ML19108A257
| ML19108A257 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/18/2019 |
| From: | NRC/RGN-II/DRS/OLB |
| To: | |
| References | |
| Download: ML19108A257 (23) | |
Text
L-18-1 NRC EXAM SECURE INFORMATION ES-301 Transient and Event Checklist Form ES-301-5 Facility: Turkey Point Units 3 & 4 Date of Exam: 1/7/2019 Operating Test No.: 2019-301 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios N1 N2 N4 N5 N6 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
R I
SROI-1 RX 4
2 2
3 1
NOR 1*
1 1
I/C 2,3,5 1,3, 4,5 1,4 9
4 MAJ 6
6 5
3 2
TS 2,3 2,5 4
2 SROI-2 RX 4
2 2
3 1
NOR 1*
1 1
I/C 2,3,5 1,3, 4,5 1,4 9
4 MAJ 6
6 5
3 2
TS 2,3 2,5 4
2 SROI-3 RX 4
2 2
3 1
NOR 1*
1 1
I/C 2,3,5 1,3, 4,5 1,4 9
4 MAJ 6
6 5
3 2
TS 2,3 2,5 4
2 SROI-4 RX 5
1 2
1 NOR 4
1 1
I/C 2,5 2,3 2,3, 4,5 8
4 MAJ 6
6 6
3 2
TS 2,3 2
2 SROI-5 RX 5
1 2
3 1
NOR 1*
1 1
I/C 2,3, 4
2,3, 4,5 1,4 9
4 MAJ 6
6 6
3 2
TS 3,5 2,3 4
2 ES-301-5 pg 1 of 3
L-18-1 NRC EXAM SECURE INFORMATION ES-301 Transient and Event Checklist Form ES-301-5 SROI-6 RX 5
1 2
3 1
NOR 1*
1 1
I/C 2,3, 4
2,3, 4,5 1,4 9
4 MAJ 6
6 6
3 2
TS 3,5 2,3 4
2 SROI-7 RX 5
2 2
1 NOR 1
1 1
I/C 1,2, 3,4 3,5 1,4 8
4 MAJ 6
6 6
3 2
TS 3,5 2
2 SROI-8 RX 1
2 2
1 NOR 2
1 1
I/C 2,4 3,5 1,3, 4
7 4
MAJ 6
6 5
3 2
TS 2,4 2
2 SROI-9 RX 1
2 2
1 NOR 2
1 1
I/C 2,4 3,5 1,3, 4
7 4
MAJ 6
6 5
3 2
TS 2,4 2
2 SROI-10 RX 1
2 2
1 NOR 2
1 1
I/C 2,4 3,5 1,3, 4
7 4
MAJ 6
6 5
3 2
TS 2,4 2
2 ES-301-5 pg 2 of 3
L-18-1 NRC EXAM SECURE INFORMATION ES-301 Transient and Event Checklist Form ES-301-5 RO-1 RX 4
1 1
NOR 5
2 2
1 I/C 1,3 1,4 3,4 6
4 MAJ 6
6 5
3 2
RO-2 RX 5
1 1
NOR 4
1 2
1 I/C 2,5 2,3 3,5 6
4 MAJ 6
6 6
3 2
RO-3 RX 4
1 1
NOR 5
2 2
1 I/C 1,3 1,4 3,4 6
4 MAJ 6
6 5
3 2
RO-4 RX 5
1 1
NOR 4
1 2
1 I/C 2,5 2,3 3,5 6
4 MAJ 6
6 6
3 2
RO-5 RX 4
1 1
NOR 5
2 2
1 I/C 1,3 1,4 3,4 6
4 MAJ 6
6 5
3 2
Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301-5 pg 3 of 3
L-18-1 NRC EXAM SECURE INFORMATION ES-301 Competencies Checklist Form ES-301-6 Instructions:
Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant. (This includes all rating factors for each competency.) (Forms ES-303-1 and ES-303-3 describe the competency rating factors.)
Facility: Turkey Point Units 3 & 4 Date of Examination: 1/7/2019 Operating Test No.: 2019-301 APPLICANTS SRO-I RO BOP SRO-I RO BOP SRO-I RO BOP Competencies SCENARIO SCENARIO SCENARIO N1 N2 N4 N5 N6 N1 N2 N4 N5 N6 N1 N2 N4 N5 N6 Interpret/Diagnose Events and Conditions 1-6 1-6 1-6 1-6 1-5 1-6 1-6 1-6 1-6 1-5 1-6 1-6 1-6 1-6 1-5 Comply with and Use Procedures (1) 1-6 1-6 1-6 1-6 1-5 1-6 1-6 1-6 1-6 1-5 1-6 1-6 1-6 1-6 1-5 Operate Control Boards (2)
N/A N/A N/A N/A N/A 1,3 4,6 2,3 5,6 1,2 4,6 1,2 4,6 1,2 4,5 2,4 5,6 1,4 5,6 1,3 5,6 2,3 5,6 2,3 4,5 Communicate and Interact 1-6 1-6 1-6 1-6 1-5 1-6 1-6 1-6 1-6 1-5 1-6 1-6 1-6 1-6 1-5 Demonstrate Supervisory Ability (3) 1-6 1-6 1-6 1-6 1-5 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Comply with and Use TS (3) 2,3 3,5 2,3 2,5 2,4 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Notes:
(1)
Includes TS compliance for an RO.
(2)
Optional for an SRO-U.
(3)
Only applicable to SROs.
ES-301-6 pg 1 of 1