|
---|
Category:- No Document Type Applies
MONTHYEARML23333A0122023-11-27027 November 2023 Attachment D - Bill Nuttle 2023 Expert Declaration ML23263A9872023-09-0707 September 2023 FOIA-2023-000207 - Resp 1- Final, Agency Records Subject to the Request Are Enclosed ML23263A9892023-09-0707 September 2023 FOIA-2023-000207 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed ML23031A1992023-02-0101 February 2023 Nd 4 Environmental Remote Audit Requests for Confirmation of Information ML22073A1242022-03-25025 March 2022 SLR License ML22073A1232022-03-25025 March 2022 SLR License ML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML21035A2112021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2017 Annual Monitoring Report ML21035A2052021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix C ML21035A2072021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix a ML21035A2062021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix J ML21035A2102021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Combined CCS Modeling Reports 2012-2017 Part 1 ML21035A2082021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix G ML21035A1932021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, FPL 2019_a_2018 Annual Remediation Report_R327649-004 (Dup) ML21035A1942021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2017-09 FPL Annual Monitoring Report ML21035A2132021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Combined CCS Modeling Reports 2012-2017 Part 2 ML21035A2122021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Combined CCS Modeling Reports 2012-2017 ML21035A2142021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2015 Post Power Uprate Report ML21035A2162021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2012 Preuprate Report - Evaporation ML21035A2152021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2014 Turkey Point Post-Uprate Monitoring Report ML21035A2182021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2016 Annual Monitoring Report ML21035A2172021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2012 Preuprate Report ML21035A2022021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix B ML21035A1892021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2016-01-29 Freshening Effectiveness Report ML21035A1902021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2017-01-27 FPL Phase One Remediation Plan ML21035A1912021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Re_ Turkey Point_ _More Favorable Climatic Conditions_ ML21035A1922021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2017-09 FPL Annual Monitoring Report-03 ML21035A1962021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, FPL 2017_b_2017-11 Annual Remediation Restoration Report ML21035A1952021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, FPL 2018 Appg EDMS CSEM Summary ML21035A1972021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Fw_ List of Documents for PNNL ML21035A2042021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2019 Annual Monitoring Report ML21035A2012021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix E ML21035A1992021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2017-01-27 FPL Attachment 1 Gw Flow and Transport Model ML21035A1982021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2018-08-08 Spreadsheet Response to WRI-12 ML21035A2032021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix N ML21013A1612021-01-12012 January 2021 NRC-2020-000123 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed, Part 2 of 4 ML21013A1622021-01-12012 January 2021 NRC-2020-000123 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed, Part 4 of 4 ML21013A1632021-01-12012 January 2021 NRC-2020-000123 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed, Part 1 of 4 ML21013A1592021-01-12012 January 2021 NRC-2020-000123 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed, Part 3 of 4 ML20315A0862020-10-30030 October 2020 NRC-2020-000123 - Resp 3 - Interim, Agency Records Subject to the Request Are Enclosed ML20272A1402020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 3 of 9 ML20272A1432020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 6 of 9 ML20272A1442020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 7 of 9 ML20272A1452020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 8 of 9 ML20272A1462020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 9 of 9 ML20272A1412020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed.Part 4 of 9 ML20272A1382020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 1 of 9 ML20272A1392020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 2 of 9 2023-09-07
[Table view] Category:License-Operator
