MONTHYEARML24197A2302024-07-15015 July 2024 Request for Additional Information - Oconee SLRA - Annual Update ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24190A0462024-07-0505 July 2024 Notification of Inspection and Request for Information ML24086A3772024-03-26026 March 2024 Request for Additional Information License Amendment Request to Revise Technical Specification 5.5.2 ML23284A3322023-10-11011 October 2023 Request for Additional Information Alternative Request (RA-22-0174) (L-2022-LLR-0060) ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23156A2452023-06-0505 June 2023 Audit Summary and RAI-RCI - Revised Enclosure ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23095A0052023-04-0404 April 2023 002 Radiation Safety Baseline Inspection Information Request ML23086C0362023-03-27027 March 2023 Request for Additional Information Steam Generator Tube Inspection Report (03R31) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23038A1832023-02-0707 February 2023 Request for Additional Information Alternative Request (RA-22-0174) to Use ASME Code Case N-752 ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final ML22251A2902022-09-0808 September 2022 Request for Additional Information Additional Mode Change Limitations Applicable to the Adoption of Technical Specifications Tasks Force Traveler (TSTF) No. 359, Revision 9 ML22234A0052022-08-30030 August 2022 SLRA - Feedback for RAI B2.1.7-4a to Duke - August 16, 2022 ML22157A0042022-06-0606 June 2022 10 CFR 50.59 Inspection Initial Information Request ML22157A0012022-06-0101 June 2022 Email from NRC (Angela Wu) to Duke (Paul Guill) - Oconee SLRA - Additional NRC Comments on RAI 4.6.1-1a ML22154A2122022-06-0101 June 2022 SLRA - 2nd Round RAI B2.1.7-4b ML22124A1632022-05-0303 May 2022 (Public) Oconee SLRA - 2nd Round RAI B2.1.7-4a ML22124A1612022-05-0303 May 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B2.1.7-4a ML22122A0182022-04-28028 April 2022 Attachment: Oconee SLRA - 2nd Round RAI B2.1.9-2a ML22122A0192022-04-28028 April 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B2.1.9-2a ML22122A1312022-04-27027 April 2022 (Public) Oconee SLRA - 2nd Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.6 Redacted ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22112A0072022-04-20020 April 2022 Email from Marieliz Johnson (NRC) to Steve Snider (Duke) - Oconee SLRA - Request for Confirmation of Information 3.5.2.2.2.6-L ML22113A0092022-04-20020 April 2022 Attachment: Oconee SLRA - Final RAI 3.1.2-1 ML22081A0062022-03-21021 March 2022 Attachment: Oconee SLRA - 2nd Round RAI B4.1-3 ML22081A0052022-03-21021 March 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B4.1-3 ML22080A0772022-03-16016 March 2022 SLRA - RAI Set 4 (2nd Round Rais) ML22069A0012022-03-0808 March 2022 Attachment: Oconee SLRA - Final Requests for Confirmation of Information - Set 4 ML22063A4502022-03-0404 March 2022 Request for Additional Information Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump RA-22-0036, Responses to NRC Request for Additional Information Set 22022-02-14014 February 2022 Responses to NRC Request for Additional Information Set 2 ML22019A1032022-01-18018 January 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - Requests for Additional Information - Set 3 ML22019A2442022-01-18018 January 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000269/2022010, 05000270/2022010, 05000287/2022010) and Request for Information (RFI) ML22019A1042022-01-18018 January 2022 Attachment: Oconee SLRA - Final Requests for Additional Information - Set 3 ML22012A0422022-01-11011 January 2022 SLRA - Final Requests for Additional Information - Set 2 ML22010A1132022-01-0505 January 2022 SLRA - RCIs - Set 3 ML21333A0392021-11-29029 November 2021 RP Inspection Document Request ML21327A2782021-11-23023 November 2021 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - Final RAIs (Set 1 and 2nd Round RAI B2.1.27-1a) ML21327A2792021-11-23023 November 2021 SLRA - Final Requests for Additional Information - Set 1 ML21327A2802021-11-23023 November 2021 SLRA - Final 2nd Round RAI - RAI B2.1.27-1a ML21330A0192021-11-23023 November 2021 Attachment: Oconee SLRA - Final Requests for Confirmation of Information - Set 2 