCI PIPE.T3 FLANGE ISI-I-23-5 CS' 2 ' C-F C5.21

.E8-23-738- 2, C-F C5.21 HPCI EB-23-FS5' ~ VALVE TO PIPE ISI-I-23-2 CS ISI-I-23-2 CS 2 C-F C5.21 HPCI dB-23-F59 PIPE 10 V ALVE HPCI E8-23-F61 ELBOW TO PIPE. ISI-I-23-2 CS 2 C-F' .C5.21

'151-1-23-2 CS 2- C-F C5.21 - HPCI.

E9-23-F6o 'PIPO TO ELB0s HPCI

' PIPE T3 TEE 151-I-23-2 CS 2 C-F' C5.21 E3-23-F6sA ..

g/A F-8; F(1-3) HPCI 1-23-1-1235 LATERAL RESTRAINT. ISI-I-23-1 1 151-1-23-1 1/4 1 F-8' F(1-3) . HPCI 1-23-1-1246 LATERAL RESTRAINT 1/4 1 F-s' F(1-3) . HPCI d-23-1-75 ,RIGIO HANGER ISI-I-23-1 ISI-I-23-1 1Nis 1 F-S F(1-3) HPCI 1-23-1-76 'RI3IO HANGER HPCI 9-23-1-x52 ANCHOR. 'ISI-I-23 N/A 1 F-8 F(1-3)

ISI-I-23-5 g/A. 2 F-8 F(1-3) HPCI 1-23-1-13SA ANCH02 N/A 2 F-8 F(1-3)~ H P C I .9201 4-23-1-153 GUIDE- ISI-I-23-2

. GUIDE - . ISI-I-23-2 N/A 2 - F F(1-3)- HPCI 01 d-23-1-159' F-A .F(1-3) - HPCI H-23-1-155' LATERAL RESTRAINT 15I-1-23-2 1/A 2 ISI-I-23-3 N/A 2- F-C F(1-3)- 'HPCI 4-23-1 RIGID HANGER

.ISI-I-23-2 N/A' 2 F-C F(1-3) LHPCI 1-23-1-1o5 LATERAL RESTRAINT HPCI ISI-I-25-3. N/A 2 .F-C F(1-3)-

1-23-1-17 RIGI3 HANGER .HPCI RIGID HANGER.- 'ISI-I-23-3 N/A . 2- F-C F(1-3) 4-23-1-13 HPCI 1-23-1-1SH " ANCHOR. ISI-I-23-4 N/A 2. F-9 .F(1-3)- ,

ISI-I-23-4 N/A 2 F-B. .. F (1-3) L .HPCI 4-23-1-21 RIG 13 4&NGER Page137f of 44 e

" * ' ' ' ' ". I W "

6 F* *b i 5 F "FWud" $- W W

}

h PILGRIM NUCLEAR PodER STATION ~

2" COMPONENTS SCHEDULED FOR-EWAMINATION OURINS THE SEC3ND TEN FEAR INSPECTION INTERVAL COM NENTS IN THE HPCI SYSTEM

^

.......... COMPONENT ID NO.. COMPONENT............ ISDHETRIC NO. MAT *L CL.. CAT... ITEM NO. RELIEF. SYSTEM DESCRIPTION RE0 JEST ISI-I-23-5  : N/A 2 F-C F(1-3) HPCI H-23-1-215A ANCHOR HPCI d-23-1-22 RIGID HANGER ISI-I-23-4' N/A 2 F-B F(1-3)

P1510'SOPPORT ISI-I-23-5 N/A 2 F-5 P(1-3) HPCI 1-23-1-225 H-23-1-23SA ANCHOR. ISI-I-23-5 N/A 2 F-8 F(1-3) HPCI RIGIO SUPPORT ISI-I-23-4 N/A 2 F-B F(1-3) HPCI d-23-1-24 HPCI 1-23-1-25 . RIGID HANGER ISI-I-23-4 N/A 2 .F-8 F(1-3)

ISI-I-23-1 N/A 2 F-e F(1-3) HPCI H-23-1-23SR 'RIGI3 HANGER HPCI H-23-1-265- GUIDE ISI-I-23-5 N/A 2 F-B- F(1-3)

ISI-I-23-1 N/A 2 F-8 F(1-3). 'HPCI H-23-1-26SA ANCHOR F(1-3) HPCI.

H-23-1-275 RIGIO HANGER ISI-I-23-5 N/A 2 F-8 RIGID HANGER 'ISI-I-23-5 1/A 2 F-8 F(1-3) HPCI 1-23-1-24 HPCI H-23-1-235 RIGIO HANGER ISI-I-23-2 N/A 2 F-8 F(1-3) 15I-1-23-4 N/A 2 F-5 F(1-3) HPCI H-23-1-2SR. LATERAL RESTRAINT HPCI H-2 3 3 RIGID HANGER ISI-I-23-5 N/A 2 F-C F(1-3) 151-1-23-5 N/A 2 F-8 F(1-3) HPCI H-23-1-33 RI3ID HANGER ISI-I-23-4 N/A 2 F-5' F(1-3) HPCI.

H-23-1-3SP LATERAL RESTRAINT HPCI H-23-1-45R. RIGIO HANGER ISI-I-23-4 N/A 2 F-8 F(1-3)

,RIGIO HANGER ISI-I-23-2 N/A 2 F-C F(1-3) HPCI 1-23-1-7 HPCI H-?3-1-STSR LATERAL RESTRAINT ISI-I-23-4 N/A 2 F-C F(1-3)

RIGIO HANGER ISI-1-23-4 N/A 2 F-8 F(1-3) HPCI H-26-1-135 HPCI HL-23-C3c03-1 STIFFENER COLLAR ISI-I-23-3 CS 2 F-3 F(1-3)

STIFFENER COLLAR I51-I-23-3 CS 2 F-8 F(1-3) HPCI

- it-23-C3503-2 HPCI STIFFENER COLLAR ISI-I-23-3 CS 2 F-8 F C.1 -3 )

it-23-C9603-3 HPCI 4-23-1-73 SPRIN3' HANGER ISI-I-23-1 N/A 1 F-8 F(1-4)

SPRIN3 H ANGER- ISI-I-23-1 N/A 1 F-C F(1-4) HPCI i 1-23-1-77 HPCI 1-23-1-30 -SPRING H4NGER ISI-I-23-1 N/A 1 F-C F(1-4)

SPRING HANGER 151-I-23-1 N/A 1 F-C F(1-4) HPCI-d-23-1-31 HPCI-H-23-1-32 SPRIN3 HANGER- ISI-I-23-1 N/A 1 F-C .F(1-4)

SNu8aER -ISI-I-23-1 N/A 1 F-C F(1-4) HPCI H-2 3 5 513 SNUB 8ER ISI-I-23-1 N/A 1 F-C F(1-4) HPCI 1-23-1-5514 SPRIN3 HANGER I5I-1-23-5 N/A 2 F-C F(1-4) HPCI H-23-1-1 SPRIN3 HANGER ISI-I-23-2 N/A 2 P-C F(1 4) HPCI H-23-1-13 HPCI' i-23-1-11 SPRIN3 HANGER- 151-1-23-2 N/A 2' F-C F(1-4)

SN038ER. ' 151-I-23-3 N/A 2 F-C F(1-4) HPCI 4-23-1-1155 HFCI 1-23-1-1.55 SNUBSER 'ISI-I-23 N/A. 2 F-C F(1-4)-

HPCI H-23-1-13 .SPRINS HANGER. .ISI-I-23-2 N/A 2 F-C. F(1-4)

ISI-I-23-3 N/A 2 F-C F(1-4) -HPCI

, M-23-1-1355 SNUB 3ER

'HPCI H-23-1-14 SPRINS HANGER ISI-I-23-3 N/A 2 F-C F(1-4)

SNUBBER ISI-I-23-3 N/A -2. F-Cf F(1-4) HPCI 1-23-1-1455 HPCI H-23-1-15 SPRING MANGER LISI-I-23-3 N/A 2 F-C F(1-4)

LISI-I-23-3 N/A. 2 F-C F(1-4) HPCI H-23-1-15SS SNU33ER HPCI H-23-1-175- 5NuddEa ISI-I-23 N/A z- F-C F(1-4)

SPRIN3 HANGEk .ISI-I-23-3 -N/A 2 F-C" F(1-4) HPCI

- H-23-1-14 F(1-4) 'HPCI H-23-1-135 :SNuS3ER ISI-I-23-2 A/A 2 :F-C 3

Page;38' of 44 l'

_ c , ~ . --

r Cd

+

A' PILGRIM NUCLEAR POWER STATION "N C01 PONE 1T 5 SCH EOUL ED FOR 6

  • AMIN ATION DURI'13 THE - SEC3ND T EN YEAR INSPECTION INTERVAL COMPO4ENT5'IN THE HPCI SYSTEM

!.......... COMPONENT .ID NO.. COMPONENT............ ISOMETRIC NO. MAT *L CL..

CAT...' ITEM NO. RELIEF. SYSTEM [

REyJEST DESCRIPTION 4 F-C F(1-4) HPCI jj 4-23-1-2 SPRING HANGER ISI-I-23-5 1/4 2 SPRING HANGER ISI-I-23-3 N/A 2 F-C ;F(1-4) HPCI 4-23-1-20 4-23-1-205 SNUB 3ER' 151-I-23-2 N/A 2 F-C F(1-A) HPCI SPRING HANGER ISI-I-23*4 N/A 2 F-C F(1-4). HPCI 4-2 3-1 -2 b HPCI 1-23-1 SPtINS HANGER ISI-I-23-4' N/A 2 F-C F(1-4)

SPRING HANGER 151-I-23-5' N/A 2' F-C F(1-A) HPCI d-25-1-32 HPCI 1-23-1-33 15PRINS HANGER ISI-I-23-5 1/4 2 F-C F(1-4)

SPRINS HANGER ISI-I-23-5 N/A .2 F-C --F(1-4) HPCI' 1-23-1-35 HPCI n-2 3 4 SPRING HANGER I51-I-23-5 N/A 2 F-C F(1-4) 23-1-6 ' SPRING HANGER' 151-I-23-2 N/A 2 F-C 'F(1-4) -HPCI SPRING HANGER ISI-I-23-2 N/A 2 - F-C F(1-4) HPCI i-23-1-3 HPCI H-23-1-So' $NU$BER .. -ISI-I-23-3 N/A 2 F-C F(1-4)

SPRING HANGER 151-I-23-2 N/A 2 F-C F(1-4) 'HPCI H-23-1-9 SPaING HANGER ISI-I-23-4 N/A 2 P-C' F(1-4) . HPCI -

20-1-318 t

Page ~ 39' of 44 L s

i 95

s. < , s s r , w., 4 ,% ,+4 , ,. 4 Lw, m -m.-- + - <.m

' - 7' g

,~

f PILG24M NUCLEAR P0dt e 5 74 710 4 -

CO*a0NENTS SCMEDULEO COMPONENTS'IN THEFOR SSW EXAMINATIO9 SYSTEN 004I43 THE SEC3ND IEN YEAR INSPECTION INTERW -

.'......... COMPONENT 10 MO.. C01PONENT............

DESCRIPTION ISOMETRIO a0. 14T*L Ct.. CAT... ITEM NO. RELIEF. SYSTEM +

.REJJEST 4-20-1-1 RIGID HANGER 4-2<-1-1345 ISI-I-29-1 N/4 3 P-8 F(1-3)

RESinAINT 151-I-29-1 SSW 4-2v-1-1062 1/4 F-C ~

3 F(1-3)

GUIDE ISI-I-29-1 SSW 4-29-1-1063 GUIDE 1/A 3 F-8 F(1-3) $$W 1-2d-1-13e4 GUIDE ISI-I-29-1 N/A 3 F-B F(1-3)

ISI-I-29-1 $$W d-20-1-1365 N/4 3 F-B. F(1-3)

-GUIDE 151-I-29-1 SSW M-29-1-13SG N/A 3 F-8 F(1-3)

RESTRAINT TSI-I-29-1 SSW N-20-1-11 N/A 3' F-C F(1-3)

RIGIO 1 ANGER ISI-I-29-1 SSW

' 1-29-1-11SG GUIDE.

4/4 3 P-8 F(1-3) SSW N-29-1-12 ISI-I-29-1 N/A 3 F-8 FC1-3) dI3I3 1 ANGER ISI-I-29-1 SSW 1-?9-1-125G GUIDE 1/4- 3 . F-8 F(1-3) SSW 1-2 v-1 -13 RIGIO HANGER

.151-1-29-1 N/A 3 F-S F(1-3) 151-1-29-1 N/4 SSW 1-29-1-13215A A1CH32 3 F-8 F(1-3) $$W 1-24-1-133354 ISI-I-29-1 N/4' 5 F-5 F(1-3)

ANCHOR ISI-I-29-1 N/A SSW 1-29-1-15 RIGI3 4AN3ER -3 F-8 F(1-3) SSW M-29-1-16 ISI-I-29-1 N/4 3 F-B F(1-3)

RIGIO 1 ANGER ISI-I-29-1 -N/A SSW H-29-1*17 3 F-8 F(1-3)

RIGIO HANGER ISI-I-29-1 N/4 SSW 1-29-1-19 RIGIO HANGER-3 F-B F(1-3) SSW 1-2 9 1 SR ' ISI-t-29-1 N/A 3 P-8 F(1-3) mIGIO HANGER ISI-I-29-1 N/A SSW 1-29-1-2 3 F-8: F(1-5) 21310 HAN3ER ISI-I-29-1 SSW N-24-1-23 RIGI3 MANGER N/4 3 F-8 8(1-3) SSW 1-29-1-21 J51-1-29-1 N/A 3 P-8 F(1-3)'

RIGIO HANGER ISI-I-29-1 SSW 1-29-1-22 RIGIO. DANGER N/A 3 F-S F(1-3) SSW -

1-29-1-23 151-1-29-1 M/4 3 F-6 F(1-3)-

RIGIO HANGER ISI-I-29-1 S;W 1-29-1-24 RIGIO MAN 3ER N/A 3 F-S P(1-3) $$w H-29-1-25 151-I-29-1 1/4 3 F-8 F (1 -3 )

RIGIO HANGER ISI-I-29-1 N/A SSW 1-29-1-2o RIGIO HANGER' 3 F-5 F(1-3) SSW 4-24-1-27 ISI-I-29-1 N/A 3 F-8 F(1-3)

RIGID MANGER ISI-I-29-1 N/A SSW M-29-1-25R RIGIO MAN 3Ea 3 F-S F(1-3) ~ $$w 1-29-1-33 ISI-I-29-1 4/4 3- F*B F(1-3)

RI3IO HANGER ISI-I-29-1 .SSW M-29-1-37 RIGIO MANGER

.4/4 3 F-8 F(1-3) 1-2 4-1-3 S R 151-1-29-1l 1/4 3 F-B F(1-3)

--SSW RIGIO 44NGER .ISI-I-29-1 N/A SSW H-29-1-4 3 F-8 F(1 3)

RI3ID 1 ANGER. 'ISI-I-29-1 N/A' SSW M-24-1-4SA RISI3 4 ANGER 3 'F-8 F(1-3) S$W n-29-1-5 ISI-I-29-1 -4/4 3 F-S RIGID HANGER .F(1-3)! SSW 4-24-1-SSR ISI-I-29-1 N/A 3 F-8 RIGID HANGER . F(1-3) S S W .-

M-27-1-6 'ISI-I-29-1 N/A- .3 F-8 F(1-3)

RIGID 44N3ER ISI-I-29-1 1/4 .SSW N-29-1-6SR RIGIJ 4 ANGER 3  : F-8 Ff1-3) SSW.

n-29-1-B ISI-I-29-1 N/A 3 F-CE -F(1-3) .

RIGI3.44NGER ISI-I-29-1 SSW 1-29-1-862 PIPE SJPPORT 1/4 .3' F-S F(1-3). .SSW 1-29-1-863 -ISI-I-29-1 N/A 3 F-8 ^ F(1-331 PIPE RESTRAINT ,151-1-29-1 N/4 3.

SSW 6-2 0 9 5 G ' RESTRAINT F-5 F(1-3) SSW ISI-I-29-1 N/A 3 F-C 'F(1-3). SSW

Page 40 of 441

, , ,,. _ _ _ _ u- _ fla L > = -- I ^-

PILGRIM 10 CLEAR P0iER STATION C04PONENTS SCHEDUL53 FOR EXAMINAT104 OUTING (NE SECON3: TEN TEAR INS #iCTION INTERVAL 9 COMPONENTS IN THE RECCW SYSTE9

.......... C04PONiNT 13 N3.. 00400NENT............ ISOMETRIC NO. MAT *L CL..' CAT... ITEM NO. RELIEF. SYSTEM DESCRIPTION REJJEST 4-30-1-111 RIGIO HANGER 'ISI-I-33-1 N/A 3 F-8 F(1-3) R$CCW  ?

