NRC-2020-000123 - Resp 5 - Final, FPL 2017_b_2017-11 Annual Remediation Restoration Report
ML21035A196
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/21/2021
From:
NRC/OCIO
To:
Shared Package
ML21035A187 List:
References
NRC-2020-000123
Download: ML21035A196 (99)


Text

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Table of Contents iii TABLE OF CONTENTS Section Page Executive Summary..................................................................................... ES-1 1.

Background.............................................................................................. 1 2.

Status....................................................................................................... 2 2.1 CCS Freshening Activities.......................................................................................2 2.1.1 Upper Floridan Aquifer Freshening Well Operations................................ 2 2.1.2 Marine Freshening Well Operations........................................................... 3 2.1.3 Thermal Efficiency Plan............................................................................. 3 2.1.4 Nutrient Management Plan......................................................................... 3 2.2 Remediation/Restoration/Containment Activities...................................................4 2.2.1 Groundwater Recovery Well System.......................................................... 4 2.2.2 Barge Canal - Turtle Point Canal Restoration............................................ 5 2.2.3 Site Assessment Plan and Report................................................................ 5 2.2.4 Inspection of CCS Perimeter...................................................................... 6 2.3 Mitigation for Impacts Related to Historical Operations of the CCS......................6 2.3.1 Saltwater Interface Allocation of Contribution........................................... 6 2.3.2 Agreements to Convey Property Interests.................................................. 7 2.3.3 Increase Weir Elevations in FPLs Everglades Mitigation Bank............... 7 2.3.4 Escrow Funding for Mitigation of Saltwater Intrusion............................... 7 2.4 Monitoring and Reporting........................................................................................7 2.4.1 Continuous Surface Electromagnetic Mapping.......................................... 8 2.4.2 Expanded Groundwater Monitoring........................................................... 8 2.4.3 Expanded Biscayne Bay Water Quality Sampling..................................... 9 2.4.4 Expanded reporting of CCS Related Monitoring Data............................... 9 2.4.5 Annual Progress Reports............................................................................. 9 3.

Progress in Achieving the Objectives of the CA and CO........................ 10 4.

Recommendations for Refinement of Activities.................................... 11

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Table of Contents iv Appendices A

Daily Water Inputs into CCS B

Salinity of Floridan and Point Wells C

Analytical Results from Floridan Wells D

Daily Summary of Average CCS Salinity E

Monitoring Well Logs and Construction Details F

USGS Analytical Results G

Biscayne Bay Bimonthly Analytical Results

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 List of Tables v

LIST OF TABLES Table Page Table 2.0-1 Permitting Activities Status...................................................................................13 Table 2.0-2 Overall Status of Activities....................................................................................17 Table 2.1-1 Monthly Summary of Upper Floridan Aquifer and Marine Water Inputs During the Reporting Period (October 2016-September 2017)............................19 Table 2.2-1 Monthly Summary of Water Pumped from Temporary Production Wells and Net Mass Salt Removed from Groundwater (October 2016-September 2017)......................................................................................................................20 Table 2.4-1 Additional Related Water Monitoring Data Required by Other Governmental Entities (CO Paragraph 31.b.; Data Provided in the Florida Power & Light Company Electronic Data Management System).........................21 Table 2.4-2 Additional Consent Order Related Reports Required by Other Governmental Entities and Provided in the Florida Power & Light Company Electronic Data Management System...................................................23

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 List of Figures vi LIST OF FIGURES Figure Page Figure 2.1-1 Location of Floridan Wells and Point Wells..........................................................25 Figure 2.1-2 Daily Rainfall (NEXRAD) into CCS.....................................................................26 Figure 2.1-3 Average Monthly Water Inputs and Salinity in the CCS.......................................26 Figure 2.1-4 CCS Thermal Efficiency........................................................................................27 Figure 2.2-1 Location of Recovery Wells, Temporary Production Wells, and Injection Well........................................................................................................................28 Figure 2.2-2 Monthly Total Salt Removed and Flow in the UIC Well......................................29 Figure 2.4-1 Location of New Groundwater Monitoring Stations Relative to the Existing Groundwater Monitoring Network..........................................................30 Figure 2.4-2 Location of New Surface Water Monitoring Stations per the Consent Order and Consent Agreement...............................................................................31

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Acronyms and Abbreviations vii ACRONYMS AND ABBREVIATIONS Agencies Miami-Dade Countys Department of Regulatory and Economic Resources and the Florida Department of Environmental Protection Barge Basin Barge Canal Turning Basin CA Miami-Dade County Consent Agreement CCS Cooling Canal System CO Florida Department of Environmental Protection Consent Order CSEM Continuous Surface Electromagnetic Mapping DERM Miami-Dade Countys Department of Environmental Resources Management EDMS Florida Power & Light Company Turkey Point Power Plant Electronic Data Management System EMB Everglades Mitigation Bank EPU Extended Power Uprate FDEP Florida Department of Environmental Protection FDOH Florida Department of Health FPL Florida Power & Light Company MDC Miami-Dade County mgd million gallons per day mg/L milligrams per liter NAVD 88 North American Vertical Datum of 1988 NEXRAD Next Generation Radar NGVD National Geodetic Vertical Datum NMP Nutrient Management Plan Plant Florida Power & Light Company Turkey Point Power Plant psu practical salinity unit RAP Remediation Action Plan RWS Recovery Well System SAP Site Assessment Plan

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Acronyms and Abbreviations viii SAR Site Assessment Report SFWMD South Florida Water Management District TEP Thermal Efficiency Plan TKN total Kjeldahl nitrogen UFA Upper Floridan aquifer UIC underground injection control USACE United States Army Corps of Engineers USGS United States Geological Survey

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Executive Summary ES-1 EXECUTIVE

SUMMARY

The Cooling Canal System (CCS) is an integral part of the Florida Power & Light Company (FPL) Turkey Point Power Plant (Plant) site that has provided economical, reliable, and extreme low emission power generation for FPL customers for over 40 years. The CCS was uniquely designed to minimize environmental impacts to adjacent Biscayne Bay and surrounding saline groundwater. As with any human undertaking, unintended environmental impacts can occur.

Over the past seven years, FPL has been actively working with state and local agencies to assess the unintended impacts of the CCS operation to groundwater and surface water resources. As that information has been collected, analyzed, and better understood, unintended impacts have been identified in some areas and dispelled in others. Strategies for addressing the unintended impacts have been developed. These strategies are based on the concepts of abatement, remediation, onsite containment, restoration, and monitoring. The Consent Agreement (CA) between FPL and Miami-Dade County (MDC) and the Consent Order (CO) between FPL and the Florida Department of Environmental Protection (FDEP) guide the development and implementation of these strategies, where such action is required.

The main objective of the CA is to demonstrate a statistically valid reduction in the salt mass and volumetric extent of hypersaline water (as represented by chloride concentrations above 19,000 milligrams per liter [mg/L]) in groundwater west and north of FPLs property without creating adverse environmental impacts. A further objective of the CA is to reduce the rate of, and, as an ultimate goal, arrest migration of hypersaline groundwater. The objectives of the CO are threefold and include: (1) the cessation of discharges from the CCS that impair the reasonable beneficial use of adjacent G-II groundwaters; (2) prevention of releases of groundwater from the CCS to surface waters connected to Biscayne Bay that result in exceedances of surface water standards in the Bay; and (3) mitigation for impacts related to the historical operations of the CCS.

Progress made during this reporting period (October 2016 through September 2017) has advanced the objectives of both the CA and CO. FPL fully implemented the authorized CCS freshening activities, adding nearly 4.4 billion gallons of low salinity Upper Floridan aquifer (UFA) water to the CCS to offset freshwater that evaporated during the abnormally dry 2017 dry season. These actions, coupled with the return of a healthy wet season rainfall, resulted in a September 30, 2017, CCS salinity level of 41.2 practical salinity units (psu), which is the lowest September CCS salinity recorded since 1995. The abatement of hypersalinity in the CCS helps arrest the migration of hypersaline groundwater beneath and surrounding the CCS.

Secondly, FPL was successful in gaining regulatory approval to conduct an extended injection test of 15 million gallons per day (mgd) of hypersaline groundwater from beneath the CCS during the time when the approved groundwater Recovery Well System (RWS) was being permitted and constructed. During this test, hypersaline groundwater from the Biscayne aquifer

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Executive Summary ES-2 was pumped into a confined regional groundwater disposal horizon located 3,000 feet below the Biscayne aquifer. From October 2016 through September 2017, almost 5 billion gallons of hypersaline groundwater were removed from the Biscayne aquifer beneath the CCS, with an equivalent amount of salt removed exceeding 1,290,000 tons.

Finally, FPL conducted sampling and analyses of surface water, porewater, canal sediments and groundwater from numerous sites inside, beneath, and surrounding the CCS, as prescribed under the MDC approved Site Assessment Plan (SAP). The objective of this plan was to identify the source(s) of the ammonia exceedances and the delineation of the vertical and horizontal extents of the subject ammonia exceedances in waters tidally connected to Biscayne Bay. The analyses of the data were compiled in FPLs Site Assessment Report (SAR) submitted to MDC, which concluded that the collected data indicated the presence of elevated ammonia values in excess of MDCs surface water standards in waters adjacent to the CCS are not the result of point or non-point-source contamination attributable to the Plant. The SAR is currently under review by MDC.

Specifically, the following actions that further the objectives of the CA and CO were completed during this past year:

All compliance targets were achieved, as required by the CA and CO.

UFA and marine wells successfully limited the CCS salinity levels to less than 70 psu during the sixth driest dry season in the past 49 years and, combined with wet season rainfall, CCS salinity dropped to 40 psu by the end of the reporting period, which was the lowest salinity level in September since 1995.

FPL submitted its CCS Thermal Efficiency Plan (TEP) and Nutrient Management Plan (NMP) to FDEP. FDEP has reviewed both of these plans and instructed FPL to implement them. The annual CCS thermal efficiency for the reporting period was approximately 84%, which is well above the CO action level of 70%.

Designs for the groundwater RWS have been approved by MDC and FDEP and permits have been applied for and issued. Construction is underway, with a scheduled completion and operation in April 2018.

Plans and designs for the Barge Canal Turning Basin (Barge Basin) and Turtle Point Canal restoration projects have been completed and permit applications have been submitted and are under review.

FPL implemented the MDC approved SAP and submitted the required SAR to MDC, which concludes that the CCS is not the cause of ammonia exceedances measured in deep, man-made, dead-end canals adjacent to the Plant and CCS. The SAR was under review by MDC at the time of this report.

Inspection of the CCS perimeter by an independent licensed dam safety engineer revealed no structural defects or breaches. Maintenance recommendations are being implemented in 2017.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Executive Summary ES-3 Modeling to allocate relative contributions of other entities or factors on the movement of the saltwater interface, as required under the CO, has begun.

An agreement between FPL and the South Florida Water Management District (SFWMD) on conveying property rights in support of the Biscayne Bay Coastal Wetlands Everglades Restoration Project has been reached, with final appraisals being completed.

Assessment of impacts to raising weir elevations in the FPL Everglades Mitigation Bank (EMB) culverts required by MDC was completed and reports were filed, as required, with MDC and FDEP. The study concluded the increased stages resulted in high downstream salinities capable of adversely affecting success criteria of the EMB permit.

Normal permitted operations were restored at the end of the study.

Expansion of groundwater and surface water monitoring stations, as required in the CA and CO, were permitted and construction was initiated (with the exception of the TPGW-18 well cluster, pending MDC Class I permit issuance). Sampling of the installed wells will be conducted prior to startup of the recovery well system.

Expanded monitoring reporting has been made available on the FPL Plants Electronic Data Management System (EDMS) available to MDC and FDEP.

Extensive numbers of permit applications have been successfully prepared and submitted in support of the activities required under the CA and CO. A total of 30 permit applications were filed with county, state, and federal agencies, and all but five permit applications have been issued.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Section 1 1

1. BACKGROUND Miami Dade County and FPL entered into a CA on October 7, 2015 (amended on August 15, 2016) in which FPL agreed to conduct specific actions to remediate groundwater impacts adjacent to the Plant and the associated CCS and to take actions to address MDCs allegations that FPL violated water quality standards related to exceedances of ammonia. FDEP and FPL entered into a CO on June 20, 2016, which also required actions to be undertaken by FPL to address groundwater impacts associated with the CCS.

Paragraph 17.d.v. of the MDC CA states:

FPL shall submit annual reports providing an evaluation of progress in achieving the objectives of this Consent Agreement, status of implementing projects identified above, and the results of monitoring to determine the impacts of these activities. Recommendations for refinements to the activities will be included in the annual report. This may include deletions of monitoring that is demonstrated to no longer be needed, or additional monitoring that is warranted based on observations.

