ML20044D206

From kanterella
Revision as of 04:51, 12 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 93-003-00:on 930328,Point Beach Unit 2 Tripped Due to Surveillance Testing Problems.Test Procedures Can Trip Unit Due to Equipment or Human Failure.Failure Tests Delayed Until Unit 1 & Knpp Restored to power.W/930510 Ltr
ML20044D206
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/10/1993
From: Link B, Sherwood G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-93-060, CON-NRC-93-60 LER-93-003-01, LER-93-3-1, VPNPD-93-099, VPNPD-93-99, NUDOCS 9305180117
Download: ML20044D206 (10)


Text