MONTHYEARIR 05000413/20230042024-02-0202 February 2024 Integrated Inspection Report 05000413-2023004 and 05000414-2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined IR 05000413/20230012023-05-0505 May 2023 Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20234012023-03-0101 March 2023 Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations IR 05000413/20224032022-11-17017 November 2022 Cyber Security Inspection Report 05000413/2022403 and 05000414/2022403 (Public) ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22319A0942022-11-10010 November 2022 EN 56219 - Flowserve. 10 CFR Part 21 Report 38878-8 Solenoid Valve at Duke, Catawba Flowserve Evaluation 105 IR 05000414/20220032022-10-31031 October 2022 Integrated Inspection Report 05000414/2022003 and 05000414/2022003 IR 05000413/20224022022-10-28028 October 2022 Security Baseline Inspection Report 05000413 2022402 and 05000414 2022402 ML22297A2642022-10-25025 October 2022 Project Manager Assignment ML22276A2492022-10-25025 October 2022 Completion of License Renewal Commitment No. 10, Aging Management of Environmentally Assisted Fatigue ML22303A0052022-10-24024 October 2022 EN 56178 - Tioga Final. LTR-TP-22-29 2021 10CFR Part 21 Improper Notification of NRC ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22303A0042022-08-31031 August 2022 Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Supply of 6 NPS Sch. 40 Seamless Stainless-Steel Pipe; Manufacturer: Maxim Tubes Company Pvt. Ltd.; Heat No: N200309AW01, SR No: 7; 9 Pcs; 180 Feet Total Procured as Unquali IR 05000413/20220052022-08-26026 August 2022 Updated Inspection Plan for Catawba Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000413/2022005 and 05000414/2022005 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) IR 05000413/20220022022-07-29029 July 2022 Integrated Inspection Report 05000413/2022002 and 05000414/2022002 IR 07200045/20220012022-07-26026 July 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200045/2022001 ML22215A2502022-07-25025 July 2022 EN 55960 - Update - Curtiss Wright IR 05000413/20220102022-07-21021 July 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000413/2022010 and 05000414/2022010 ML22195A2432022-07-19019 July 2022 Request for Withholding Information from Public Disclosure Regarding Reactor Vessel Closure Head Repair Alternative ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22199A2552022-07-0606 July 2022 Ds Catawba 2022 RQ Inspection Notification Letter ML22222A0092022-07-0101 July 2022 EN 55974 - Flowserve, Part 21 Report Re Solenoid Coil Failure of Model 38878-8 Solenoid Valve at Catawba Nuclear Station for Use on FWIV Actuator ML22175A0342022-06-28028 June 2022 Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000413/2022403 and 05000414/2022403 ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22111A3572022-05-16016 May 2022 Letter Issuing Exemption to Catawba IR 05000414/20220012022-04-28028 April 2022 Integrated Inspection Report 05000413/ 2022001 and 05000414/2022001 2024-02-02
[Table view] Category:Meeting Notice
MONTHYEARML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 PMNS20230332, and Oconee Nuclear Station Annual Assessment Meeting for 20222023-03-30030 March 2023 and Oconee Nuclear Station Annual Assessment Meeting for 2022 PMNS20221105, Pre-submittal Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Catawba Nuclear Station, Units 1 and 22022-10-25025 October 2022 Pre-submittal Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Catawba Nuclear Station, Units 1 and 2 PMNS20220375, Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve2022-04-19019 April 2022 Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve PMNS20220232, and Oconee Nuclear Station Annual Assessment Meeting for 20212022-03-10010 March 2022 and Oconee Nuclear Station Annual Assessment Meeting for 2021 PMNS20211387, Pre-application Meeting with Duke Energy Carolinas to Discuss Relief Request Related to the Reactor Vessel Closure Head Nozzle Repair for Catawba Nuclear Station Unit 22021-10-25025 October 2021 Pre-application Meeting with Duke Energy Carolinas to Discuss Relief Request Related to the Reactor Vessel Closure Head Nozzle