Paragraph 28 of the FDEP CO states:

FPL shall expand the 2009 Monitoring Plan database to include all additional water monitoring data related to this Order required by all other governmental agencies and entities, including but not limited to the SFWMD, Nuclear Regulatory Commission, Miami-Dade County and the Florida Department of Health, as well as all monitoring data that is required in this Order. This language is essentially repeated in Paragraphs 31.a. and b. of the CO.

FPL submits this consolidated 2017 Annual Turkey Point Power Plant Remediation/Restoration Report in compliance with the reporting requirements of the MDC CA and FDEP CO as a single report that presents a comprehensive update and status of the progress FPL is making in meeting the remediation, restoration, and reporting requirements of both agency directives. This annual report also expands upon the September 2017 Turkey Point Plant Annual Monitoring Report by providing all other water monitoring data that are required by the MDC CA and FDEP CO and additional water monitoring data required by other governmental agencies/entities. These data are summarized here and provided to the Agencies electronically in the FPL EDMS. This report is organized consistent with the sections of the MDC CA and FDEP CO that require actions by FPL and covers the reporting period of October 2016 through September 2017.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Section 2 2

2. STATUS FPL continues to make progress in implementing the measures outlined in the CA and CO.

These measures focus on CCS freshening, groundwater salinity remediation and containment, external canal restoration, assessment of ammonia in surface waters adjacent to the CCS, monitoring, and reporting. To achieve the objectives of the CA and CO, design, agency coordination/approval, permitting, and construction are required to be completed prior to implementation/operation. The following is a summary of the actions taken during the reporting period (October 2016 through September 2017) to meet the requirements of the CA and CO. A summary of the permits required and the overall status of activities is provided in Table 2.0-1 and Table 2.0-2.

2.1 CCS Freshening Activities Higher specific gravity hypersaline water can displace fresher groundwater contributing to saltwater migration in groundwater surrounding the CCS. FPL has proposed to use fresher water sources to replace freshwater evaporated from the CCS and thereby reduce average annual CCS salinity. Sustained average annual salinities closer to those of Biscayne Bay (34 psu) will support seagrass re-population and associated natural nutrient management in the CCS.

Currently, FPL has two sources of fresher water available to moderate CCS salinity: UFA groundwater and shallow marine groundwater from the Biscayne aquifer. Due to the high salinity of the marine well water, this source is limited to extraordinary circumstances to avoid extremely high CCS salinities or extremely low water levels. A summary of the use and status of both sources is provided below in Sections 2.2.1 and 2.1.2. FPL elected to discontinue the L-31E canal source for freshening, and the pumping facilities were decommissioned in December 2016.

FPL continues to work with MDC on a feasible reclaimed water application for the CCS and Plant, as recommended by MDCs Department of Environmental Resources Management (DERM) in their letter to FPL dated December 22, 2016.

2.1.1 Upper Floridan Aquifer Freshening Well Operations FPL filed an application to modify Site License Number PA 03-45D (September 14, 2014) to include the construction and use of up to six low salinity UFA wells with a total daily allocation of 14 mgd. The recommended site license modification was issued by FDEP and administratively challenged. A hearing was held in November 2015, and the final order approving the modification was issued on March 29, 2016. Pursuant to achieving the objective in Paragraph 20.a. of the FDEP CO, FPL proceeded with the construction of the UFA freshening system, which became fully operational on November 28, 2016. The wells flow under natural artesian pressure and have been in continuous operation since startup. Between November 28, 2016, and September 30, 2017, the wells pumped approximately 4.4 billion gallons of low salinity groundwater, into the CCS (Table 2.1-1 and Appendix A), with an average cumulative salinity of 2.3 psu. Appendix B provides a summary of salinity results for the UFA wells.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Section 2 3

Approximately 14 mgd have been discharged into the CCS from the UFA since November 28, 2016. Figure 2.1-1 shows the locations of the operating UFA wells; F-2 is a backup well that has not been constructed and is not shown. Results from quarterly sampling of the wells are included in Appendix C.

Wet season rainfall (Figure 2.1-2) combined with the freshening activities were effective in lowering CCS salinity by the end of the reporting period. During the dry season, peak CCS salinity reached 68.9 psu but dropped to 41.2 psu by September 30, 2017. Monthly volumes of freshening sources, rainfall, and average monthly CCS salinity for the reporting period are shown on Figure 2.1-3. Appendix D, which was used to develop Figure 2.1-3, provides a daily summary of the average CCS salinity calculated in accordance with Paragraph 29.j. of the FDEP CO.

2.1.2 Marine Freshening Well Operations Due to exceptionally dry conditions that persisted from November 2016 through the 2017 dry season (sixth driest January through May period in the previous 49 years: FPL, September 2017 Turkey Point Annual Monitoring Report), FPL operated up to three marine wells in conjunction with the UFA freshening wells during the reporting period (the locations of these wells are shown on Figure 2.1-1). The marine wells were operated at varying rates from March through August 2017, as necessary, to keep the CCS salinities below 70 psu. The total volume of water added was a little over 4.1 billion gallons (Table 2.1-1 and Appendix A), with an average salinity of approximately 36 psu (Appendix B).

2.1.3 Thermal Efficiency Plan Pursuant to Paragraph 20.b. of the FDEP CO, FPL submitted a TEP to FDEP on December 14, 2016. FPL identified that maintaining high thermal efficiency within the CCS was necessary for controlling evaporation and CCS salinity. The plan identified primary and secondary performance metrics to be monitored. These metrics are used to guide corrective actions, and near-and long-term actions to maintain high thermal efficiencies (equal or greater than 70). On July 7, 2017, FDEP instructed FPL to implement the plan. Several of the near-term actions have been implemented to varying degrees in the CCS. These actions have included sediment removal in many of the CCS canals, flow management within the CCS, water stage management, and vegetation management.

As a result, thermal efficiency during the 2017 reporting period met objectives, with an annual CCS efficiency for October 2016 through September 2017 of approximately 84%. Figure 2.1-4 shows a monthly summary of the thermal efficiency since October 2010 and the improvements in efficiency since 2015.

2.1.4 Nutrient Management Plan Pursuant to Paragraph 21.b. of the FDEP CO, FPL submitted a NMP to FDEP on September 16, 2016. The NMP is composed of three primary nutrient management strategies: active algae/nutrient removal; canal and berm maintenance; and salinity reduction and controlled flow management. On July 7, 2017, FDEP instructed FPL to implement the NMP. A copy of the NMP is provided on the EDMS.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Section 2 4

During this reporting period, FPL has performed many bench and pilot tests to find the most appropriate active nutrient/algae removal regime for the unique ecology and water chemistry of the CCS. These methods include chemical flocculants/coagulants, non-chemical physical removal methods, and aeration. In addition, FPL has reviewed canal practices in order to integrate the goal of minimizing erosion and nutrient inputs from sediment and berm sources.

FPL is in the process of evaluating appropriate, cost-efficient, and non-harmful methods to achieve the goals of the NMP considering information gathered from pilot testing, supplemental evaluations, and input from subject matter experts.

2.2 Remediation/Restoration/Containment Activities Phase I of the MDC CA and the first objective of the FDEP CO focus on halting the westward migration of hypersaline groundwater from the CCS and reducing the westward extent of the hypersaline plume to the L-31E canal. These objectives are to be achieved through the design, construction, and operation of a groundwater RWS. The second objective of the CO is to prevent releases of groundwater from the CCS to surface waters connected to Biscayne Bay by undertaking restoration projects in the Turtle Point Canal and Barge Basin. The amendment to the MDC CA directed FPL to identify the sources and vertical and horizontal extents of ammonia exceedances in surface waters surrounding the facility. During the reporting period, FPL has completed designs for the remediation and restoration projects, pursued permit approvals, initiated construction prescribed by the Agencies, conducted water quality sampling, and completed an analysis of ammonia surrounding the CCS. Further description of the project status is provided below in Sections 2.2.1 through 2.2.4.

2.2.1 Groundwater Recovery Well System Pursuant to Paragraph 20.c.i. and ii. of the FDEP CO and Paragraph 17.b.i. of the MDC CA, the groundwater RWS design, informed by the FPL variable density 3-D solute transport groundwater flow model, was submitted to MDC on May 16, 2016, and to FDEP on July 20, 2016. In a letter dated September 29, 2017, MDC required FPL to submit a Phase I Remediation Action Plan (RAP) within 120 days. Elements required to be included in the RAP were numerous revisions to and sensitivity analyses conducted by the 3-D variable density model and details regarding monitoring and reporting over the first several years of RWS operations. FPL submitted the Phase I RAP on January 27, 2017, and conditional approval of the RAP and original design of the RWS was provided by MDC on May 15, 2017. FPL filed permit applications for the RWS at the local, state, and federal levels on September 16, 2016 (see Table 2.0-1 for permitting details).

During the permitting process, FPL identified some alternative locations and piping paths that eliminated potential wetland impacts for the projects. FPL initiated construction of the RWS on June 19, 2017, consisting of road and site improvements, transmission line installations, well construction, and pipe placement. The construction is proceeding on schedule, with an estimated completion date in April 2018. The location of the RWS is shown on Figure 2.2-1. Where available, well logs generated during the construction of the RWS are included in Appendix E.

Part of the RWS design includes the repurposing of a permitted underground injection control (UIC) disposal test well located on site. The existing test injection well (DIW-1) was installed

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Section 2 5

into a regionally confined disposal horizon (the Boulder Zone) located over 3,000 feet below the Biscayne aquifer. FPL applied for and received a UIC permit modification for extended operational injection testing of DIW-1 (Permit No. 293962-003-UC/MM, issued on September 21, 2016). In order to conduct the extended testing, FPL designed and constructed four 90-foot-deep Biscayne aquifer production wells (Figure 2.2-1). The disposal well and production wells are equipped with pumps and power adequate for the withdrawal and injection of 15 mgd of hypersaline groundwater from beneath the CCS into the Boulder Zone.

FPL began injection testing of DIW-1 on September 28, 2016. Since injection testing began, the system has removed and safely disposed of approximately 5 billion gallons of hypersaline groundwater through September 2017 (Table 2.2-1). The mass of salt removed from the Biscayne aquifer associated with the volume of hypersaline groundwater disposed of during the extended injection testing as of September 2017 was 1,296,500 tons. Figure 2.2-2 shows a monthly summary of the salt mass removed and the volume of water pumped. The extended injection testing shall continue until the RWS is operational, at which time the four test wells will be secured and the ten RWS plume extraction wells will commence operations.

2.2.2 Barge Canal - Turtle Point Canal Restoration Pursuant to Paragraph 21.a. of the FDEP CO, FPL developed a detailed plan and design for restoration of the Barge Basin and Turtle Point canals. These artificial deep canals were originally designed as the cooling water intake and discharge for Units 1 and 2 at the Plant. The plan includes filling the deep areas of the Barge Basin to an elevation of -15 feet NAVD 88 (North American Vertical Datum of 1988) and the deep areas of Turtle Point to an elevation

-7 feet NAVD 88. This restoration strategy will significantly reduce any potential groundwater flow from the CCS to the surface waters and is very effective at maintaining water quality in the canals, as the shallower depths will allow tidal flows and natural reaeration of the canals. In order to further improve coastal habitat, FPL proposes to fill one-third of the Turtle Point canal to +1 foot NAVD 88 starting at the CCS berm and sloping fill toward the mouth of the canal to a final depth of approximately -7 feet NAVD 88. This design will provide additional mangrove and American crocodile habitat east of the CCS.

Plans and designs of FPLs proposed canal remediation were provided to FDEP on August 19, 2016. FPL submitted all permit applications for the restoration projects to FDEP, the United States Army Corps of Engineers (USACE), and MDC within 90 days of the effective date of the CO (pursuant to FDEP CO Paragraph 21.b.). The specific permits are described in Table 2.0-1.

FPL received Environmental Resource Permit and Submerged Lands Permit 13-0127512-013 on September 27, 2016. USACE Nationwide Permit 27 - Habitat Restoration and Enhancement and MDC Class I Permit for Coastal Construction are still pending (Table 2.0-1). Monitoring at new station TPBBSW-7T will commence when the permits authorizing the restoration efforts have been issued.

2.2.3 Site Assessment Plan and Report Pursuant to Paragraph 34.a. of the MDC CA, FPL submitted a SAP on September 14, 2016, for the purpose of identifying the source and extent of ammonia in surface waters surrounding the Plant facility that exceeded MDC water quality standards. In a letter dated December 21, 2016,

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Section 2 6

MDC identified revisions to the FPL SAP, and on December 29, 2016, FPL submitted an amended SAP and commenced sampling with MDC approval on January 3, 2017 (letter documenting MDC approval received February 14, 2017).

