Category:Meeting Summary
MONTHYEARML19317D0762019-11-18018 November 2019 Summary of Meeting Near Vermont Yankee Power Station Regarding Establishment and Opration of Community Advisory Boards ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML17173A7672017-07-28028 July 2017 Summary of 6/20/2017 Meeting with Entergy to Discuss Plan for Decommissioning Licensing Actions of Palisades, Pilgrim, Indian Point, Units 2 and 3, and Vermont Yankee ML17192A3752017-05-25025 May 2017 Summary of Vermont Nuclear Decommissioning Citizens Advisory Panel Public Meeting of May 25, 2017 ML17031A2772017-02-0101 February 2017 January 24, 2017, Summary of NRC Public Meeting on the Proposed License Transfer of Vermont Yankee for Decommissioning ML15068A2672015-03-0909 March 2015 Summary of Meeting with Vermont Yankee and the Public Webinar Regarding the Decommissioning of Vermont Yankee ML14154A4422014-06-0303 June 2014 Summary of Annual Assessment Meeting for Vermont Yankee Nuclear Power Station on 5/28/14 ML13181A0062013-07-0303 July 2013 6/12/13 Summary of Conference Call with Entergy Nuclear Operations, Inc. to Discuss Draft Requests for Additional Information for Vermont Yankee NRC Order Number EA-12-049 Related to Mitigation Strategies ML13127A0372013-05-0606 May 2013 4/30/13 - Summary of Annual Assessment Meeting with Vermont Yankee ML12333A2222012-11-30030 November 2012 Summary of Pre-Application Meeting with Entergy Nuclear Operations, Inc., Regarding the Proposed License Amendment Request to Revise the Vermont Yankee Licensing Basis for Station Blackout Diesel Generator ML12156A1572012-06-0404 June 2012 2011 Annual Assessment Meeting Summary ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML1118613262011-07-0505 July 2011 Summary of the June 22, 2011 Annual Assessment Public Meeting ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML1110401712011-04-27027 April 2011 04/5/2011 Summary of Preapplication Meeting with Entergy Operations, Inc. to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1022204552010-08-10010 August 2010 Summary of Vermont Yankee Annual Assessment Open House and Public Meeting ML1022204782010-08-10010 August 2010 Summary of the July 14, 2010 Roundtable Meeting with Representatives of Stakeholder and Public Interest Groups Regarding Vermont Yankee ML1011100082010-04-21021 April 2010 Summary of Public Meeting to Discuss the Results of Entergy Nuclear Plant Safety Culture Workplace Survey ML1006802992010-03-0303 March 2010 Transcript of 2.206 Petition Vermont Yankee and Raymond Shadis Teleconference Dated March 3, 2010. Pages 1-30 ML0916304732009-06-17017 June 2009 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Discuss a Proposed License Amendment for the Use of a Fiber-Reinforced Polymer (FRP) System ML0908603802009-05-0808 May 2009 Audit Summary Regarding the Vermont Yankee Nuclear Power Station License Renewal Application ML0835100522008-12-0101 December 2008 Summary of October 14, 2008 Vermont Yankee Cooling Tower Special Inspection Public Meeting, Dated 12/01/08 ML0815601802008-05-29029 May 2008 Summary of Annual Assessment Meeting with Entergy Nuclear Operations, Inc ML0805202692008-02-29029 February 2008 02/01/2008 Summary of Telephone Conference Call Between the NRC & Entergy Nuclear Operations, Inc., Concerning Confirmatory Analysis Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0802205082008-01-31031 January 2008 01/08/2008 Summary of Meeting Between the NRC Staff and Entergy Nuclear Operations, Inc. to Discuss the Response to a Request for Additional Information Pertaining to the Vermont Yankee License Renewal ML0803501662008-01-15015 January 2008 (PA-LR) Draft January 8, 2008 NRC-VY/Entergy Meeting Summary ML0736104692008-01-0202 January 2008 Summary of Telephone Conf Call Held on 10/23/07 Between NRC and Entergy Nuclear Operations Concerning Audit Questions Pertaining to the Vermont Yankee Nuclear Power Station LRA ML0736501182007-12-21021 December 2007 (PA-LR) 12/18 Meeting Summary and Draft RAI ML0733001522007-11-26026 November 2007 Summary of Telephone Conference Call Held on October 16, 2007, Between U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Audit Questions Pertaining to the Vermont Yankee Nuclear Power Station License Renewa ML0733902012007-11-19019 