M-33-1-112 RIGIO HANGER ISI-I-30-1 N/A 3 F-A F(1-3) AdCCW M-30-1-119 RIGIO HANSER ISI-I-30-1 N/A 3 F-8 F(1-3) RSCCW 4-39-1-115A ANCHOR ISI-I-30-1 m/A 3 F-s 5(1-3) asCCW n-33-1-120 RIGIO , ANGER ISI-I-33-1 1/A 3 F-S F(1-3) RBCCW H-30-1-121 RIGIO HANGER ISI-I-30-1 N/A 3 F-3 F(1-3) R8CCW 1-33-1-1224 RESTasINT ISI-I-30-2 1/4 3 F-C. F(1-3) RSCCW H-33-1-1228 RESTRAINT ISI-I-30-2 N/A 3 F-C F(1-3) RSCCW H-30-1-125A ANCHOR ISI-I-30-1 M/4 3 'F-8 F(1-3) RSCCW 4-30-1-130 RIGIO MANGER ISI-I-33-1 N/A 3 F-8 F(1-3) RdCCW 9-30-1-131 RIGID 4&NGER ISI-I-30-1 N/A 3 F-6 F(1-3) RSCCW

. 1-33-1-1524SP ANCHOR ISI-I-33-1 1/4 5 F-S F(1-3) RSCCW 4-33-1-1323SP ANCHOR ISI-I-33-2 1/A 3 F-d F(1-3) R 6CCW -92WQ1 1-33-1-133 RIGID 1 ANGER ISI-I-33-2 N/A 3 F-8 F(1-3) RSCCW H-30-1-134 RIGIO HANGER ISI-I-30-2 N/A 3 F-e F(1-3) 48CCW 1-3)-1-135 RIGIO HANGER -ISI-I-30-2 N/A .3 F-9 F(1-3) .RSCCW 1-33-1-1354 LATERAL RESTHAINT ISI-I-33-1 N/A 3 F-s F(1-3) EsCCW 1-33-1-145G .GJIDE ISI-I-30-1 N/A 3 F-B~ F(1-3) RBCCW n-33-1-ISSG RIGID MANGER ISI-t-30-1 N/A 3 F-8 F(1-3) EBCCW 4-30-1-1 MSG GJIDE 151-I-33-1' N/A 3 F-8 F(1-3) R8CCh 4-33-1-175 -RIGIO MANGER, :ISI-I-30-2 .N/A 3 F-8 F(1-3) RSCCW 4-33-1-15A thCHOR ISI-I-33-2 N/A 3 F-B F(1-3) 28CCW 4-33-1-233 RTGID MANGER ISI-I-30*2 N/A 3 F-S F(1-3) RdCCW

' d-30-1-239 RIGIO MANGER ISI-I-30-2 N/A 3 F-5 F (1-3 ) RsCCW-4-33-1-245A AMCHOR ISI-I-30-2 N/A 3 F-s F(1-3) R$CCW 4-30-1-25 RIGI3 MANGER 151-I-33-2 N/A 3 F-S F(1-3) RSC~W H-30-1-2iSR- LATERAL RESTRAINT ISI-I-30 4/4 3 F-8 F(1-3) RSCCW N-3 3-1 -2 6 5 4 LATERAL RESTRAINT 151-I-33-2 N/A 3 F-8 7(1-3) RSCCW 4-30-1-27 . RIGIO MANGER. I51-I-33-2 4/4 3 F-8 F(1-3) RBCCW 1-30-1-2754 A1CHOR ISI-I-30-2 .1/4 3 F-8 F(1-3)^ R$CCW n- 3J 2 2 RIGIO HANGER ISI-I-30-2' 4/4 3 F-B F(1-3) ;RSCCW M-33-1-255 6UIDE ISI-I-30-1 N/A 3 F-8 F(1-3). R$CCW" 1-30-1-2$6 GJIDE ISI-I-33-1 1/4: 3 F-8 F(1-3) 46CCW.

H-30-1-287 GUIDE. ISI-I-30-1 N/A 3 F-5 F(1-5) R$CCW 1-30-1-2$5 CJIDE ISI-I-33-1 N/A 3 F-8 F(1-3) 'RBCCW 1-33-1-2dSR RIGI3 MANGER- ISI-I-33-2 1/A' 3" F-S. F(1-3) 48CCW 4-30-1-27 RIGIO HANGER .ISI-I-33-2~ N/A 3' F-8 F(1-3) RSCCW 1-33-1-270 GUIDE ISI-I-33 N/A -5 F-8 F(1-3) . RSCCW .

H-3J-1-291 GUIDE 'IS1-I-30-1 N/A 3 F-B F!1-33' RSCCW 1-3J-1-272 GJIDE .ISI-I-33-1 N/A 3 F-8 F(1-3) R8CCW 1-33-1-274 RIGIO HANGER- ISI-I-33-1. N/A 3 F-B' F(1-3) RsCCW 4-33-1-2dSa ANCHOR .. .ISI-I-30-2 N/A .3. F-B' F(1-33' RSCCW 9-30-1-33 . RIGID. HANGER. ISI-I-33-27 N/A 3 F-5: LF(1-3) R$CCW' d-33-1-3]SA AMCHOR ISI-I-30-2; N/A 3 F -n' F(1-3)- RSCCW Page. 41 of 44 -

F N;

4 PILGRIM NUCLEAR POWER SToTION l' CO*PONENT5 SCHEDULEO FOR EXAMINATION'DURING THE SECOND TEN TEAR INSPiCTION INIERVAL q COMPO4ENTS IN IHE R3CCW SYSTEM .1

  • l

........... COMP 3NENT.IO No.. C04PONiNY............ ISOMETRIC No. gat *L CL.. CAT... ITEM NO. RELIEF. SYSTEM il DESCRIPTION RE2 JEST l

RSCCW 'l H-30-1-31 RIGID MANGER ISI-I-30-1 N/A 3 F-B F(1-3) -1 4-30-1-315A ANCHOR ISI-I-33-2 N/A 3 F-s P(1-3) RBCCW RBCCW -)

1-33-1-32 RIGID SUPPORT ISI-t-30-1 g/A 3 F-B F(1-3) i 4-33-1-325H RIGIO HANGER ISI-I-30-2 N/A 3 F-8 F(1-3) R8CCW RIGIO HANGER ISI-I-33-1 N/A 3 F-s F(1-3) RSCCW 6-30-1-33 RIGID HANGER ISI-I-30-2 N/A 3 F-8 F(1-3) asCCW M-33-1-33SR R6CCW 1-33-1-34 RIGIO MANGin 151-I-30-1 N/A 3 F-8 F(1-3)

GJIDE ISI-I-30-2 1/A 3 F-8 F(1-3) RSCCd 4-33-1-346 RIGIO MANGER ISI-I-30-2 N/A 3 F-8 F(1-3) RBCCW 4-30-1-345R 1-33-1-35 RIGI3 HANGER ISI-I-30-1 1/A 3 F-B P(1-3) RBCCW-a1CHOR ISI-I-33-1 g/A 3 F-8 F(1-3) 28CCW H-30-1-3o54

- H-33-1-375R GUIDE ISI-I-30-1 N/A 3 F*$ F(1-33 RACCW ISI-I-33-2 N/A 3 F-5 F(1-3) 43CCW 4-3 3 3 dv G')13 E 1-30-1-370 GUIDE ISI-I-33-1 g/A 3 F-8 F(1-3) RSCCW 1-30-1-342 RIGID MANGER ISI-I-33-1 N/A 3 F-8 F(1-3). RdCCW 1-33-1-395R LATERAL RESTRAINT ISI-I-30-1 N/A 3 P-B F(1-3). RdCCW 1-30-1-415G GJIDE ISI-I-30-1 N/A 3 - F-B F(1-3) RSCCW 1-3 3 4 2 S R GUIDE ISI-I-30-1 N/A 3 F-B F(1-3) RSCCW 4-30-1-43 RIGIO nANGER ISI-I-30-1 N/A 3 F-5 F(1-3) RBCCW -

< H-33-1-457 RIGI3 HANGER ISI-I-33-1 N/A 3 F-S F(1-3) RdCCW H-3 3-1 -4 3 5 RIGID MANGER- ISI-I-33-1 M/4 3 F-S F(1-3) RSCCW 4-33-1-439 RIGID HANGER ISI-I-33-1 N/A 3 F-B F(1-3) RSCCW 4-33-1-4354 RIGID. HANGER ISI-I-33-1 m/A 3 F-C FC1-3) RSCCW H-33-1-44 RIGID HANGER ISI-I-33-1 N/A 3 F-8 'F(1-3) R8CCW 1-30-1-440 - RIGIO HANGER 151-I-33-1 N/A 3 F-8 F(1-3) RSCCW 1-33-1-441 RIGI3 HANGER ISI-I-33-1 N/A 3 F-B _F(1-3) R3CCW 4-33-1-442 RIGIO' HANGER .ISI-I-30-1 -N/A 3 F-5 F (1-3) RdCCW H-30-1-44SG GUIDE ISI-I-30-1 N/A 3 F-5 .F(1-3) . RBCCW

--RIGIO HANGER ISI-I-30-2' N/A 3 F-8 F(1-3) 'RBCCW 9-30-1-52 M-33-1-53 LRIGID HANGER 'ISI-I-33-2 N/A 3 F-B. F(1-3) RSCCW RIGIO HANGER ISI-I-33-2 .N/A 3 F-8 F(1-3) #6CCW H-33-1-54 4-33-1-57 RIGID MANGER ISI-I-33-2 1/A 3 .F-B F(1-3)- RSCCW M-33-1-575A ANCHOR ISI-I-30-1 1/A 3' F-S F(1-3) RBCCW

. RIGID MANGER ISI-I-30-2 N/A 3 F-S F(1-3) 48CCW 4-30-1-S$

4-30-1-535A ANCHOR ISI-I-33-1 'N/A 3- F-5 F(1-3) RSCCW 1-30-1-39 RIGID HANGtR ISI-I-30-2 N/A 3 F F(1-3) RSCCW 6-3 0-1 -5 9 5 A ANCHOR ISI-I-33-1 N/A 3 .F-8 fF(1-3) R8CCW g/A 3 F-B F(1-3) RSCCW 4-33-1-63SR GJIDE ISI-I-33-1 RSCCW H-33-1-61 RIGI3 MANGER .ISI-I-30-2l h/4 5 F-8 F(1-3) 1-30-1-61SA ANCHOR .ISI-I-30-1 N/A 3 F-S F(1-3) R3CCW 1-33-1-62 RIGID HANGER ISI-I-30 N/A 3 F-5 F(1-3) -RSCCW ANCHOR ISI-I-30-1 .N/A 3. F-8 F(1-3)

,RSCCW 4-33-1-s25A .

1-3J-1-63 . 41GIO HANGER LISI-1-30-2 N/A F-8 F(1-3) RSCCW 4-33-1-635A A4CHOR. ISI-I-33-2: s/4 '3 .F-5 F(1-3) RBCCW Page 42:of. 44

'y .

'-j'

' N,-5 ..

p

- v

.,A PILGRIM NUCLEAR POWER STATION -

COMPONENTS SCHEDULED F0W E14MINATION DURING THE SECOND TEM YEAR INSPECTION INTERVAL COMPONENTS IN THE R8CCW Sv5TE1

!.......... COMP 3NENT 13 No.. COMPONENT............ ISOMETRIC NO. 4Af*L CL.. CAT... ITEM NO. RELIEF. SYSTEM OESCRIPTION' AEQJEST H-3J-1-$4 RIGID HANGER ISI-I-30-2 N/A 3 F-S F(1-3) AdCCW i-30-1-645A ANCHOR ISI-I-30-2 N/A 3 F-8 F(1-3) 28CCW H-3J-1-65 FIGIO MANGER ISI-1-30-2 N/A 3 F-8 F(1-3) R8CCW d-30-1-$$ RIGIO HANGER 151-I-33-2 N/a 3 F-S F(1-3) RSCCW M-30-1-ooSS/347 4UIDE ISI-I-30d2 N/4 3 F-8 F(1-3) RdCCW H-3J-1-67 RIGIO MANGER ISI-I-33-2 N/A 3 F-8 F(1-3) RSCCW 1-33-1-675G/343 GJI3E ISI-I-30-2 N/A 3 F-8 F(1-3) RBCCW ~

1-30-1-62 'RIGIO MANGER ISI-I-33-2 1/A 3 F-8 F(1-3) R8CCW 4-30-1-$355/349 GUIDE ISI-I-33-2 N/A 3 P-S F(1-3) NBCCW 4-33-1-e9 RIGID MAN 3ER ISI-I-33-2 N/A 3 F-8 F(1-3) RBCCW 1-33-1-$95A/350 ANCHok I51-I-30-2 N/A 3 F-S F(1-3) R$CCW 1-30-1-$55 RIGIO HANGER ISI-I-30-1 N/A 3 F-8 F(1-3) RSCCW

-i-3 0-1 -70 SG / 3 51 'GJIDE ISI-I-33-2 N/a 3 F-5 F(1-3) RBCCW 1-30-1-71SG/352' Gut 0E ISI-I-33-2 N/A 3 F-5 F(1-3) ReCCW 1-30-1-72SG/353 GUIDE ISI-I-30-2 N/a 3 F-8 F(1-3) RBCCW 1-30-1-73SH RIGID HANGER ISI-I-30-2 N/A 3 F-S F(1-3) R6CCW 8-30-1-754 ANCHOR ISI-I-33-1 N/A 3 F-5 F(1-3) RSCCW 1-30-1-95A ANCHOR .ISI-I-30-1 N/A 3 F-8 F(1-3) RSCCW 1-33-1-99 RIGIO HANGER . ISI-I-33-2 N/A 3 F-B F(1-3) R8CCW H-30-1-75R Gu!DE 151-1-33-1 N/A 3 F-A F(1-3) RSCCW 1-33-1-S;11 suIDE ISI-I-33-2 N/a 3, F-B F(1-3) RSC~W 1-33-1-5R10 RIGIO MANGER - I515I-30-1 N/A 3 F-8 'F(1-3) . RSCCW H-33-1-74SA ANCHOR ISI-I-30-2 N/A 4- F-8 F(1-3) R$CCW H-30-1-104 RIGIO MANGER ISI-I-30-1 . M/ 4 '3- F-8 F(1-4) R$CCW M-30-1-13SS RIGIO HANGER ISI-I-33-1^ N/A 3 F-C .F(1-4) R8CCW. s^

4-30-1-113 RIGIO 4 ANGER ISI-I-33-1 N/A 3l F-B F(1-4) RBCCW H-30-1-115 'RIGIO HANGER ISI-I-30-1 N/4 3 F-5 F(1-4) RBCCW 4-33-1-3356 SPRINi HANGED ISI-I-33-1 N/A 3 F-C F(1-4) RBCCW

' 4-30-1-405H SPRINT MANGER - ISI-I-30-1 N/4 3- F-8 F(1-4) RBCCW' H-30-1-46 RIGIO HANSER ISI-I-30-1 N/A 3 F-8 F(1-4) RSCCW 1-33-1-se SPRIN5 HANGER ISI-I-30 'Nin 3: 'F-8 .F(1-4) 48CCW 4-30-1-53 -SPRING HANGER ISI-I-30-2 N/A 3 F-C F(1-4) RSCCW' d-30-1-51 SPRIN3 HANGER ISI-I-30-2 MIA. -3 F-C :F(1-4) RSCCW 4-30-1-6SSH' SPRIN3 MANGER 151-1-30-2 'N/A 3. F-C F(1-4) .R8CCW 4

4-33-1-5512 54UB3ER -ISI-I-30-2 N/A 3 F-C F(1-4) RaCCW~

' Page 43 of 44L t

.t -' w- ne f d - e

e 4 -

ig -

PILGRIM' NUCLEAR POWER'STATIot- --

C 01PO N E NT S SCHEDULED FOR EXAMINATI34 DURING THE SECONO TEN YEAR IN5PiCTIO4-INTERVAL COMPONENTS'IN.THE CACS SYSTE4.

....... .. . COMP 3NENT ID No.. COMPONENT............ ISOMETRIC N0. MAT *L CL..uCAT... ITEM No. RELIEF. REQJEST SYSTEM DESCRIPTION I$1-I-50-1 4/A 2 F - C- F(1-3) CACS 1-45-1-1 RIGID MANGER M-4 5 1 S G RIGID HANGER ISI-I-50-1 N/A 2 F-C- FC1-3) CACS

'I51-I-53-1 1/A' 2 F-C F(1-3) CACS d-45-1-25R RITIO HANGER ISI-I-50-1 N/A 2 F-C F(1-3) CACS 4-45-1-35G RESTRAINT 151-I-50-1 g/A 2 F-8 F(1-3) CACS 1-45-1-45G RIGI0' HANGER CAC$

4-45-1-55 .GJIDE 151-1-50-1 N/A 2 F-C .F(1-3)

ISI-I-50 N/A 2 F-C 'F(1-4) CACS a-45-1-4 SPRING HANGER ISI-I-Saal N/A 2 F-C F(1-4) CACS n-45-1-5 . SPRING HANGER ISI-I-50 N/A 2 F-C Ft1-4) CACS M-45-1-6 $PRING HANGER-a s

1 4

'Page 44; of' 44' L

v i.