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23191A8622023-07-10010 July 2023 301 Exam ADAMS 2B Administrative Items L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations ML22237A2022022-08-25025 August 2022 Notification of Licensed Operator Initial Examination 05000250/2023301, and 05000251/2023301 L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21160A2702021-06-0909 June 2021 301 ADAMS 2A-3 ML21160A2642021-06-0909 June 2021 301 ADAMS 2A-2 ML21160A2282021-06-0909 June 2021 301 ADAMS 2B ML21123A3032021-05-0303 May 2021 301 Exam Report Items - SRO as Given Written Exam ML21123A3022021-05-0303 May 2021 301 Exam Report Items - RO as Given Written Exam ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML19275G9532019-10-0202 October 2019 Exam Administrative Items (ADAMS-2D) ML19199A1702019-07-17017 July 2019 Operator Licensing Examination Approval 05000250/2019302 and 05000251/2019302 L-2019-108, NRC Regulatory Issue Summary 2019-02: Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 NRC Regulatory Issue Summary 2019-02: Preparation and Scheduling of Operator Licensing Examinations ML19108A2572019-04-18018 April 2019 301 ADAMS 2D Exam Admin Items - Normal Release ML19099A2912019-04-0909 April 2019 2019 Schedule Confirmation for Turkey Point ML19072A2502019-01-26026 January 2019 Tp 2019301 Post Exam Comments ADAMS-1B ML19004A3722019-01-0303 January 2019 Operating Licensing Examination Approval Letter 05000250/2019301 and 05000251/2019301 L-2018-202, NRC Regulatory Issue Summary 2018-02-Revised Response Preparation and Scheduling of Operator Licensing Examinations2018-10-30030 October 2018 NRC Regulatory Issue Summary 2018-02-Revised Response Preparation and Scheduling of Operator Licensing Examinations ML18240A4272018-08-28028 August 2018 301 Exam Draft Items 2A - Delay Release 2 Yrs ML18137A4252018-05-17017 May 2018 Tp 2017-301 Exam Administrative Items (ADAMS-2C) Delay Release 2 Yrs ML18137A4292018-05-17017 May 2018 Tp 2017-301 Exam Administrative Items (ADAMS-2D) ML17349A2092017-12-15015 December 2017 251/2017-301 Post-Exam Comments ML17349A1882017-12-15015 December 2017 05000250/2017301 and 05000251/2017301 Final SRO Written Exam - Delay Release 2 Yrs ML17349A1722017-12-15015 December 2017 05000250,251/2017-301 Final RO Written Exam - Delay Release 2 Yrs ML17298B2882017-10-20020 October 2017 Operator Licensing Written Examination Approval 05000250/2017301 and 05000251/2017301 L-2017-131, Preparation and Scheduling of Operator Licensing Examinations-Updated Response2017-07-28028 July 2017 Preparation and Scheduling of Operator Licensing Examinations-Updated Response ML17191B4822017-07-10010 July 2017 Exan Final Itens 2B - Delay Release 2 Yrs ML17191B4832017-07-10010 July 2017 Exam Administrative Items 2C - Delay Release 2 Yrs ML17065A3262017-03-0303 March 2017 Notification of Licensed Operator Initial Examination 05000250/2017301 and 05000251/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16271A0802016-09-27027 September 2016 301 Final RO Written Exam ML16271A0832016-09-27027 September 2016 301 Final SRO Written Exam ML16271A0852016-09-27027 September 2016 301 Post Exam Comments ML15119A4832015-04-29029 April 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15119A5372015-04-29029 April 2015 Initial Exam 2015-301 General Correspondence ML15119A5342015-04-29029 April 2015 Initial Exam 2015-301 Final Administrative JPMs ML15119A5262015-04-29029 April 2015 Initial Exam 2015-301 Final Sim In-Plant JPMs ML15119A5192015-04-29029 April 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15119A4992015-04-29029 April 2015 Initial Exam 2015-301 Final Administrative Documents ML15119A4972015-04-29029 April 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15119A4912015-04-29029 April 2015 Initial Exam 2015-301 Draft Sim In-Plant JPMs ML15119A4782015-04-29029 April 2015 Initial Exam 2015-301 Draft SRO Written Examination ML15119A4692015-04-29029 April 2015 Initial Exam 2015-301 Draft RO Written Exam ML15119A4672015-04-29029 April 2015 Initial Exam 2015-301 Draft Administrative Documents ML15068A0352015-03-0909 March 2015 Initial Exam 2015-301 Final SRO Written Exam ML15068A0312015-03-0909 March 2015 Initial Exam 2015-301 Final RO Written Exam L-2014-103, Preparation and Scheduling of Operator Licensing Examinations2014-05-14014 May 2014 Preparation and Scheduling of Operator Licensing Examinations ML13156A1112013-06-0505 June 2013 Initial Exam 2013-301 General Correspondence ML13156A0292013-06-0505 June 2013 Initial Exam 2013-301 Draft Administrative Documents ML13156A0322013-06-0505 June 2013 Initial Exam 2013-301 Draft SRO Written Exam 2023-07-10
[Table view] |
Text
ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: Turkey Point 3 & 4 Date of Examination: 10/25/2010 Initials Item Task Description a b* 4 1 a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401,. MA*
W b. Assess whether the outline was systematically and randomly prepared in accordance with Section D.1 of ES-401 and whether all K/A categories are appropriately sampled.
T c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.
T d. Assess whether the justifications for deselected or rejected K/A statements are appropriate.
E N
- 2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, and major s transients. p444 I b. Assess whether there are enough scenario sets (and spares) to test the projected number and M mix of applicants inaccordance with the expected crew composition and rotation schedule U without compromising exam integrity, and ensure that each applicant can be tested using at L least one new or significantly modified scenario, that no scenarios are duplicated from the applicants audit test(s), and that scenarios will not be repeated on subsequent days.
