ML13156A111

From kanterella
Jump to navigation Jump to search
Initial Exam 2013-301 General Correspondence
ML13156A111
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/05/2013
From:
NRC/RGN-II
To:
Florida Power & Light Co
References
Download: ML13156A111 (4)


Text

December 17, 2012 L-2012-447 PPL.

Chief Examiner, Region II U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Initial Operator Examination Outlines In accordance with the requirements ofNUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Florida Power and Light (FPL) is submitting herein the following initial license examination outlines for the Turkey Point Nuclear Plant for the December 2013 examination:

ES-201-2 Examination Outline Quality Checklist ES-201-3 Examination Security Agreement (copy)

ES-301-1 Administrative Topics Outline (RO)

ES-301-1 Administrative Topics Outline (SRO)

ES-301-2 Control Room/In-Plant Systems Outline (RO)

ES-301-2 Control Room/In-Plant Systems Outline (SRO-1)

ES-301-2 Control Room/In-Plant Systems Outline (SRO-U)

ES-301-5 Transient and Event Checklist (4 scenarios)

ES-D-1 Scenario Outlines (4 scenarios)

E5-401-2 PWR Examination Outline (RO/SRO Exam)

ES-40l-3 RO/SRO Generic Knowledge and Abilities Outline ES-401-4 Record of Rejected K/As Plant Reference Material (2 disks)

Electronic Exam Material (1 disk)

Florida Power & Liaht Comoanv 9760 S.W. 344 Street Homestead, FL 33035

L-2012-447 Page 2 Pursuant to the provisions of NUREG 1021, Revision 9, Supp. 1, the enclosed material shall be withheld from public disclosure until after the examinations are complete. Should there be any questions, please contact Timothy James at (305) 246-6900.

Very truly yours, Michael W. Kiley.

Vice President Turkey Point Nuclear Plant Enclosure cc: Chief, Operations Branch, Division of Reactor Safety, Region II, w/o enclosure Document Control Desk, USNRC, Washington, D.C., w/o enclosure Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant, w/o enclosure

Januaryl7,2013 fr L-2013-029 10 CFR2.390 FPL Gerard Laska Chief Examiner, Region II U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Initial Operator Examination 45 Day Submittal In accordance with the requirements ofNUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Florida Power and Light (FPL) is submitting herein the following initial license examination checklists, outlines, JPMs and scenarios for the Turkey Point Nuclear Plant for the March 2013 examination:

ES-201-2 Examination Outline Quality Checklist ES-201-3 Examination Security Agreement (copy)

ES-301-1 Administrative Topics Outline (RO) Revised ES-301-1 Administrative Topics Outline (SRO) Revised ES-301-2 Control Room/In-Plant Systems Outline (RO) Revised ES-301-2 Control Room/In-Plant Systems Outline (SRO-I) Revised ES-301-2 Control Room/In-Plant Systems Outline (SRO-U) Revised ES-301-3 Operating Test Quality Checklist ES-301-4 Simulator Scenario Quality Checklist ES-301-5 Transient and Event Checklist (4 scenarios) Revised ES-301-6 Competencies Checklist ES-C-i Job Performance Measures (18 JPMs)

ES-D-1 Scenario Outlines (4 scenarios) Revised ES-D-2 Scenario Guides (4 scenarios)

Bank JPMs (8 Originals) for modified JPMs Requested Electronic Exam Material (1 disk)

Requested Reference Material (7 disks)

Pursuant to the provisions of NUREG 1021, Revision 9, Supp. 1, the enclosed material shall be withheld from public disclosure until after the examinations are complete. Should there be any questions, please contact Mark Similey at (305) 246-6900.

Very truly yos Michael W. Kiley.

Vice President Turkey Point Nuclear Plant Enclosure cc: Chief, Operations Branch, Division of Reactor Safety, Region II, w/o enclosure Document Control Desk, USNRC, Washington, D.C., w/o enclosure Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant, w/o enclosure Florida Power & Light Company 9760 SW. 344 Street Homestead, FL 33035

0 FPL 10 CFR 2.390 Gerard Laska Chief Examiner, Region II U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Initial Operator Examination 45 Day Submittal In accordance with the requirements ofNUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Florida Power and Light (FPL) is submitting herein the following initial license written examination checklists, outlines and written examination (plus key) for the Turkey Point Nuclear Plant for the March 2013 examination:

ES-201-2 Examination Outline Quality Checklist ES-20 1-3 Examination Security Agreement (copy)

ES-3 01-3 Operating Test Quality Checklist ES-40 1-2 PWR Examination Outline, (RO/SRO Exam)

ES-40 1-3 Generic Knowledge and Abilities Outline (RO/SRO)

ES-40l-4 Record of Rejected K/As ES-40 1-5 Written Examination Key with Reference Material for Each Question (on disk)

ES-401-6 Written Examination Quality Checklist Requested Electronic Exam Material (1 disk)

Pursuant to the provisions of NUREG 1021, Revision 9, Supp. 1, the enclosed material shall be withheld from public disclosure until after the examinations are complete. Should there be any questions, please contact Mark Similey at (305) 246-6900.

Very truly yours, Michael W. Kiley.

Vice President Turkey Point Nuclear Plant Enclosure cc: Chief Operations Branch, Division of Reactor Safety, Region II, w/o enclosure Document Control Desk, USNRC, Washington, D.C., w/o enclosure Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant, w/o enclosure Florida Power & Light Company 9760 SW. 344 th Street Homestead, FL 33035