ML20065H021

From kanterella
Revision as of 14:54, 21 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 25 to Physical Security/Contingency Plan, Changing Defensive Position Responsibilities Per Response to NRC Rept 50-327/90-15 & 50-328/90-15.Rev Withheld (Ref 10CFR73.21)
ML20065H021
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/15/1990
From: Wallace E
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9010250086
Download: ML20065H021 (2)


Text

-

I x SAJEG JARDS INFORMATION TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374o1 SN 157B Lookout Place 00T 151980 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In'the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (GQN) UNITS 1 AND 2 - PHYSICAL SECURITY / CONTINGENCY PLAN (PS/CP) REVISION 25 Enclosed is-the subject item, dated August 29, 1990, and instructions for updating NRO copies 6 through 11. This revision is submitted pursuant to

>- 10 CFR 50.54(p) and contains changes clarifying defensive position responsibilities as contained in TVA response to NRC report No. 50-327-/

50-328-90-15 and deleting 10 CFR 73.71(c) reporting requirements which are now implemented'in~a separate TVA procedure. This plan revision was discussed with Cynthia Perny of your Region II staff on September 27, 1990.

This letter and the enclosed information are being sent by registered mail'.

The signed receipt signifles that you have received this information and acknowledgeithat it contains safeguards material and should be withheld from

-public; disclosure as defined by 10 CFR 73.21. This receipt will also be verification to TVA"that NRC's copies of the plan have been updated and the superseded material has been destroyede If you have any questions, please telephone F. L..Ginn at 615/751-7667.

Very truly yours, TENNESSEE VALLEY AUTHORITY.

E xr7E T$I9YA WEN 5 TED

' FROM ATTACHMENT

'E. G. Wallace, Manager Nuclear Licensing and-t Regulatory Affairs EnclosureNCopies6-9)'

cc: , See-page.2 BAFEGUARDSS:0RMATIOV

.,aosooeso101si R36MAEE9 .rE43 ps; anock osoog . ao ca .i.onoo,i oii,e mpioy ,

iy

w. a

^

^j

f .p
SAFEGL ARDS INFORM NbTi R 1

',, .i y

. U.S. 'NuclearL Regulatory Comission 00T 15 m j

< . ' . 1 5

, fec: Ms. S. C. Black, Deputy. Director

< Project' Directorate II-4

U.S.- Nuclear Regulatory Comission

- One White Flint,' North 11555 Rockville Fike -

Rockville, Maryland 20852 f

NRC. Resident Inspector. l Sequoyah Nuclear Plant L2600-Igou Ferry Road j

i Soddy Daisy, Tennessee 37379

' Mr.: Jack N.:Donohew,. Project Manager -

U.S. Nuclear- Regulatory Comission  :

One White Flint,-North 11555 Rockville Pike y- 4 i

Rockville, Maryland 20852 4 L

Mr.-B.=A. Wilson, Project Chief

' U.S.' Nuclear Regulatory Comission r Region:II.  ;

101 Marietta Street, NW, Suite 2900 Atlanta,, Georgia 130323 i g; ,

- U.S.; Nuclear Regulatory Comission (Enclosure - Copies.10 and 11)  !

Region II  ?

P.O.' Box 2257 7 g , ,

. Atlanta, Georgia ~30301. '}

J a

r 4

$ O1GttARD INFOftM ATION CLASSITICATION DOE 8 4 Hut ArrLY TO THIS PAGE % HEN SEPAR AT&D FRoM NTTACHMEfC ,_

,,_y .

.}

V p ']

l s ,

a t

1

)

lt 1 SA'FEGUARDS !NFORMATION ,

t

, s

/ ' , $

i

' i

u. .

g ..

-t O.

5

{

~~#

f

'. U ' .) ; . sy ja  %