Repair for Catawba Nuclear Station Unit 2 PMNS20211019, Pre-application Meeting with Duke Energy Carolinas to Discuss a Revision to the end-of-cycle Moderator Temperature Coefficient Measurement Methodology for Catawba and McGuire Nuclear Stations2021-08-0303 August 2021 Pre-application Meeting with Duke Energy Carolinas to Discuss a Revision to the end-of-cycle Moderator Temperature Coefficient Measurement Methodology for Catawba and McGuire Nuclear Stations PMNS20210274, Stations Annual Assessment Meeting2021-03-31031 March 2021 Stations Annual Assessment Meeting PMNS20201240, Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes2020-10-22022 October 2020 Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes ML14076A1192014-03-17017 March 2014 Notice Public Meeting to Provide the Annual Assessment of the Catawba Nuclear Station and to Discuss NRC Reactor Oversight Process ML14066A0732014-03-0707 March 2014 Notice of Category 3 Public Meeting/Open House to Discuss Annual Assessment of Catawba Nuclear Station ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC ML13136A0562013-05-16016 May 2013 7/23-24/2013 Notice of Public Meeting Announcement with All Region II Licensees, Initial Examination Writers' Workshop ML13135A5962013-05-16016 May 2013 Cancelled 05/23/2013 Notice of Forthcoming Pre-Application Meeting with Duke Energy Carolinas, Llc. to Discuss a Proposed License Amendment Request Concerning Methodology Report DPC-NE-3001-P for Catawba and McGuire Nuclear Stations ML13127A4352013-05-0909 May 2013 Notice of Forthcoming Pre-Application Meeting with Duke Energy Carolinas, Llc. to Discuss a Proposed License Amendment Request Concerning Methodology Report DPC-NE-3001-P for Catawba and McGuire Nuclear Stations ML13094A4202013-04-0404 April 2013 Meeting Notice with Public Forum to Discuss the NRC Reactor Oversight Process and the Annual Assessment of the Catawba Nuclear Station ML13072B2022013-03-19019 March 2013 Meeting Notice with Duke Energy Concerning NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants License Amendment Request for Catawba, McGuire, and H. B. Robinson ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12284A4612012-10-12012 October 2012 Forthcoming Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-Design-Basis External Events ML12221A2612012-08-0707 August 2012 09/25-26/2012 Noticeo of Meeting Announcement - 2012 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers' Workshop ML1115403882011-06-0202 June 2011 08/02-03/2011 Meeting Announcement - 2011 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers Workshop ML1108006362011-03-21021 March 2011 Notice of Public Meeting with Catawba Nuclear Station to Discuss the NRC Reactor Oversight Process and Annual Assessment ML1106603302011-03-0707 March 2011 Notice of Meeting with Duke Energy to Present Status of Licensing Submittals Regarding Implementation of National Fire Protection Association Standard 805, Requirements at Catawba Nuclear Station, Units 1 and 2 and McGuire Nuclear Station ML1029306502010-10-20020 October 2010 Notice of Forthcoming Conference Call with Duke Energy Carolinas, LLC Regarding McGuire Nuclear Station, Units 1 and 2 and Catawba Nuclear Station, Units 1 and 2, ML1021400692010-08-0404 August 2010 Notice of Meeting with Duke Energy to Discuss Duke Energy'S Assessment of the Results of the Catawba Baseline Inspection Conducted by the NRC ML1015501432010-06-0404 June 2010 08/17-18/2010 Meeting Announcement - 2010 NRC Initial Exam Writers Workshop ML1012604632010-05-0707 May 2010 Notice of Forthcoming Conference Call with Duke Energy Carolinas, LLC (Duke) to Discuss Duke'S Responses to Generic Letter 2004-02 at Catawba 1 and 2 and McGuire 1 and 2 ML1009202702010-04-0202 April 2010 Notice of Public Meeting with Catawba to Discuss NRC Reactor Oversight Process and Annual Assessment ML0922908922009-08-18018 August 2009 Notice of Conference Call with Duke Energy Carolinas, LLC (Duke), Regarding Catawba Nuclear Station, Units 1 and 2 (Catawba 1 and 2) and McGuire Nuclear Station Units 1 and 2 ML0918004532009-06-29029 June 2009 Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development Workshop ML0909702182009-04-0606 