ML20040D379

From kanterella
Revision as of 03:39, 14 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 81-020/03L-0:on 811219,frozen Sensing Line Caused High Indication of Steam Generator Pressure Instrument 1PT-482. Caused by Incomplete Insulation of Line & by Cold Weather. Instrument Placed in Tripped Position & Tubing Thawed
ML20040D379
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 01/18/1982
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20040D377 List:
References
LER-81-020-03L, LER-81-20-3L, NUDOCS 8202010238
Download: ML20040D379 (2)


Text