Pursuant to Paragraph 34.b. of the MDC CA, FPL submitted a SAR on March 17, 2017, which included all data and FPL evaluations regarding the sources and extent of elevated ammonia in surface waters. The report found that the CCS and Biscayne Bay had very low levels of ammonia, while elevated ammonia (greater than 0.5 mg/L) was measured in bottom samples collected in some of the deep, stagnant, man-made canals. The report concluded the occurrence of elevated ammonia measured during the sampling event did not come from the CCS but was likely the result of localized organic nitrogen (originating from vegetation detritus, organic soils, nitrogen fixation, etc.) being converted to ammonia through microbial processes in anaerobic, stagnant, basal portions of deep canals. The report also found that these conditions occur elsewhere in Biscayne Bay and the extent of elevated ammonia occurrences was limited (vertically, spatially, and temporarily). On July 7, 2017, MDC requested that FPL collect additional data and provide clarification and additional analyses, which were being produced at the time of this report.

2.2.4 Inspection of CCS Perimeter Pursuant to Paragraph 21.c. of the FDEP CO, FPL contracted for services for an independent, qualified, and licensed Professional Engineer to conduct an inspection of the CCS periphery, including all dams, dikes, surrounding berms, and appurtenant structures. The survey was completed, and a signed and sealed copy was provided to FDEP on October 12, 2016. The survey found no structural defects or breaches. The inspection report included recommendations for near-term and long-term maintenance activities. The near-term activities are underway and scheduled for completion by the end of 2017 and early 2018. In response to the long-term maintenance activities, FPL has established an annual and five-year preventative maintenance program that includes inspection of the perimeter berm slope and the removal of vegetation.

2.3 Mitigation for Impacts Related to Historical Operations of the CCS In order to address impacts related to historical operations of the CCS, both the MDC CA and FDEP CO included specific actions for FPL to implement. Progress made by FPL during the reporting period is described in Sections 2.3.1 through 2.3.4.

2.3.1 Saltwater Interface Allocation of Contribution Paragraph 23.a. of the FDEP CO requires FPL to complete an analysis with input from FDEP and other agencies using the variable density 3-D model developed under the MDC CA that seeks to allocate relative contributions of other entities and factors to the movement of the coastal saltwater interface. FPL has contracted for modeling services, identified modifications needed to be made to the model for the analyses, identified entities and factors to be evaluated by the model, and has shared the approach with and received input from FDEP. The modeling and analyses are scheduled to be completed by June 2018.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Section 2 7

2.3.2 Agreements to Convey Property Interests Paragraph 23.b. of the FDEP CO states that, if requested by the SFWMD, FPL will convey interests in essential properties within the Biscayne Bay Coastal Wetlands Phase I project to facilitate the Comprehensive Everglades Restoration Plan in exchange for payment based on a jointly approved appraisal process or other mutually agreeable considerations. The SFWMD provided notification of their intent to purchase FPL lands on August 25, 2016. FPL entered into negotiations with the SFWMD to identify lands for purchase, lands for easement, and procedures for appraisal and compensation, and an agreement was reached on May 5, 2017. At total of 193 acres of FPL owned lands within the Biscayne Bay Coastal Wetlands Phase I project corridor were identified to be conveyed to the SFWMD. At the time of this report, FPL and the SFWMD are finalizing appraisals for the FPL owned parcels. The land conveyance transaction for Biscayne Bay Coastal Wetland project lands is targeted to be completed by March 2018.

2.3.3 Increase Weir Elevations in FPLs Everglades Mitigation Bank Paragraph 17.c.i. of the MDC CA required FPL to raise the control elevations of the EMB culvert weirs to be no lower than 0.2 foot lower than the 2.4-foot trigger of the S-20 structure and shall maintain this elevation for one year and evaluate the change in control elevation with regards to impacts to salinity, water quality, and environmental lift in the EMB. On October 22, 2015, the weir elevations were raised, as required, to an elevation of 2.2 feet National Geodetic Vertical Datum (NGVD) and remained at that elevation for one year. FPL collected data on flow through the culverts, salinity trends downstream, and vegetation surveys upstream and downstream of the culverts. These data were compared with historical EMB data for comparative purposes and summarized in a report sent to DERM and FDEP (per Paragraph 32 of the MDC CA) on May 9, 2017. The report documented a significant reduction in freshwater flows to the south of the weirs and an associated increase in salinity to a degree that could affect the viability of freshwater wetland recruitment that has been achieved south of the L-31E levee since 2005 as well as ability of the EMB to meet the success criteria specified in the FDEP mitigation bank permit. The historical permitted operations of the weirs were restored in October 2016, and improved flows and reduced salinities in the EMB have been documented in 2017.

2.3.4 Escrow Funding for Mitigation of Saltwater Intrusion Paragraph 23.d. of the FDEP CO requires FPL to deposit $1.5 million into a Florida Department of Financial Services escrow account in accordance with an escrow agreement signed by FPL, FDEP, and the Florida Department of Financial Services. The escrow account shall be used to finance projects in the Plants region that support mitigation of saltwater intrusion. FPL and FDEP are in the process of developing the escrow agreement.

2.4 Monitoring and Reporting Both the MDC CA and FDEP CO include requirements for installation of additional monitoring stations, conducting initial baseline surveys prior to operation of the RWS, expansion of data posting, and annual reporting primarily for the purpose of monitoring progress toward achievement of the hypersaline plume retraction and determination of the rate of westward

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Section 2 8

migration of the hypersaline groundwater. Progress made by FPL during the reporting period is discussed below.

2.4.1 Continuous Surface Electromagnetic Mapping Pursuant to Paragraph 17.d.iii. of the MDC CA and Paragraph 29.a. of the FDEP CO, FPL shall conduct and report to the Agencies a baseline survey of the hypersaline plume after freshening activities are in operation but before the complete RWS begins operation. A baseline Continuous Surface Electromagnetic Mapping survey is anticipated to be conducted in January or February of 2018 prior to the operation of the complete groundwater RWS. Subsequent surveys will be conducted annually for the first three years of operation and every other year thereafter. Since a baseline survey is pending, as well as subsequent surveys, the extent, volume, and movement of hypersaline groundwater west and north of the CCS cannot be determined for this reporting period.

2.4.2 Expanded Groundwater Monitoring Pursuant to Paragraph 17.d.iv. of the MDC CA and Paragraph 27.a. of the FDEP CO, FPL is required to expand the groundwater monitoring network. The MDC CA requires that FPL add three groundwater monitoring clusters (shallow, mid, and deep) to monitor groundwater conditions in the Model Lands basin, similar in design and function to existing groundwater monitoring wells in the region, as part of the CCS monitoring program. These new groundwater wells are designated as TPGW-17, TPGW-18, and TPGW-19. On November 11, 2016, FPL filed Class I wetland permit applications for the three monitoring sites with MDC. Through negotiations with DERM, an agreement was reached to relocate TPGW-17 and TPGW-19 to upland locations to avoid wetland impacts. Figure 2.4-1 includes the locations of these three wells. The construction and installation of TPGW-17 and TPGW-19 is underway. Final well completion/construction closeout is scheduled for January 31, 2018, for both wells. Available information on construction details and initial logging information are provided in Appendix B.

The Class I permit application for TPGW-18 was under review at the time of this report.

Construction of TPGW-18 will start immediately following permit issuance.

The FDEP CO requires that FPL add monitoring data from six United States Geological Survey (USGS) wells to the EDMS (G-3946-S, G-3946-D, G-3900, G-3976, G-3966, and G-3699),

replace existing monitoring well TPGW-8S, and construct a new deep monitoring well (TPGW-

20) and a new three-well monitoring cluster (TPGW-21) consistent with the 2009 Monitoring Plan. FPL completed the construction and installation of TPGW-20 on August 24, 2017. The final construction completion/closeout for that well occurred on October 13, 2017. Construction completion of wells TPGW-8S and TPGW-21 is scheduled for December 1, 2017, and December 22, 2017, respectively. Available information on construction details and initial logging information are included in Appendix E. Figure 2.4-1 includes the locations of these wells.

Groundwater samples were not collected from the CA or CO monitoring wells during the reporting period since none of the wells reached the final completion/construction closeout phase. Groundwater sampling and monitoring of these wells will be conducted during the next reporting period.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Section 2 9

The USGS groundwater analytical data have been uploaded into a folder in the EDMS (http://css-3-4-plan.com/PublicResource; note that the address will change when the EDMS websites are consolidated). A summary of the chloride data, the only parameter collected consistently, is included in Appendix F.

2.4.3 Expanded Biscayne Bay Water Quality Sampling Pursuant to Paragraphs 23.d. and 29.k. of the FDEP CO, FPL is required to collect surface water samples in Biscayne Bay once every two months at six new stations (TPBBSW-15, TPBBSW-16, TPBBSW-17, TPBBSW-18, TPBBSW-19, and TPBBSW-20) near the top and bottom of the water column. Figure 2.4-2 shows the locations of these stations. The parameters sampled include temperature, conductivity, pH, dissolved oxygen, turbidity, salinity, tritium, ammonia, nitrate/nitrite, total Kjeldahl nitrogen (TKN), orthophosphate, total phosphorus, chlorophyll-a, and Secchi disk depth. The bimonthly results, starting in September 2016 through September 2017, are included in Appendix G and are maintained in a folder on the EDMS.

2.4.4 Expanded reporting of CCS Related Monitoring Data Pursuant to Paragraphs 28, 31, and 33 of the FDEP CO, FPL is required to expand the 2009 Monitoring Plan database to include additional water monitoring data required by all other governmental agencies and entities including, but not limited to, SFWMD, the Nuclear Regulatory Commission, MDC, and the Florida Department of Health, as well as all monitoring data that are required in the CO. In November 2017, FPL expanded the Public Resources section of the EDMS database to include these documents beginning in June 2016, when the CO was executed. Tables 2.4-1 and 2.4-2 provide a summary of the additional information added to the EDMS; this information is currently at http://css-3-4-plan.com/PublicResource, but the address will change when the EDMS websites are consolidated.

2.4.5 Annual Progress Reports Pursuant to Paragraph 17.d.v. of the MDC CA and Paragraph 31 of the FDEP CO, FPL is required to provide an annual report. The first annual report (FPL 2016) was provided to the Agencies on November 11, 2016. This report constitutes the second annual report.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Section 3 10

3. PROGRESS IN ACHIEVING THE OBJECTIVES OF THE CA AND CO FPLs progress in achieving the objectives of the CA and CO this year (October 2016 through September 2017) has been notable. Actions focused on abatement of salinity in the CCS, gaining approval and initiating construction of the RWS, design and permitting of the Barge Basin and Turtle Point canal restoration projects, permitting and construction of the expanded groundwater monitoring wells, and conducting evaluations of ammonia in surface water within and surrounding the CCS.

While CCS freshening had not reached one full year at the time this report was completed, the 10-month CCS average salinity for November 28, 2016, through September 30, 2017, was 61.7 psu. This salinity response is significant in that the rainfall over the CCS in November 2016 was 0.23 inch and the total for the period from January to May 2017 was the sixth lowest (6.7 inches) based on 49 years of data (September 2017 FPL Turkey Point Plant Annual Monitoring Report).

Despite these low rainfall totals, the addition of the UFA groundwater and marine well water was effective in keeping average CCS salinities below 70 psu. By comparison, CCS salinities during the dry seasons of 2014 and 2015 (which were not as dry as 2017) exceeded 90 psu. With the high rainfalls of the 2017 wet season (including Hurricane Irma), CCS salinities dropped to 41.2 psu by the end of September, which was the lowest September value since 1995. While it can be expected that the CCS salinities will rise during the 2018 dry season, the low initial CCS salinity combined with the addition of fresher UFA water is anticipated to further moderate annual CCS salinity in 2018 (not withstanding unusual drought conditions).

The thermal efficiency of the CCS for the period of November 28, 2016, through September 30, 2017, was approximately 84%. This is a significant improvement over levels measured in 2013 and 2014, as described in the 2016 FPL TEP. While freshening may have had a minor impact, sediment removal and implementation of near-term recommendations of the TEP are considered to be more influential factors in overall improved system efficiency.

Completion of the design and permitting phase and subsequent initiation of construction of the RWS were significant achievements of the 2017 reporting period. While not a requirement of the CA or CO, the initiation of the extended injection test of the Plants UIC well was responsible for removing nearly 5 billion gallons of hypersaline groundwater from beneath the CCS. This action was helpful in removing source waters of the hypersaline plume and, combined with CCS freshening, are positive actions toward meeting the objectives of halting and eventually retracting the hypersaline plume west and north of the CCS.

Other actions described above, including monitoring well construction, assessment of ammonia, and contributing factors to the movement of the saltwater interface, will position FPL and the Agencies to evaluate the success of the RWS once operational.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Section 4 11

4. RECOMMENDATIONS FOR REFINEMENT OF ACTIVITIES FPL recommends that reporting for the MDC CA, FDEP CO, and Extended Power Uprate (EPU) monitoring be consolidated into one report, with the focus shifted toward progress in abating/remediating the CCS plume and associated impacts per the CA and CO. FPL also recommends that the annual reports be streamlined and summarized with the backup data provided in the EDMS, rather than included in multi-volume reports.

