ML042190443

From kanterella
Revision as of 22:47, 16 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Request for Additional Information Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan
ML042190443
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 07/23/2004
From: Spaulding D
NRC/NRR/DLPM
To: Barron H
Duke Energy Corp
Spalding D, NRR/DLPM/LPD3-1, 415-2928
References
TAC MC2902, TAC MC2903, TAC MC2936, TAC MC2937, TAC MC2945, TAC MC2946, TAC MC2947
Download: ML042190443 (4)


Text

SAFEGUARDS INFORMATION July 23, 2004 Mr. Henry B. Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer Duke Energy Corporation P. O. Box 1006-EC07H Charlotte, NC 28201-1006 c/o Mr. David G. Black c/o Mr. W. T. Byers III c/o Mr. Terry King

SUBJECT:

WILLIAM B. MCGUIRE NUCLEAR STATION, UNITS 1 AND 2, CATAWBA NUCLEAR STATION, UNITS 1 AND 2, AND OCONEE NUCLEAR STATION, UNITS 1, 2 AND 3 - REQUEST FOR ADDITIONAL INFORMATION RE:

SAFEGUARDS CONTINGENCY PLAN AND SECTION 9.4.1 OF THE PHYSICAL SECURITY PLAN (TAC NOS. MC2936, MC2937, MC2902, MC2903, MC2945, MC2946, AND MC2947)

Dear Mr. Barron:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted a revised physical security plan, safeguards contingency plan, and training and qualification plan, including an implementation schedule, for William B. McGuire Nuclear Station, Units 1 and 2, Catawba Nuclear Station, Units 1 and 2, and Oconee Nuclear Station, Units 1, 2 and 3.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of your Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan. Please respond to the enclosed RAI within 10 days from the receipt of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-2743.

Sincerely, Deirdre W. Spaulding, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-369, 50-370, 50-413, 50-414, 50-269, 50-270, and 50-287

Enclosure:

As stated cc w/o encl: See next page NOTICE: The Enclosure contains Safeguards Information. Upon separation from the Enclosure, this letter is DECONTROLLED.

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION WARNING: Violation of Section 147 of the Atomic Energy Act, Safeguards Information is subject to Civil and Criminal Penalties SAFEGUARDS INFORMATION

July 23, 2004 Mr. Henry B. Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer Duke Energy Corporation P. O. Box 1006-EC07H Charlotte, NC 28201-1006 c/o Mr. David G. Black c/o Mr. W. T. Byers III c/o Mr. Terry King

SUBJECT:

WILLIAM B. MCGUIRE NUCLEAR STATION, UNITS 1 AND 2, CATAWBA NUCLEAR STATION, UNITS 1 AND 2, AND OCONEE NUCLEAR STATION, UNITS 1, 2 AND 3 - REQUEST FOR ADDITIONAL INFORMATION RE:

SAFEGUARDS CONTINGENCY PLAN AND SECTION 9.4.1 OF THE PHYSICAL SECURITY PLAN (TAC NOS. MC2936, MC2937, MC2902, MC2903, MC2945, MC2946, AND MC2947)

Dear Mr. Barron:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted a revised physical security plan, safeguards contingency plan, and training and qualification plan, including an implementation schedule, for William B. McGuire Nuclear Station, Units 1 and 2, Catawba Nuclear Station, Units 1 and 2, and Oconee Nuclear Station, Units 1, 2 and 3.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of your Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan. Please respond to the enclosed RAI within 10 days from the receipt of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-2743.