, --_ ~ ..

. - .. . . .~ _ . , .. -. ,, .

' Boston INEERVICE INSPECTIGN PROGR54 Pilgrim Nuclaar:

Edison- .SECOND TEN-YEAR INTERVAL Power.St_iton-Company ASME XI-1980 EDITION HBO ADDENDA Unit - 1 System: REACTOR PRESSURE VESSEL Paae 1 of 4 _, Rev. 3

'Section Arendment 92 P&ID Section. XI No. 03-10-92 Line or Component and XI Item . Item of Exaa Relief Description Co-ord. Class Catecory Number Descriotion Items Method Reauest Remarks Pressure retaining welds 1 B-A Bl.11 Circumferential Helds in i Vol. S% accessible /*

in the reactor vessel belt.line region 1 B-A Bl.12 Longitudinal Helds in 6 Vol. 10% acces'sible'/*

belt line region 1 B-A Bl.21 Circumferential Head Helds (a.) top head 1 Vol.

(b.) bottom head 2 Vol. (1) weld /*

inaccessible-1 B-A Bl.22 Heridonial Head Helds Vol.

(a.) top head 8 Vol.

(b.) bottom head 14 Vol. (6) inaccessible /*

bottom head welds ~

l B-A Bl.30 Shell-to-flange 1 Vol.

I B-A Bl.40 Head-to-flange 1 .Vol.

1 B-A Bl.50 -Repair Held 1. None Repair area ~not located in belt line region (GG)

Full Penetration Helds 1 B-D B3.90 Primary Nozzle to Vessei 28 Vol. PRR of Nozzles in Vessels Helds 9 1 B-D B3.100 Nozzle Inside Radius 28 'Vol. PRR /*

Section 9

/ --92-01

a Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station:

Company ASME XI 1980 EDITION H80 ADDENDA Unit .1 System: REACTOR PRESSURE VESSEL Pace 2 of 4 Rev. 3 Section Amendment B7-02 P&ID Section XI No. 12-16-B7-Line or Component and XI Item Item of Exam Relief Description Co-ord. Class Cateaory Number Descriotion Items Method Recuest Remarks Partial Penetration. 1 B-E B4.11 Nozzles 6 VT-2 Nil, N14 N15A,N15B Helds in Vessels N16A, N16Bf 1 B-E B4.12 Control Drive Nozzles 145 VT-2 Note: Inspection conducted in accordance with INA-5000

1. B-E B4.13 Instrumentation Nozzles 42 VT-2 30 LPRMs B IRMs Pressure Retaining 4 SRMs Dissimilar Metal Helds

'(a) Recirculation 252 1 B-F B5.10 Nozzle-to-Safe-End-Helds 12 /ol. 2R-NIA-1, 2R-N1B-1.

'& 2R-N2A-1 thru Surf.- 2R-N2K-1 (b) Core Spray Nozzle-to-Safe-End-Helds 2

~

242 1 B-F B5.10 14-A-1,s14-B-1 (c) CRD Return 252 1 B-F B5.10 Nozzle-to-Safe-End-Helds 1 3-I-1

.(d). JET Pump Instrument. 252 1 B-F B5.10 Nozzle-to-Safe-End-Welds 2 N9A-1 -N9B-1

-(') Hain Steam (1) 252 1 B-F 'B5.10 Nozzle-to-Safe-End-Helds 4 1-A-1 thru l-D-1 (f) Feedwater (1) 252 1 B-F .B5.10 Nozzle-to-Safe cnd-Helds- 4 6-N4A-11thru

, 6-N4D-1 (g) Vessel Head Vent 252 1 B-F B5.10 Nozzle-to-Safe-End-Helds 1 - NB-1 (h) Vessel Head Spray 252 1 B-F B5.10- . Nozzle-to-Safe-End-Helds 1 N7A-1 (1) Vessel Head Instr. 252 1 B-F- B5.10 Nozzle-to-Safe-End-Helds 1 N7B-1 (j) Rx. Hater Level. Instr 253 1 B- F .- B5.11 Nozzle-to-Safe-End-Helds 2 . Surf & N16A-R-1 N16B-R-1.

(k) SBLC & Core dP.

253- 1 B-F- -85.11 Nozzle-to-Safe-End-Helds 1 N14-1 (1) These are not dissimilar metal welds, but; for identification 'and . inspection requirements will. be classified as safe end welds.

, - , ,, - 3 y ..m ,,

1 Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power. Station Company ASHE XI 1980 EDITION H80 ADDENDA Unit - 1 System: REACTOR PRESSURE VESSEL Pace 3 of 4 Rev. 3 Section Amendment'87-02 P&ID Section XI No. 12-16-C7 Line or Component and XI Item Item- of Exam Relief Description Co-ord. Class Catecory Number Description ' Items Method Recuest Remarks Pressure retaining 253 1 B-J 89.21 Circ Helds NPS < 4" 2 Surf Ni6A-R-2

. celds in piping N16B-R - Pressure Retaining 252- 1 B-G-1 B6.10 Closure Head Nuts 56 Surf.

Bolting Larger Than 2"

. Diameter 1 B-G-1 B6.20 Closure Studs, In Place 52 Vol.

B-G-1 86.30 Closure Studs, Hhen 4 Vol. 41,'42, 43 & 44l Removed & Surf.

1 B-G-1 B6.40 Threads in Flange .56 Vol.

1 B-G-1 B6.50 Closure Hashers, 56ea. Visual VT-1 Pressure Retaining 1 -B-G-2 B7.50 Bolting of Piping 3 Visual Flanged head Bolting 2" diam. VT-1 piping and smaller Yntegral Attachments 252 1 B-H 88.10 Vessel Skirt Held 1 Vol.

1 .B-H B8.10 Head lifting Lugs 4 Surface Not a code required exam.

1 1 B-H 88.10 Stabilizer Support. 4- Surface Verify access

' Lugs .for examination

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear-Edison SECOND TEN-YEAR INTERVAL Power" Station-Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: REACTOR PRESSURE VESSEL Pace 4 of 4 Rev. 3 Section P&ID Section XI No.

Line or Component -and XI Item Item of Exam' Relief Descriotion Co-ord. Class Catecory Number Descriotion Items Method Recuest Remarks Interior of Reactor 1 B-N-1 B.13.10 Interior of Reactor i Visual Accessible area Vessel Vessel VT-3 Reactor Vessel 1 B-N B13.20 Integrally welded Visual Interior Attachments interior attachments to .VT-1 Reactor Vessel Reactor Vessel 1 8-N-2 813.21 Integrally welded Visual Core Support Core Support Structures VT-1 to Reactor Vessel Pressure Retaining Helds 1 B-0 B14.10 10% Peripheral CRD 35 Vol.

in Control Rod Housings Housings - or Surf.

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nucleari Edison SECOND TEN-YEAR INTERVAL Power Station '

Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: PRESSURE TESTING Pace 1 of 1 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Description Co-ord. Class Cateaory Number Descriotion Items Method Recuest Remarks All Pressure Retaining 1 B-P B15.10 -Reactor Vessel System Visual System Leakage.

Components - Class I Leakage Test VT-2 Test Each . 1 Refueling Outage.

RHR CS 1 B-P B15.11 Reactor Vessel Hydrosta- Visual One per Interval-FH tic Test VT-2 MS RECIRC 1 B-P B15.50 Piping - Leakage Test Visual System Leakage RHCU VT-2 Test Each.

SBLC Refueling Out-RCIC age.

HPCI RPV 1 B-P B15.51 Piping - Hydrostatic Visual Once per Interval CRD Test VT-2 1 B-P .B15.60 Pumps - Leakage Test Visual System _ Leakage VT Test Each Refueling Out-age.

1 B-P B 15.61 Pumps - Hydrostatic _ Visual -Once'per Interval Test VT-2.

1 B-P B15.70' Valves - Leakage Test' Visual System Leakagei YT-2 . Test Each Refueling Out-age 1 'B-P_ 'B15.71 Valves -- Hydrostatic Test ' Visual Once per Interval VT . . - . . -

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL -Power Station.

Company ASME XI 1980 CDITION H80 ADDENDA Unit - 1 System: HAIN STEAM Pace 1 of 6 Rev. 3 Section P&ID Section XI No.

.Line or Component and XI Item Item of Exam kellef-Descriotion Co-ord. Class Catecory Number Description- Items Hethod Recuest Remarks Line "A" 252 1 B-G-2 B7.70 Valves-Bolts studs, nuts 4 Visual .(2) MSIV's 2" diameter and less VT-1 (1) Relief Valvel .-

-(1) Safety. Valve 1 B-J RB9.11 Piping n.p.s. 1 4" 19 Surf. PRR ' Inaccessible weld Circumferential welds & Vol. 1 penetration' X-7A-1 B-J 89.31 Piping n.p.s. 1 4" 2 Surf. (2) Heldolet:

branch connection weld & Vol.

1 B-K-1 B10.10 Piping - Integrally 4 Surf. PRR: (8) Inaccessible welded attachments 1 Lugs'in Penetration X-7A.

1 B-H-2 B12.40 Valve body > 4" n.p.s. 4 Visual PRR (2) MSIV's VT-3 3 (1) Relief Valve (1) Safety Valve 1 . Group Circumferential pipe. 3' Vol.. 1-A-7 I: welds inspected in each 1-A-8

-Helds' ten year interval ;1-A-9 1 B-F B5.10 Piping n.p.s. > 4" 1 See' System RPV Nozzle to safe.end' weld Held 1-A .

a

~

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear-

-Edison SECOND TEN-YEAR INTERVAL PowerStation Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: MAIN STEAM Pace 2 of 6 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Catecory Number Description Items Method Reavest Remarks Line "B" 252 1 B-G-2 B7.70 Valves-Bolts 3 Visual (2) MSIV's studs, nuts VT-1 (1) Relief Valve 2" diam. and less 1 B-J 89.11 Piping n.p.s. 1 4" 17 Surf. PRR Inac essible weld Circumferential welds & Vol. I penetration X-78 1 B-J 89.31 Piping n.p.s. 1 4" 1 Surf. Relief Line branch connection welds & Vol.

1 B-K-1 B10.10 Pipi.1g - integrally welded 5 Surf. PRR-(8) Inaccessible attachments I lugs.in penetra-tion X-78 1 B-H-2 12.40- Valve body > 4" n.p.s. 3 VT-3 PRR (2) HSIV's-3 (1) Relief Valve 1 Group Circumferential pipe welds 2 Vol.

1-8-8 I- inspected in each ten year 1-B-9 Welds interval 1 B-F- b5.10 Piping n.p.s. > 4" See System RPV nozzle to safe-end weld Held I-B-1

' Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME X! 1980 EDITION H80 ADDENDA ' Unit - 1 System: MAIN STEAM Pace 3 of 6 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Description Co-ord. Class Catecory Number Descriotion Items Method Reauest ' Remarks Line "C" 252- 1 B-G-2 B7.70 Valves-Bolts, 3 Visual (2) MSIV's studs,. nuts 1 'VT-1 -(l) Safety Valve 2" diameter 1 B-J 89.11 Piping n.p.s. 2 4" 17 Surf. PRR Inaccessible weld Circumferential welds & Vol. 1 in penetration X-7C 1 B-J B9.31 Piping n.p.s. 1 4" 1 Surf. Relief branch connection welds & Vol. Line i B-J 89.32 Piping n.p.s. < 4" 1 Surf. RCIC Out branch connection welds 1 half coupling 1 B-K-1 B10.10 Piping - integrally welded 4 Surf. PRR (8) Inaccessible attachments I lugs in penetra-tion X-7C 1 B-M-2 B12.40. Valve body n.p.s. > 4" 3 Visuai PRR (2) MSIV's VT-3' 3 (1) Safety Valve 1 B-F B5.10 Piping n.p.s. > 4" 1 See system RPV nozzle to safe-end weld weld 1-C-1

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclearu Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit .11 System: MAIN STEAM Pace 4 of 6 Rev. 3 Section P&ID Section XI No.

Line cr Component and XI Item Item of Exam Relief

__D.es cri pti on Co-ord. Class Cateoory Number Descriotion Items Method Recuest Remarks Line "C" 1 Group Circumrerential welds 2 Vol. 'l-C-8 I Helds inspected in each ten 1-C-9 year interval Line "D" 252 1 B-G-2 B7.70 Valves-Bolts, 4 Visual (2)'HSIV's studs, nuts i VT-1 (2) Reli sa 'ves 2" diameter 1 B-J 89.11 Piping n.p.s. 1 4" 19 Surf. .PRR Inaccessible weld ~

Circumferential welds & Vol. I pe-'tration X-7D 1 B-J B9.31 Piping n.p.s. 1 4" 3 Surf. Relief Valve (s)

Branch connection welds & Vol. HPCI Line 1 B-K-1 B10.10 Piping - Integrally 4 Surf. PRR (8) Inaccessible welded attachments 1 in penetration.

X-7D 2

1 B-F B5.10 Piping n.p.s. > 4" 1 See System RPV Nozzle to safe-end weld Held 1-D-1 f

Boston INSERVICE INSPECTION PROGRAM ' Pilgrim Nuclear:

Edison SECOND TEN-YEAR INTERVAL. Power Station:

Company ASME XI 1980 EDITION H80 ADDENDA . Uni t -' 1 System: MAIN STEAM Pace 5 of 6 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class' Cateaory Number Description Items Method Recuest Remarks Line "0" (Cont.) 1 B-M-2 B12.40 Valve body > 4" n.p.s. 4 Visual PRR (2) MSIV's VT-3 3 (2) Relief Valves 1 Group Circumferential welds 3 Vol. 'l-D-7 I inspected in each ten .1-D-8 Helds year interval 1-D-9 3" Drain Manifold 252 i B-F B5.51 Piping n.p.s < 4" 1 Surf. 1-5D-10 Dissimilar metal butt welds 1 B-J- 89.21 Piping n.p.s. < 4" 5 Surf. PRR (1) Inaccessible Circumferential welds l' weld in X-8 1 3-K-1 B10.10 Piping - integrally 1 Surf. PRR (8) Inaccessible welded. attachments 1 lugs in'penetra-tion X-8 a Main' Steam Line A 'l F-C F(1-4)- Spring Hangers. 4 VT-3 &4 1 F-C- F(1-4) Snubbers 3 VT-3 &4 1 F-C .F(1-3) Rigid Support i VT-3 1 F-B .F(1-3)' Anchor' ~ 1 VT-3 ;X-7A Main Steam Line'B 1 F-C .F(1-4) Spring Hangers 3' VT-3&4 1 F-C- .F(1-4) Snub 5ers 3 VT-3&4

'l F-C ~ 'F(1-3) Rigid Support l' VT-3 1 .F-B 'F(1-3) Anchor 1 VT X-7B

Boston INSERVICE INSPECTION. PROGRAM Pilgrim Nuclear-Edison SECOND TEN-YEAR INTERVAL Power Station:

Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: MAIN STEAM Pace 6 of 6 Rev. 3 Section P&ID Section- XI No.

Line or Component and XI Item- Item 'of Exam Relief Descriotion Co-ord. Class Catecory Number Descriotion Items Method Reauest Remarks Main Steam Line C 1 F-C F(1-4) Spring Hangers 3 VT-3&4

-1 F-C F(1-4) Snubbers 3 VT-3&4 1 F-C F(1-3) Rigid Support i VT-3 1 F-B F(1-3) Anchor 1 VT-3 X-7C Main Steam Line D 1- F-C F(1-4) Spring Hangers 4 VT-3&4

-1 F-C F(1-4) Snubbers 3 VT-3&4 1 F-C F(1-3) Rigid Suport i VT-3 1 F-B F(1-3) Anchor 1 VT-3 X-70 Steam Drain Line 1 F-B F(1-3)- Anchor i VT-3 X-8

- - .- - - - = - a

Boston INSERVICE INSPECTION PROGRAM Pilgrim. Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: RECIRC Pace 1 of 5 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Description Co-ord. Class Cateaory Number Descriotion Items Method Recuest' Remarks Recirc Loop "A" 252 1 B-G-1 B6.180 Pumps-Bolts and studs i Vol. 16 Cap. Screws 2", 12", 22", and >2" Dia 28" Pipe 252 1 B-G-1 B6.190 Pumps-Flange Surface 2 Visual H5en connection VT-1 is disassembled 252 1 B-G-1 86.200 Pumps-Nuts Bushings, 1 Visual . Disassembly notl and Washers >2" Dia. VT-1 required. Acces-sible areas'only 252 i B-G-2 B7.50 Piping-folts,' Studs, 2 Visual Decontamination and Nuts 12" Dia. VT-1 Connections

.252 i B-G-2 B7.70 Valves-Bolts, Studs, 2 Visual MO-4A:

and Nuts 1 2" Dia .VT-1 MO-5A 252- 1 B-J 89.11 Circumferential Helds 28 Surf. All nozzle-to '

NPS 1 4" & Vol. ' safe-end welds are listed'in

.RPV system.