November 2007 (PA-LR) 10/16/2007 Summary of Telephone Conference Call Between NRC and Entergy Nuclear Operations, Inc., Concerning Audit Questions Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0731101582007-11-16016 November 2007 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Requests for Additional Information Pertaining to Vermont Yankee ML0730202072007-11-16016 November 2007 Summary of Telephone Conference Call Held on September 14, 2007, Between the NRC and Entergy Nuclear Operations, Inc., Concerning a Request for Additional Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Ap ML0731803742007-11-16016 November 2007 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Audit Questions Pertaining to the Vermont Yankee Nuclear Power Station LRA ML0729200762007-10-25025 October 2007 08/20/2007 Summary of Telephone Conference Call with Entergy Nuclear Operation, Inc., Concerning License Renewal Application ML0733811982007-10-24024 October 2007 (PA-LR) 08/27/2007 and 09/15/2007 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning a Draft Request for Additional Information Pertaining to the Vermont Yank ML0733811942007-10-24024 October 2007 (PA-LR) 10/20/07 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Vermont Yankee Nuclear Power Station License Renewal Application ML0726300102007-10-0101 October 2007 08/13/2007 Summary of Meeting with Entergy Nuclear Operation, Inc., Representatives Re License Renewal Application ML0727403852007-09-18018 September 2007 (PA-LR) 8/17 Summary of Telephone Conference - August 17, 2007, Between the NRC and Entergy Nuclear Operations, Inc., Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0723601112007-09-0505 September 2007 08/08/2007 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0722703942007-08-28028 August 2007 Summary of Telephone Conference Call Held on August 1, 2007, Between the Us NRC and Entergy Nuclear Operations, Inc., Concerning New Information Pertaining to the Vermont Yankee Nuclear Power Station, License Renewal Application ML0727403672007-08-23023 August 2007 (PA-LR) 08/08 Teleconference Letter Comments ML0727403862007-08-23023 August 2007 (PA-LR) August 8 Call Summary ML0724705292007-08-20020 August 2007 (PA-LR) Review and Response ML0724705342007-08-0101 August 2007 (PA-LR) Call Summaries for Your Review and Comment ML0718301872007-07-10010 July 2007 06/01/2007 Summary of Telephone Conference Call Between the NRC and Entergy Nuclear Operations, Inc., Concerning Items Pertaining to the Vermont Yankee License Renewal Safety Evaluation Report ML0718301562007-06-29029 June 2007 Summary of Telephone Conference Call Held on May 29, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Vermont Yankee Nuclear Power Station License Renewal Application ML0717100572007-06-25025 June 2007 03/23/2007 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0717101412007-06-25025 June 2007 Summary of Telephone Conference Call Held on April 2, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0715000282007-05-30030 May 2007 Meeting Summary for Vermont Yankee AA Meeting 2019-11-18
[Table view] Category:Note to File incl Telcon Record
MONTHYEARML21055A8342021-03-30030 March 2021 Memo to File: Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Vermont Yankee ISFSI ML1107303732011-03-0808 March 2011 Transcript of 10 CFR 2.206 Petition Re Vermont Yankee. Pages 1 - 22 ML1024402752010-09-0808 September 2010 G20100388 - 2.206 Petition Review Board Vermont Yankee Nuclear Power Station ML0807001642008-02-20020 February 2008 (PA-LR) February 1, 2008 Telecon Summary ML0736007522008-01-17017 January 2008 Summary of Telephone Conference Call Held on December 18, 2007, Between NRC and Entergy Nuclear Operations, Inc., Concerning a Request for Additional Information Pertaining to the Vermont Yankee License Renewal Application ML0730201872007-11-16016 November 2007 Summary of Telephone Conference Call with Entergy Nuclear Operation, Inc., Clarify the Staff'S Draft Request for Additional Information ML0726301242007-09-26026 September 2007 Summary of Telephone Conference Call Held on August 17, 2007, Between the NRC and Entergy Nuclear Operations, Inc., Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0710005532007-04-17017 April 2007 Summary of Telephone Conference