FPL will provide a RWS startup report and quarterly reports (for one year) as required by MDC, but recommends that the annual reporting be part of the larger comprehensive single report recommended above. Since it is anticipated that the RWS will begin operations during the spring of 2018, the first annual report will be submitted 15 months later. The reporting period will run from June 2018 through May 2019, with this first report submitted to the Agencies at the end of August 2019. The RWS startup report will cover the reporting period of October 2017 through May 2018 and will include the baseline data for the RWS system along with the EPU monitoring information. The startup report will be provided to the Agencies by September 2018.

In addition, FPL suggests shifting the report text away from specific conductance and presenting salinity data instead, since the CA and CO refer to salinity and not specific conductance. Early in the EPU project, the Agencies requested that FPL use specific conductance or salinity in the annual reports, but not interchangeably. Since specific conductance is a more direct measurement than salinity, FPL opted to focus on specific conductance in the previous reports; however, moving forward, salinity will be used consistent with the reporting requirements of the CA and CO.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Tables 12 TABLES

2017 Annual Turkey Point Power Power Plant Remediation/Restoration Report November 2017 Tables 13 Table 2.0-1 Permitting Activities Status Project Agency Permit Type Permit Application Number Permit Number Submittal Date Permit Issued Date FDEP Consent Order Paragraph 21.a Turtle Point and Barge Canal Restoration Florida Department of Environmental Protection Joint Application Environmental Resource Permit 13-0127512-013 13-0127512-013 8/4/16 9/27/16 Turtle Point and Barge Canal Restoration U.S. Army Corps of Engineers Section 404: Dredge

& Fill SAJ-2016-02462(SP-MLC)

Pending 8/4/16 Pending Turtle Point and Barge Canal Restoration Miami-Dade County Department of Environmental Resource Management Class I Wetlands Permit CLI-2016-0244 Pending 8/4/16 Pending FDEP Consent Order Paragraph 27.c Groundwater Monitoring Wells:

TPGW-8S Miami-Dade County Right of Way 2017002979 2017002979 9/15/16 5/18/17 Groundwater Monitoring Wells:

TPGW-8S Miami-Dade County Well Construction Permit 13-59-13647 13-59-13647 4/7/17 4/11/17 MDC Consent Agreement Paragraph 17.d.iv Groundwater Monitoring Wells:

TPGW-17 Miami-Dade County Well Construction Permit Shallow: 13-59-13648 Mid:13-59-13692 Deep: 13-59-13693 Shallow: 13-59-13648 Mid:13-59-13692 Deep: 13-59-13693 4/7/17 5/2/17 Groundwater Monitoring Wells:

TPGW-18 Miami-Dade County Well Construction Permit Shallow: 13-59-13885 Mid:13-59-13886 Deep: 13-59-13887 Shallow: 13-59-13885 Mid:13-59-13886 Deep: 13-59-13887 6/30/17 7/6/17 Groundwater Monitoring Wells:

TPGW-18 Florida Department of Environmental Protection Joint Application Environmental Resource Permit 13-0127512-014EI 13-0127512-014EI 9/15/16 12/19/16

2017 Annual Turkey Point Power Power Plant Remediation/Restoration Report November 2017 Tables 14 Table 2.0-1 Permitting Activities Status Project Agency Permit Type Permit Application Number Permit Number Submittal Date Permit Issued Date Groundwater Monitoring Wells:

TPGW-18 U.S. Army Corps of Engineers Section 404: Dredge

& Fill SAJ-2016-02462 SAJ-2016-02462 9/15/16 2/27/17 Groundwater Monitoring Wells:

TPGW-18 Miami-Dade County Department of Environmental Resource Management Class I Wetlands Permit CLI-2016-0303 Pending 11/11/16 Pending Groundwater Monitoring Wells:

TPGW-19 Miami-Dade County Well Construction Permit Shallow: 13-59-13888 Mid: 13-59-13889 Deep: 13-59-13884 Shallow: 13-59-13888 Mid: 13-59-13889 Deep: 13-59-13884 6/30/17 7/6/17 FDEP Consent Order Paragraph 27.d Groundwater Monitoring Wells:

TPGW-20 City of Homestead Right of Way NA 17-14 3/2/17 5/30/17 Groundwater Monitoring Wells:

TPGW-20 Miami-Dade County Well Construction Permit Deep: 13-59-13650 Deep: 13-59-13650 4/7/17 4/11/17 FDEP Consent Order Paragraph 27.b Groundwater Monitoring Wells:

TPGW-21 Miami-Dade County Right of Way 2017002980 201700298 9/15/16 5/18/17 Groundwater Monitoring Wells:

TPGW-21 Miami-Dade County Well Construction Permit Shallow: 13-59-13649 Mid:13-59-1394 Deep: 13-59-13695 Shallow: 13-59-13649 Mid:13-59-1394 Deep: 13-59-13695 4/7/17 5/2/17

2017 Annual Turkey Point Power Power Plant Remediation/Restoration Report November 2017 Tables 15 Table 2.0-1 Permitting Activities Status Project Agency Permit Type Permit Application Number Permit Number Submittal Date Permit Issued Date FDEP Consent Order Paragraph 21.c and MDC Consent Agreement Paragraph 17.b.i Recovery Well System: Pipeline &

L31 Levee Crossing South Florida Water Management District Right of Way 16-0920-2 14742 9/15/16 3/7/17 Recovery Well System: Pipeline &

L31 Levee Crossing U.S. Army Corps of Engineers Section 408 NA Pending 2/24/17 Pending Recovery Well System: Pipeline along Palm Drive Miami-Dade County Right of Way 2017003859 2017003859 5/30/17 8/16/17 Recovery Well System: Consumptive Use (15 MGD)

South Florida Water Management District Consumptive Water Use 160916-12 13-06251-W 9/15/16 3/1/17 Recovery Well System: RWS-1 Miami-Dade County Well Construction Permit 13-59-13736 13-59-13736 5/5/17 5/8/17 Recovery Well System: RWS-2 Miami-Dade County Well Construction Permit 13-59-13737 13-59-13737 5/5/17 5/8/17 Recovery Well System: RWS-3 Miami-Dade County Well Construction Permit 13-59-13738 13-59-13738 5/5/17 5/8/17 Recovery Well System: RWS-4 Miami-Dade County Well Construction Permit 13-59-13739 13-59-13739 5/5/17 5/8/17 Recovery Well System: RWS-5 Miami-Dade County Well Construction Permit 13-59-13740 13-59-13740 5/5/17 5/8/17 Recovery Well System: RWS-6 Miami-Dade County Well Construction Permit 13-59-13741 13-59-13741 5/5/17 5/8/17 Recovery Well System: RWS-7 Miami-Dade County Well Construction Permit 13-59-13742 13-59-13742 5/5/17 5/8/17

2017 Annual Turkey Point Power Power Plant Remediation/Restoration Report November 2017 Tables 16 Table 2.0-1 Permitting Activities Status Project Agency Permit Type Permit Application Number Permit Number Submittal Date Permit Issued Date Recovery Well System: RWS-8 Miami-Dade County Well Construction Permit 13-59-13743 13-59-13743 5/5/17 5/8/17 Recovery Well System: RWS-9 Miami-Dade County Well Construction Permit 13-59-13744 13-59-13744 5/5/17 5/8/17 Underground Injection Control Well: Disposal Well Florida Department of Environmental Protection Injection Test 293962-003-UC/MM 293962-003-UC/MM 8/31/16 9/21/16 Underground Injection Control Well: Disposal Well Florida Department of Environmental Protection Operational Permit 0293962-004-UO/1I 0293962-004-UO/1I 6/1/17 Pending

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Tables 17 Table 2.0-2 Overall Status of Activities Activity CO / CA No.

Status Additional Comments CCS Freshening Activities Upper Floridan Aquifer Wells CO 20.a.

14 mgd capacity UFA well system operational 11/28/17. Operations maintained throughout reporting period (307 days).

Average salinity of UFA water added during reporting period: 2.3 psu.

Total UFA water added to CCS during reporting period: 4.37 billion gallons.

Existing Marine Wells CA 17.a.i.2.

Wells activated on 3/8/17 and secured on 8/28/17 (141 days of operation during reporting period).

Average salinity of marine well water added during reporting period:

36.4 psu. Total marine well water added to CCS during reporting period: 4.18 billion gallons.

L-31E Source Water CA 17.a.i.2.

Not Available.

FPL removed L-31E facilities in December 2016 with close-out inspection by the SFWMD on 1/9/17.

Evaluation of Alternative Sources CA 17.a.ii.

FPL working with MDC on use of reclaimed water for CCS freshening source.

Thermal Efficiency Plan (TEP)

CO 20.b.

FPL submitted TEP to FDEP: 12/14/2016. FDEP instructs FPL to implement plan 7/7/2017.

Average CCS thermal efficiency during the reporting period is approximately 84%.

Nutrient Management Plan (NMP)

CO 21.b.

FPL submitted NMP to FDEP: 9/16/2016. FDEP instructs FPL to implement plan 7/7/2017.

Remediation - Restoration Activities Recovery Well System (RWS)

CO 20.c.i. & ii.

CA 17.b.i.

RWS designs submitted to MDC 5/16/2016 and to FDEP 7/20/2016. Permit applications for RWS filed on 9/16/2016, all permits issued except USACE 408 permit and UIC Operational Permit (pending). MDC approves RWS: 5/15/2017.

Construction initiated on 6/19/17.

UIC extended injection well testing permit issued by FDEP: 9/21/2016.

FPL initiated 15mgd injection testing using hypersaline GW from beneath CCS: 9/29/2016.

5 billion gallons containing 1,296,500 tons of salt disposed of during reporting period injection test.

RWS target operational startup:

April 2018.

Turtle Point and Barge Basin Canal Restoration CO 21.a.

Plans and designs submitted to FDEP 8/19/2016. Permit applications filed 8/4/2016.

COE 404 and MDC Class I applications are under review.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Tables 18 Table 2.0-2 Overall Status of Activities Activity CO / CA No.

Status Additional Comments Site Assessment Plan (SAP)

CA 34.a.

SAP submitted by FPL 9/14/2016, Plan amended 12/29/2016. Plan approved by MDC 2/14/2017.

Sampling completed in January 2017.

Site Assessment Report (SAR)

CA 34.b.

Report submitted.

3/17/2017. MDC issued RFI on 7/7/2017.

FPL responses to RFI on 11/13/17.

Inspection of CCS perimeter CO 21.c.

Inspection report filed with FDEP 10/12/2016.

Inspection found no structural defects or breaches. Recommended maintenance activities are underway in 2017.

Mitigation for Impacts Related to Historical Operations of the CCS Saltwater Interface allocation of contributions CO 23.a.

Contract for modeling issued and work has begun.

Completion date 6/20/2018.

Agreements to convey property interests for CERP BBCW and S-20 structure projects CO 23.b.

CA 17.c.iii.

District notified FPL of intent to purchase: August 25, 2016. Agreement reached on 5/5/2017.

Appraisals conducted and sales documents are being drafted. No determination of need by District at this time for S-20 structure.

Completion of the land conveyance transaction for BBCW project lands estimated for completion March 2018.

Filling portions of Model Lands North Canal CA 17.c.ii.

Activity completed.

No additional actions required.

Increase weir control elevation test in FPL Everglades Mitigation Bank CO 32.

CA 17.c.i.

Activity completed, report submitted to MDC and FDEP: 5/9/2017.

No additional actions required.

Escrow funding for mitigation of saltwater intrusion CO 23.d.

FPL and FDEP in process of developing the escrow agreement.

Monitoring and Reporting CSEM Baseline Survey C0 29.a.

CA 17.d.iii.

Bid for services issued.

Baseline survey to be conducted no more than 60 days prior to RWS startup.

Expanded groundwater monitoring in Model Lands and surrounding area CO 27a.,b., c.,

& d.

CA 17.d.iv.

Permitting for construction of all new monitoring wells complete (except TPGW-18). Construction of TPGW-20, 21, 17, 19 and 8S began during the reporting period. TPGW-18 Class I permit pending.

USGS well data posted on EDMS and included in this report. Sampling of newly constructed monitoring wells to begin 60 days or less prior to RWS startup.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Tables 19 Table 2.0-2 Overall Status of Activities Activity CO / CA No.

Status Additional Comments Expanded Biscayne Bay WQ sampling CO 23.d., CO 29.k.

Bi-monthly sampling was initiated in September 2016 and will continue for two years.

Data provided on EDMS database and included in this report.

Expanded reporting of CCS related monitoring CO 28., 31.

Updates to EDMS and posting of reports complete:

November 2017.

Data can be found in the FPL EDMS.

Submit annual progress reports CO 31.

CA 17d.v.

Provided November 2016 and 2017.

Provide FDEP with copies of submittals to other agencies CO 33.

Copies of FPL reports and compliance submittals to MDC and EPU reports to SFWMD provided to FDEP.