7 , .. t s s . . ., .

E+;

~

u

. Boston ' INSERVICE 5 INSPECTION PROGRAM' ' +

.' Pilgrim Nucleari v-

, Edison- SECOND TEN-YEARsINTERVAL Power StationL

, . Company'. ASME XI 1980 EDITION W80 ADDENDA' i Unit -;1;

- System: RECIRC Paae 2 of 5 Rev .' ' 3 " +,

. Section. H P&ID: Section- XI No.

Linejor- Component and . -XI- ' Item Item' of. Exam Relief' .4 Descriotion ' Co-ord. Class Cateaory Number Descriotion - Items Method ~ Reauest Remarks y
Recirc Loop ~"A" -252 1 B-J. 89.31 Branch Pipe Connections '2 ~ Surf. 2R-N1B-98C : '(Continued). NPS 1 4" & Vol., 2R-BPA-1

.252. 1- B-J .B9.32 Branch Pipe Connections 1 Surf. 2R-N18-9BC '

J n-

.NPS < 4"' 2" Drain to~

. C. R.H.- -;

252 '1 B-J. B9.40 : Socket Helds' 2" Surf.. 2"lDrain.to'-

. C.R.H. ,

252- 1 B-K-l'. B10.10 Piping-Integrally; ,24 Surf. 14HL2(4)..

Helded attachments 5HLl(4)f H 252 'l .B-K-1 'B10.20-. Pumps-Integrally 3- . Surf. ,

l

, cHelded attachments

, 252l 11 B-L-2:-.B12.20.'PumpCaslingL  ; 1.. Visual PRR.

VT-3 L2-252- 1 -B-M-2-.1B12.40 Valves - NPS >f4"- .. 2 ' Visual PRR- 'MO-4A

.. VT-3 ; :3f '. MD-SA ' q

  • 1 ..

t

, , .l c

.. s .

,p' ^ 1 ;,

I

. , , .. .I  :.

' y  %- ~

' ' ' ~ #_~_

LL .. .:6. ,. ' '

, ,..e ..y ,.-e.,.,, - ,,

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: RECIRC Pace 3 of 5 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam ' Reli ef, Descriotion Co-ord. Class Cateaory Number Descr10 tion Items Method Recuest Remarks Recirc Loop "A" 252 1 F-C F(1-4) Spring Hangers 9 Visual (Continued) VT-3&4 252 1 F-C F(1-4) Snubbers 12 Visual VT-3&4 252 1 F-C -F(1-3) Guide 1 Visual on 2" drain VT-3 to C.R.H.

RECIRC Loop "B" 252 1 B-G-1 B6.180 -Pumps-Bolts and 1 Vol. 15 Cap Screws 2", 12", 22" & 28" Pipe Studs > 2" Dia 252 1 B-G-1 B6.190 Pumps-Flange Surface 2 Visual When connection VT-1 .is disassembled 252 1 8-G-1 B6.200 Pumps-Bolts,1 Studs, 2 . Visual, Disassembly not' and washers > 2" dia. VT-1 required, Acces-sible' areas only.

252 1 B-G-2 B7.50 Piping-Bolts. Studs, 2 Visual Decontamination and Nuts <2" Dia. VT-1 Connections 252 .1 B-G-2 B7.70 Valves-Bolts. Studs Visual H0-4B and Nuts 1 2" Dia. VT-1 MO-58

7 i * ~

rJ

-Boston ~ .

INSERVICE INSPECTION'PROGRAMI ~PilgrimNbclear Edisoni SECOND TEN-YEAR' INTERVAL Power..: Station Company-- .ASME XI 1980' EDITION H80 ADDEEQ&  : Unit,- 1

~ System:'RECIRC Pace 4 of 5- Rev. 3-

'Section P&ID' .Section XI No.

Line or; Component 'and .

XI Item Item- of ~ Exam Relief- .

Descriotion Co-ord. Class Cateoory Number Description Items ' Method Reauest Remarks-

Recirc' Loop'"B"' 252 1 .B-J 89.11
Circumferential Helds 28 l Surf. A11' nozzle-to ;

.N.P.S. 1 4" & Vol. Jsafe.endiwelds',

1 'are'11sted~ini RPV System 252 1 8-J E9.31 Branch Pipe Connections ' 2- Surf.- 2R-N1 A-7 BC-1

'NPS 1 4" & Vol.: 2R-BP-1Aj

'252- 1 B-J 89.32 Branch Pipe Connection' 1 Surf 2R-M1 A-7BC-2 z NPS I 4" L

252- L1 ' B-J 89.40 Socket Helds' -2 Surf- '2" drainito.

C.R.M.

252- l1. B-K-17:B10.10.; Piping-Integrally 2 ' Surf; 12HL2(4). 4 Helded Attachments 14HLi(4) 252' 1 B-K-1. 810.20 Pumps-Integrally 3 tSurff Helded Attachments' "

l

'252 14 B-L-2; 812;20l: Pump Casing- 1. -Visual- PRRfy. , .

' i

[

~

LVT-3 21 , ,

-252 1 B-M-2.:B12.40- Valve'si- NPS > 4"" 2. Visuall PRR  : MO-4B; _

.VT-3 a3: lMO-5B l 1.

I i

> t

=..$-

s J ^i -s e v H e-i e W- e 7 -

Boston INSERVICE INSPECTION PROGRAM Pilgrim Fuclear Edison SECOND TEN-YEAR-INTERVAL , Power Station Company- ASME XI'1980 EDITION H80 ADDENDA Unit - l'  ;:)

System: RECIRC Pace 5 of 5 Rev.' 3 Section P&ID Section XI No.

Line or Component and XI Item . Item of Exam Relief Descriotion Co-ord.' Class Catecorv Number DescriDtion Items Method Recuest Remarks-Recirc Loop B 252 1 F-C F(1-4) ' Spring Hangers' 9 Visual VT-3&4 252 1 F-C F(1-4) Snubbers 12 Visual VT-3&4 252 1 . F-C F(1-3) Guide 1 Visual on 2" Drain VT-3 to CRH n'% ^

f p

Bosten INSERVICE INSPECTION PROGRAM Pilgrim Wuclear

- Ed9 son SECOND TtN-YEAR INTERVAL Power Station

, Company ASMr XL190 CDITION M80 ADOENDA Unit - 1 System: CONTROL R00 DRIVE Face 1 of 2 Rev. 3 Section

=-'

=: P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Catecory Number DescriDtion. Items Method Recuest Remarks Hydraulic Return 250 1 B-J B9.21 Piping n.p.s. < 4" 1 Surf. Nozzle M10 to (Cut & Capped in 1980) Circumferential Helds Cap Held in RPV System 6" Scram Discharge 2.50 2 C-F C5.11 Circumferential Butt 21 Surf.

Header - Hest Held.N.H.T.1 5" 250 2 F-C F(1-3) Restraints 2 Visual

, VT-3

_ 250 2 F-B F(1-3) Guides 4 Visual VT-3 250 2 F-C F(1-3) Rigid Support 10 Visual VT-3 250 2 F-B F(1-3) Anchors 2 Visual VT-3 250 2 F-C- F(1-4) Spring Hanger 1 Visual VT-3 & 4

-12" Scram Discharge 250 2 C-F C5.21 Circumferential Helds ' . Surf.&

Volume -' Hest NHT > .5" Vol. q v

2 l

I

I'ISERVICE INSPECTION PROGRAM Pligrim Nuclear Boston- Power Etation Edison SECOND TEN-YEAR INTERVAL ASME XI 1980 EDITION HSO ADDENDA Un't - 1 Company Pace 2 of 2 Rev. 3 System: CONTROL ROD DRIVE Amendment 87-01 Section XI No. 12-15-87 P&ID Section Line or Component and XI Item Item of Exam Relief Co-ord. Class Cateqory Number Descriotfoo Items Method Recuest Remarks Descriotion 6" Scram Discharge 250 2 C-F C5.11 Circumferential Butt 25 Surf Header-East Helds N.H.T.I .5" 250 2 F-C F(1-3) Restraint i Visual VT-3 250 2 F-B F(1-3) Guides 5 Visual VT-3 250 2 F-C F(1-3) Rigid Support 7 Visual VT-3 250 2 F-B F(1-3) Anchor' 2 Visual VT-3

'12" Scram Discharge 250 2 C'-F C5.21 Circumferential Butt 2 Surf ,

Helds > .5" & Vol l 87-01 l Volume East  !

Pressure Retaining 250 2 C-H C7.20 System Leakage Test Visual.  !

VT-2 l Components-Piping l 250 2 C-H C7.21 System Hydro Test Visual VT-2 Pressure Retaining 250 2 C-H C7.30 System Leakage Test Visual VT-2 Components-Valves.

-250 2 C-H C7.31 System Hydro Test Visual VT .

,.J

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 Systam: FEEDHATER Pace 1 of 3 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Eram Relief Descriotion Co-ord. Class Catecory Number Description Items Method Recuest Remarks Loop "A" 12" Diameter 252 1 B-J 89.11 Piping n.p.s. 1 4" 21 Vol.& 6-N4(A-D)-1 Helds Piping Circumferential Helds Surf. in System RPV B-K-1 B10.10 Piping - Integrally 3 Surf. 6-N4A-5HL1(4) welded attachments 6-N4A-9HL1(8) 6-N4B-5HLl(4)

Loop "A" 18" Diameter 252 1 B-G-2 B7.70 Valves - Bolts, studs, 3 Visual 6-57A, 6-58A.

Piping nuts 1 2" diameter VT-1 6-62A 1 B-J 89.11 Piping n.p.s. 1 4" 15 Vol.& PRR Inaccessible weld Circumferential Helds Surf. 1 in penetration X-9A 1 B-J B9.31 Piping n.p.s. 1 4" Branch 1 Vol.& RHCU Inlet connection welds Surf.

1 B-K-1 B10.10 Piping - Integrally 3 Surf. PRR (8) Inaccessible welded attachments 1 lugs in penetra-tion X-9A.

6-A-4HLi(8) 6-A-6HLi(4) 1 B-H-2 B12.40 Valve Body n.p.s > 4" 3 VT-3 PRR 6-S7A, 6-58A.

3 6-62A

6 l-g Boston INSERVICC INSPECiiUN FROGRArt Pilgr > M . ; a r Edison SECOND TEN-YEAR INTERVAL Power. Station ~

LCompany. ASME XI 1980 EDITION H80 ADOEMDA Unit - l' System
FEEDNATER Pace 2 of 3 Rev. 3 Section
P&ID -Section XI. No.
Line or Component and XI Item Item of Exam Relief Description Co-ord. Class Cateaory Number Descriotion Items Method' Recuest Remarks Loop "A" 12 & 18" 252 1 Group Circumferential welds 9 Vol. 6-N4A-7 6-N44-12

. Diameter Piping- I- inspected it'each ten 6-N4A-9 6-N4A-13 Helds year interval 6-N4A-10 6-N48-8 1

6-N4A-11 6-N48 . 6-N4A-8~

Loop "B" 12" Diameter- 252 1 B-J 89.11 Piping n.p.s. 1 4" 25 Vo?.&

Piping Circumferential Helds Surf.

I 1 B-K-1 B10.10 Piping integrally 4 Surf. 6-N40-5HLl(4) welded attachments N4C-7HLl(4)"

6-N40-13HLi(8)

6-N40-9HLl(8)
. Loop "B" 18" Diameter '252 1 B-G-2 B7.70 Valves - Bolts, studs, 3 Visual 6-578, 6-588, Piping nuts ,1 2* diameter VT-1 6-628 1 - B-J B9.11 . Piping n.p.s. 1 4" 16' Vol.& PRR Inaccessible weld Circumferential Helds . Surf. 1 - in penetration X-96 1 B-K-1' 810.10 Piping - integrally welded - 2 .- .PRR . 6-8-3HLI (4)

- attachments 1 (8) Inaccessible i lugs in penetratton X-98 4

l' 1' B-M-2 B12.40 Valye Body n.p.s. > 4" :3 Visval PRR . 6-578, 6-588 VT-3 3 6-628-

e

+ ,

,;.,- .e. ,-. ~ g + g- ,y,,m ..--w- ry--- ..-,-. . , -- .+  %. eH, , , c- ,, . . . ,.,r,er,-- ,- . , w ..w .>wm .

u.

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station

' Company- ASME XI 1980 EDITION H80 ADDENDA Unit - 1 Sysicm: FEEDRATER Pace 3 of 3 Rev. 3 Section P&ID Section XI No.

Line 'or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Catecory Number Description Items Method Recuest Remarks Loop "B" 18" Diameter 252 1 Group Circumferential welds 9 Vol. 6-N4C-8 6-N40-12 Piping (Cont.) I Helds inspected in each ten 6-N4C-9 6-N4D-13 year interval 6-N40-8 6-N4D-14 6-N4D-10 6-N4D-9 6-N4D-11 Loop "A"' 252 1 F-C F(1-4). Spring Hangers 7 VT-3 VT-4 F-C F(1-4) Snubbers 5 VT-3 VT 4 F-C F(1-3) Rigid Hanger 2 .VT-3 F-B F(1-3) Anchor i VT-3 X-9A Loop "B" 252 1 F-C F(1-4) Spring Hangers 7- VT-3 VT-4 F-C F(1-4) Snubbers 5 VT-3 VT-4 F-C F(1-3) Rigid Hanger 2 VT-3 F-B F(1-3) Anchor 1 VT-3 X-98

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear

-Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 1 of 24 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Catecory Number Descriction Items Method Recuest Remarks

.RHR (in) - LPCI - Loop 241 1 B-G-2 B7.70 Valves-bolts, studs, 3' Visual 1001-33A "A" from MO 1001-29A to nuts i 2" VT-1 1001-6SA 28" Recirc. Olsch. Loop 1001-29A "A"

1 B-J 89.11 Piping n.p.s 1 4" 16 Surf.& PRR Inaccessible weld Circumferential welds Vol. 1 in penetration X-51A 1 B-K-1 B10.10 Piping - Integr.11y 3 Surf. PRR 10R-IA-8HLi(4) welded attachments 1 10R-IA-8HL2(4)

(8) Inaccessible lugs in X-51A 1 Group Circumferential Helds 1 Vol. 10R-IA-5 I Inspected in each 10 Yr Helds Interval 1 B-M-2 B12.40 Valve Body n.p.s. > 4" 3 Visual PRR 1001-33A VT-3 3 1001-68A 1001-29A 1 F-C F(1-4) -Spring Hangers 3 Visual VT-3&4 1 F-C F(1-4) Snubbers 2 Visual

, VT-3&4 1 F-B F(1-3) Anchor 1 Visual X-51A VT-3

% w := y, . -

._ m - - --.-,.,m , 1 y .- --w ,

e.-

. Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SEODND TEN-YEAR INTERVAL Power Station Company ASHE XI 1980 EDITION W80 ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 2 of 24 Rev. 3 i Section P&ID. Section XI No.

Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Catecory Number DescriDtion Items Method Reavest Remarks RHR (in) - LPCI - Loop ~241 1 B-G-2 B7.70 Valve-bolts, studs, nuts Visual 1001-33B "B" from HD 1C01-29B to 1 2" diameter VT-1 1001-688 28" Main Recirc. Disch 1001-29B Loop."B" 241 1 B-J 89.11 Piping n.p.s.1 4" 16 Vol.& PRR Inaccessible weld Circumferential welds Surf. 1 in penetration X-51B 1 B-K-1 B10.10 Piping-Inte, rally 3 Surf PRR 10R-IB-8HLl(4) welded attachments 1 10R-IB-8HL2(4)

(8) Inaccessbible lugs in X-51B i

1 Group Circumferential welds 1 Vol 10R-IB-5 I Inspected in each 10 year Welds Interval 1 B-M-2 B12.40 Valve body n.p.s. > 4" 3 Visual PRR 1001-338 VT-3 3 1001-688 1001-29B 1 F-C F(1-4) Spring Hangers 3 Visual VT-3&4 1- F-C F(1-4) Snubbers 2 Visual VT-3&4-1 F-B F(1-3) Anchor i Visual X-51B VT-3 4" Head. Spray from 241 1 B-F B5.50 Piping n.p.s. > 4" 1 Vol.& 10-HS-23 Nozzle Flange to Dissimilar metal butt Surf

,- _4 ..

t- + 5-+-Y-w' e' 4 " '- * * ' '

  • Boston INSERVICE ~ INSPECTION PROGRAM Pilgrim Nuclear Edison. SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 l System: RESIDUAL HEAT REMOVAL (RHR)- Pace 3 of 24 Rev. 3 Section P&ID' Section XI No.

Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Catecory Number Description Items Method Recuest Remarks 4" head spray from 241 1 B-G-2 B7.50 Piping-bolts, studs, 2 Visual nozzle flange to nuts i 2" diameter VT-1 M01001-60 (Continued)

ISI-I-10-5A 241 1 B-G-2 B7.70 Valves-bolts, studs, 3 Visual 1001-60 nuts 1 2" diameter VT-1 1001-63 1001-64 4' 241 1 B-J B9.11 Piping n.p.s. 1 4" 32 Vol.& PRR Inaccessible weld Circumferential welds Surf. 1 in penetration X-17 241 1 B-K-1 B10.10 Piping-Integrally welded 1 Surf. PRR (8) Inaccessible attachments i lugs in X-17 241 1 F-C F(1-3) Restraint i Visual VT-3 241 1 F-C F(1-3) Rigid Support i Visual VT-3 F(1-4) Spring Hanger Visual 241 1 F-C 3 VT-3&4 i

241' 1 F-C F(1-4) Snubbers 2 Visual VT-3&4 241 1 .F-B F(1-3) Guide 1 Visual VT-3 241 1 F-C F(1-3) Anchor i Visual X-17 VT-3

, v ,-e ~ + , . - - - -~~---e v

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station

" Company ASME XI 1980 EDITION HBO ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 4 of 24 Rev. 3 Section Amendment 92-01 P&ID Section XI No. 03-30-92 Lina or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Catecory Number Descriotion Items Method' Recuest Remarks RHR "OUT" from 28" 241 1 B-F B5.50 Piping n.p.s. > 4" 1 Vol.& 10R-0-14 Recirc. Piping Dissimilar metal butt Surf to MD-1001-47 welds ISI-I-10-1A 241 1 B-G-2 B7.70 Valve bolts, studs, nuts 3 Visual 1001-51 1 2" diameter VT-1 1001-50 1001-47 241 1 B-J B9.11 Piping n.p.s. 1 4" 24 Vol.& PRR Inaccessible weld Circumferential welds Surf. 1 in penetration PRR X-12. Clamp over 19 10R-O-9tD/*

241 1 B-J B9.31 Piping n.p.s. 1 4" 1 Vol.& RHOU Tie-In Branch Connection Helds Surf. 12R-0-1 241 1 Group Circumferential Helds 4 Vol. 10R-0-6, 10R-0-7 I Inspected in each 10 Year 10R-0-8, 10R-0-9 Helds Interval 241 1 B-K-1 B10.10 Piping - Integrally 4 Surf. PRR SHLi(2) welded attachments 1 25HLi(4) 10HLi(8)

(8) Inaccessible Lugs in X-12 241. 1 B-M-2 B12.40 Valve body n.p.s. > 4" 3 Visual PRR 1001-47 VT-3 3 1001-50 1001-51 241- 1 F-C F(1-4) Spring Hangers 3 Visual -

VT-3&4  ;

./* 92-01  ?

INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Boston Power Station Edisen- SECOND TEN-YEAR INTERVAL Company ASME XI 1980 EDITION W80 ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 5 of 24 Rev. 3 Section P&ID Section XI No.

Line or Component .and XI Item Item of Exam Relief Co-ord. Class Cetecory Number Descriotion Items Method Recuest Remarks Descriotion RHR "OUT" from 28" 1 F-C F(1-4) Snubbers 4 Visual VT-3&4 Main Recirc. Suction Loop "A" to M0-1001-47 F-B F(1-3) Rigid Support i Visual

'(cont'd). 1 VT-3 1 F-B F(1-3) Anchor i Visual X-12 VT-3 18 Suction Piping from 241 2- C-F C5.11 Circumferential 24 Surf.

Torus nozzle X-222A Helds N.N.T. 1 5" to pump 203A casing

'(Includes-piping dwnstrm 241 2 F-C F(1-3) Restraint 3 Visual VT-3 of MO-43A) 241 2 F-B F(1-3) Rigid Support 5 Visual VT 241 2 F-B F(1-4) Spring Support i Visual VT3&4 18 Suction Piping from 241 2 C-F C5.11 Circumferential 19 Surf torus nozzle X-222D to Helds N.H.T. 1 5" L Pump 2038 Casing.

L(includes piping dwnstra 241 2. F-C' F(1-3) Restraint 3 Visual VT-3 of M0-43B)-

2a1 2- F-8 F(1-3) Rigid Support 3 Visual VT-3 I

li _ _ _ _ _

Boston- INSERVICE INSPECTION PROGRAM Pilgrim Huclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 6 of 24 Rev. 3 Section P&ID Section XI No.

. Line or Component and XI Item Item of Eram Relief Descriotion Co-ord. Class Catecory Number Descriotion Items Method Recuest Remarks 18 Suction Piping from 241 2 F-B F(1-4) Spring Support i Visual torus nozzle X-222D to VT-3&4

- Pump 2038 Casing

- (includes piping dwnstrm 241 2 C-C C3.40 Integral Attachments 1 Surf 140 HLl(4) of H0-438)(Cont.) .

18" Suction Piping from 241 2 C-F C5.11 Circumferential 19 Surf torus nozzle X-2228 to Helds NHT 1 5" Pump 203CLcasing (includes piping dwnstrm 241 2 F-C F(1-3) Restraint 3 Visual of MO-43C) VT-3 241 2 F-B F(1-3) Rigid Support 3 Visual VT-3 241 2 F-B (1-4) Spring Support i Visual VT-3&4 241 2 C-C C3.40 Integral 1 Surf 188HLl(8)

Attachments w

g g *-' W rM'- O 9 1F e 7 e g y+fw Mm* * - % .eraw

INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Boston Power Station Edison SECOND TEN-YEAR INTERVAL ASME XI 1980 EDITION H80 ADDENDA Unit - 1 Company Pace 7 of 24 Rev. 3 System: RESIDUAL HEAT REMOVAL (RHR) Amendment 92-01 Section Section XI No. 03-30-92 P&ID and XI Item Item of Eram Relief Line or Component Remarks Description Co-ord. Class Catecory Number DescriDtion Items Method Recuest 18" Suction Piping from 241 2 C-F C5.11 Circumferential 24 Surf Torus nozzle X-222C to Helds NWT i .5" pump 203D casing Visual (includes piping dwnstrm 241 2 F-C F(1-3) Restraint 3 of H0-430) 241 2 F-C F(1-3) Rigid Support 5 Visual VT-3 241 2 F-B F(1-3) Spring Support i Visual VT-3&4 C-F C5.11 Circumferential 12 Surf 12" Piping on discharge 241 2 of Pump 205A welds NHT 1 5" 241 2 F-C F(1-3) Restraint i Visual VT-3 241 2 F-B F(1-4) Spring Support i Visual VT-3&4 >

C-F C5.11 Circumferential 12 Surf 12" Piping on discharge 241 2 of Pump P203C Helds NNT 1. 5" i

Boston INSERVICE INSPECTION PROGRAM Pilgrim. Nuclear

' Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION HBO ADDENDA Unit - 1 System: RESIDUAL HEAT-REMOVAL (RHR) Pace 8 of 24 Rev. 3 Section P&ID Section XI No.

Line.or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Cateaory Number' Description Items Method Recuest Remarks 12" Piping'on discharge 241 2 F-B. F(1-4) Spring Support i Visual -i

'of Pump P203C (Cont) VT-3&4 241 2 F-B F(1-3) -Restraint i Visual 16" Piping on inlet 241 2 C-F C5.11 Circumferential 11 Surf to H.X."A" (E-207A) Helds N.H.T.1 5" 241 2 F-C F(1-4) Spring Hangers 2 Visual VT-3&4 241 2 F-C F(1-4) . Hydraulic Snubber i Visual VT-3&4 18" Piping on Inlet 241 2- .C-F C5.11 Circumferential 2 Surf to HX "A" (E-207A) Helds 1 5" 2 C' F

-C5.31 Branch Connection 1 Surf 2 F-C F(1-3) Rigid Support i Visual VT-3 16" Discharge Piping 241 2 C-F C5.11 Circumferential 5 Surf from H.X. "A" (E-207A) Helds N.H.T. 1 5"

,ws - - * - - +

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION HBO ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 9 of 24 Rev. 3 Section i P&ID Section XI No.

Line or Component and .

-XI Item Item of Exam Relief

-Descriotion Co-ord. Class Catecory Number Descriction items Method Recuest Remarks 18" discharge piping .241 2 C-F C5.11 Circumferential 43 Surf from 12"X18" reducer Helds N.H.T. 1 5" to MO-28A and to H0-19

(on Disch. X-connect). 241 2 C-F C5.31 Branch Pipe Connec. 2 Surf Circumferential Helds 241 2 C-C C3.40 Integral 1 Surface 117HLi(4)

Attachment 241 2 F-C F(1-3) Restraint 4 Visual VT-3 241 2 F-B F(1-3) Guide 1 Visual VT-3 241. 2 F-C F(1-3) Rigid Support 7 Visual VT-3 241 2 F-C F(1-4) Spring Hanger 3 Visual

, VT-3&4 i

'241 2 F-B F(1-4) Spring Support i Visual VT-3&4 a

241 2 F-B F(1-3) ' Anchor i Visual VT-3 l

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION W80 ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 10 of 24 Rev. 3 Section P&ID Section XI No.

Line or Component .and XI ' Item Item of Exam Relief Description Co-ord. Class Catecory Number Descriotion Items Method Recuest Remarks 18" Piping between 241 2 C-F C5.20 Circumferential 4 Vol.& DB/DC-10-3002-MO-29A and MO-28A Helds N.H.T.>.5" Surf 3-3 is a dis-similar metal weld 241 2 F-8 F(1-3) Rigid Support i Visual '

VT-3 12" Piping from 12"X18" 241 2 C-F C5.11 Circumferential 19 Surf weldolet, bounded >y Helds N.H.T i .5" 12"X10" reducer, MO36A, and the 12"X6" reducer 241 2 F-B F(1-3) Rigid Support i Visual VT-3 241 2 ~F-C F(1-4) Spring Hanger 3 Visual VT-3 241 2 F-C F(1-4) Anchor i Visual VT-3 6" Piping from 12"X6" 241 2 C-F C5.11 Circumferential 17 Surf reducer- (upstrm of Helds N.W.T. 1 5" M037A) to torus Penetration X-211A 241 2 C-F F(1-3) Rigid Support 4 Visual VT-3 241 2 F-B F(1-3) Anchor 1 Visual VT-3 241 2 F-B F(1-3) Guide; 1 Visual VT-3

Boston INSERVICE INSPECTION PROGRAM Ptigrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 11 of 24 Rev. 3 Section Amendment 87-02 P&ID Section XI No. 12-16-87 Line or Component and XI Item Item of Exam Relief

'DescriDtion Co-ord. Class Catecory Number Descriotion Items Method Recuest Remarks 12" Piping from MO-36A 241 2 C-F C5.11 Circumferential 14 Surf to 16"X12" Reducer Helds NNT 1 5" (upstrm of X-210A) 241 2 C-F C5.31 Branch Pipe Conn. 1 Surf Circum. Held 241 2 C-C C3.40 Integral Attachments 1 Surface 200HLi(4) 4 241 2 F-B F(1-3) Rigid Support i Visual VT-3 241 2 F-C F(1-4) Spring Hanger 3 Visual VT-3&4 241 2 F-B F(1-3) Anchor i Visual i

VT-3 16" Piping from 16"X12" 241 2 C-F C5.11 Circumferential 2 Surf reducer to torus. nozzle Helds NHT 1 5" X-210A 6" Piping from 1401-35A 241 2 C-F C5.11 Circumferential 1 Surf C.S. Test Line 1401-35A to 6 "X 12" Welds NHT 1 5 weldolet.

4 (dwnstm of H036A) 1

. , -,, . , , - , .a

-Boston ~ INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION WBO ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 12 of 24 Rev. 3 Section P&ID Section XI No.

LLine or Component and- XI Item Item of Exam Relicf DescriDtion Co-ord. Class Catecory Number Descriotion Items Method Recuest Remarks 10" Piping from 12"X10" 241 2 C-F C5.11 Circumferential 25 Surf reducer to X-39A Helds NHT 1. 5" 241 2 F-C F(1-4) Spring Hangen- 5' Visual VT3&4 241 2 F-B F(1-3) Guide 1 Visual VT-3 241 2 F-B F(1-4) Spring Support i Visual VT-3&4 16" Discharge Piping 241 2 C-F C5.11 Circumferential 5 Surf from E-207B Helds NHT 1 5" 241 2. F-C F(1-3) Restraint 1 Visual VT-3 16" Piping on Inlet 241 2 C-F C5.11 Circumferential 11 Surf to H.X."B" (E-2078) . Helds N.H.T. 1 5" 241 2 F-C F(1-4) Spring Hanger 2 Visual VT-3&4

... _ _ _ . . _1 _ _

, Boston- INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison' SEODND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 13 of 24 Rev. 3

, Section Amendment 92-01 P&ID Section XI No. 03-30-92 Line or Component and XI. Item Item of Exam Relief Descriotion Co-ord. Class Catecory Number Descriotion Items Method Recuest Remarks 16" Piping on inlet to -241 2 F-B F(1-3) Restraint. 1 .

, H.X. "B" (E-2078)(Cont.) V1

.12" Piping on Discharge 241 2 .C-F C5.11 Circumferential 12 Surf of Pump 203D Helds N.H.T. 1 .S" 241 2 F-C F(1-4) Spring Support i Visual VT-3&4 241 2 F-C F(1-3) Restraint i Visual VT-3

12" Piping on discharge 241 2- C-F C5.11 Circumferential 12 Surf of Pump 203B Helds, N.H.T. 1 5"

241 2- C-C F(1-4) Spring Support i Visual VT-3&4

'241' 2 F-C F(1-3) Restraint i Visual VT-3

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear

-Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 14 of 24 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief

' Description Co-ord. Class Cateoory Number DescrIDtion Items Method Recuest Remarks 18" discharge Piping 241 2 C-F C5.11 Circumferential 44 Surf from the 12"X18" & Helds N.H.T. 1 5"

'16"X18" reducers to MO-28B including piping up to 1001-53 241 2 C-F C5.31 Branch pipe Conn. 2 Surf (on disch. X-connect) Circum. Held 241 2 F-C F(1-3) Rigid Support 7 Visual VT-3 241 2 F-C F(1-3) Restraint 5 Visual VT-3 ISO-10-3B and 10-48 241 2. F-B F(1-3) Guide 1 Visual VT-3 241 2 F-C F(1-4) Snubber 2 Visual VT-3&4 241 2 F-C F(1-4) Spring Hanger 5 . Visual

'VT-3&4 241 2 C-C C3.40 Integral 3 Surf 17aHLl(2)

Attachments 19HLi(4) 12HLl(4) 18" Piping between 241 2 C-F C5.20 Circumferential 3 Vol.& DB/DC MO-28B and MD-298 -Welds N.H.T. >.5" Surf 3001-2-1 is a dissimilar metal weld

Boston INSERVICE INSPECTION PROGRAM Pligrim Nuclear

. Edison SEODND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 15 of 24 Rev. 3 Section Amendment 92-01 P&ID Section XI No. 03-30-92 Line'or Component and- XI Item Item of Exam Relief

- Description Co-ord. Class Catecory Number Descriotion Items Meti,od Recuest Remarks

'18" RHR discharge 241 2 C-F C5.11 Circumferential 4 Surf X-Connect Piping Helds N.H.T 15

'between M0-19. 1001-53, and 18"X12" Reducer. . 241 2 C-F C5.31 Branch Pipe Conn. I Surf 1(On Servica Hater line) Circum. Held 241 2 F-B F(1-3) Anchor i Visual VT-3 6" piping to fuel pool 241 2 C-F. C5.11 Circumferential 2 Surf from discharge X-Conn. Helds NHT 1 5" piping 12" piping-from service 241 2 C-F C5.11 Circumferential 37 Surf PRR /*

cater system to 18"X12" Helds NHT 1 5" 17 reducer on the discharge X-connect line

.241 2 C-F C5.31 Branch Pipe Conn 1 Surf To fire Main Circum. Held 241 2 F-C F(1-3) Restraint 2 Visual VT-3 241 2 F-C F(1-3) Anchor 3 Visual VT-3

-241 2 F-C .F(1-3) Rigid Support 9- Visual VT-3 241 2 .F-C F(1-4) Spring Hanger 1- Visual VT-3&4

ts n .nt

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1

- System: RESIDUAL HEAT REMOVAL (RHR) Pace 16 of 24 Rev. 3-Section Amendment 87-02 ,

1 P&ID Section XI No. 12-16-87 <

l Line or Component and . XI I'cem Item of Exam Relief Descriotion Co-ord. Class Cateoory Number Descriotion Items Method Recuest Remarks 12" Piping to containment 241 2 C-F C5.11 Circumferential 17- Surf Includes F28 '

. spray header, bounded Helds N.W.T. 1 5" by 12"X18" weldolet, 12"X10" reducing elbow 241 2 C-F C5.31 Branch Connection 1 Surf and H036B 241 2 F-B F(1-3) Restraint i Visual H-10-1-40SA VT-3 241 2 F-B F(1-3) Rigid Support 2 Visual VT-3 6" Piping from 12"X16" 241' 2 C-F C5.11 Circumferential 13 Surf teldolet '(upstrm of Helds N.H.T. 1 5" M0378) to torus.

penetration X-2118 241 2 F-C F(1-3) Guide 1 Visual VT-3 l 241 2 F-C F(1-3) Rigid support 2 Visual VT-3 6" Piping from .