April 2009 EOC Public Meeting Notice ML0831009482008-11-10010 November 2008 Notice of Meeting with Duke Energy Carolinas, LLC, (Duke), Catawba, Units 1 and 2, and McGuire, Units 1 and 2 ML0831107952008-11-0606 November 2008 Cancellation of Meeting with Duke Energy Carolinas, LLC, to Discuss the Request for Additional Information Generic Letter 2004-04, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents. ML0829701832008-10-30030 October 2008 Notice of Meeting with Duke Energy Carolinas, LLC, to Discuss the Request for Additional Information Generic Letter 2004-04, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents ... ML0819806712008-07-16016 July 2008 Notice of Public Meeting with Catawba to Discuss Current Plant Performance, Current Challenges, and Future Plans ML0819600282008-07-11011 July 2008 08/05-06/2008-Notice of Meeting - 2008 Us Nuclear Regulatory Commission Initial Examination Development Workshop ML0818301542008-07-0101 July 2008 Notice of Meeting with Duke Energy Carolinas, LLC to Discuss Transition to ASME NQA-1-1994 ML0807700512008-03-17017 March 2008 Notice of Catawba 2007 End of Cycle Public Meeting to Discuss the NRC Reactor Oversight Process Annual Assessment of Catawba ML0800202162008-01-0303 January 2008 Forthcoming Meeting with Duke Power Company LLC Catawba Nuclear Station to Discuss the Relief Request Dated October 26, 2006 (Agencywide Documents Access and Management System Accession No. ML063120211) ML0800201632008-01-0303 January 2008 Cancelled - Meeting with Duke Power Company ML0736102262007-12-28028 December 2007 Notice of Meeting with Duke Power Company to Discuss the Relief Request Dated 10/26/2006 That Proposes the Use of Polyethylene Material in Nuclear Safety-Related Piping Applications ML0733711662007-12-0303 December 2007 Notice of Meeting with Progress Energy & Duke Energy Regarding Fire Probabilistic Risk Assessment for the Pilot Plants Transitioning to the National Fire Protection Association Standard NFPA 805 ML0713706072007-05-17017 May 2007 Notice of Meeting for NRC Training Managers' Conference Hosting by Rgn II ML0708002012007-03-21021 March 2007 Notice of Meeting with Duke Energy Carolinas, LLC, to Discuss the NRC Reactor Oversight Process Annual Assessment for Catawba ML0704400362007-02-12012 February 2007 Notice of Forthcoming Meeting with Duke Power Company to Discuss Proposed License Request for Post-Accident Water Management at Catawba ML0618700742006-07-0505 July 2006 and 07/20/2006 Meeting Announcement 2006 NRC Initial Exam Development Workshop to Clarify the Exam Development Process and Question Development for Both the Written and Operating Portion of the Initial Examination ML0614603682006-05-26026 May 2006 Notice of Public Augmented Inspection Team (AIT) Exit Meeting to Present the Results of the AIT Inspection Conducted for the Loss of Offsite Power and Dual Unit Reactor Trip Event at Catawba Nuclear Station on May 20, 2006 ML0608200942006-03-22022 March 2006 Errata Letter for Public Meeting Announcement Catawba Nuclear Station ML0607600072006-03-16016 March 2006 Notice of Public Meeting with Duke Energy Corporation to Discuss the NRC Reactor Oversight Process Annual Assessment for Catawba ML0533900722005-12-0707 December 2005 Notice of Forthcoming Meeting with Duke Energy Corporation, to Discuss Reload Design and Safety Analysis Methodology Report Submittals 2023-06-13
[Table view] |
Text
March 22, 2006 Duke Energy Corporation ATTN: Mr. D. M. Jamil Site Vice President Catawba Nuclear Station 4800 Concord Road York, SC 29745
SUBJECT:
ERRATA LETTER FOR
PUBLIC MEETING ANNOUNCEMENT
CATAWBA NUCLEAR STATION DOCKET NOS. 50-413, 50-414, 72-45
Dear Mr. Jamil:
This letter is being sent to you to correct an error in the cover letter to our meeting announcement dated March 16, 2006, for the public Annual Assessment Meeting. In that letter, we incorrectly referred to your Catawba Nuclear Station as the Catawba Electric Generating Plant. Please replace the original cover letter with the enclosed corrected cover letter. We apologize for any resulting inconvenience.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact Mr. Curtis Rapp at (404) 562-4674.