- c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative and R quantitative criteria specified on Form ES-301-4 and described in Appendix D.
- 3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
(1) the outline(s) contain(s) the required number of control room and in-plant tasks distributed W among the safety functions as specified on the form I (2) task repetition from the last two NRC examnations is within the limits specified on the form T (3) no tasks are duplicated from the applicants audit test(s)
(4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.
- b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
(1) the tasks are distributed among the topics as specified on the form (2) at Least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations
- c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
- 4. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections.
- b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.
N c. Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5.
E d. Check for duplication and overlap among exam sections.
- e. Check the entire exam for balance of coverage.
L f. Assess whether the exam fits the appropriate job level (RD or SRO).
4 ri ted N e/S ature gate,
- a. Author Greg Laughlin! Z(llfU
- b. Facility Reviewer (*) J?hn Eaton / 1/
- c. NRC Chief Examiner (#) , 2-- i
- d. NRC Supervisor L4LCLA t.
Note: # Independent NRC reviewer initial items in Column c; chief examiner concurrence required.
Not applicable for NRC-prepared examination outlines
1ThL t-ES-201 Examination Security Agreement Form ES-201-3
- 1. Pre-Examination acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of L as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations andlor an, enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
- 2. Post-Examination To the best of my knowege, 1 did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) oø(41(f. From the date that I entered intO this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those apphcants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
PRINTED NAME JOB TITLE I RESPONSIBILITY SIGNATURE (1) DATE SIGNATURE (2) DATE NOTE
- 2. Mi4A7. !5LLL 3.&fl.Lei-.ti1 &ir.rcr O-.
4 kqJ I 4iTi *:.
. ..: Jf/f , -
1 SSv /
- 7. 4 - w6
- 8. 4.Jic C_o 4u[i L-(\. Vi.ii
. c i-A ,-
V
- 10. C)Al S 4 r\IWr . 3--l frc5 13.
14.
15.
NOTES:
ES-201, Page 26 of 27
ES-301 Administrative Topics Outline Form ES-301-J Facility: Turkey Point Units 3 & 4 Date of Examination: 03/04/20 11 Exam Level: SRO (I) Operating Test Number: 201 1-301 Administrative Topic Type Code Describe Activity to be performed (See Note) (See Note)
A. l.a Determineticense Status (Active/Inactive) V.
CR N Conduct of Operations 2.1.ISRO4.2 Maintain Operations Key Log. V A.l.b CR,N Conduct of Operations V 2.1.29 S.RO 4.0 V
V V Review Boric Acid Pmp Discharge Valve Clearance A V
. CRD Equipment Control V V
V 2.2 13 SRO 3.8
., Determine the Airborne Activity Dose Rate V A.
CRM V V
Radiation Control 2.3.4 SRO 3.1 V
V C1assify Event and Determine PARS V V
A.4 Emergency V
V
- *V CR N V Procedures/Plan 2.441 SRO 4.6 V V V
V V
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
Types and Codes (C) Control Room (5) Simulator (CR) Classroom (D)irect from bank (3 for ROs, 4 for SROs)
(N)ew or (M)odified from bank (1)
(P)reious 2 Exams (1 Randomly selected)
ES-301 Operating Test Quality Checklist Form ES-301-3 Facility: Turkey Point 3 & 4 Date of Examination: 10/25/2010 Operating Test Number:201 0-301 Initials
- 1. General Criteria
. a b* c#
- a. The operating test conforms with the previously approved outline; changes are consistent with g.)J ,
sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution). 14 i4 rI
- b. There is no day-to-day repetition between this and other operating tests to be administered during this examination. -
- c. The operating test shall not duplicate items from the applicants audit test(s). (see Section D. l.a.) -
- d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. -
- e. It appears that the operating test will differentiate between competent and less-than-competent V
/ I f applicants at the designated license level.
- 2. Walk-Through Criteria -- --
- a. Each JPM includes the following, as applicable:
- references and tools, including associated procedures
- reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee
- operationally important specific performance criteria that include:
detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable
- b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301 -1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-20l -2.
- 3. Simulator Criteria -- --
The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ,J/
ES-30l-4 and a copy is attached.
))4 Printed Name / Sig ture Date
- a. Author Greg Laughlin! 3 13 1
- b. Facility Reviewer(*) John Eaton! .//7 /1 c.
d.
NRC Chief Examiner (#)
NRC Supervisor JJ&j-ç G. -
itir-1 NOTE:
- The facility signature is not applicable for NRC-developed tests.
- Independent NRC reviewer initial items in Column c; chief examiner concurrence required.