241 2 C-F C5.11 Circumferential Helds 2 Surface C.S. Test Line 1401-358 to'6" X 12" N.H.T. <.5"

. Heldolet (dwnsr of M036B).

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear.

TEdison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION HBO ADDENDA Unit - 1

. System: RESIDUAL HEAT REMOVAL (RHR) Pace 17 of 24 Rev. 3 Section Amendment 87-02 P&ID Section 'XI No. 12-16-87 Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Catecory Number Descriotion Items Method Recuest Remarks 12" Piping from MO-36B 241 2 C-F C5.11 Circumferential 16 Surf to 16" X 12" Reducer' Helds N.H.T 1 5" (upstream of X-2108)

Branch Pipe Conn. Surf

~

241 2 C-F C5.31 2 Circum Helds 241 2 C-C C3.40 Integral Attachments 2 Surf 152HLi(2) 79FS 241 2 F-B F(1-3) Guide 1 Visual VT-3 241 2 F-B F(1-3) Rigid Support i Visual VT-3 241 2 F-B F(1-3) Anchor 1 Visual VT-3 241- 2 F-C F(1-3) Rigid Support 3 Visual VT-3 16" Piping from 16"X12" 241 2 C-F C5.11 Circumferential 2 Surf reducer to torus- Helds N.W.T. 1 5" Ponetration.X-2108-

, 8" Connection from 241 2 C-F C5.11 Circumferential 1 Surf Valve ~10-HO-511 to Helds N.W.T. 1 5" the RHR/SSH X-Tie 241 2 -F-B F(1-3) Guide 1 Visual-VT-3 1

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 18 of 24 Rev. 3 Section P&ID Section XI No.

_.Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Cateoory Number Descriotion Items Method Recuest Remarks

- 10" piping from 12"X10" 241 2 C-F C5.11 Circumferential 27 Surf reducing elbow to X-39B Helds N.H.T. 1 5" 241 2 F-C F(1-3) Restraint 3 Visual VT-3 241 2 F-B F(1-3) Guide 1 Visual VT-3 241 2 F-C F(1-3) Rigid Support 6 Visual VT-3 241 2 F-C F(1-4) Spring Hanger 7 Visual Includes VT-3&4 supports on 1001-23B&26B 1

~ 6"' Piping from check 241 2 C-F C5.11 Circumferential 2 Surf Valve (from conden. Held N.H.T. 1 5" storage tank)

-to 12"X6" weldolet 241 2 F-C F(1-3) Rigid Support i Visual VT-3 20" Suction Piping from 241 2 C-F C5.11 Circumferential 21 Surface 1001-47 to RHR Pumps- Helds N.H.T. 1 5" A&C 1

w

Boston; INSERVICE INSPECTION PROGRAM '

Pilgrim Nuclear Edison' SECOND TEN-YEAR INTERVAL Power Station-Company ASME XI 1980 EDITION W80 ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 19 of 24 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Cateoory Number Descriotion Items Method Recuest Remarks

, 20" Suction Piping from 241 2 C-C C3.40 Integral Attachments 3 Surface 28HLl(2) 1001-47 to RHR Pumps 83PS A & C (Continued) ~ 83HLl(4) 241 2 F-B F(1-3) Guide 2 Visual j VT-3 241. 2 F-C F(1-3) Rigid Support 2 Visual VT-3

- F-B F(1-3) Rigid Support i Visual

VT-3 i- , '241 2 F-B F(1-3) Anchor i Visual-VT-3 241 2 F-C F(1-4) Spring Hanger 4 Visual VT-3&4

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison. SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 20 of 24 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Description Co-ord. Class Catecory Number Description Items Method Recuest Remarks 20" Soction Piping from 241 2 C-F- C5.11 Circumferential 17 Surf tee dwnstrm of 1001-47 Welds N.H.T. 1 5"

. 2o RHR Pumps B&D 241 2 C-C C3.40 Integral Helds 2 Surf 91PS ,

92HLl(4) 241 2 F-C F(1-3) Restraints 3 Visual VT-3 241 2 F-B F(1-3) Guides 2 Visual VT-3 241. 2 F-B F(1-3) Rigid Support 4 Visual ,

VT-3 l 241 2 F-B F(1-3) Anchor i Visual VT-3 241 2 .F-C F(1-4) Spring Hanger 4 Visual VT-3&4 g 4 1v- wm y y

Boston- INSERVICE INSPECTION PROGRAM Pilgrim Nuclear-Edison SEODND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 21 of 24 Rev. 3 Section

. P&ID Section XI No.

. -Line or Component and XI Item Item of Exam Relief

. Descriotion Co-ord. Class Catecory Number DescriDtion Items Method Recuest Remarks i

18" Suction Piping 241 2 C-F C5.11 Circumferential 3 Surf upstrm of 1001-43A Helds N.H.T. 1 5" .,

241 2 C-C C3.40 Integral Attachment 1 Surf 294HLl(8) 241 2 F-B F(1-3) Restraint i Visual VT-3

. 241 2 F-C F(1-4) Spring .1 Visual l Hanger VT-3&4

~18" SU' c tion Piping 241 2 C-F C5.11 Circumferential 2 Surface Upstream of 1001-43B Helds NHT 1 5" 241 2 F-C F(1-4) Spring Hanger 1 Visual VT-3&4 1

18" Suction Piping 241 2 C-F C5.11 Circumferential 2 Surface Upstream of.1001-43C Helds NHT 1 5" 241- 2 F-C F(1-4) Spring Hanger i Visual VT-3&4

- 18" Suction Piping 241 2 C-F C5.11 Circumferential 3 Surface

. Upstream of.1001-43D Helds NNT 1 5" 241 2: F-8 F(1-3) Restraint i Visual VT-3 5

3 .

. . . - . - _ . , . . ~. . _ _

Boston' INSERVICE INSPECTION PROGRAM Pilgrim Nuclear

. Edison -SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA. Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 22 of 24 Rev. 3 Section. Amendment 92 P&ID Section XI No. 03-30-92 Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Cateaory Number Descriction Items Method Recuest Remarks 18" Suction Piping 241 2 F-C F(1-4) Spring 1 Visual upstream of 1001-43D Hanger VT-3&4 (continued) 6 Line from fuel pool 241 2 C-F C5.11 Circumferential 19 Surface PRR 17 Blockwalls/*

cooling to suction Helds NHT 1 5" Backwash X-Connect. Receiver Tank Room 241 2 F-B F(1-3) Restraint 1 Visual VT-3 241 2 F-B F(1-3) Guide 1 Visual VT-3 241 2. F-8 F(1-3) Anchor i Visual PRR 18 H-10-1-13SA/*

VT-3 241 2 F-C F(1-4) Spring Hanger 3 Visual H-10-1-187 VT-3&4 241 2 F-C F(1-4) Spring Support 3 Visual VT-3&4 241 2 F-C F(1-3) Rigid Support i Visual VT-3

/ 01

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station =

Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 23 of 24 Rev. 3 Section P&ID Section XI No.

Line er Component and XI Item Item of Exas Relief Description Co-ord. Class Cateaory Number Descriotion Items Method Recuest Remarks RHR Heat Exchanger "A" 241 2 C-A C1.10 Shell Circum. 2 Vol. E207A-1 Held E207A-2(Ex empt)

E207A-3 2

241 2 C-A C1.20 Head Circumfer 2 Vol. E207A-4 Held E207A-5 241 2 C-B C2.21 Nozzle to Shell 2 Vol.& PRR E207A-N4A-1 Surf. 8 E207A-N3A-1 241 2 C-C C3.10 Integral 4 Surf.

Attachment RHR Heat Exchanger "B" 241 2 C-A C1.10. Shell Circumfer. 2 Vol. E207B-1 Helds E207B-2(Exempt)

E207B-3 241- 2 CA C1.20 Head Circumfer. Held 2 Vol. E207B-4 E2078-5 241 2 C-B C2.11 Nozzle to Shell 2 Vol.& PRR E2078-N4B-1 Surf. 8 E207B-N3B-1 241 2 C-B C3.10 Integral 4 Surf.

Attachment

"4

. ' Boston INSERVICE INSPECTION PROGRAM _ Pilgrim Nuclear.

Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION M80 ADDENDA Unit - 1 System: RESIDUAL HEAT REMOVAL (RHR) Pace 24 of 24 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item . Item of Exam Relief Descriotion Co-ord. Class Cateoory Number Description Items Nethod Recuest Remarks __

RHR Pumos 233A, 241- 2 C-C C3.70 Integral Attach 4 Surf B,C&D- (Pump Support Pedestal)

Residual Heat 241 2 C-H C7.10 System Leak Test VT-2 Removal System Of Pressure Vessels System Hydtv Test

  • 241 2 C-H C7.11 VT-2 Of Pressure Vessels 241 2 C-H C7.20 System Leak Test of VT-2 Blockwalls Piping 241 2 C-H - C7.21 System Hydro Test of VT-2 Blockwalls Piping 241 2 C-H C7.30 System Leak Test VT-2 of Pumps 241 2 C-H C7.31. System Hydro. Test VT-2 of Pumps 241 2 .C-H .C7.40 System Leak Test VT-2 of Valves-241 '2 C-H -C7.41- System Hydro Test VT-2 of Valves

Boston INSERVICE INSPECTION PROGRAM . Pilgrim Nuclear .

' Edison SECOND TEN-YEAR INTERVAL Power Station-

' Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1

' System: STANDBY LIOUID CONTROL Pace 1 of 2 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Description Co-ord. Class Cateaory Number Description Items Method Recuest- Remarks

'1 1/2 li.ie from 1101-16 249 1 B-G-2 B7.70 Valves-Bolts, studs, 3 Visual .110;-16.

to RPV Nozzle N-14 and nuts i 2" Dia. VT-1 1101-15 1101-1.

249 1 B-J 89.40 Socket Helds 69 Surf 249 1 FB/FC F(1-3) Guides 21 Visual VT-3 249 1 F-B F(1-3) Anchor 1 Visual X-42' VT-3 249 1 F-C F(1-3) Rigid Support 1 Visual VT-3 249 1 F-C F(1-4) Spring Hanger i Visual VT-354 L49 2 C-H C7.20 System. Leak Test of Visual Piping VT-2 249 2 C-H /,/.21 System Hydro Test of Visual Piping- VT-2 249 '2 C-H C7.30 System Leak Test Visual of Pumps VT-2

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: STANDBY LIOUID CONTROL Pace 2 of 2 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Description Co-ord. Class Catecory Number Description Items Method Reauest Remarks 249 2 C-H C7.31 System Hydro Test Visual of Pumps 'VT-2 249 2 C-H C7.40 System Leak Test Visual of Valves VT-2 249 2 C-H C7.41 System Hydro Test Visual of Valves VT-2

Boston INSERVICE INSPECTION FROGRAM Pilgrim-Nuciear.

Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: REACTOR PRESSURE VESSEL DRAIN Paae 1 of 1 Rev. 3 Section Amendment 92-01 P&ID Section XI No. 03-30-92 Line or Component and XI Item Item of Exam Relief Description Co-ord, Class Cateaory Number Descriotion Items Method Recuest Remarks 2" RPV Drain Line 252 1 B-F B5.52 Piping-Dissimilar i Surf 12R-BC-14 from Nozzle N-il Metal socket welds and 2" branch connection piping from RHCU system 252 1 B-G-1 B7.70 Valves - Bolts, studs 3 Visual 1201-65 and Nuts 1 2" dia. VT-1 1201-39 1201-40'

~

252 1 B-J 89.40 Piping-NPS 4" 33 Surf 12R-BC-1 is Socket Helds Branch conn.

weld see RWCU system 4-Nil-1 is in RPV' system 252 1 F-B F(1-3) Guides 7 Visual PRR H-4-1-6/*

VT-3 18

/* = 92-01

Boston INSERVICE INSPECTION PROGRAM LPilgrim Nuclear.

Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: REACTOR HATER CLEAN-UP (RHCU) Pace 1 of 2 Rev. 3 ,

Section Amendment 92-01:

P&ID Section XI No. .

03-30-92; Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Cateaory Number Description Items Method Reauest Remarks 4" and 6" piping from 247 1 B-F B5.50 Piping n.p.s. 1 4" 1 Vol. 12-I-16' H0 1201-80 to 18" Dissimilar metal butt & Surf.

Feedwater Piping welds 247 1 B-G-2 B7.70 Valves Bolts, studs, 3 Visual 1201-80 and nuts 1 2" diameter VT-1 1201-81 1201 247 1 B-J 89.11 Piping n.p.s. 1 4" 37 Vol.& PRR 12-I-20/*

Circumferential welds Surf 17 12-I-22/*

247 1 B-H-2 B12.40 Valve body n.p.s. > 4" 2 Visual PRR 1201-81 VT-3 3 1201-82 247 1 F-C F(1-3) Rigid Support. 1 Visual VT-3 247 1 F-C F(1-4). -Spring Hanger- 5 Visual VT-3&4 247 1 F-C' 'F(1-3) Restraints 3 Visual VT-3 247 1 F-B F(1-3). Guides 6 ' Visual H-12-1-111/*

VT-3 H-12-1-112/*

.H-12-1-113/*

Whip Restraints /*

247 1 . F-B F(1-3) Anchdr 1 Visual VT-3 LI 01

= -- -. - = -

.=.- _

Boston. INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI'1980 EDITION H80 ADDENDA Unit - 1 System: REACTOR HATER CLEAN-UP (RHCU) Pace 2 of 2 Rev. 3 Section Amendment 92-01 P&ID Section XI No. 03-30-92 Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Catecory Number Descriotion Items Method Recuest Remarks 6" Supply piping from 247 1 B-G-2 B7.70 Valves-Bolts, studs, Visual 1201-85

'20" RHR piping to and nuts 1 2" diameter VT-1 1201-2 M01201-5 1201-5 247 1 B-J B9.11 Piping n.p.s. 2 4" 35 Vol. & PRR (1)/*

Circumferential welds Surf 1 Inaccessible weld in X-14, 12R-0-1 is a branch conn.

see RHR system 247 1 .B-J B9.32 . Piping n.p.s. < 4" 1 Surf 12R-BC-1/*

Branch connection weld 247 1 B-K-1 B10.10 Integrally welded 1 Surf PRR (8)/*

Attachments 1 Inaccessible Lugs in X-14 247 1 B-M B12.40 Valve body n.p.s. > 4" 3 Visual PRR 1201-85/*

VT-3. 3 1201-2 1201-5 247 1 F-C F(1-4) Spring Hangers 5 Visual VT-3&4 247 1 F-B F(1-3) Anchor 3 Visual X-14/*

VT-3 247 1 F-B F(1-3) Guide 1 Visual .H-12-1-97/*

VT-3 247 1 F-B F(1-3) Rigid Support 1 Visual H-12-1-115/*

.VT-3 Whip Restraint

/* - /92-01

-n Boston INSERVICE INSPECTION PROGRAM Pilgrim' Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASHE XI 1980' EDITION W80 ADDEND 6 Unit - 1 System: REACTOR CORE ISOLATION COOLING (RCIC) Pace 1 of 6 Rev. 3 Section

.P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Descriotion Co-ord.-Class Cateacry Number Description Items Hethod Reauest -Remarks 13" Steam Supply from 245 1 B-G-2 B7.70 Valves-Bolts. Studs 2 Visual 1301 Main Steam Line and nuts 1.2" dia. VT-1 1301-17, "C" to H01301 245 1 B-J 89.21 Piping n.p.s. < 4" 20 Surf PRR (1)

Circumferential welds 1 Inaccessible weld in X-53 245 1 -B-K-1 B10.10 Piping - Integral 2 Surf (8) attachments Inaccessible lugs in X-53, 11HLl(8)-

245_ 1 F-C F(1-4) Spring Hangers 2 Visual VT3&4

'245 1- F-C F(1-4)' Snubbers 2 Visual VT3&4 245 'l F-C F(1-3) Anchor 1 visual VT-3

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company. ASME XI 1980 EDITION H80 ADDENDA Unit - 1

. System: REACTOR CORE ISOLATION COOLING (RCIC) Pace 2 of 6 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Description Co-ord. Class Catecory Number Descriotion Items Method Recuest- Remarks 4" discharge Piping 245 1 B-G-2 B7.70 Valves-Bolts, Studs 2 Visual 1301-49 from M01301-49 _

and Nuts 1 2" Dia VT-1 1301-50 to 6" RHCU Piping 245 1 B-J 89.11 Piping - NPS 1 4" 17 Vol.&

Circumferential Held Surf 245 1 F-C F(1-3) Rigid Supports 3 Visual VT-3 245 1 F-C F(1-4) Spring Hangers 2 Visual VT3&4 245- 1 F-C F(1-3) Restraint i Visual VT-3 245 1 F-C F(1-3)' Anchor i Visual VT-3

~

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear.

