ML043520229

From kanterella
Revision as of 10:18, 15 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
November 2004 Monthly Operating Report for Callaway Unit 1
ML043520229
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/08/2004
From: Keith Young
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC05103
Download: ML043520229 (4)


Text

AmerenUE PO Box 620 CallawayPlant Fulton, MO 05251 December 8, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC05 103 Ladies & Gentlemen:

wAmeren DOCKET NUMBER 50-483 UNION ELECTRIC CO.

UF CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT November/2004 The enclosed Monthly Operating Report for November/2004 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.

Mngr D.Young Manager, Regulatory Affairs KDY/ENVH/slk Enclosure

' 1_r a subsidiary ofAmeren Corporation

ULNRC05103 December 8, 2004 Page 2 cc: Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 65102-0360

Enclosure ULNRC05 103 December 8, 2004 DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I COMPLETED BY: E. Henson TELEPHONE: 573/676-8848 FAX: 573/676-4202 REPORTING PERIOD: November/2004 I. DESIGN ELECTRICAL RATING (MWe-Net): 1171

2. MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 720 6188.57 156,134.57
4. HOURS GENERATOR ON-LINE 720 6,113.02 154,107.02
5. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GENERATED (MWH) 839,923 6,968,442 170,212,281 Page I of 2

Enclosure ULNRC05 103 December 8, 2004 UNIT SHUTDOWNS DOCKET NO.: 50483 UNIT NAME: CALLA WAY UNIT I COMPLETED BY: E. Henson TELEPHONE: 573/676-8848 FAX: 573/676-4202 REPORT: November /2004 TYPE METHOD OF CORRECTIVE F: FORCED DURATION SHUTTING DOWN ACTIONS/

NO. DATE S: SCHEDULED (HOURS) REASON THE REACTOR COMMENTS

SUMMARY

Callaway Plant operated at approximately 100% power for the month of November.

REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4. CONTINUATION E: OPERATOR TRAINING / LICENSE EXAMINATION 5: OTHER (EXPLAIN)

F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

Page 2 of 2