Call Held on March 13, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the VYNPS License Renewal Application ML0701805612007-01-29029 January 2007 Summary of a Telephone Conference Call Held on December 14, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to Vermont Yankee Nuclear Power Station License Renewal Application ML0701805342007-01-29029 January 2007 Summary of a Telephone Conference Call Held on December 6, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0633303582006-12-0101 December 2006 2006/12/01-Summary of a Telephone Conference Call Held on November 8, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0629601252006-10-27027 October 2006 Summary of Telephone Conference Call Held on September 27, 2006, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the VY Nuclear Power Station LRA ML0627103592006-09-28028 September 2006 2006/09/28-Summary of a Telephone Conference Call on August 7, 2006, Between the U.S. Nuclear Regulatory Commission & Entergy Nuclear Operations, Inc., Concerning Information Pertaining to Vermont Yankee Nuclear Power Station License Renewa 2021-03-30
[Table view] Category:Verbal Comm
MONTHYEARML21055A8342021-03-30030 March 2021 Memo to File: Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Vermont Yankee ISFSI ML1107303732011-03-0808 March 2011 Transcript of 10 CFR 2.206 Petition Re Vermont Yankee. Pages 1 - 22 ML1024402752010-09-0808 September 2010 G20100388 - 2.206 Petition Review Board Vermont Yankee Nuclear Power Station ML0807001642008-02-20020 February 2008 (PA-LR) February 1, 2008 Telecon Summary ML0736007522008-01-17017 January 2008 Summary of Telephone Conference Call Held on December 18, 2007, Between NRC and Entergy Nuclear Operations, Inc., Concerning a Request for Additional Information Pertaining to the Vermont Yankee License Renewal Application ML0730201872007-11-16016 November 2007 Summary of Telephone Conference Call with Entergy Nuclear Operation, Inc., Clarify the Staff'S Draft Request for Additional Information ML0726301242007-09-26026 September 2007 Summary of Telephone Conference Call Held on August 17, 2007, Between the NRC and Entergy Nuclear Operations, Inc., Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0710005532007-04-17017 April 2007 Summary of Telephone Conference Call Held on March 13, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the VYNPS License Renewal Application ML0701805612007-01-29029 January 2007 Summary of a Telephone Conference Call Held on December 14, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to Vermont Yankee Nuclear Power Station License Renewal Application ML0701805342007-01-29029 January 2007 Summary of a Telephone Conference Call Held on December 6, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0633303582006-12-0101 December 2006 2006/12/01-Summary of a Telephone Conference Call Held on November 8, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0629601252006-10-27027 October 2006 Summary of Telephone Conference Call Held on September 27, 2006, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the VY Nuclear Power Station LRA ML0627103592006-09-28028 September 2006 2006/09/28-Summary of a Telephone Conference Call on August 7, 2006, Between the U.S. Nuclear Regulatory Commission & Entergy Nuclear Operations, Inc., Concerning Information Pertaining to Vermont Yankee Nuclear Power Station License Renewa 2021-03-30
[Table view] |
Text
October 27, 2006 LICENSEE: Entergy Nuclear Operations, Inc.
FACILITY: Vermont Yankee Nuclear Power Station
SUBJECT:
SUMMARY
OF A TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 27, 2006, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PERTAINING TO THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Entergy Nuclear Operations, Inc., held a telephone conference call on September 27, 2006, to discuss and clarify the staffs requests for additional information concerning the Vermont Yankee Nuclear Station license renewal application. The conference call was useful in clarifying the staffs questions. provides a listing of the conference call participants. Enclosure 2 contains a listing of the issues discussed with the applicant, including a brief discussion of the items status.
The applicant had an opportunity to comment on this summary.