Table 2.1-1 Monthly Summary of Upper Floridan Aquifer and Marine Water Inputs During the Reporting Period (October 2016-September 2017)

Month Total Water Inputs (million gallons)

Upper Floridan Wells Marine Wells Oct-16 63.9 0.0 Nov-16 320.1 0.0 Dec-16 420.2 0.0 Jan-17 409.5 0.0 Feb-17 375.9 0.0 Mar-17 406.3 421.0 Apr-17 388.4 900.1 May-17 409.9 1,176.7 Jun-17 382.5 207.5 Jul-17 422.3 582.0 Aug-17 401.7 891.1 Sep-17 371.0 0.0 Total 4,371.8 4,178.5

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Tables 20 Table 2.2-1 Monthly Summary of Water Pumped from Temporary Production Wells and Net Mass Salt Removed from Groundwater (October 2016-September 2017)

Month Gallons Pumped (Millions)

Average Salinity (PSU)

Monthly Tons of Salt Removed 10/2016 429 61 113000 11/2016 442 59 114500 12/2016 455 59 117000 1/2017 445 60 116000 2/2017 412 60 107000 3/2017 455 60 118500 4/2017 436 60 114000 5/2017 409 59 105500 6/2017 438 60 114500 7/2017 438 60 113500 8/2017 387 57 96000 9/2017 251 62 67000 Total 4,997 1,296,500

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Tables 21 Table 2.4-1 Additional Related Water Monitoring Data Required by Other Governmental Entities (CO Paragraph 31.b.; Data Provided in the Florida Power & Light Company Electronic Data Management System)

EDMS Folder Permit/Condition #

Submittal/Parameters Frequency Government Agency Industrial Wastewater Facility Permit (Outfalls I-001 & I-002)

FL0001562 pH Monthly FDEP Temperature Monthly FDEP Specific conductance Quarterly FDEP TSS, pH, salinity, specific conductance Quarterly FDEP TSS, lead, oil & grease, copper, zinc Semi-annually FDEP Copper, iron, zinc Semi-annually FDEP Log check and report Monthly FDEP Domestic Wastewater Annual Operating Permit DWO-000010-2017/2018 DMR Monthly MDC Domestic Wastewater Facility Permit and Underground Injection Well FLA013612 and 0127512-006-UO MOR Monthly FDEP Wastewater effluent stream analysis Within 6 months expiration of permit FDEP Permit renewal notice 60 days prior to expiration FDEP Other data/documents (Consent Agreement) 17.d.ii L-31E data (current and historic) groundwater and surface water data Weekly, Quarterly, SA MDC Addendum SAP and SAP associated data collection TBD MDC 17.d.ii/17.b.ii Data reports including operation of RWS, consistent with the data reports currently required by the MDC Class I permit Monthly/Semi-Annual MDC Other data/documents (Consent Order)

SC 23.d Data from six Biscayne Bay sites Every 2 months (for 2 years)

FDEP SC 27.a Data from six USGS wells Updated monthly FDEP

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Tables 22 Table 2.4-1 Additional Related Water Monitoring Data Required by Other Governmental Entities (CO Paragraph 31.b.; Data Provided in the Florida Power & Light Company Electronic Data Management System)

EDMS Folder Permit/Condition #

Submittal/Parameters Frequency Government Agency Interceptor Ditch (5th Supplemental Agreement)

Monitoring Plan Seasonal readings Updated Bi-Monthly SFWMD Telemetry based readings Updated Daily SFWMD Surface water samples Updated Bi-Monthly SFWMD Manual readings Updated Bi-Monthly SFWMD ID readings and pump operations entries Updated Bi-Monthly SFWMD ID staff gauge surveys and pump calibrations Annual or as needed SFWMD

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Tables 23 Table 2.4-2 Additional Consent Order Related Reports Required by Other Governmental Entities and Provided in the Florida Power & Light Company Electronic Data Management System EDMS Folder Permit/Condition #

Submittal/Parameters Frequency Government Agency Other Reports (Consent Agreement)

Addendum SAR Single submittal MDC 17.d.v Alternative Water Supply Report Single submittal MDC 17.d.v Model Documentation Reports Single submittal MDC 17.d.ii/17.b.ii Data reports including operation of RWS, consistent with the data reports currently required by the MDC Class I permit Monthly/Semi-Annual MDC SC 20.b Thermal Efficiency Plan Single submittal FDEP SC 28 Nutrient Management Report Single submittal FDEP SC 28 REMP/RETZ reports Annual report FDEP Interceptor Ditch (5th Supplemental Agreement)

Monitoring Plan Annual Interceptor Ditch Assessment (as part of Annual Uprate Report)

Annual SFWMD UIC Class I Injection Well System Permit 293962-002-UC UIC MOR Monthly FDEP Upper Floridan Aquifer data/documents (Conditions of Certification )

PA 03-45E UFA Water withdrawal Report Quarterly SFWMD/FDEP Nuclear Regulatory Commission CA, Special Condition 28 REMP/RETZ reports Annual report FDEP Florida Department of Health (FDOH)

COC VII. B.4.

Tritium monitoring Monthly FDOH

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Figures 24 FIGURES

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Figures 25 Figure 2.1-1 Location of Floridan Wells and Point Wells

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Figures 26 Figure 2.1-2 Daily Rainfall (NEXRAD) into CCS Figure 2.1-3 Average Monthly Water Inputs and Salinity in the CCS

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Figures 27 Figure 2.1-4 CCS Thermal Efficiency

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Figures 28 Figure 2.2-1 Location of Recovery Wells, Temporary Production Wells, and Injection Well

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Figures 29 Note: Probes were not reporting salinity values 9/6-9/25/2017. The average of available salinity values from 9/26-10/1/2017 was used for salt removed calculations during this period.

Figure 2.2-2 Monthly Total Salt Removed and Flow in the UIC Well

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Figures 30 Figure 2.4-1 Location of New Groundwater Monitoring Stations Relative to the Existing Groundwater Monitoring Network

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Figures 31 Figure 2.4-2 Location of New Surface Water Monitoring Stations per the Consent Order and Consent Agreement

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Appendix A Daily Water Inputs into CCS

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 10/1/2016 0.46 58.48 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/2/2016 0.06 7.56 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/3/2016 0.21 26.98 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/4/2016 0.01 1.18 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/5/2016 0.04 4.96 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/6/2016 0.43 54.94 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/7/2016 0.00 0.00 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/8/2016 0.00 0.00 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/9/2016 0.00 0.00 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/10/2016 0.00 0.00 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/11/2016 0.00 0.00 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/12/2016 0.13 15.93 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/13/2016 0.00 0.10 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/14/2016 0.00 0.56 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/15/2016 0.51 64.68 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/16/2016 0.34 43.26 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/17/2016 0.00 0.00 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/18/2016 0.09 10.96 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/19/2016 0.00 0.00 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/20/2016 0.00 0.18 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/21/2016 0.00 0.00 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/22/2016 0.00 0.00 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 10/23/2016 0.00 0.00 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/24/2016 0.00 0.00 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/25/2016 0.00 0.00 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/26/2016 0.18 22.27 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/27/2016 1.62 206.44 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/28/2016 0.02 2.67 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/29/2016 0.16 20.14 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/30/2016 0.11 14.30 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10/31/2016 0.34 42.73 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11/1/2016 0.00 0.00 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11/2/2016 0.00 0.00 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11/3/2016 0.00 0.59 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11/4/2016 0.00 0.00 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11/5/2016 0.04 4.50 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11/6/2016 0.01 1.84 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11/7/2016 0.04 5.56 2.1 0.0 3.9 0.0 4.7 0.0 0.0 0.0 0.0 11/8/2016 0.00 0.00 2.1 0.0 3.7 0.0 4.7 0.0 0.0 0.0 0.0 11/9/2016 0.00 0.00 2.1 0.0 3.7 0.0 4.7 0.0 0.0 0.0 0.0 11/10/2016 0.00 0.00 2.1 0.0 3.7 0.0 4.7 0.0 0.0 0.0 0.0 11/11/2016 0.00 0.00 2.1 0.0 3.7 0.0 4.7 0.0 0.0 0.0 0.0 11/12/2016 0.00 0.00 2.1 0.0 3.7 0.0 4.7 0.0 0.0 0.0 0.0 11/13/2016 0.00 0.00 2.1 0.0 3.7 0.0 4.7 0.0 0.0 0.0 0.0

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 11/14/2016 0.00 0.00 2.1 0.0 3.6 0.0 4.4 0.0 0.0 0.0 0.0 11/15/2016 0.01 1.74 2.0 0.0 3.5 0.0 4.2 0.0 0.0 0.0 0.0 11/16/2016 0.07 8.85 2.0 0.0 3.5 2.5 4.2 0.0 0.0 0.0 0.0 11/17/2016 0.00 0.00 2.0 0.0 3.5 4.0 4.2 0.0 0.0 0.0 0.0 11/18/2016 0.00 0.00 2.0 0.0 3.5 4.0 4.2 0.0 0.0 0.0 0.0 11/19/2016 0.00 0.00 2.0 0.0 3.5 4.0 4.2 0.0 0.0 0.0 0.0 11/20/2016 0.00 0.00 2.0 0.0 3.5 4.0 4.2 0.0 0.0 0.0 0.0 11/21/2016 0.00 0.00 2.0 0.0 3.5 3.9 4.1 0.0 0.0 0.0 0.0 11/22/2016 0.00 0.00 2.0 0.0 3.6 3.8 3.9 0.0 0.0 0.0 0.0 11/23/2016 0.00 0.00 2.0 0.3 3.6 3.8 3.9 0.0 0.0 0.0 0.0 11/24/2016 0.00 0.00 2.0 0.0 3.6 3.8 3.9 0.0 0.0 0.0 0.0 11/25/2016 0.00 0.00 2.0 0.0 3.6 3.8 3.9 0.0 0.0 0.0 0.0 11/26/2016 0.00 0.00 2.0 0.0 3.6 3.8 3.9 0.0 0.0 0.0 0.0 11/27/2016 0.10 13.16 2.0 0.0 3.6 3.8 3.9 0.0 0.0 0.0 0.0 11/28/2016 0.01 1.58 2.0 0.2 3.4 3.8 4.0 0.0 0.0 0.0 0.0 11/29/2016 0.01 1.03 2.0 0.0 3.2 3.8 4.0 0.0 0.0 0.0 0.0 11/30/2016 0.00 0.00 2.0 0.0 3.2 3.8 4.0 0.0 0.0 0.0 0.0 12/1/2016 0.05 6.81 2.0 0.0 3.2 3.8 4.0 0.0 0.0 0.0 0.0 12/2/2016 1.17 148.40 2.0 0.0 3.2 3.8 4.0 0.0 0.0 0.0 0.0 12/3/2016 0.00 0.00 2.0 0.0 3.2 3.8 4.0 0.0 0.0 0.0 0.0 12/4/2016 0.00 0.00 2.0 0.0 3.2 3.8 4.0 0.0 0.0 0.0 0.0 12/5/2016 0.00 0.00 1.1 1.5 3.3 3.1 4.2 0.0 0.0 0.0 0.0

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 12/6/2016 0.00 0.00 1.1 1.5 3.3 3.1 4.2 0.0 0.0 0.0 0.0 12/7/2016 0.33 41.88 1.1 1.5 3.3 3.1 4.2 0.0 0.0 0.0 0.0 12/8/2016 0.36 45.34 1.1 1.5 3.3 3.1 4.2 0.0 0.0 0.0 0.0 12/9/2016 0.38 48.71 1.1 1.5 3.3 3.1 4.2 0.0 0.0 0.0 0.0 12/10/2016 1.08 137.44 1.1 1.5 3.3 3.1 4.2 0.0 0.0 0.0 0.0 12/11/2016 0.16 19.93 1.1 1.5 3.3 3.1 4.2 0.0 0.0 0.0 0.0 12/12/2016 0.00 0.00 0.0 3.5 3.0 3.7 3.3 0.0 0.0 0.0 0.0 12/13/2016 0.00 0.00 0.0 3.5 3.0 3.7 3.3 0.0 0.0 0.0 0.0 12/14/2016 0.00 0.00 0.0 3.5 3.0 3.7 3.3 0.0 0.0 0.0 0.0 12/15/2016 0.00 0.00 0.0 3.5 3.0 3.7 3.3 0.0 0.0 0.0 0.0 12/16/2016 0.00 0.00 0.0 3.5 3.0 3.7 3.3 0.0 0.0 0.0 0.0 12/17/2016 0.00 0.18 0.0 3.5 3.0 3.7 3.3 0.0 0.0 0.0 0.0 12/18/2016 0.01 0.69 0.0 3.5 3.0 3.7 3.3 0.0 0.0 0.0 0.0 12/19/2016 0.00 0.00 0.0 3.5 3.0 3.7 3.4 0.0 0.0 0.0 0.0 12/20/2016 0.00 0.00 0.0 3.5 3.0 3.7 3.4 0.0 0.0 0.0 0.0 12/21/2016 0.00 0.00 0.0 3.5 3.0 3.7 3.4 0.0 0.0 0.0 0.0 12/22/2016 0.00 0.60 0.0 3.5 3.0 3.7 3.4 0.0 0.0 0.0 0.0 12/23/2016 0.42 53.90 0.0 3.5 3.0 3.7 3.4 0.0 0.0 0.0 0.0 12/24/2016 0.00 0.00 0.0 3.5 3.0 3.7 3.4 0.0 0.0 0.0 0.0 12/25/2016 0.00 0.00 0.0 3.5 3.0 3.7 3.4 0.0 0.0 0.0 0.0 12/26/2016 0.00 0.00 0.0 3.4 3.1 3.8 3.6 0.0 0.0 0.0 0.0 12/27/2016 0.00 0.00 0.0 3.4 3.1 3.8 3.6 0.0 0.0 0.0 0.0