ML21313A2342021-11-0404 November 2021 Attachment: Oconee SLRA - Final Requests for Confirmation of Information - Set 1 ML21274A0682021-10-0101 October 2021 Request for Additional Information Alternative Request (RA-20-0334) Regarding Use of an Alternative to the ASME Code Case N-853 Acceptance Criteria ML21273A0492021-09-30030 September 2021 Request for Additional Information Alternative Request (ON-RPI-OMN-28) to Use Code Case OMN-28 ML21271A5892021-09-28028 September 2021 SLRA - RAI B2.1.27-1 (Draft) ML21271A5902021-09-28028 September 2021 SLRA - RAI B2.1.27-1 (Final) ML21271A5882021-09-22022 September 2021 SLRA - Request for Additional Information B2.1.27-1 - Email from Angela Wu (NRC) to Steve Snider (Duke) ML21217A1912021-08-0505 August 2021 Request for Additional Information Alternative Request (RA-20-0334) Regarding Use of an Alternative to the ASME Code Case N-853 Acceptance Criteria 2024-07-05
[Table view] |
Text
1 Oconee SLRA - TRP 16 (PWR Vessel Internals) - Feedback for Response to RAI B2.1.7-4a
[NOTE: The page numbers in the draft response of 8/5/2022 are non-consecutive and do not start with 1; thus the references below are to the PDF page number.]
Sufficient Examination Coverage for 100% Coverage The following inspection coverage terminology is unclear to the staff:
(a) Page 7: the term 100% as used herein is to be consistent with ASME Section XI, 2017 Edition, Subarticle S-2300... during performance of a preservice or inservice examination essentially 100% coverage is required of the examination surface for surface or visual examination or of the examination volume for volumetric examination (b) Page 8: Consistent with the Oconee ASME Section Inservice Inspection, Subsections IWB, IWC, and IWD AMP, which requires essentially 100% coverage, any reduction in coverage during the SPEO shall be addressed through 10 CFR 50.12.
A quantitative meaning of the term essentially 100% coverage is not provided in either the RAI response, the cited AMP or ASME Section XI, 2017 Edition, Subarticle S-2300.
The staff notes that ASME Section XI, 2017 Edition, Paragraph IWA-2200(c), states, Essentially 100% coverage is achieved when the applicable examination coverage is greater than 90%.
Corrective Actions for < 100% Weld Inspection Coverage The inspection coverage basis (page 7): For the proposed core barrel cylinder weld inspections during the SPEO, any limitations to the examination coverage shall be addressed through the exemption process in accordance with 10 CFR 50.12 consistent with the ASME Section XI requirements for the Oconee Nuclear Station.
Since 10 CFR 50.12 regulatory exemption criteria do not appear to apply (e.g., there is no regulation that would require this inspection for which exemption would be necessary), what regulatory process would be used for Duke to submit an alternative weld coverage criterion for staff approval if (upon completion of the CB Primary weld inspections) the applicable essentially 100% weld coverage criterion is not met for the Primary weld type?
Should the weld coverage criterion (and the examination schedule) be addressed as an enhancement to the program?
2 Core Barrel Weld Examination Schedule Clarification on inspection schedule terminology no later than two refueling outages from the beginning of the license renewal period. [e.g., PDF pages 7, 24, 25.]
Is this to be interpreted as meaning at least two refueling outage prior to entering into the subsequent period of extended operation or within two refueling outages from the date of entering into the subsequent period of extended operation?
The staff notes:
If the core barrel circumferential welds had been appropriately identified as accessible in MRP-227-A (instead of inaccessible), these welds would have been inspected at ONS at least one time already and 2X prior to SPEO.
The lack of inspection data for these Primary category welds at ONS (or any other B&W design plant) increases the uncertainty regarding the condition of the core barrel welds prior to entering the SPEO.
Under Consideration:
The staff is considering an additional license condition regarding the inspection of essentially 100% of the Primary category core barrel circumferential welds at ONS Unit 2 prior to entry to the SPEO.