ML081980671

From kanterella
Revision as of 00:52, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Public Meeting with Catawba to Discuss Current Plant Performance, Current Challenges, and Future Plans
ML081980671
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/16/2008
From: Steven Rose
NRC/RGN-II/DRP/RPB1
To: Morris J
Duke Energy Carolinas
References
Download: ML081980671 (6)


Text

July 16, 2008 Duke Energy Carolinas, LLC ATTN: Mr. J. R. Morris Site Vice President Catawba Nuclear Station 4800 Concord Road York, SC 29745

SUBJECT:

MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 -

PERFORMANCE DISCUSSION MEETING, CATAWBA NUCLEAR STATION, DOCKET NOS. 50-413 AND 50-414

Dear Mr. Morris:

This letter confirms the conversation between Mr. Bill Pitesa of your staff and Mr. Andy Sabisch of the NRC staff on June 2, 2008, concerning a Category 1 public meeting which has been scheduled for August 1, 2008, at 1:00 p.m. (EDT). The meeting will be at the Region II Office, Sam Nunn Atlanta Federal Center, 61 Forsyth Street S.W., Atlanta, GA, in Suite 24T20. The meeting, which is being conducted at your request, is to discuss current plant performance, current challenges, and future plans at your Catawba Nuclear Station. The notice, which provides additional details, is enclosed.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 562-4609.

Sincerely,

/RA/

Steven D. Rose, Acting Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52

Enclosure:

As stated cc w/encl: (See page 2)

_ _ X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP SIGNATURE EJS /RA/ SDR /RA/

NAME EStamm SRose DATE 07/16/2008 07/16/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO DEC 2 cc w/encl: R. Mike Gandy Randy D. Hart Division of Radioactive Waste Mgmt.

Regulatory Compliance Manager S.C. Department of Health and Duke Power Company, LLC d/b/a Duke Environmental Control Energy Carolinas, LLC Electronic Mail Distribution Electronic Mail Distribution Beverly O. Hall R. L. Gill, Jr. Chief, Radiation Protection Section Manager Department of Environmental Health Nuclear Regulatory Issues & Industry Affairs N.C. Department of Environment and Duke Power Company, LLC d/b/a Duke Natural Resources Energy Carolinas, LLC Electronic Mail Distribution Electronic Mail Distribution Elizabeth McMahon Dhiaa M. Jamil Assistant Attorney General Group Executive and Chief Nuclear Officer S.C. Attorney General's Office Duke Energy Carolinas, LLC P.O. Box 11549 Electronic Mail Distribution Columbia, SC 29211 Kathryn B. Nolan Vanessa Quinn Senior Counsel Federal Emergency Management Agency Duke Energy Corporation 500 C Street, SW 526 South Church Street-EC07H Room 840 Charlotte, NC 28202 Washington, DC 20472 Lisa F. Vaughn North Carolina Electric Membership Associate General Counsel Corporation Duke Energy Corporation Electronic Mail Distribution 526 South Church Street-EC07H Charlotte, NC 28202 County Manager of York County York County Courthouse David A. Repka York, SC 29745 Winston Strawn LLP Electronic Mail Distribution Piedmont Municipal Power Agency Electronic Mail Distribution North Carolina MPA-1 Suite 600 Peggy Force P.O. Box 29513 Assistant Attorney General Raleigh, NC 27525-0513 State of North Carolina P.O. Box 629 Susan E. Jenkins Raleigh, NC 27602 Assistant Director, Division of Waste Management Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution

DEC 3 Letter to J. R. Morris from Steven D. Rose dated July 16, 2008

SUBJECT:

MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 -

PERFORMANCE DISCUSSION MEETING, CATAWBA NUCLEAR STATION, DOCKET NOS. 50-413 AND 50-414 Distribution w/encl:

Region II Administrator=s Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS J. Stang, NRR L. Slack, RII EICS RIDSNRRDIRS RIDSNRRDIRSIPAB OE Mail RIDSNRRDIRS PUBLIC

SUBJECT:

PUBLIC MEETING WITH DUKE ENERGY CAROLINAS, LLC FACILITY: Catawba Nuclear Station DOCKETS: 05000413 and 05000414 DATE & TIME: Friday August 1, 2008 - 1:00 p.m. to 3:00 p.m.

LOCATION: Suite 24T20 Region II Office, Sam Nunn Atlanta Federal Center, 61 Forsyth Street, S.W., Atlanta, GA PURPOSE: The purpose of the meeting is to discuss current plant performance, current challenges, and future plans at your Catawba Nuclear Station. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings.

CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

The NRC provides reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC=s meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

NRC OFFICE Region II PARTICIPATING:

OTHER None ORGANIZATIONS PARTICIPATING:

PARTICIPANTS: NRC (partial list)

L. Reyes, Regional Administrator, Region II (RII)

V. McCree, Deputy Regional Administrator for Operations, RII J. Moorman, Deputy Director, Division of Reactor Projects (DRP), RII R. Croteau, Deputy Director, Division of Reactor Safety (DRS), RII S. Rose, Acting Chief, Reactor Projects Branch 1, DRP, RII LICENSEE (partial list)

J. Morris, Site Vice President B. Pitesa, Plant Manager G. Hamrick, Engineering Manager T. Hamilton, Safety Assurance Manager MEETING Steven D. Rose CONTACT: 404-562-4609 Steven.Rose@nrc.gov AUDIO TELE- Interested members of the public can participate in this meeting via a toll-free CONFERENCING audio teleconference. Please contact the NRC meeting contact in advance of the meeting, indicating your intent to attend and to obtain teleconferencing information.

VIDEO TELE- Not Available CONFERENCING Enclosure