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 12/28/2016 0.00 0.00 0.0 3.4 3.1 3.8 3.6 0.0 0.0 0.0 0.0 12/29/2016 0.00 0.00 0.0 3.4 3.1 3.8 3.6 0.0 0.0 0.0 0.0 12/30/2016 0.00 0.00 0.0 3.4 3.1 3.8 3.6 0.0 0.0 0.0 0.0 12/31/2016 0.00 0.00 0.0 3.4 3.1 3.8 3.6 0.0 0.0 0.0 0.0 1/1/2017 0.00 0.00 0.0 3.4 3.1 3.8 3.6 0.0 0.0 0.0 0.0 1/2/2017 0.02 1.94 0.0 3.5 3.0 3.7 3.5 0.0 0.0 0.0 0.0 1/3/2017 0.02 2.85 0.0 3.5 3.0 3.7 3.5 0.0 0.0 0.0 0.0 1/4/2017 0.47 59.25 0.0 3.5 3.0 3.7 3.5 0.0 0.0 0.0 0.0 1/5/2017 0.00 0.00 0.0 3.5 3.0 3.7 3.5 0.0 0.0 0.0 0.0 1/6/2017 0.00 0.16 0.0 3.5 3.0 3.7 3.5 0.0 0.0 0.0 0.0 1/7/2017 0.14 18.21 0.0 3.5 3.0 3.7 3.5 0.0 0.0 0.0 0.0 1/8/2017 0.00 0.00 0.0 3.5 3.0 3.7 3.5 0.0 0.0 0.0 0.0 1/9/2017 0.00 0.00 0.0 3.5 3.0 3.7 3.6 0.0 0.0 0.0 0.0 1/10/2017 0.00 0.36 0.0 3.5 3.0 3.7 3.6 0.0 0.0 0.0 0.0 1/11/2017 0.00 0.20 0.0 3.5 3.0 3.7 3.6 0.0 0.0 0.0 0.0 1/12/2017 0.00 0.00 0.0 3.5 3.0 3.7 3.6 0.0 0.0 0.0 0.0 1/13/2017 0.02 2.70 0.0 3.5 3.0 3.7 3.6 0.0 0.0 0.0 0.0 1/14/2017 0.00 0.22 0.0 3.5 3.0 3.7 3.6 0.0 0.0 0.0 0.0 1/15/2017 0.00 0.00 0.0 3.5 3.0 3.7 3.6 0.0 0.0 0.0 0.0 1/16/2017 0.00 0.00 0.0 3.3 2.9 3.6 3.5 0.0 0.0 0.0 0.0 1/17/2017 0.00 0.00 0.0 3.3 2.9 3.6 3.5 0.0 0.0 0.0 0.0 1/18/2017 0.00 0.00 0.0 3.3 2.9 3.6 3.5 0.0 0.0 0.0 0.0

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 1/19/2017 0.00 0.00 0.0 3.3 2.9 3.6 3.5 0.0 0.0 0.0 0.0 1/20/2017 0.00 0.00 0.0 3.3 2.9 3.6 3.5 0.0 0.0 0.0 0.0 1/21/2017 0.00 0.00 0.0 3.3 2.9 3.6 3.5 0.0 0.0 0.0 0.0 1/22/2017 0.00 0.00 0.0 3.3 2.9 3.6 3.5 0.0 0.0 0.0 0.0 1/23/2017 0.44 56.01 0.0 3.5 3.0 3.7 3.6 0.0 0.0 0.0 0.0 1/24/2017 0.00 0.00 0.0 3.5 3.0 3.7 3.6 0.0 0.0 0.0 0.0 1/25/2017 0.00 0.00 0.0 3.5 3.0 3.7 3.6 0.0 0.0 0.0 0.0 1/26/2017 0.00 0.00 0.0 3.5 3.0 3.7 3.6 0.0 0.0 0.0 0.0 1/27/2017 0.00 0.00 0.0 3.5 3.0 3.7 3.6 0.0 0.0 0.0 0.0 1/28/2017 0.00 0.00 0.0 3.5 3.0 3.7 3.6 0.0 0.0 0.0 0.0 1/29/2017 0.08 10.14 0.0 3.5 3.0 3.7 3.6 0.0 0.0 0.0 0.0 1/30/2017 0.00 0.00 0.0 3.4 2.9 3.6 3.5 0.0 0.0 0.0 0.0 1/31/2017 0.00 0.00 0.0 3.4 2.9 3.6 3.5 0.0 0.0 0.0 0.0 2/1/2017 0.00 0.00 0.0 3.4 2.9 3.6 3.5 0.0 0.0 0.0 0.0 2/2/2017 0.00 0.00 0.0 3.4 2.9 3.6 3.5 0.0 0.0 0.0 0.0 2/3/2017 0.00 0.00 0.0 3.4 2.9 3.6 3.5 0.0 0.1 0.0 0.0 2/4/2017 0.00 0.00 0.0 3.4 2.9 3.6 3.5 0.0 0.0 0.0 0.0 2/5/2017 0.00 0.00 0.0 3.4 2.9 3.6 3.5 0.0 0.0 0.0 0.0 2/6/2017 0.00 0.00 0.0 3.5 2.9 3.7 3.5 0.0 0.0 0.0 0.0 2/7/2017 0.00 0.00 0.0 3.5 2.9 3.7 3.5 0.0 0.0 0.0 0.0 2/8/2017 0.00 0.00 0.0 3.5 2.9 3.7 3.5 0.0 0.0 0.0 0.0 2/9/2017 0.00 0.00 0.0 3.5 2.9 3.7 3.5 0.0 0.0 0.0 0.0

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 2/10/2017 0.00 0.00 0.0 3.5 2.9 3.7 3.5 0.0 0.0 0.0 0.0 2/11/2017 0.00 0.00 0.0 3.5 2.9 3.7 3.5 0.0 0.0 0.0 0.0 2/12/2017 0.00 0.00 0.0 3.5 2.9 3.7 3.5 0.0 0.0 0.0 0.0 2/13/2017 0.00 0.00 0.0 3.4 2.9 3.6 3.5 0.0 0.0 0.0 0.0 2/14/2017 0.00 0.00 0.0 3.4 2.9 3.6 3.5 0.0 0.0 0.0 13.1 2/15/2017 0.00 0.00 0.0 3.4 2.9 3.6 3.5 0.0 0.0 0.0 13.7 2/16/2017 0.00 0.00 0.0 3.4 2.9 3.6 3.5 0.0 0.0 0.0 8.5 2/17/2017 0.00 0.00 0.0 3.4 2.9 3.6 3.5 0.0 0.4 0.0 9.4 2/18/2017 0.00 0.00 0.0 3.4 2.9 3.6 3.5 0.0 0.0 0.0 0.0 2/19/2017 0.15 19.25 0.0 3.4 2.9 3.6 3.5 0.0 0.0 0.0 0.0 2/20/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 12.8 2/21/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 22.6 2/22/2017 0.82 104.89 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 9.7 2/23/2017 0.00 0.23 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 0.0 2/24/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 0.0 2/25/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 0.0 2/26/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 0.0 2/27/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 0.0 2/28/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 0.0 3/1/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 0.0 3/2/2017 0.00 0.07 0.0 3.4 2.8 3.6 3.5 0.2 0.3 0.3 0.0 3/3/2017 0.01 0.83 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 0.0

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 3/4/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 0.0 3/5/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 0.0 3/6/2017 0.00 0.00 0.0 3.3 2.8 3.5 3.4 0.0 0.0 0.0 0.0 3/7/2017 0.00 0.00 0.0 3.3 2.8 3.5 3.4 0.0 0.0 0.0 0.0 3/8/2017 0.00 0.00 0.0 3.3 2.8 3.5 3.4 5.9 9.9 10.0 7.0 3/9/2017 0.00 0.00 0.0 3.3 2.8 3.5 3.4 10.4 17.0 17.3 22.6 3/10/2017 0.00 0.00 0.0 3.3 2.8 3.5 3.4 10.5 17.1 17.2 9.3 3/11/2017 0.00 0.00 0.0 3.3 2.8 3.5 3.4 10.5 17.1 17.2 0.0 3/12/2017 0.24 30.30 0.0 3.3 2.8 3.5 3.4 5.0 8.2 8.2 0.0 3/13/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 12.2 3/14/2017 0.40 50.71 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 12.4 3/15/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 0.0 3/16/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 0.0 3/17/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 0.0 3/18/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 0.0 3/19/2017 0.00 0.00 0.0 3.4 2.8 3.6 3.5 0.0 0.0 0.0 0.0 3/20/2017 0.00 0.00 0.0 3.3 2.8 3.5 3.4 0.0 0.0 0.0 0.0 3/21/2017 0.00 0.00 0.0 3.3 2.8 3.5 3.4 0.0 0.0 0.0 0.0 3/22/2017 0.00 0.00 0.0 3.3 2.8 3.5 3.4 0.0 0.0 0.0 0.0 3/23/2017 0.96 122.74 0.0 3.3 2.8 3.5 3.4 0.0 0.0 0.0 0.0 3/24/2017 0.27 33.79 0.0 3.3 2.8 3.5 3.4 0.0 0.0 0.0 0.0 3/25/2017 0.00 0.00 0.0 3.3 2.8 3.5 3.4 0.0 0.0 0.0 0.0

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 3/26/2017 0.12 14.67 0.0 3.3 2.8 3.5 3.4 0.0 0.0 0.0 0.0 3/27/2017 0.00 0.00 0.0 3.4 2.7 3.5 3.4 0.0 0.0 0.0 0.0 3/28/2017 0.00 0.00 0.0 3.4 2.7 3.5 3.4 10.8 0.0 0.0 0.0 3/29/2017 0.00 0.00 0.0 3.4 2.7 3.5 3.4 10.8 0.0 8.0 0.0 3/30/2017 0.00 0.00 0.0 3.4 2.7 3.5 3.4 10.8 0.0 18.6 0.0 3/31/2017 0.00 0.00 0.0 3.4 2.7 3.5 3.4 10.8 0.0 18.6 0.0 4/1/2017 0.02 2.90 0.0 3.4 2.7 3.5 3.4 10.8 0.0 18.6 0.0 4/2/2017 0.00 0.00 0.0 3.4 2.7 3.5 3.4 10.8 0.0 18.6 0.0 4/3/2017 0.00 0.00 0.0 3.5 2.7 3.5 3.4 10.8 0.0 19.7 0.0 4/4/2017 0.00 0.00 0.0 3.5 2.7 3.5 3.4 10.8 0.0 19.7 0.0 4/5/2017 0.00 0.00 0.0 3.5 2.7 3.5 3.4 10.8 0.0 19.7 0.0 4/6/2017 0.00 0.00 0.0 3.5 2.7 3.5 3.4 10.8 0.0 19.7 0.0 4/7/2017 0.00 0.00 0.0 3.5 2.7 3.5 3.4 10.8 0.0 19.7 0.0 4/8/2017 0.00 0.00 0.0 3.5 2.7 3.5 3.4 10.8 0.0 19.7 0.0 4/9/2017 0.02 2.07 0.0 3.5 2.7 3.5 3.4 10.8 0.0 19.7 0.0 4/10/2017 0.00 0.49 0.0 3.4 2.7 3.5 3.4 10.8 0.0 19.0 0.0 4/11/2017 0.00 0.00 0.0 3.4 2.7 3.5 3.4 10.8 0.0 19.0 0.0 4/12/2017 0.30 38.04 0.0 3.4 2.7 3.5 3.4 10.8 0.0 19.0 0.0 4/13/2017 0.10 12.69 0.0 3.4 2.7 3.5 3.4 10.8 0.0 19.0 0.0 4/14/2017 0.00 0.56 0.0 3.4 2.7 3.5 3.4 10.8 0.0 19.0 0.0 4/15/2017 0.02 2.26 0.0 3.4 2.7 3.5 3.4 10.8 0.0 19.0 0.0 4/16/2017 0.02 2.79 0.0 3.4 2.7 3.5 3.4 10.8 0.0 19.0 0.0

