Rev 3 to Procedure 8.7.1.10, Pressure Test Automatic Depressurization Sys Accumulator Sys IntegrityML20077F944 |
Person / Time |
---|
Site: |
Pilgrim |
---|
Issue date: |
05/13/1983 |
---|
From: |
BOSTON EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20077F939 |
List: |
---|
References |
---|
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.28, TASK-TM 8.7.1.10, NUDOCS 8308030226 |
Download: ML20077F944 (5) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20196D0241999-06-16016 June 1999 Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20205A1451999-03-23023 March 1999 Core Shroud Insp Plan ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20151S3851998-08-31031 August 1998 Long-Term Program:Semi-Annual Rept ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211N6871997-09-16016 September 1997 Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program ML20211G2381997-09-15015 September 1997 Rev 8 to PNPS-ODCM, Pilgrim Nuclear Power Station Odcm ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20216C0631997-08-29029 August 1997 Semi-Annual Long Term Program Schedule ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20210K3551997-07-0101 July 1997 Rev 16 to Procedure 7.8.1, Water Quality Limits ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20117K6611996-07-17017 July 1996 Rev 15 to PNPS Procedure 1.2.2 Administrative OPS Requirements ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20100J2521995-11-22022 November 1995 Rev 7 to Pilgrim Nuclear Power Station Odcm ML20092B5861995-09-0101 September 1995 Rev 0 to Third Ten-Yr Interval ISI Plan for Pilgrim Nuclear Power Station ML20092C4331995-09-0101 September 1995 Startup Test Rept for Pilgrim Nuclear Power Station Cycle 11 ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077Q1181995-01-13013 January 1995 Owner'S Specification for Reactor Shroud Repair ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20078N8421994-11-18018 November 1994 Rev 32 to Procedure 8.7.3, Secondary Containment Leak Rate Test 1999-06-16
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20205A1451999-03-23023 March 1999 Core Shroud Insp Plan ML20151S3851998-08-31031 August 1998 Long-Term Program:Semi-Annual Rept ML20211N6871997-09-16016 September 1997 Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program ML20211G2381997-09-15015 September 1997 Rev 8 to PNPS-ODCM, Pilgrim Nuclear Power Station Odcm ML20216C0631997-08-29029 August 1997 Semi-Annual Long Term Program Schedule ML20210K3551997-07-0101 July 1997 Rev 16 to Procedure 7.8.1, Water Quality Limits ML20117K6611996-07-17017 July 1996 Rev 15 to PNPS Procedure 1.2.2 Administrative OPS Requirements ML20100J2521995-11-22022 November 1995 Rev 7 to Pilgrim Nuclear Power Station Odcm ML20092B5861995-09-0101 September 1995 Rev 0 to Third Ten-Yr Interval ISI Plan for Pilgrim Nuclear Power Station ML20077Q1181995-01-13013 January 1995 Owner'S Specification for Reactor Shroud Repair ML20127N2711992-11-24024 November 1992 Rev 4 to Pilgrim Nuclear Power Station Procedure 8.I.1.1, Inservice Pump & Valve Testing Program ML20128M7701992-03-31031 March 1992 Amend 92-01 to Second Ten Year ISI Program ML20094P5411992-03-19019 March 1992 Rev 23 to Procedure 5.4.6, Primary Containment Venting & Purging Under Emergency Conditions, Revising Coversheet & Attachment 1,Sheet 3 of 5,page 8 of 20 ML20058E5281990-10-25025 October 1990 Rev 1 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program ML20005F0791989-12-13013 December 1989 Rev 0 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program. ML20247N3611989-07-31031 July 1989 Rev 2 to Dcrdr Program Plan ML20245D6551989-04-21021 April 1989 Power Ascension Program Resumption Plan ML20235R3441988-12-28028 December 1988 Rev 26 to, Pilgrim Nuclear Power Station Secondary Containment Leak Rate Test ML20235R4671988-12-22022 December 1988 Rev 25 to, Pilgrim Nuclear Power Station Secondary Containment Leak Rate Test ML20155C0141988-09-28028 September 1988 Rev 3 to Appendices to Restart Plan ML20155F9041988-09-0707 September 1988 Rev 3 to Pilgrim Nuclear Power Station Plant-Specific Technical Guidelines