JUL 2 8 2017 L-2017-131 U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 NRG Regulatory Issue Summary 2017-03 Preparation and Scheduling of Operator Licensing Examinations-Updated Response The purpose of this letter is to provide the information requested by NRG Regulatory Issue Summary (RIS) 2017-03, "Preparation and Scheduling of Operator Licensing Examinations,"

issued April 5, 2017. The Operator Licensing Examination Data, NRG Form 536, is enclosed.

Please note there will be two initial operator license examinations in 2019. As such, two sets of number of operators and proposed examination dates are reflected in the attached NRG Form for CY2019.

Should there be any questions, please contact Mr. Joseph Gionfriddo, Initial Operator Training Supervisor, at (305) 246-6515.

Sincerely,

~Jh-m-e_r_s _ __

Regional Vice President, Southern Region Turkey Point Nuclear Plant Enclosure cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Florida Power & Light Company 9760 SW 344 St Homestead, FL 33035

NRG FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This i>Q.p-P-R""~~

<' information collection is used to plan budgets and resources for operator examinations. Send

.§ 0

OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to If" I;;

~ EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

"!/+. 0-..: NEOB-10202, (3150-0131), Office of Management and Budge~ Washington, DC 20503. If a means

~ ,.**"""" used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRG REGION Turkey Point Nuclear Plant 9760 SW 344th Street II Homestead, FL 33035 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2019 CY2020 CY2021 CY2022 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 2 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS

8. INITIAL OPERATOR LICENSE EXAMINATIONS CY2019 CY2020 CY2021 CY2022 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 6 and 8 8 8 8 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 10 and 4 4 4 ) 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 1/7/19 and 7/22/19 07/20/2020 07/19/2021 07/18/2022 ALTERNATE DATE 1/21/19 and 8/5/19 07/27/2020 08/02/2021 08/01/2022 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2019 CY 2020 PROPOSED NUMBER MARCH SEPTEMBER MARCH

--- SEPTEMBER ESTIMATED NUMBER OF 12 0 12 0 CANDIDATES NRG FORM 536 (05-2016)