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 4/17/2017 0.00 0.00 0.0 3.4 2.6 3.5 3.3 10.7 0.0 18.9 0.0 4/18/2017 0.00 0.00 0.0 3.4 2.6 3.5 3.3 10.7 0.0 18.9 0.0 4/19/2017 0.01 1.03 0.0 3.4 2.6 3.5 3.3 10.7 0.0 18.9 0.0 4/20/2017 0.01 0.86 0.0 3.4 2.6 3.5 3.3 10.7 0.0 18.9 0.0 4/21/2017 0.00 0.00 0.0 3.4 2.6 3.5 3.3 10.7 0.0 18.9 0.0 4/22/2017 0.00 0.16 0.0 3.4 2.6 3.5 3.3 10.7 0.0 18.9 0.0 4/23/2017 0.55 69.51 0.0 3.4 2.6 3.5 3.3 10.7 0.0 18.9 0.0 4/24/2017 0.00 0.00 0.0 3.4 2.6 3.5 3.4 10.7 16.0 18.6 0.0 4/25/2017 0.00 0.00 0.0 3.4 2.6 3.5 3.4 10.7 16.0 18.6 0.0 4/26/2017 0.00 0.00 0.0 3.4 2.6 3.5 3.4 10.7 16.0 18.6 0.0 4/27/2017 0.00 0.00 0.0 3.4 2.6 3.5 3.4 10.7 16.0 18.6 0.0 4/28/2017 0.00 0.00 0.0 3.4 2.6 3.5 3.4 6.7 10.0 11.6 0.0 4/29/2017 0.06 7.09 0.0 3.4 2.6 3.5 3.4 0.0 0.0 0.0 0.0 4/30/2017 0.05 6.88 0.0 3.4 2.6 3.5 3.4 0.0 0.0 0.0 0.0 5/1/2017 0.00 0.00 0.0 3.4 2.6 3.5 3.3 10.6 14.3 15.7 0.0 5/2/2017 0.12 15.40 0.0 3.4 2.6 3.5 3.3 10.6 14.3 15.7 7.9 5/3/2017 0.00 0.00 0.0 3.4 2.6 3.5 3.3 10.6 14.3 15.7 11.2 5/4/2017 0.00 0.00 0.0 3.4 2.6 3.5 3.3 10.6 14.3 15.7 7.5 5/5/2017 0.04 5.09 0.0 3.4 2.6 3.5 3.3 10.6 14.3 15.7 14.9 5/6/2017 0.00 0.00 0.0 3.4 2.6 3.5 3.3 10.6 14.3 15.7 0.0 5/7/2017 0.00 0.00 0.0 3.4 2.6 3.5 3.3 10.6 14.3 15.7 0.0 5/8/2017 0.00 0.00 0.0 3.3 2.4 3.4 3.3 10.6 14.6 16.9 7.3

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 5/9/2017 0.00 0.00 0.0 3.3 2.4 3.4 3.3 10.6 14.6 16.9 4.2 5/10/2017 0.00 0.00 0.0 3.3 2.4 3.4 3.3 10.6 14.6 16.9 0.0 5/11/2017 0.00 0.00 0.0 3.3 2.4 3.4 3.3 10.6 14.6 16.9 11.6 5/12/2017 0.00 0.00 0.0 3.3 2.4 3.4 3.3 10.6 14.6 16.9 9.7 5/13/2017 0.00 0.00 0.0 3.3 2.4 3.4 3.3 10.6 14.6 16.9 0.0 5/14/2017 0.01 1.14 0.0 3.3 2.4 3.4 3.3 10.6 14.6 16.9 0.0 5/15/2017 0.00 0.00 1.9 3.3 1.9 3.5 3.3 10.6 14.4 16.8 23.5 5/16/2017 0.00 0.16 1.9 3.3 1.9 3.5 3.3 10.6 14.4 16.8 35.8 5/17/2017 0.01 1.09 1.9 3.3 1.9 3.5 3.3 10.6 14.4 16.8 23.8 5/18/2017 0.13 16.42 1.9 3.3 1.9 3.5 3.3 10.6 14.4 16.8 25.7 5/19/2017 0.26 33.57 1.9 3.3 1.9 3.5 3.3 10.6 14.4 16.8 15.8 5/20/2017 0.00 0.00 1.9 3.3 1.9 3.5 3.3 10.6 14.4 16.8 0.0 5/21/2017 0.00 0.00 1.9 3.3 1.9 3.5 3.3 10.6 14.4 16.8 0.0 5/22/2017 0.00 0.00 1.9 3.3 1.9 3.4 3.3 10.7 0.0 19.1 23.7 5/23/2017 0.00 0.00 1.9 3.3 1.9 3.4 3.3 10.7 0.0 19.1 33.0 5/24/2017 0.42 53.75 1.9 3.3 1.9 3.4 3.3 10.7 0.0 19.1 21.9 5/25/2017 0.00 0.00 1.9 3.3 1.9 3.4 3.3 10.7 0.0 19.1 11.9 5/26/2017 0.37 46.50 1.9 3.3 1.9 3.4 3.3 10.7 0.0 19.1 8.0 5/27/2017 0.00 0.58 1.9 3.3 1.9 3.4 3.3 10.7 0.0 19.1 10.5 5/28/2017 0.00 0.00 1.9 3.3 1.9 3.4 3.3 10.7 0.0 19.1 0.0 5/29/2017 0.00 0.00 1.8 3.2 1.8 3.4 3.2 10.6 0.0 19.0 2.6 5/30/2017 0.00 0.00 1.8 3.2 1.8 3.4 3.2 10.6 0.0 19.0 7.0

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 5/31/2017 0.02 2.03 1.8 3.2 1.8 3.4 3.2 10.6 0.0 19.0 15.9 6/1/2017 0.01 1.73 1.8 3.2 1.8 3.4 3.2 10.6 0.0 19.0 7.8 6/2/2017 0.08 10.30 1.8 3.2 1.8 3.4 3.2 10.6 0.0 19.0 16.4 6/3/2017 0.23 29.77 1.8 3.2 1.8 3.4 3.2 10.6 0.0 19.0 0.0 6/4/2017 0.01 1.10 1.8 3.2 1.8 3.4 3.2 10.6 0.0 19.0 0.0 6/5/2017 0.05 5.75 1.9 3.2 1.8 3.4 3.3 0.0 0.0 0.0 8.4 6/6/2017 0.14 17.95 1.9 3.2 1.8 3.4 3.3 0.0 0.0 0.0 22.3 6/7/2017 1.68 213.98 1.9 3.2 1.8 3.4 3.3 0.0 0.0 0.0 16.7 6/8/2017 0.01 1.47 1.9 3.2 1.8 3.4 3.3 0.0 0.0 0.0 0.0 6/9/2017 1.79 227.90 1.9 3.2 1.8 3.4 3.3 0.0 0.0 0.0 0.0 6/10/2017 0.00 0.00 1.9 3.2 1.8 3.4 3.3 0.0 0.0 0.0 0.0 6/11/2017 0.02 2.73 1.9 3.2 1.8 3.4 3.3 0.0 0.0 0.0 0.0 6/12/2017 0.16 20.93 1.9 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 6/13/2017 0.57 72.26 1.9 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 6/14/2017 0.19 23.80 1.9 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 6/15/2017 0.28 36.15 1.9 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 6/16/2017 0.07 9.01 1.9 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 6/17/2017 0.03 3.69 1.9 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 6/18/2017 0.36 46.09 1.9 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 6/19/2017 0.26 33.29 1.8 3.1 1.8 3.4 3.3 0.0 0.0 0.0 0.0 6/20/2017 0.00 0.00 1.8 3.1 1.8 3.4 3.3 0.0 0.0 0.0 0.0 6/21/2017 0.06 8.26 1.8 3.1 1.8 3.4 3.3 0.0 0.0 0.0 0.0

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 6/22/2017 0.06 8.07 1.8 3.1 1.8 3.4 3.3 0.0 0.0 0.0 0.0 6/23/2017 0.01 0.98 1.8 3.1 1.8 3.4 3.3 0.0 0.0 0.0 0.0 6/24/2017 0.00 0.00 1.8 3.1 1.8 3.4 3.3 0.0 0.0 0.0 0.0 6/25/2017 0.00 0.00 1.8 3.1 1.8 3.4 3.3 0.0 0.0 0.0 0.0 6/26/2017 0.00 0.00 1.8 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 6/27/2017 0.00 0.38 1.8 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 6/28/2017 0.00 0.43 1.8 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 6/29/2017 0.03 4.45 1.8 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 6/30/2017 0.00 0.00 1.8 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 7/1/2017 0.00 0.00 1.8 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 7/2/2017 0.06 7.28 1.8 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 7/3/2017 0.00 0.00 1.8 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 7/4/2017 0.03 4.00 1.8 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 7/5/2017 0.00 0.59 1.8 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 7/6/2017 0.10 12.62 1.8 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 7/7/2017 0.01 1.21 1.8 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 7/8/2017 0.24 30.38 1.8 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 7/9/2017 0.04 4.73 1.8 3.1 1.8 3.4 3.2 0.0 0.0 0.0 0.0 7/10/2017 1.32 168.50 1.8 3.0 1.8 3.4 3.1 30.0 4.1 5.3 0.0 7/11/2017 0.18 22.30 1.8 3.0 1.8 3.4 3.1 10.5 14.9 18.2 0.0 7/12/2017 1.16 147.46 1.8 3.0 1.8 3.4 3.1 10.5 14.9 18.2 0.0 7/13/2017 0.01 0.88 1.8 3.0 1.8 3.4 3.1 10.5 14.9 18.2 0.0

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 7/14/2017 0.07 8.45 1.8 3.0 1.8 3.4 3.1 10.5 14.9 18.2 0.0 7/15/2017 0.04 4.74 1.8 3.0 1.8 3.4 3.1 10.5 14.9 18.2 0.0 7/16/2017 0.00 0.07 1.8 3.0 1.8 3.4 3.1 10.5 6.3 7.7 0.0 7/17/2017 0.09 11.13 1.9 3.1 1.8 3.4 3.2 10.7 0.0 4.7 0.0 7/18/2017 0.00 0.32 1.9 3.1 1.8 3.4 3.2 10.7 0.0 0.0 0.0 7/19/2017 0.01 1.19 1.9 3.1 1.8 3.4 3.2 10.7 0.0 0.0 0.0 7/20/2017 0.49 62.42 1.9 3.1 1.8 3.4 3.2 10.7 0.0 3.5 0.0 7/21/2017 0.31 38.94 1.9 3.1 1.8 3.4 3.2 10.7 0.0 6.4 0.0 7/22/2017 0.00 0.00 1.9 3.1 1.8 3.4 3.2 10.7 0.0 11.8 0.0 7/23/2017 0.02 2.24 1.9 3.1 1.8 3.4 3.2 10.7 0.0 0.0 0.0 7/24/2017 0.05 6.40 1.8 3.0 1.8 3.4 3.1 10.7 0.0 6.9 0.0 7/25/2017 0.00 0.12 1.8 3.0 1.8 3.4 3.1 10.7 0.0 19.2 0.0 7/26/2017 0.00 0.09 1.8 3.0 1.8 3.4 3.1 10.7 0.0 19.2 0.0 7/27/2017 0.01 1.27 1.8 3.0 1.8 3.4 3.1 10.7 0.0 19.2 0.0 7/28/2017 0.14 17.64 1.8 3.0 1.8 3.4 3.1 10.7 0.0 19.2 0.0 7/29/2017 0.31 39.27 1.8 3.0 1.8 3.4 3.1 10.7 0.0 19.2 0.0 7/30/2017 1.17 148.32 1.8 3.0 1.8 3.4 3.1 10.7 0.0 19.2 0.0 7/31/2017 0.26 32.85 1.8 3.0 2.1 3.4 3.1 10.8 0.0 18.9 0.0 8/1/2017 0.03 4.37 1.8 3.0 2.1 3.4 3.1 10.8 0.0 18.9 0.0 8/2/2017 0.00 0.58 1.8 3.0 2.1 3.4 3.1 10.8 0.0 18.9 0.0 8/3/2017 0.00 0.00 1.8 3.0 2.1 3.4 3.1 10.8 0.0 18.9 0.0 8/4/2017 0.00 0.00 1.8 3.0 2.1 3.4 3.1 10.8 0.0 18.9 0.0