Edison SECOND TEN-YEAR INTERVAL Power; Station Company ASME XI 1980 EDITION H80 ADDENDA UnitL- 1

System: REACTOR CORE ISOLATION COOLING (RCIC) Pace 3 of 6 Rev. 3 Section P&ID Section' XI No.

Line or Component and. XI Item Item .of Exam Relief-Descriotion- Co-ord.'i ass Cateaory Number- Description items Method Recuest Remarks-6". Suction. Piping from 245 2 C-F C5.11 Circumferential welds 14 Surface M026 and from' check NHT 15" valve 1301-23~to Pump P-206 Suction Nozzle.

2 F-C F(1-3) Restraint i Visual VT-3 2 F-C F(1-4) Spring Hanger i Visual VT-3&4 2 F-A F(1-3) Rigid Support 1 Visual VT-3 L6" Suction Piping from 245 2 C-F C5.ll' Circumferential Helds 9 Surface Torus Nozzle X-220 to NHT 1. 5" HO-25 2 F-A F(1-3) Rigid Support' 2 . Visual VT-3

INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Boston Power Station Edison SECOND TEN-YEAR INTERVAL ASME XI 1980 EDITION H80 ADDENDA Unit - 1 Company Paae 4 of 6 Rev. 3 System: REACTOR CORE ISOLATION COOLING (RCIC)

Section P&ID Section XI No.

XI Item Item of Exam Relief Line or Component and Reauest Remarks Description Co-ord. Class Catecory Number Description Items Method 6" Suction Piping from 245 2 C-F C5.ll Circumferential Helds 4 Surface M025 to M026 NHT I .5" 2 F-A F(1-3) Guide 1 Visual '

VT-3 2 F-A F(1-3) Rigid Support 2 Visual VT-3 C3.40 Integrally Welded 1 Surface F-HLl(2) 8" Exhaust Piping from 245 2 C-C Attachments to Piping

. Turbine Exhaust Nozzle up to PSD 1301-9 and Surface check valve 1301-41 2 C-F C5.11 Circumferential Helds 25 NHT 1 5" 2 F-A F(1-3) Anchor i Visual VT-3 2 F-C F(1-4) Spring Hanger 3 Visual VT-3&4 2 FA/FC F(1-3) -Rigid Support 2 Visual VT-3 f

I

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station-

. Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: REACTOR CORE ISOLATION COOLING (RCIC) Pace 5 of 6 Rev.'3 Section P&ID Section XI No.

Line or Component and XI Item . Item- of Exam Relief ~

' Descriotion Co-ord.' Class Cateoory Number Descriotion Items Method Reauest- Remarks 8" Exhaust Piping 245 2 C-F C5.Il Circumferential Helds 8 Surface from Check Valve. NHT 1 5" 1301-41 to Torus 2 F-C 'F(1-4)' Snubber i Visual VT-3&4 2 'F-A F(1-3) Guide 1 Visual VT-3 8" Exhaust Piping 245 2 C-F C5.11 Circumferential Helds 5 Surf from PSD 1301.9 to NHT 1 5" PSD-1301 2 F-A F(1-3) Anchor i Visual VT-3 2 F-C F(1-3) Rigid Support 1 . Visual VT-3

~ -

-c .

INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Boston Power Ststion Edison SECOND TEN-YEAR INTERVAL ASME XI 1980 EDITION H80 ADDENDA Unit - 1

' Company Pace 6 of 6 Rev. 3 System: REACTOR CORE ISOLATION COOLING (RCIC)

Section

~

.P&ID Section XI No.

e ..

Line or Component and XI Item Item of Exam Relief Co-ord. Class Catecory Number Descriotion Items Method Recuest Remarks Description 2 C-H C7.20 System Leak Test of VT-2 RCIC System - 245 Pressure Retaining Piping Components VT-2 2 C-H C7.21 System Hydro Test of Piping 2 C-H C7.30 System Leak Test of VT-2 Pumps I

2 C-H C7.31 System Hydro Test VT-2 l of Pumps l 2 C-H C7.40 System Leak Test VT-2 of Valves 2 C-H C7.41 System Hydro Test VT-2 of Valves

~

4- _ ..

+

4

.)

f ~ -Boston INSERVICE INSPECTION. PROGRAM . Pilgrim Nuclearl '

Edison: SECOND TEN-YEAR INTERVAL  : Power!StationL Ccmpany' ASME XI 1980 EDITION H80 ADDENDA ' Unit 71 System: CORE SPRAY- Pace 1 of-9 Rev. 3-Section- ' '

P&ID Section XI No.

  • Lt.ine[or Component: and - XI Item -Item of Exam Relief- .

- Descri otion Co-ord. Class Cateaory Number Descriotion Items Method Reauest' Remarks Loop'"A" Discharge- 242 1 .B-F -85.50 Piping -lN.P.S. 2 4" . 2 Vol. 14-A-3 -' -

l Piping from Dissimilar metal welds & Surf 14-A-10AL M0::-.1400-25A to RPV'

' Nozzle N6A . . ..

242 1 B-F- B5.10 Piping JN.P.S. > 4" See RPVisys .

Nozzle to: safe.end- -tem for weldL .

4 dissimilar metal weld' 14-A-1 242. 1 B-G-2 B7.70 Valves-Bol ts". 3 Visual' - 1400-6A: J studs and' nuts, 1 2" dia.

VT-1 ~ 1400-9A ,

1400-25A '..

'242. 1 B-J 89.11: Fiping - N;P.S. 1 4" .

19- Surf PRR - Inaccessible"

'Circumferential welds - & Vol. 'l weld'.

in X-16A-1B-K-1 'B10.10 Piping J242. J1 JIntegrally; -l- PRR.
(8); ..

welded attachments -1 . Inaccessible ::

flugs ti_ni X-16A-  :)

242. 1 B-M-2 B12.40 -Valve body 1.P.S. > 4" 3= 1 Visual PRR: ' 1400-6Al j

, .VT-3: '3 '1400-9AL E

. 1400-25A h

F

% g

,.a% -

f s y 7g , ,.y. _k.- # , U , g,. .,.. , 3 , .,,s ,[,,.4.. .r ,

, ~ -

x+ .

'-[

Boston. INSERVICE, INSPECTION PROGRAM Pilgrim Nuclearn ,

Edison SECOND: TEN-YEARLINTERVAL Power Station?

Company ASME XI 1980 EDITION H80 ADDENDA- Unit - 1:

' System: CORE SPRAY- Paae 2 of 9 Rev. 3-Section:

P&ID Section- XI No. 't Line.or Component - and XI Item ' Item' of' . Exam Relief ..

i Description Co-ord.' Class- Cateaory Number Description Items Method Recuest Remarks Lloop "A"cdischarge- 242 1 F-C F(1-4) Spring Hangers 2- Visual piping from M01400-25A VT-3&4 t'o RPV nozzle N6A' (Cont.): 242. 1 .F-C F(1-4) .Squbbers 2. Visual ~

VT-3&4 '

-241 1 .F-B F(1-3)- Anchor i Visual X-16AL t VT-3

" Loop "B" discharge _ 242 1 B-F B5.50 Piping .N.P.S. 1 4" 2 Vol.& 14-B-3 piping from H01400-25B Dissimilar metal welds~

Surf 14-B-10A_ ';

tto RPV: Nozzle N6B-242- 1 B-F -B5.10. Piping --N.P.S.' 2 4" .see RPV sys '

Nozzle to-safe end: . tem or weld l dissimilar meta 11 weld ' 14-B-l '

242  :

1 B-G-2' B7.70 Valves-bolts,-studs 3 Visual 1400-6B and nuts.1 2"'dia. -VT-l' :1400-98.

l1400-25B .

4

.242 B-J :89.11 iPiping -;N.P.S? 1 4" Inaccesible- P '

211 .Vol.&. -PRR~

1 Circumferential Helds' .

Surf 'l Neld In-X-16B~

252 -I B-K-1 -l B10.10 L Piping '- Integrally . 1. PRR- .(8)cInaccess-s

'HeldedLattachments- :1: 'ible,1ugs o Lin X-168-1 i

+

+

% } j- #

, . ,, , , . , - - , .~

.[ .

~

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison- SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: CORE SPRAY Paae 3 of 9 Rev. 3 Secticn Amendment;87-02:

P&ID Section XI No. 12-16-87 LLine or Component and XI Item Item of Exam Relief Description Co-ord. Class Cateaory Number Descriotion Items Method Recuest Remarks Loop "B" discharge from. 252 1 B-H-2 B12.40 Valve Body - N.P.S. 1 4" 3 Visual 1400-6B HO-25B to RPV Nozzle N6B VT-3 1400-98 (Cont.) 1400-25B 242 1 F-C F(1-4) Spring Hanger 2 Visual VT-3&4 242 1 F-C F(1-4) Snubbers 2 Visual VT-3&4 242 1 F-B F(1-3) Anchors i Visual X-16B VT-3 Loop "A" - 18" Pump 242 2 C-F C5.ll Circumferential Helds 24 Surf.

Suction Piping from N.H.T 1 5" 1 Torus Nozzle X-22.9A to 12"X18" reducer 242 2 C-F C5.31 Pipe branch Connection 1 Surf From conden-sate storage tank 242 2 F-C F(1-3) Restraints 3 Visual VT-3 242 2 F-B F(1-3) Rigid Support 6 Visual VT-3 J

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear

' Edison ' SECOND TEN-YEAR INTERVAL Power-Station Company ASME XI 1980 EDITION H80 ADDEND 6 Unit - 1

' System: CORE SPRAY Paae 4 of 9 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Description Co-ord. Class Cateoory Number Descriotion Items Hethod Recuest Remarks 12" Piping from 11ve 242 '2 C-F C5.11 Circumferential Helds 2 Surf

'1400-2A (Suction Piping N.H.T. 1 5" from cond. storage tank) to branch connection on 242 2 F-B F(1-3) Rigid Support i Visual located 18" < ' tion piping from VT-3 upstream toru. of '400-2A 242 2 F-C F(1-3) Restraint i Visual located VT-3 upstream-of1400-2A .

12" suction piping from 242 2 C-F C5.11 Circumferential Helds 2 Surf 18"X12" reducer to P-215A NHT 1 5" 10" Discharge piping 242 2 C-F C5.11 Circumferential welds 38 surf from P215A to H025A N.H.T. 1 5" 242 2 C-F C5.21 Circumferential welds 4 Vol.& . DC/DB-14-3002-5-1 N.W.T.) .5" Surf. is a dissimilar metal weld 242 2 C-F C5.31 Branch Pipe Connections 1 Surf Test line conn'.

Circumferential Held 242 2 C-C C3.40 Integral Attachments 2 Surf 28HL2(4) 8HLl(4)

Boston. INSERVICE INSPECTION PROGRAM ' Pilgrim Nuclear

' Edison SECOND TEN-YEAR INTERVAL Power $tation.

Company ASME XI 1980 EDITION W80 ADDENDA Unit - 1 System: CORE SPRAY Pace 5 of 9 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class 'Cateaory Number Descriotion Items Method Recuest Remarks 10" discharge piping 242- 2 F-C F(1-3) Restraints 2 Visual Continued 'VT-3 242 2 F-8 F(1-3) Guides T Visual VT-3 242 2 F-B F(1-3) Rigid Supports 2 Visual VT-3 242 2 F-C f(1-3) Rigid Supports 6 Visual VT-3' 242 2 F-8 F(1-3) Anchor i Visual VT-3 242 2 .F-C F(1-4) Spring Hangers 2 ' Visual VT3&4 6" test line piping 242 2 C-F C5.11 .Circumferential Helds 13 Surf (A-Loop) from 10"X6" 241 NHT 1 5" Weldolet (on P215A discharge. piping)to 242 2 F-C F(1-4) Spring Support 1 . Visual 1401-35A

Boston INSERVICE INSPECTION PROGRAM Pilgrim' Nuclear

-Edison SECOND TEN-YEAR INTERVAL Power. Station Company ASME XI 1980 EDITION H80 ADDENDA Unit System: CORE SPRAY Paae 6 of 9 Rev. 3 Section - Amendment 87-02 P&ID Section XI No. 12-16-87 Line or Component and .XI Item Item of Exam Relief-Descriotion Co-ord. Class Catecory Number Descriotion Items Method Recuest- Remarks Loop "B"-18" pump 242 2 C-F C5.11 Circumferential Helds 23 Surf suction piping from NHT 1 5" torus nozzle X-229B to 12"X18" Reducer 242 2 C-F C5.31' Pipe Branch Connection 1 Surf from condensate Circumferential Held storage tank 242 2 F-C F(1-3) Restraint 3 Visual VT-3 242 2 F-B F(1-3) Rigid Support 6 Visual VT-3 12" Piping from valve' 242 2 C-F. C5.11 Circumferential Helds 2 Surf

'1400-28 (Suction piping NHT 1 5" from conden. storage tank) to branch- 242 2 F-C F(1-3) Restraint i Visual located upstream-connection on 18" VT of.1400-2B suction piping from torus 242 2 F-B F(1-3) Rigid Support. 1 Visual . located upstream.

VT-3 - of 1400-28

a Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear -

Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: CORE SPRAY Pace 7 of 9 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief

' Description Co-ord. Class Cateaory Number Descriotion Items Method Recuest' Remarks 12" Suction piping from 242 2 C-F C5.11 Circumferential Helds 2 Surf 18"X12" reducer to P215B ~NHT 1 5" 10" discharge' piping 242 2 C-F- C5.11 Circumferential Helds 29 Surf from P2158 to MO-258 NHT 1 5" 242 2 C-F C5.21 Circumferential Helds 3 Vol& DC/DB-14-3001-4-1 NHT >.5" Surf. is a dissimilar-metal weld 242 2 C-F C5.31 Branch pipe connection 1 Surf Test line conn.:

circumferential weld 242 2 C-C C3.40 Integral attachments 3 Surf 2HLl(4) lHLl(4) 22HLl(4)

=

' Boston INSERVICE INSPECTION PROGRAM ' Pilgrim Nuclear.

Edison SECOND TEN-YEAR INTERVAL Power Station-Company ASME XI 1980 EDITION H80 ADDENDA. Unit - 1

. System: CORE SPRAY Pace 8 of 9 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Description Co-ord. Class Cateaory Number Descrit-tion Items Method Reauest Remarks

'10" discharge piping 242 2 F-B F(1-3) Restraint i Visual

'from P215B to H0-258 VT-3 (continued) 242 2 F-B F(1-3) Guide i Visual VT-3 242 2 F-B F(1-3) Rigid-Support 1 ' Visual VT-3 242 2 F-C F(1-3) ' Rigid Support 3 Visual VT-3 242 2 F-B F(1-3) Anchor 2 Visual VT-3 242 2 F-C F(1-4) Spring Hanger. .3 . Visual VT-3&4 6" test line piping 242 2 C-F C5.ll Circumferential Helds 7 Surf (B-Loop) from 10"X6" 241 NWT 1 5" weldolet (on P-215B:

discharge piping) to- 242 2 F-B F(1-3) Guide i Visual 1401-35B

, u.iLau.J__ , . _ _ _ _ _A-. -

m. -,. __ -

y Boston INSERVICE INSPECTION PROGRAM  : P11 grim' Nuclearf Edison. SECOND TEN-YEAR INTERVAL ' Power Station Company. ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: CORE SPRAY Paae 9 of 9 Rev. 3 Section

.. P&ID Section XI No.

.Line or Component and. XI Item Item of Exam Relief Descriotion Co-ord. Class Cateaory Number Description Items Method Reauest Remarks-Pressure Retaining' 242: 2 C-H C7.20 System leak test Visual

. components-piping 'VT-2 242 2 C-H. C7.21 System Hydro Test Visual VT-2 Pressure Retaining: 242 2 C-H C7.30 System Leak Test Visual components-pumps VT-2 242 2 .C-H C7.31 . System Hydro Test Visual >

VT-2 Pressure Retaining 242 2 C-H C7.40 System Leak Test Visual

' Components-Valves VT-2 242 2 C-H C7.41 System Hydro fest -Visual VT ..