/RA/
Jonathan Rowley, Project Manager License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-271
Enclosures:
As stated cc w/encls: See next page
ML062960125 OFFICE PM:RLRB LA:RLRB BC:RLRB NAME JRowley I. King JZimmerman DATE 10/25/06 10/27/06 10/27/06 Vermont Yankee Nuclear Power Station cc:
Regional Administrator, Region I Ms. Carla A. White, RRPT, CHP U. S. Nuclear Regulatory Commission Radiological Health 475 Allendale Road Vermont Department of Health King of Prussia, PA 19406-1415 P.O. Box 70, Drawer #43 108 Cherry Street Mr. David R. Lewis Burlington, VT 05402-0070 Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, N.W. Mr. James M. DeVincentis Washington, DC 20037-1128 Manager, Licensing Vermont Yankee Nuclear Power Station Mr. David OBrien, Commissioner P.O. Box 0500 Vermont Department of Public Service 185 Old Ferry Road 112 State Street Brattleboro, VT 05302-0500 Montpelier, VT 05620-2601 Resident Inspector Mr. James Volz, Chairman Vermont Yankee Nuclear Power Station Public Service Board U. S. Nuclear Regulatory Commission State of Vermont P.O. Box 176 112 State Street Vernon, VT 05354 Montpelier, VT 05620-2701 Director, Massachusetts Emergency Chairman, Board of Selectmen Management Agency Town of Vernon ATTN: James Muckerheide P.O. Box 116 400 Worcester Rd.
Vernon, VT 05354-0116 Framingham, MA 01702-5399 Operating Experience Coordinator Jonathan M. Block, Esq.
Vermont Yankee Nuclear Power Station Main Street 320 Governor Hunt Road P.O. Box 566 Vernon, VT 05354 Putney, VT 05346-0566 G. Dana Bisbee, Esq. Mr. John F. McCann Deputy Attorney General Director, Licensing 33 Capitol Street Entergy Nuclear Operations, Inc.
Concord, NH 03301-6937 440 Hamilton Avenue White Plains, NY 10601 Chief, Safety Unit Office of the Attorney General Mr. Gary J. Taylor One Ashburton Place, 19th Floor Chief Executive Officer Boston, MA 02108 Entergy Operations 1340 Echelon Parkway Jackson, MS 39213
Vermont Yankee Nuclear Power Station cc:
Mr. John T. Herron Ms. Stacey M. Lousteau Sr. VP and Chief Operating Officer Treasury Department Entergy Nuclear Operations, Inc. Entergy Services, Inc.
440 Hamilton Avenue 639 Loyola Avenue White Plains, NY 10601 New Orleans, LA 70113 Mr. Oscar Limpias Mr. Norman L. Rademacher Vice President, Engineering Director, NSA Entergy Nuclear Operations, Inc. Vermont Yankee Nuclear Power Station 440 Hamilton Avenue P.O. Box 0500 White Plains, NY 10601 185 Old Ferry Road Brattleboro, VT 05302-0500 Mr. Christopher Schwartz Vice President, Operations Support Mr. Raymond Shadis Entergy Nuclear Operations, Inc. New England Coalition 440 Hamilton Avenue Post Office Box 98 White Plains, NY 10601 Edgecomb, ME 04556 Mr. Michael J. Colomb Mr. James P. Matteau Director of Oversight Executive Director Entergy Nuclear Operations, Inc. Windham Regional Commission 440 Hamilton Avenue 139 Main Street, Suite 505 White Plains, NY 10601 Brattleboro, VT 05301 Mr. Travis C. McCullough Mr. William K. Sherman Assistant General Counsel Vermont Department of Public Service Entergy Nuclear Operations, Inc. 112 State Street 440 Hamilton Avenue Drawer 20 White Plains, NY 10601 Montpelier, VT 05620-2601 Mr. Theodore Sullivan Mr. Michael D. Lyster Site Vice President 5931 Barclay Lane Entergy Nuclear Operations, Inc. Naples, FL 34110-7306 Vermont Yankee Nuclear Power Station P.O. Box 0500 Ms. Charlene D. Faison 185 Old Ferry Road Manager, Licensing Brattleboro, VT 05302-0500 440 Hamilton Avenue White Plains, NY 10601 Mr. James H. Sniezek 5486 Nithsdale Drive Mr. James Ross Salisbury, MD 21801 Nuclear Energy Institute 1776 I Street, NW, Suite 400 Mr. Garrett D. Edwards Washington, DC 20006-3708 814 Waverly Road Kennett Square, PA 19348
Vermont Yankee Nuclear Power Station cc:
Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Diane Curran, Esq.