Sincerely,

/RA/

Deirdre W. Spaulding, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-369, 50-370, 50-413, 50-414, 50-269, 50-270, and 50-287

Enclosure:

As stated cc w/o encl: See next page DISTRIBUTION:

SPRT R/F RidsNsirDns RidsNrrDlpm OGC ACRS L. Olshan, J. Shea, S. Peters S. Coffin (A) E. Hackett V. McCree, RII ADAMS Accession Number: ML042190443 OFFICE SPRT/NRR/PM SPRT/NRR/LA SPRT/NSIR SPRT/NRR/SC NAME DWSpaulding CHawes JPeralta JNakoski DATE 7/23/04 7/23/04 7/24/04 7/23/04 OFFICIAL RECORD COPY

McGuire Nuclear Station Catawba Nuclear Station Oconee Nuclear Station cc:

Ms. Lisa F. Vaughn Mr. T. Richard Puryear Duke Energy Corporation Owners Group (NCEMC)

Mail Code - PB06E Duke Energy Corporation 422 South Church Street 4800 Concord Road P.O. Box 1244 York, South Carolina 29745 Charlotte, North Carolina 28201-1244 Henry Barron County Manager of Mecklenburg County Group Vice President, Nuclear Generation 720 East Fourth Street and Chief Nuclear Officer Charlotte, North Carolina 28202 P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. C. Jeffrey Thomas Regulatory Compliance Manager Lee Keller, Manager Duke Energy Corporation Regulatory Compliance McGuire Nuclear Site Duke Energy Corporation 12700 Hagers Ferry Road 4800 Concord Road Huntersville, North Carolina 28078 York, South Carolina 29745 Anne Cottingham, Esquire North Carolina Municipal Power Winston and Strawn Agency Number 1 1400 L Street, NW 1427 Meadowwood Boulevard Washington, DC 20005 P.O. Box 29513 Raleigh, North Carolina 27626 Senior Resident Inspector c/o U.S. Nuclear Regulatory Commission County Manager of York County 12700 Hagers Ferry Road York County Courthouse Huntersville, North Carolina 28078 York, South Carolina 29745 Dr. John M. Barry Piedmont Municipal Power Agency Mecklenburg County 121 Village Drive Department of Environmental Greer, South Carolina 29651 Protection 700 N. Tryon Street Karen E. Long Charlotte, North Carolina 28202 Assistant Attorney General North Carolina Department of Justice Mr. Peter R. Harden, IV P.O. Box 629 VP-Customer Relations and Sales Raleigh, North Carolina 27602 Westinghouse Electric Company 6000 Fairview Road, 12th Floor NCEM REP Program Manager Charlotte, North Carolina 28210 4713 Mail Service Center Raleigh, North Carolina 27699-4713 Mr. Richard M. Fry, Director Division of Radiation Protection North Carolina Electric Membership Corp.

North Carolina Department of P.O. Box 27306 Environment, Health and Natural Raleigh, North Carolina 27611 Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721

McGuire Nuclear Station Catawba Nuclear Station Oconee Nuclear Station cc:

Senior Resident Inspector U.S. Nuclear Regulatory Commission 4830 Concord Road York, South Carolina 29745 Mr. Michael A. Schoppman Henry Porter, Assistant Director Framatome ANP Division of Waste Management 1911 North Ft. Myer Drive Bureau of Land and Waste Management Suite 705 Dept. of Health and Environmental Control Rosslyn, VA 22209 2600 Bull Street Columbia, South Carolina 29201-1708 Mr. B.G. Davenport Regulatory Compliance Manager Mr. R.L. Gill, Jr., Manager Oconee Nuclear Site Nuclear Regulatory Issues Duke Energy Corporation and Industry Affairs ON03RC Duke Energy Corporation 7800 Rochester Highway 526 South Church Street Seneca, South Carolina 29672 Mail Stop EC05P Charlotte, North Carolina 28202 Mr. Ronald A. Jones Vice President, Oconee Site Saluda River Electric Duke Energy Corporation P.O. Box 929 7800 Rochester Highway Laurens, South Carolina 29360 Seneca, SC 29672 Mary Olson Director of the Southeast Office Nuclear Information and Resource Service 729 Haywood Road, 1-A P.O. Box 7586 Asheville, North Carolina 28802 Dhiaa M. Jamil Vice President Catawba Nuclear Station Duke Energy Corporation 4800 Concord Road York, South Carolina 29745-9635 Manager, LIS NUS Corporation 2650 McCormick Drive, 3rd Floor Clearwater, Florida 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, South Carolina 29672