E J

k

' Bos ton -- ' INSERVICE INSPECTION PROGRAM:  : Pilgrim Nuclearj

- Edison SECOND TEN-YEAR INTERVAL ~ Power Station-Company. ASME'XI 1980 EDITION H80 ADDENDA LUnit -.1 =

-System:'HIGH PRESSURE COOLANT INJECTION- Paae 1 of 8 ' Rev.:3 .

Section Amendment 87-02

. - P&ID Section' XI No .- 12-16-87!

Line. or: Component -

land . XI Item Item of Ex'am . . Reli ef.. -

Descriotion Co-ord.' Class Cateaory Number 'Descriotion- Items Method ~Recuest- ' Remarks' _ ,

- 10".. Steam Supply from- . 243- B-J . Circumferential' Surf & 'PRR , Inaccessible ~ weld &

-1 B9.11 23 Main Steam Line ."D" to: 244: Helds N.P.S. 1 4" Volume- .1 in~X-52!

2301-5 '

F- 243' 1 'B-K-1' B10.10 Integral Attach. ,

2 Surface'PRR' 8HLi(8)/*

1 L8 inaccessible 1 lugs in:X-52t  :

243 1 B-M-2 B12.40. Valve Body 2 Visual'..PRR 2301-4 N.P.S 2 4" VT-3^ 2301--5 l 243' .1 .B-G-2B7.70 Valve-Bolts, Studs ~2 -Visual L 2301-4.-

and Nuts'I 2",Dia. VT-1 2301-5.. "

243.  : 1 LF-C F(1-4) Snubber 2 Visual VT-3&4' ....

L243 1- -. F-C ' .. F(1 4) Spring'. 13 Visual

-Supports- , VT-3&4 243 .1 .. F-B: 'F(1-3).JAnchorf .1' .V1sual 'X-52/*

VT-3' '

/ =!92 .

e - .

=

y" z' g 9 m g7 .h-

~'

k enY- p vy "

9 g. 9 jf f } dT f V tV $ F- y y$V k-Itt g y 4 que.w- k "'3H' If V 4

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL ;ower Station Company ASME XI 1980 EDITION H80 ADDENDA Unit System: HIGH PRESSURE COOLANT INJECTION Pace 2 of 8 Rev. 3 Section Amendment 92-01 P&ID Section XI No. 03-30-92 Line or Component and XI Item Item of Exam Relief Description Co-ord. Class Catecorv Number Description Items Method Recuest Remarks 14" Discharge Piping 243 1 B-J B9.11 Circumferential 18 Surf.&

from MO-8 to Feedwater 244 Helds N.P.S. 2 4" Volume Line "B" 243 1 B-M-2 B12.40 Valve Body 2 Visual PRR-3 -2301-7 N.P.S. 1 4" VT-3 2301-8 243 1 B-G-2 .87.70 Valves-Bolts, Studs 2 Visual 2301-7

& Nuts 1 2" Dia VT-1 2301-8 243 1 B-K-1 B10.10 Integral 1 Surf 12PS(2)/*

Attachments 243 1 F-C F(1-3) Restraint i Visual VT-3 243 1 F-B F(1-3) Guide 1 Visual VT-3 243 1 F-C F(1-3) Rigid Support 3 Visual VT-3 243 1 F-B F(1-3) . Anchor i Visual VT-3 243 1 F-C F(1-4) Spring Hanger 2 Visual VT-3&4 Group Circumferential welds 3 Vol. 23-0-9 I Helds . inspected in ten year 23-0-10' interval 23-0-14

/ 01

.x I

' Boston' ' INSERVICE INSPECTION PROGRAM' LP11 grim Nuclear t Edison SECOND TEN-YEAR' INTERVAL Power Station Company ASME XI 1980 EDITION H80' ADDENDA' ~ Unit -'1 System: HIGH PRESSURE COOLANT INJECTION Pace 3 of 8 Rev.-3 Section

. P&ID' Section XI No.

Line-or Component and 'XI Item Item of Exam Relief

'Descriotion Co-ord. Class Catecorv Number Descriotion Items Method Recuest Remarks 16" Pump' Suction. Piping 243 2 'C-F

. C5.11 Circumferential 43 Surf fro 1 Torus'and Condensate Welds.,N.W.T. 1 5" Storage Line (MO-6) to 16"'X 14" Reducer _ .

243 2 C-C. C3.40' . Integral Attach. .1 Surf .175HLi(1).

243 2 F-B F(1-3) Restraint i Visual VT-3 243 2 .F-C F(1-3) Restraint 2 Visual '

VT-3 243 2 F-B F(1-3) Anchor i Visual VT-3 243 '2: F-B 'F(1-3) Rigid 4' Visual' Support VT-3 243 '2 'F-Ce LF(1-3) Rigid. 2- Visual-Support. VT >

243- 2 F-C" F(1-4) -Spring 3 Visual Hanger- VT-3&4

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station

' Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: HIGH PRESSURE COOLANT INJECTION Paae 4 of 8 Rev. 3-Section P&ID Section XI No. Amendment 92 Line or Component and XI Item Item of Exam Relief '03-30-92 Descriotion Co-ord. Class Cateaory Number Descriotion Items Method Recuest Remarks 14 Inch Pump Suction 243 2 C-F C5.11 Circumferential 1 Surface Piping from 16" X 14" Held N.H.T. 1 5" Reducer to Pump Inlet 14". Discharge Piping 243 2 C-F C5.21 Circumferential 34. Surface

.from P205 to MD-8 Helds. N.H.T 1 5" and Volume 243 2 C-C C3.40 Integral 3 Surface 51HLl(4) /*

Attachments 53HLl(4). 53PS(2):

243 2 F-C F(1-4) Spring Hangers 6 Visual VT-3 243 2 F-B F(1-3) Rigid Support 2 Visual VT-3 243 2 .F-B F(1-3) Anchor 3 Visual VT-3' 10" HPCI Discharge 243 2 C-F .C5.21 Circumferential Helds 12 Volume.

Piping to M0-10 NHT >.5" and Surf 243 2 F-B F(1-3) Rigid Support 3 V1sual H-23-1-27S VT-3 Included

/* 01

Boston INSERVICE INSPECTION PROGRAM . Pilgrim Nucleare -

Edison SECOND TEN-YEAR INTERVAL Power. Station Company ASME XI 1980 EDITION W80 ADDENDA Unit - 1 System: HIGH PRESSURE COOLANT INJECTION Paae 5 of 8 Rev. 3 Section Amendment 92-01 P&ID Section XI No. 03-30-92--

.Line or Component and XI Item Item of Exam Relief Description Co-ord. Class Catecory Number Descriotion Items Method Recuest Remarks-10" HPCI Discharge 243 2 F-8 F(1-3) Guide 1 Visual Piping to MO-10 VT-3 (Cont.)

10" Turbine Steam. supply 243 2 C-F C5.21 'Circumferential 31 Vol. &

from H0-5 to turbine Helds N.H.T. >.5" Surface.

Inlet 243 2 C-C C3.40 Integral 3 Surface 59HLi(4)

Attachments 62HLl(4) 13HLi(4) 243 2 F-C- F(1-3) Restraint 2 Visual VT-3 243 2 F-C F(1-3) Rigid Supports- 2 Visual VT-3 243 2 F-C F(1-4) Snubber 3 Visual

' VT-3&4 ' .

243 2 F-C F(1-4) Spring 6 Visual Hangers .VT-3&4 243 2 F-8 F(1-3) Guide .2 Visual NED 87-145/*

VT-3 P-23-1-158/*

H-23-1-159/*

/ 01

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASHE XI 1980 EDITION H80 ADDENDA Unit - 1 System: HIGH PRESSURE COOLANT INJECTION Pace 6 of 8 Rev. 3 Section Amendment 87 P&ID Section XI No. 12-16-87 Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Cateaory Number Descriotion Items Method Reauest Remarks-18" Turbine Exhaust Line 243 2 C-F C5.11 Circumferential 2 Surface 244 Helds N.H.T. 1 5" 20" Turbine Exhaust Line 243 2 C-F C5.11 Circ mferential 21 Surface 244 Helds N.H.T. 1 5" 243 2 C-C C3.40 Integral Attachments 1 Surface 75HL1(8) 243 2 F-C F(1-3) Rigid Support 2 Visual VT-3 243 2 F-C F(1-4) Snubbers 4 Visual VT-3&4 243 2 F-C F(1-4) Spring 2 Visual Hangers VT-3&4 24" Turbine Exhaust -243 2 C-F C5.11 Circumferential 7 Surface Includes from 24" X 20" reducer Helds. N.H.T. 1 5" elbowlet to-to torus penetration reducer weld X-223 243 2 C-F C5.31 Branch Pipe Conn. 1 Surface To Vacuum Circum. Helds Breaker 243 2 C-C C3.40 Integral Attach. .1 Surface- 69HLl(24)- .

Boston . INSERVICE. INSPECTION PROGRA.M Pilgrim Nuclear-

' Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION H80 ADDENDA Unit .1

System: HIGH PRESSURE COOLANT INJECTION Pace 7 of 8 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Catecory Number Descriotion Items Method Reauest Remarks 24" Turbine Exhaust from 243 2 F-C F(1-3) Rigid Support 1 Visual 1 24" X 20" reducer-to VT-3 Torus Penetration X-223 (Cont.)

243- 2 F-C F(1-4) Snubber- 1 Visual VT-3&4 243 2 F-B F(1-3) Stiffener Collars 3 Visual C-8603 VT-3

' 16" Turbine Exhaust 244 2 -C-F C5.11 Circumferential 8 Surf Piping To PSD-69 Helds-N.W.T. <.5 .

243 2 F-C F(1-4) Spring Hanger 2 Visual i VT-3&4 243 2 F-C F(1-4) Snubber i Visual ,

VT-3&4 l Pressure retaining 243 2 C-H C7.20 -System Leakage Test VT-2 components (piping).

243 2 C-H C7.21 System Hydro Test VT Pressure retaining 243 _2 C-H C7.30 System Leakage Test VT-2 components-(pumps) 243 2 C-H C7.31 System Hydro Test VT-2

~

_a_--.=- = _ - . -

a- - - 1

~

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear--

Edison SECOND TEN-YEAR INTERVAL Power Station t . Company ASME XI 1980 EDITION H80 ADDENDA Unit - 1 System: HIGH PRESSURE COLLANT INJECTION Pace 8 of 8 Rev. 3 Section .

-P&ID Section XI No.

, .Line or Component and .

XI Item Item of Exam Relief DescriDtion Co-ord. Class Catecory Number Description Items Method Recuest Remarks Pressure retaining 243 2 C-H C7.40 System Leakage Test VT-2

components'(valves) 243 2 C-H .C7.41 System Hydro Test VT-2 4

t

, _ ~

i

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company ASME XI 1980 EDITION W80 ADDENDA Unit - 1 System: SERVICE HATER SYSTEM Pace 1 of 1 Cev. 3 Section P&ID Section XI No.

.Line or Component and XI Item Item of Exam Relief

__ pes tri ction Co-ord. Class Catecory Number Descriction Items Method Reauest Remarks

'P-203A and B Discharge 212 3 FB/FC F(1-3) Restraints, Guides, 9 Visual Includes Piping up to MO-3808, Rigid Supports and- VT-3 H-29-1-13215A AO-3915 and up to anchors the buried portion of discharge piping P-2030 and E discharge 212 3 FB/FC F(1-3) Restrairts, Guides, 9 Visual Includes Piping up to M0 3813, Rigid Supports, and VT-3 H-29-1-13335A A0-3925 and up to anchors

, the buried portion of discharge piping E-209A&E-122A(A-Loop) 212 3 FB/FC F(1-3) Restraints, Guides 12 Visual inlet and outlet piping rigid supports, and VT-3 (piping in aux-bay) anchors E-209B&E-122B (B-Loop) 212- 3 FB/FC F(1-3) Restraints, guides 12 Visual inlet and outlet piping rigid supports and VT-3 (piping in aux bay) anchors P-208 A, B, C, D, & E 212 3 FA F(1-3) Pump support 5 Visual VT-3 212 3 FB/FC F(1-3) Lower pump casing 15 Visual restraint VT-3 Pressure Retaining- 212 3 D-B D2.10 System hydro / leakage Visual components test- VT-2

Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison- SECOND TEN-YEAR INTERVAL Power Station ,

Company. ASHE XI 1980 EDITION H80 ADDENDA Unit - 1 System: REACTOR BUILDING CLOSED COOLING HATER SYSTEM Pace 1 of 3 Rev. 3 Section P&ID Section XI No.

'Line or-Component and XI Item Item of Exam Relief i Descriotion Co-ord. Class Catecory Number Descriotion Items Method Recuest Remarks RBCCH "A" -

Loop Suction 215 3 D-B D2.20 Integral Attachments 6 Visual H-34-1-61 ,

piping bounded by D-C D3.20 VT-3 H-30-1-65SH P202A, B & C. 401-12 H-30-1-66 .

.E-207A, E-206A. and H-30-1 .,

.408-58. H-30-1-68 H-30-1-26SR 215 3 FB/FC .F(1-4) Pipe Supports 40 Visual I VT-3 RBCCH "B" Loop Suction 215 3 D-B D2.20 Integral Attachments 8 Visual H-30-1-275A  ;

piping bounded by D-C D3.30 VT-3 H-30-1-52

  • P-202 D, E, & F. E-207B, H-30-1-53  !

401-12.and 400-98 H-30-1-54 H-30-1-30SA ,

H-30-1-ISA H-30-1-315A H-30-1-99 215 3 FB/FC F(1-4) Pipe Supports 22 Visual VT-3

--= .- - _

I INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Boston Power Station Edison SECOND TEN-YEAR INTERVAL ASME XI 1980 EDITION H80 ADDENDA Unit - 1 Company Pace 2 of 3 Rev. 3 System: REACTOR BUILDING CLOSED COOLING HATER SYSTEM Amendment 87-02 Section XI No. 12-16-87 P&ID Section and XI Item Item of Exam Reife' Line or Component Remarks Co-ord. Class Catecory Number Descriotion Items Hethod Rew_

Descriotion D2.20 Integral Attachments 11 Visual H-30-1-130 RBCCH "A" Loop Discharge 215 3 D-B 03.20 VT-3 H-30-1-131 Piping bounded by P202A, D-C H-30-1-85A B and C, 408-5A, E-207A, H-30-1-437 E-206A and 401-197. H-30-1 438 H-30-1-439 H-30-1-121 H-30-1-10SS H-30-1-11SA H-30-1-62SA H-30-1-294 215 3 FB/FC F(1-4) Pipe Supports 40 Visual '

VT-3 D2.20 Integral Attachments 11 Visual H-30-1 445G RBCCW "B" Loop Discharge 215 3 D-B 03.20 VT-3 H-30-1 43SH Piping Bounded by P-2020, D-C H-30-1-42SR E and F, H-30-1 41SG H-30-1-46 H-30-1-375R H-30-1-12SA H-30-1-104 H-30-1-440 H-30-1 441 H-30-1-442 215 3 F8/FC F(1-4) Pipe Supports 22 Visual VT-3

INSERVICE INSPECTION PROGRAM Pilgrim Nuclear

. Boston . Power Station

-Edison SECOND TEN-YEAR INTERVAL '

ASME XI 1980-EDITION H80 ADDENDA Unit - 1 Company Pace 3 of 3 Rev. 3 System: REACTOR BUILDING CLOSED COOLING HATER SYSTEM Section P&ID Section XI No.

' Line or Component and XI Item Item of Exam Relief-Co-ord. Class Catecory Number Description Items Method Recuest Remarks Descriotion Pressure Retaining 215 3 0-A D1.10 System Leakage and Visual Hydro Test VT-2 Components.

P202-A,B,C,0,E,&F 215 3 F-A F(1-3) Pump Supports 6 Visual VT-3 215 3- F-A F(1-3) Heat Exchanger 4 Visual E209-A&B VT-3 Support i

I

~ _ _ _

7.-_-

i Boston INSERVICE INSPECTION PROGRAM Pilgrim Nuclear Edison SECOND TEN-YEAR INTERVAL Power Station Company E A XI 1980 EDITION H80 ADDENDA Unit - 1 System: CONTAINMENT ATMOSPHERE CONTROL Pace 1 of 1 Rev. 3 Section P&ID Section XI No.

Line or Component and XI Item Item of Exam Relief Descriotion Co-ord. Class Catecory Number Description Items Method Recuest Remarks Purge Line to Drywell 227 2 F-C F(1-3) Pipe Supports 2 Visual From A0-5035A VT-3 Purge Line to Torus 227 2 F-C F(1-3) Pipe Supports 2 Visual From A0-5036A VT-3 Vent Line from Torus 227 2 F-C F(1-3) Pipe Supports 2 Visual Bounded by AO-5040 A&B VT-3 and A0-5042B 227 2 F-C F(1-4) Spring Supports 3 Visual VT3&4

> p a .e i q y w e- ea e--* s- .u-- - -_.m.u.-.-__.__---____-.-..a -A-u*----i--a ---