Sincerely,
/RA/
Michael E. Ernstes, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414, 72-45 License Nos.: NPF-35, NPF-52
Enclosures:
- 1. Errata Sheet
- 2. Meeting Announcement Amended Cover Page cc w/encls: (See page 2)
DEC 2 cc w/encls:
Randy D. Hart Membership Corporation Regulatory Compliance Manager Electronic Mail Distribution Duke Energy Corporation Electronic Mail Distribution Peggy Force Assistant Attorney General Lisa Vaughn N. C. Department of Justice Associate General Counsel Electronic Mail Distribution Duke Energy Corporation 526 South Church Street County Manager of York County, SC Mail Code EC 07H Electronic Mail Distribution Charlotte, NC 28202 Piedmont Municipal Power Agency Timika Shafeek-Horton Electronic Mail Distribution Assistant General Counsel Duke Energy Corporation R. L. Gill, Jr., Manager 526 South Church Street-EC07H Nuclear Regulatory Issues Charlotte, NC 28202 and Industry Affairs Duke Energy Corporation David A. Repka 526 S. Church Street Winston & Strawn LLP Charlotte, NC 28201-0006 Electronic Mail Distribution Email Distribution w/encls: (See page 3)
North Carolina MPA-1 Electronic Mail Distribution Henry J. Porter, Asst. Director Div. of Radioactive Waste Mgmt.
S. C. Department of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.
S. C. Department of Health and Environmental Control Electronic Mail Distribution Elizabeth McMahon Assistant Attorney General S. C. Attorney General's Office Electronic Mail Distribution Vanessa Quinn Federal Emergency Management Agency Electronic Mail Distribution North Carolina Electric
OFFICE RII:DRP SIGNATURE CWR1 NAME CRapp DATE 03/22/2006 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO March 16, 2006 Duke Energy Corporation ATTN: Mr. D. M. Jamil Site Vice President Catawba Nuclear Station 4800 Concord Road York, SC 29745
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING CATAWBA NUCLEAR STATION DOCKET NOS. 50-413, 50-414, 72-45
Dear Mr. Jamil:
This letter confirms the conversation between Ms. Sandra McGee, of your staff, and Mr. Eugene Guthrie, of this office, concerning a Category 1 meeting which has been scheduled for April 26, 2006, at 1:00 p.m. The meeting notice, which provides additional details, is enclosed. The purpose of the meeting is to discuss the NRC Reactor Oversight Process Annual Assessment of your Catawba Electric Generating Plant.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact Mr. Curtis Rapp at (404) 562-4674.
Sincerely,
/RA/
Michael E. Ernstes, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414, 72-45 License Nos.: NPF-35, NPF-52
Enclosure:
As stated cc w/encl.: (see page 2)
Enclosure 1
March 16, 2006 Duke Energy Corporation ATTN: Mr. D. M. Jamil Site Vice President Catawba Nuclear Station 4800 Concord Road York, SC 29745
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING CATAWBA NUCLEAR STATION DOCKET NOS. 50-413, 50-414, 72-45
Dear Mr. Jamil:
This letter confirms the conversation between Ms. Sandra McGee, of your staff, and Mr. Eugene Guthrie, of this office, concerning a Category 1 meeting which has been scheduled for April 26, 2006, at 1:00 p.m. The meeting notice, which provides additional details, is enclosed. The purpose of the meeting is to discuss the NRC Reactor Oversight Process Annual Assessment of your Catawba Nuclear Station.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact Mr. Curtis Rapp at (404) 562-4674.
Sincerely,
/RA/
Michael E. Ernstes, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414, 72-45 License Nos.: NPF-35, NPF-52
Enclosure:
As stated cc w/encl.: (see page 2)
Enclosure 2