Harmon, Curran, Spielberg &
Eisenberg, L.L.P 1726 M Street, NW, Suite 600 Washington, DC 20036
Note to Entergy Nuclear Operations, Inc., from Jonathan Rowley dated October 27, 2006
SUBJECT:
SUMMARY
OF A TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 27, 2006, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PERTAINING TO THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION HARD COPY DLR R/F JRowley E-MAIL:
JFair RWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)
SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes JRowley RLaufer JShea CAnderson, RI RPowell, RI DScrenci, RI MModes, RI DPelton, Sr. Resident MYoung RidsOpaMail
LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION September 27, 2006 PARTICIPANTS AFFILIATIONS Jonathan Rowley U.S. Nuclear Regulatory Commission (NRC)
Michael Morgan NRC Michael Kennedy Information Systems Laboratories*
Andy Taylor Entergy Nuclear Operations, Inc. (ENO)
Lori Potts ENO Alan Cox ENO Dave Lach ENO Reza Ahrabli ENO
- NRC contractor Enclosure 1
VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION September 27, 2006 The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Entergy Nuclear Operations, Inc., held a telephone conference call on September 27, 2006, to discuss and clarify the staffs requests for additional information (RAIs) and other issues concerning the Vermont Yankee Nuclear Power Station (VYNPS) license renewal application (LRA). The following issues were discussed during the telephone conference call:
RAI 3.3.1-22-K-01 Please confirm that no auxiliary components have elastomer linings or stainless steel cladding.
If there are such components, please provide a list of these components. Also, provide additional justification for the determination that pitting and crevice corrosion do not require aging management.
Discussion: The staff requested clarification of the applicants response in their September 5, 2006, letter (License Renewal Application, Amendment 12) to this RAI. The staff required confirmation that the Water Chemistry Control and One-Time Inspection Programs were used to manage the aging of components that have elastomer linings. The applicant stated that both programs are used.
RAI 3.3.1-68-K-03 Beginning on Page 3.3-206 of the VYNPS LRA, loss of material from carbon steel components is managed using One-Time Inspection (OTI). Please justify the use of OTI for carbon steel exposed to raw water as opposed to a periodic inspection.
Discussion: The staff requested clarification of the applicants response in their September 5, 2006, letter (License Renewal Application, Amendment 12) to this RAI. The staff requested the applicant to further clarify the term untreated water as used in the application and RAI response. The applicant will provide a supplemental response to this concern in a future letter to the NRC.
RAI 3.1.1-17-P-01 According to USNRC Regulatory Guide 1.190, Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence, analytic uncertainty (Section 1.4.1) is to be considered in the calculation of fluence. As noted by the staff, in GE-NE-000-0007-2342-R1-NP (dated July 2003), Entergy Northeast Vermont Yankee Neutron Flux Evaluation, flux variations of up to but less than 19% was considered. In response to staff AMR audit question #202, the applicant provided extrapolated data to determine if the top of the recirculation inlet nozzles (located at a 104R940 height of 202 inches) might experience an extended power uprate fluence of >1XE17.
Enclosure 2
Was a maximum flux variation of ~19%, considered in this extrapolated data? If not, what calculated fluence level would be experienced by the top of the recirculation inlet nozzles when the applicant considers a maximum flux variation of just less than 19%?
Discussion: The staff requested clarification of the applicants response in their September 5, 2006, letter (License Renewal Application, Amendment 12) to this RAI. The applicant stated that they addressed a similar concern in the response to RAI 4.2-1. The staff will have an internal discussion to determine if that response satisfies both RAIs.