for Emergency Operating Procedures ML20153H6481988-08-31031 August 1988 Ascension Program ML20235R3801988-08-0909 August 1988 Special Post-Startup Training Program to Satisfy Requirements of NUREG-1021,Section ES-109,Parts B.2.e & B.2.f for Reactor Operator Licensed Personnel & Parts D.2.e & D.2.f for Senior Reactor .. ML20150C0271988-05-26026 May 1988 Rev 2 to Vol 2 to Apps to Restart Plan ML20151F9481988-04-0606 April 1988 Rev 2 to Emergency Operating Procedure 1.3.4-13, Emergency Operating Procedures Verification Program ML20151C8111988-04-0606 April 1988 Rev 3 to Emergency Operating Procedure 1.3.4-10, Writers Guide for Emergency Operating Procedures ML20151F9681988-04-0606 April 1988 Rev 2 to Emergency Operating Procedure 1.2.4-14, Emergency Operating Procedure Validation Program ML20151C8151988-03-28028 March 1988 Emergency Operating Procedures Training Program Summary Description ML20153B1061988-03-14014 March 1988 Rev 1B to Inservice Testing Program for Pumps & Valves, Pilgrim Nuclear Power Station ML20236T2171987-11-20020 November 1987 Rev 3 to Pilgrim Nuclear Power Station Plant-Specific Technical Guidelines for Emergency Operating Procedures ML20236T2241987-11-20020 November 1987 Rev 3 to Apps to Pilgrim Nuclear Power Plant-Specific Technical Guidelines ML20236T2361987-11-20020 November 1987 Collection of Plant Operating Procedures Utilized to Develop,Process & Issue Plant-Specific Emergency Operating Procedures ML20236N7751987-11-12012 November 1987 Rev 1 to Procedure 3.M.1-1, Preventive Maint ML20236F0201987-10-26026 October 1987 Rev 1 to Vol 2 of Pilgrim Nuclear Power Station Apps to Restart Plan ML20155F9171987-10-16016 October 1987 Rev 1 to Procedure 1.3.4-13, Emergency Operating Procedure Verification Program ML20155F9111987-10-15015 October 1987 Rev 2 to Procedure 1.3.4-10, Writers Guide for Emergency Operating Procedures ML20235X2461987-10-15015 October 1987 Power Ascension Program ML20195H6341987-09-22022 September 1987 Rev 23 to Procedure 8.7.3, Secondary Containment Leak Rate Test ML20238E8311987-09-0101 September 1987 Revised Nuclear Operations Dept Procedures,Including Rev 5 to Procedure 5.7.4.1.1, Post-Accident Sampling Sys,Small Vol Liquid Sample from Jet Pump Flow Sensing Line & Rev 6 to Procedure 5.7.4.1.2, ...Undiluted Liquid Sample.. ML20236G4071987-07-30030 July 1987 Vol 1 to Pilgrim Nuclear Power Station Restart Plan. Rev 0 to Vol 2,appendices,encl ML20236F9531987-07-28028 July 1987 Matl Condition Improvement Action Plan ML20155F9201987-07-10010 July 1987 Rev 0 to Procedure 1.3.4-14, Emergency Operating Procedure Validation Program ML20204F7431986-06-16016 June 1986 Rev 1 to Temporary Procedure Tp 86-85, RHR Intersys Leakage Assessment & Controlled Leakoff ML20204F7301986-06-10010 June 1986 Rev 11 to Procedure 2.3.2.1, Panel Procedures Panel 903 Left ML20204F7481986-06-10010 June 1986 Rev 0 to Temporary Procedure Tp 86-84, RHR Discharge Piping Venting Procedure ML20137M4811985-08-21021 August 1985 Rev 1 to Procedure 5.7.5, Estimating Core Damage ML20138R4501985-07-19019 July 1985 Rev 0 to Procedure 1.3.4-10, Writers Guide for Emergency Operating Procedures ML20128N9341985-03-0606 March 1985 Rev 0 to Procedure 5.7.5, Estimating Core Damage ML20101S7121984-12-13013 December 1984 Rev 11 to Procedure 2.1.12, Daily Diesel Generator Surveillance ML20101S7201984-12-12012 December 1984 Rev 15 to Procedure 8.9.1, Manually Start & Load Each Diesel Generator Once Per Month 1999-03-23
[Table view] |
Text
.
. I e
i s BOS"QN L' 11 ') ISOn COV?ANY NDC:.IAE OPERJTIONS DE? Alt:ENT ,
FILGtIM NUCLEAR POGER STATION Procedars No. 8.7.1.10 PRESSURE TEST ADS ACCUMULATOR SYSTEM INTEGRITY
. List of Effective Pages 8.7.1.10-1 '
8.7.1.10-2 8.7. 1.10-3 Attachments 8.7.1.10A-1 8.7.1.10B-1 i ,,,,,ee #4 4 # 4 #
ORC C(air =an
, n.:. duf/ 3 #6
/
U N.C OMT ROLiE.G0-1 Rec 0 P Y 8308030226 0307E9 DR ADOCK 05000
'I. PURPOSE The purpose of this procedure is to provide detailed instructions for the perfocmance of a Pressure Test of the ADS Accumulator Systems to assure emergency pneumatic supply for the FSAR required number and duration of valve operations.
