MONTHYEARML22222A1112022-07-28028 July 2022 2022 Kmkt Fort Calhoun Flood Finding and 2011 Missouri River Flooding Reduce ML20080M1542020-02-21021 February 2020 PFHA-2020-3B-2-George-Fort-Calhoun-2011-compressed ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML17163A0192017-06-0909 June 2017 Post Shutdown Decommissioning Activities Report Public Meeting ML17160A3842017-05-31031 May 2017 Public Meeting, May 31, 2017 Region IV Slides Fort Calhoun PSDAR ML16291A0192016-10-17017 October 2016 OPPD Pre-Submittal Meeting Regarding Fort Calhoun Station Decommissioning October 18, 2016 ML16027A0792016-02-0202 February 2016 Meeting Slides for 2/2/16 Teleconference with Omaha Public Power District - License Amendment Request (Lar), Proposed Changes to Implementation of NFPA 805 (2001 Edition) at Fort Calhoun Station ML15114A3862015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Class I Structures ML15114A3962015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Use of Ansi/Ans 58.14 ML15105A4702015-04-15015 April 2015 Summary of Category 1 Meeting Between NRC and Omaha Public Power District to Discuss Transition to the Normal Reactor Oversight Process and Actions for Continued Sustained Performance Improvements ML14338A6252014-12-0202 December 2014 Oppd'S Fort Calhoun Station Driving to Excellence, Public Meeting with the U.S. Nuclear Regulatory Commission Containment Internal Structures 12/2/201 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14143A2892014-05-23023 May 2014 May 13, 2014 Summary of Meeting with Omaha Public Power District Presented the Status of Inspection Manual Chapter 0350 Oversight Activities at Fort Calhoun Station ML14149A0902014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Detailed Schedule June 2012 Through February 2015 Gantt Chart ML14149A0882014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Detailed Schedule May 2014 Through February 2015 Gantt Chart ML14149A0852014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Hi-Level Overview Schedule for Flooding Hazard Reevaluation Report ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML14065A2532014-03-0505 March 2014 Summary of Category 1 Public Meeting with Omaha Public Power District to Discuss Status of Oversight Activities at Fort Calhoun Station ML13339A7242013-12-0505 December 2013 Meeting Summary Slides ML13239A1032013-08-27027 August 2013 2013-08-27 Region IV Visit Final Presentation ML13144A7762013-05-24024 May 2013 Summary of Meeting with Omaha Public Power District on Preliminary Results of a Manual Chapter 0350 Team Inspection ML13112A0522013-04-22022 April 2013 Meeting Handouts April 22, 2013 Meeting with Omaha Public Power District to Discuss Potential Fort Calhoun Licensing Actions ML13114A9362013-04-22022 April 2013 Redacted Meeting Handouts from Closed April 22, 2013 Meeting with Omaha Public Power District to Discuss Means for Protecting Fort Calhoun Station, Unit 1, Against Flooding ML13093A4732013-04-0303 April 2013 Summary of Meeting with Omaha Public Power District ML13008A3672013-01-0808 January 2013 Briefing on Fort Calhoun Station, January 8, 2013 ML12349A1512012-12-12012 December 2012 Licensee Slides from 12/12/2012 Public Meeting with Omaha Public Power District to Discuss Containment Internal Structures Issues to Support Restart of Fort Calhoun Station, Unit 1 ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12220A3772012-08-0303 August 2012 Summary of Meeting with Omaha Public Power District ML12102A0412012-04-11011 April 2012 Public Meeting Slides (0350) ML12102A0432012-04-0404 April 2012 04/4/2012 Omaha Public Power District Public Meeting (0350) ML12053A2092012-02-22022 February 2012 M120222B - Slides, Briefing on Fort Calhoun ML1115702962011-05-26026 May 2011 Licensee Slides from 5/26/11 Pre-Submittal Meeting to Discuss NFPA 805 Fire Protections ML1110201362011-04-12012 April 2011 Summary of Public Meeting with Omaha Public Power District to Discuss the Fort Calhoun Station 2010 Performance ML1109505962011-04-0505 April 2011 Licensee Slides from 4/5/11 Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML1101402412011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Impact of EPU on Rps/Esfas Setpoints