II. DISCUSSION j As required by BECo letter #80-11, dated January 18, 1980 " Response to I&E Bulletin 80-01". Ergineering evaluation for Peach Bottom 2 and 3 disclosed that the Autr,matic Depressurization System (AES) pneumatic supply (either nitrogan or air) may not be operable for all possible events because of a combination of misapplication of check valve, a lack of pressure testing of the accumulator system backing up each ADS l valve operator and questions about the continued operability of the l , pneumatic supply in a seismic event. The test frequency is to be during
) refueling outage not to exceed every two years.
III. REFERENCE MATERIAL A. P&ID M-252 B. P&ID M-220, Sheet 2 C. Design Specification 6498-M-18 D. Kl8AC - 28.1 - Ingersoll - Rar1 Co. Vertical Air Receiver E. M.18-41-2BC - Certificate of Shop Inspection IV. PETREQUISITES 1
A. Obtain Watch Engineers permission to start test.
f B. Instrument Air System Operaole.
C. All modifications to Air Lines / Check Valves Completed.
D. Radiarion Work Permit and Maintenance Request approved.
E. Communications established as required.
F. Insure the Accumulators including any fittings attached to them are leak tight against normal system air pressure when " snooped".
V. APPARATUS
! A. Four (4) Calibrated Temperature Indicators B. Four (4) Pressure Gauges (0-160 psig)
C. Timing Device D. Esta Sheets E. Four (4) new Flange Gaskets F. St oop
F
, VI . PRECAUTIONS A. Be aware that radiological and personal safety hazards exist with all work performed in the drywell no matter how minor.
B. Allow accumulator pressure and temperature to stabilize before starting this rest.
VI
I. PROCEDURE
A. Tag the accumulators out of service securing air to each and draining them down.
NOTE: An M.R. should be written for the test to include Green (Testing)
Tags for drains and air supply valves to t?,e accumulators.
B. Issue an MR to have a calibrated pressure gage (0-100 psig or equivalent) and a temperature indicator installed on each accumulator (typical accumulator arrangement shown on page 8.7.1.10B-1).
C. Repressurize the accumulators with Station Instrument Air System, to 84 psig.
D. Close RV 9084, SV 203A and drain valve (typical for all four accumulators).
E. Close the one-inch manual air supply valves from the instrument air header.
F. Uncouple the bolted flanges located at each accumulator check valve inlet.
G. Read and record accumulator pressures and temperatures on Data Sheet (Attachment A 1) ct the beginning of the test.
H. Read and record accumulator pressures and temperatures on Data Sheet (Attachment A-1) at the end of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test, I. Recouple bolted flanges installing new flange gaskets.
J. Open the one-inch esnual air supply valves from the instrument air header and snoop bolted flanges for leaks.
K. Compare results of Step G to Acceptance Criteria and notify Watch Engineer of any discrepancies.
VIII. ACCEPTANCE CRITERIA
- A. Seat leakage shall not drop each at .umulator's pressure below 70 PSI, in four
.) hours.
B. NED shall be advised of a failure of a valve test to meet their criteria.
IX. ATTACHMENTS A. ADS Accumulator System Pressure Test Data B. Relief Valve Accumulators Diagram.
U N.C ONT ROLLED COPY 8.7.1.10-3 Rev. 3
p ADS ACCUMULATOR SYSTEM PRESSURE TEST DATA
-w I. Obtain Data and Record in Table Parameter T-221-A T-221-B T-221-C T-221-D Exact Time Initials Beginning of Test Data Pressure Temperature End of Test Data Pressure Temperature II. Results compared to Acceptance Criteria of Section VIII and discrepancies identified in accordance with Station Procedure 1.3.24, FAILURE and MALFUNCTION REPORTS.
s Verified By:
Performance Engineer /STA l
l l
U N. CONT ROLLED COPY 8.7.1.10A-1 Rev. 3
/ .
l ..
^
R e Lie r \/ALVE A c c vu vuros s
, _ ~ ,.A A. M
- f c. r. Aos RJiiLiCf VALVG ADS A
, ,, .aem & ssenten aceun'AM vaw:
!~..R I.,'y--<
p g.ss.
,- ~ ,..
l o- ~.-g na,,,, n- - see ~
t T X '~~ ,',-
l l
s/ 2
,am-sur n iT I. 9' TYPIC A L DF fava.
l l
l l
l U N.C ONT ROi i_ETf' BC dYY l
,