ML1101402332011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Spent Fuel Pool Criticality Analysis ML1014606292010-05-26026 May 2010 Summary of Public Meeting with Omaha Public Power District on the Fort Calhoun Station 2009 Performance ML0931401622009-11-0505 November 2009 Presentation Slides from November 5, 2009, Category 1 Meeting with Omaha Public Power District on Plans to Submit an Extended Power Uprate Application ML0912405962009-05-0404 May 2009 Meeting Summary, 2008 EOC Public Meeting with Omaha Public Power District on Fort Calhoun Station ML0903704552009-01-28028 January 2009 Licensee Slides, January 28, 2009, Meeting with Omaha Public Power District to Discuss Oppd'S Plans to Submit an Extended Power Uprate Request for the Fort Calhoun Station, Unit 1 ML0903706482009-01-28028 January 2009 Licensee Slides, January 28, 2009, Meeting with Omaha Public Power District, to Discuss the Fort Calhoun Station'S Transition to National Fire Protection Association (NFPA) 805 ML0815003632008-05-29029 May 2008 Summary of Meeting with Omaha Public Power, Fort Calhoun Station on 2007 Performance and Regulatory ML0806703502008-03-0404 March 2008 Meeting Summary for Public Meeting with Omaha Public Power District ML0736200572007-12-27027 December 2007 Summary of Meeting with Omaha Public Power District to Discuss Performance at Fort Calhoun Station & Status of Station Performance Improvement Plan ML0729806702007-10-24024 October 2007 Meeting Presentation on GEH Chemical Effects Testing Update ML0725306142007-09-21021 September 2007 Public Meeting Summary on the Reactor Oversight Process ML0717906542007-06-28028 June 2007 Handout for Meeting with Representatives of Omaha Public Power District for Fort Calhoun ML0712105252007-05-0101 May 2007 Summary of Fort Calhoun Station End-of-Cycle Public Meeting to Discuss Performance for Period January 1 Through December 31, 2006 ML0625704792006-09-0707 September 2006 Meeting Handouts of September 7, 2006, Meeting with Omaha Public Power District to Discuss Options for Next Dry Cask Storage Campaign 2022-07-28
[Table view] |
Text
Fort Calhoun Station Steam Generators-Pressurizer-RV Head Replacement Projects Omaha Public Power District Presentation to the Nuclear Regulatory Commission March 25,2004 MOU 2CJ4 BE I Introduction and Overview Sudesh Gambhir Division Manager - Nuclear Projects HZEj4 2 1
I Meeting Agenda
- Introduction - Sudesh Gambhir
- Project Overview - Ron Short
- Component Design/Fabrication - Jay Cate
- RRP/RRVH Installation - John Brandeau
- Licensing - Tom Matthews 03/M004 11X 3FfP.
3 2
Project Goals
- Nuclear safety/quality o First time quality in everything we do
- Industrial safety o No one injured
- Improved plant performance o Reliability 03r.doM4 EL;G Chug $
Power Uprate Plans
- Plans currently indefinitely deferred
- Replacement components sized for up to 17% power uprate 03MO04 6 3
Meeting Objectives and Projects Summary Ron Short Manager - NSSS Refurbishment Project 03-004 § 7 Meeting Objectives
- Introduce project plans and team to NRC staff
- Provide overview of project responsibilities
- Provide overview of replacement component designs
- Provide summary of schedules
- Establish plans for additional meetings/
presentations 40;4
=SrZWL 4
Scope
- Replace Pressurizer - 2006 RFO
- Replace Reactor Vessel Head - 2006 RFO
- Install Rapid Refueling Package o New Missile and Neutron Shields in 2005 RFO (Phase 1) o Remainder in 2006 RFO (Phase 2)
-e on520 E90Aff 9 I Vendors Involved
- RSGs o Mitsubishi Heavy Industries (MHI): Design, Fabrication, and ,t Mitsubishi Delivery o Framatome ANP (Areva): _. =-
- t- =
Licensing/Safety Analysis o Bechtel: Installation
- RRVH o MHI: Design, Licensing, Fabrication, and Delivery 9 (Westinghouse is Licensing subcontractor) o TBD: Installation OWestinghouse OM2WW4 10 5
I Vendors Involved
- RPZR o MHI: Design, Licensing, Fabrication, and Delivery A, mitsubishi (Westinghouse is Design and Licensing subcontractor) o Bechtel: Installation
- RRP o Westinghouse: Phase 1 Design, Fabrication, and Installation o TBD: Phase 2 Design, OWestinghouse Licensing, Fabrication, and Installation
=5/2CO4 11 WWII I Schedule
- N-1 RFO: February 25 - April 21, 2005
- NSSS components delivery to FCS:
May 15,2006
- SGRO: September 8 - December 7, 2006 03,22004 12fi12 6
I Project Team
=522004 13 O25P2OO4 13 Component Design and Fabrication Jay Cate NSSS Component Lead 03/25d2004 14 7
NSSS Components - General
- Designed to ASME 1I1,1989 edition, no addenda
- Design and material enhancements MW2sn004 15 8
I Replacement Pressurizer (RPZR)
Fabrication/Design Features Safety Nozzle
- Safe End integrally Forged Nozzles -
Manway All Forged She" Components Improved Heater Sleeve Material Added Heater Sleeve Repair Pads Larger Support Skirt Access Holes Reduced Number of Heaters Safe End Surge Nozzle 032S004 17 I Replacement RV Head (RRVH)
Fabrication/Design Features Flange eliminated CEDM Penetrations (redundant below Graytoc penetrations removed)
One Piece - t iz UWtLug Forging Improvements Alloy 690 Penetration Weld - Alloy 690 Equivalent J-groove weld 03/2&2004 18
--- k1 9
NSSS Component Supplier Responsibilities
- Mitsubishi Heavy Industries (MHI) contracted to supply RSGs, RPZR, RRVH
+ Material procurement
- Delivery to Fort Calhoun 03=2W4
.e-0i 19 HERBM Major Sub-suppliers of MHI
. RPZR Design -Westinghouse
- Heavy Forgings - Japan Steel Works
- RSG Tubing - Sumitomo Metals Industries
. Various other forging/material/services sub-suppliers - all accepted under MHI Quality Assurance Program 5/2WO4 20 10
Component Installation Ron Bayer NSSS Installation Manager O3/251204 21 Component Installation 2 Phase Approach
- Phase 1 o Perform engineering studies to determine optimum installation method o Identify risks and propose mitigation o Identify "first of a kind" evolutions for further action
- Phase 2 o Perform detailed installation engineering o Perform detailed planning 03d2512004 # 11 22 11
Component Installation
- Maintenance Rule evaluations as appropriate
- Containment Opening o Similar to other plants o Complex process due to the helical tendon design and number of tendons o Octagon opening allows removal of the fewest tendons
-=5r2Y04 23 Component Installation
- Inside Lift System (ILS) o Used for SG movements
- Double Runway System o Outside rails
-l supports ILS o Inside rails used to transport components out of and in to Containment 03125r2004 24
- - W_F; 12
I Closing Containment Opening
- Reinstall Containment Liner
- Reinstall Tendon Sheathing
- Pour Concrete to Close Opening
- Code pressure testing 03d252004E 25 I RRP/RRVH Installation John Brandeau RRP/RRVH Installation Lead 03t25/2004 f,;pif 26 13
I RRP/RRVH Installation Before 200.5 Marve off00 MRAF 27 ThULI 27 RRP/RRVH Installation
- RRVH installed with rapid refueling enhancements o Retractable utility bridges, integral fans o Missile & neutron shield installation 2005 RFO o Concept similar to Seabrook, Wolf Creek, others
- RRVH largely assembled prior to 2006 RFO
- Limited laydown space in Containment o Difficult to reuse old components o Unique CEDM design (rack & pinion)
- OEM vendor (Westinghouse) as technical lead o325WOo4 F ' 28
/
I Licensing Approach Tom Matthews Projects Licensing Lead 031252004 29 Licensing Strategy
- Benchmarked with other licensees u 10 CFR 50.59 Evaluation approach for component replacements o Framatome-ANP (Areva), Westinghouse o Interface meetings
- Coordination with NRC o Frequent communications with NRC/NRR Project Manager o Schedule meetings with NRC o Allow time for licensing actions review
- Minor relief request(s) and TS changes anticipated 0-5/2004 30 15
License Amendment Requests
- Non-TS changes requiring NRC approval (per 50.59) have not been identified to date
- Technical Specifications Changes
- Table 1-1, Item 3 (Low Steam Generator Water Level RPS Trip Setpoint description) o 3.17 (SG tube inspection requirements)
- Revised requirements for new SGs o 4.3.1 (RCS volume)
OT252004 epp31 Relief Requests
Type A integrated leak rate testing of Containment Building o Precedents are North Anna and Surry RV Head replacements oaM2S2004 32 16
I Licensing Actions Schedule
- License Amendment Requests (TS changes) and any Code Relief Requests submitted to NRC for review no later than March 1, 2005
- NRC approvals by no later than July 1, 2006
- Individual vs. batch submittals 0,V2WW4 33 I Conclusion
- Plans for next meeting 03d25.2004 34 17