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 8/5/2017 0.00 0.00 1.8 3.0 2.1 3.4 3.1 10.8 0.0 18.9 0.0 8/6/2017 0.05 6.15 1.8 3.0 2.1 3.4 3.1 10.8 0.0 18.9 0.0 8/7/2017 0.00 0.15 1.8 3.0 2.1 3.4 3.1 10.6 0.0 19.1 0.0 8/8/2017 0.01 1.41 1.8 3.0 2.1 3.4 3.1 10.6 0.0 19.1 0.0 8/9/2017 0.01 1.76 1.8 3.0 2.1 3.4 3.1 10.6 0.0 19.1 0.0 8/10/2017 1.06 134.23 1.8 3.0 2.1 3.4 3.1 10.6 0.0 19.1 0.0 8/11/2017 0.51 64.53 1.8 3.0 2.1 3.4 3.1 10.6 0.0 19.1 0.0 8/12/2017 0.00 0.62 1.8 3.0 2.1 3.4 3.1 10.6 0.0 19.1 0.0 8/13/2017 0.00 0.23 1.8 3.0 2.1 3.4 3.1 10.6 0.0 19.1 0.0 8/14/2017 0.00 0.00 1.8 3.0 2.1 3.4 3.1 10.8 0.0 18.9 0.0 8/15/2017 0.00 0.00 1.8 3.0 2.1 3.4 3.1 10.8 0.0 18.9 0.0 8/16/2017 0.00 0.00 1.8 3.0 2.1 3.4 3.1 10.8 0.0 18.9 0.0 8/17/2017 0.01 1.21 1.8 3.0 2.1 3.4 3.1 10.8 0.0 18.9 0.0 8/18/2017 0.00 0.00 1.8 3.0 2.1 3.4 3.1 10.8 0.0 18.9 0.0 8/19/2017 0.01 1.14 1.8 3.0 2.1 3.4 3.1 10.8 0.0 18.9 0.0 8/20/2017 0.81 103.56 1.8 3.0 2.1 3.4 3.1 10.8 0.0 18.9 0.0 8/21/2017 0.18 22.73 1.8 3.0 2.2 3.4 3.1 10.5 9.0 18.0 0.0 8/22/2017 0.19 24.26 1.8 3.0 2.2 3.4 3.1 10.5 14.9 18.0 0.0 8/23/2017 0.45 57.56 1.8 3.0 2.2 3.4 3.1 10.5 14.9 18.0 0.0 8/24/2017 0.55 70.09 1.8 3.0 2.2 3.4 3.1 10.5 14.9 18.0 0.0 8/25/2017 2.61 331.71 1.8 3.0 2.2 3.4 3.1 10.5 14.9 18.0 0.0 8/26/2017 0.00 0.51 1.8 3.0 2.2 3.4 3.1 10.5 14.9 18.0 0.0

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 8/27/2017 0.00 0.08 1.8 3.0 2.2 3.4 3.1 10.5 14.9 18.0 0.0 8/28/2017 0.00 0.16 1.9 2.7 1.7 3.3 2.7 0.0 0.0 0.0 0.0 8/29/2017 0.00 0.00 1.9 2.7 1.7 3.3 2.7 0.0 0.0 0.0 0.0 8/30/2017 0.00 0.00 1.9 2.7 1.7 3.3 2.7 0.0 0.0 0.0 0.0 8/31/2017 0.00 0.00 1.9 2.7 1.7 3.3 2.7 0.0 0.0 0.0 0.0 9/1/2017 0.00 0.00 1.9 2.7 1.7 3.3 2.7 0.0 0.0 0.0 0.0 9/2/2017 0.21 26.44 1.9 2.7 1.7 3.3 2.7 0.0 0.0 0.0 0.0 9/3/2017 0.00 0.00 1.9 2.7 1.7 3.3 2.7 0.0 0.0 0.0 0.0 9/4/2017 0.00 0.28 1.8 3.0 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/5/2017 0.02 1.93 1.8 3.0 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/6/2017 0.12 15.67 1.8 3.0 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/7/2017 0.10 12.68 1.8 3.0 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/8/2017 0.24 31.10 1.8 3.0 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/9/2017 1.72 218.35 1.8 3.0 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/10/2017 3.38 430.36 1.8 3.0 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/11/2017 0.09 10.99 1.8 3.0 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/12/2017 0.00 0.00 1.8 3.0 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/13/2017 0.00 0.00 1.8 3.0 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/14/2017 0.00 0.00 1.8 3.0 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/15/2017 0.00 0.00 1.8 3.0 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/16/2017 0.00 0.00 1.8 3.0 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/17/2017 0.00 0.00 1.8 3.0 2.1 3.4 3.1 0.0 0.0 0.0 0.0

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix A Table A-1 Daily Water Inputs into CCS Date Nextrad Rainfall*

Upper Floridan Wells Point Wells Interceptor Ditch (MG)

Amount (Inches)

Volume (MG)

F-1 (MG)

F-3 (MG)

F-4 (MG)

F-5 (MG)

F-6 (MG)

PW-1 (MG)

SW-1 (MG)

SW-2 (MG) 9/18/2017 0.00 0.00 1.5 2.9 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/19/2017 0.00 0.17 1.5 2.9 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/20/2017 0.00 0.00 1.5 2.9 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/21/2017 0.00 0.00 1.5 2.9 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/22/2017 0.79 100.40 1.5 2.9 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/23/2017 0.03 3.60 1.5 2.9 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/24/2017 0.00 0.20 1.5 2.9 2.1 3.4 3.1 0.0 0.0 0.0 0.0 9/25/2017 0.18 22.54 1.6 3.0 2.1 3.4 3.0 0.0 0.0 0.0 0.0 9/26/2017 0.05 5.88 1.6 3.0 2.1 3.4 3.0 0.0 0.0 0.0 0.0 9/27/2017 0.30 38.37 1.6 3.0 2.1 3.4 3.0 0.0 0.0 0.0 0.0 9/28/2017 0.05 6.31 1.6 3.0 2.1 3.4 3.0 0.0 0.0 0.0 0.0 9/29/2017 0.97 122.83 1.6 3.0 2.1 3.4 3.0 0.0 0.0 0.0 0.0 9/30/2017 0.01 1.22 1.6 3.0 2.1 3.4 3.0 0.0 0.0 0.0 0.0

  • Nextrad rainfall values presented here are slightly different than the monthly totals presented in the EPU report due to a change to the Nextrad algorithm made by the SFWMD and rounding.

Key:

MG = million gallons

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix B Appendix B Salinity of Floridan and Point Wells

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix B Table B-1 Salinity (PSU) of Floridan Wells Salinity Sample Date F-1 F-3 F-4 F-5 F-6 Average 2016-10-01 2016-10-03 2.1 2.5 2.3 2016-10-21 2.0 2.2 2.1 2016-11-04 2.5 2.5 2016-11-07 2.3 2.2 2.3 2016-11-16 2.3 2.3 2016-11-28 2.2 2.2 2016-12-12 2.1 2.1 2.2 2.5 2.2 2016-12-15 2.3 2.3 2017-01-10 2.1 2.1 2.3 2.5 2.2 2017-02-07 2.1 2.1 2.2 2.5 2.2 2017-03-17 2.1 2.2 2.3 2.5 2.3 2017-04-10 2.1 2.2 2.3 2.5 2.3 2017-05-09 2.1 2.2 2.3 2.5 2.3 2017-05-31 2.3 2.3 2017-06-07 2.3 2.2 2.2 2.3 2.6 2.3 2017-07-10 2.3 2.2 2.3 2.3 2.6 2.3 2017-08-07 2.4 2.2 2.3 2.3 2.6 2.4

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix B Table B-2 Salinity (PSU) of Point Wells Date PW-1 SW-1 SW-2 Average 2016-10-01 No pumping No pumping No pumping 2016-11-01 No pumping No pumping No pumping 2016-12-01 No pumping No pumping No pumping 2017-01-01 No pumping No pumping No pumping 2017-02-01 No pumping No pumping No pumping 2017-03-08 36.8 36.9 36.8 36.8 2017-04-12 38.0 No pumping 36.9 37.5 2017-05-17 NA NA NA 2017-06-19 No pumping No pumping No pumping 2017-07-31 35.0 No pumping 33.9 34.5 2017-08-16 37.3 No pumping 35.9 36.6 2017-09-01 No pumping No pumping No pumping

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix C Appendix C Analytical Results from Floridan Wells

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix C PRELIMINARY DATA Table C-1 Floridan Well Sampling Event (September 2016)

Parameter Units Field Temperature

°C 25.38 NA NA NA NA NA Field pH SU 7.99 NA NA NA NA NA Oxygen, Dissolved mg/L 2.38 NA NA NA NA NA Specific Conductance S/cm 4078 NA NA NA NA NA Turbidity NTU 0.11 NA NA NA NA NA Copper mg/L 0.0025 U

NA NA NA NA NA Calcium mg/L 73.90 NA NA NA NA NA Magnesium mg/L 73.00 NA NA NA NA NA Potassium mg/L 32.70 NA NA NA NA NA Sodium mg/L 623 NA NA NA NA NA Boron mg/L 0.55 NA NA NA NA NA Strontium mg/L 4.14 NA NA NA NA NA Bromide mg/L 3.52 NA NA NA NA NA Chloride mg/L 1000 NA NA NA NA NA Fluoride mg/L 1.32 NA NA NA NA NA Sulfate mg/L 301 NA NA NA NA NA Ammonia as N mg/L 0.16 I

NA NA NA NA 0.10 U

Nitrate Nitrite as N mg/L 0.0250 U

NA NA NA NA 0.0050 U

Nitrogen, Kjeldahl mg/L 0.20 U

NA NA NA NA 0.10 U

Nitrogen, Total mg/L 0.20 U

NA NA NA NA 0.11 U

Orthophosphate as P mg/L 0.0061 I

NA NA NA NA 0.0021 U

Phosphorus as P mg/L 0.0078 I

NA NA NA NA 0.0030 U

Total Dissolved Solids mg/L 800 NA NA NA NA NA Salinity 2.16 NA NA NA NA NA Tritium pCi/L (1) 6.1 (6.9)

UJ NA NA NA NA NA NOTES:

Laboratory results are reported with 3 digits although only the first 2 are significant figures.

  • PSS-78 salinity is unitless.

KEY:

°C = Degrees Celsius.

NTU = Nephelometric Turbidity Units(s).

S/cm = MicroSiemen(s) per centimeter.

pCi/L = PicoCuries per liter.

FB = Field blank.

SU = Standard unit(s).

I = Value between the MDL and PQL.

TKN = Total Kjeldahl nitrogen.

mg/L = Milligram(s) per liter.

TPBBSW = Turkey Point Biscayne Bay Surface Water.

mg/m3 = Milligram(s) per cubic meter.

U = Analyzed for but not detected at the reported value.

N = Nitrogen.

NA = Not available, as well not online yet or sample not collected.

F-1-Well F-3-Well F-4-Well 09/13/2016 F-6-Well 091316-FB1 09/13/2016 09/13/2016 09/13/2016 09/13/2016 09/13/2016 F-5-Well

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix C PRELIMINARY DATA Table C-2 Floridan Well Sampling Event (December 2016)

Parameter Units Field Temperature

°C 24.20 24.80 24.90 25.30 25.40 NA Field pH SU 7.72 7.74 7.80 7.79 7.84 NA Oxygen, Dissolved mg/L 1.81 2.97 3.85 4.09 4.19 NA Specific Conductance S/cm 4255 3938 4009 4223 4637 NA Copper mg/L 0.0025 U

0.0025 U

0.0025 U

0.0025 U

0.0025 U

0.0025 U

Calcium mg/L 73.00 70.00 72.30 79.20 83.00 0.1 U

Magnesium mg/L 72.30 68.20 70.30 75.50 81.20 0.02 U

Potassium mg/L 29.90 29.10 29.40 30.50 32.50 0.19 U

Sodium mg/L 617 604 603 638 724 0.5 U

Boron mg/L 0.54 0.52 0.52 0.55 0.59 0.01 U

Strontium mg/L 4.01 3.60 3.65 4.26 4.69 0.001 U

Bromide mg/L 3.65 3.29 3.35 3.61 3.98 0.025 U

Chloride mg/L 1100 992 1020 1080 1220 0.2 U

Fluoride mg/L 1.44 1.16 1.09 1.07 1.09 0.032 U

Sulfate mg/L 322 275 284 298 350 0.4 U

Ammonia as N mg/L 0.19 I

0.17 I

0.17 I

0.18 I

0.19 I

0.10 U

Nitrate Nitrite as N mg/L 0.0250 U

0.0250 U

0.0250 U

0.0250 U

0.0250 U

0.0050 U

Nitrogen, Kjeldahl mg/L 0.31 I

0.20 U

0.20 U

0.30 I

0.20 U

0.10 U

Nitrogen, Total mg/L 0.31 0.23 U

0.23 U

0.30 0.23 U

0.11 U

Orthophosphate as P mg/L 0.006 I

0.0070 I

0.0038 I

0.0038 I

0.005 I

0.0021 U

Phosphorus as P mg/L 0.005 I

0.0067 I

0.0045 I

0.0052 I

0.005 I

0.0030 U

Total Dissolved Solids mg/L 2300 Q

2040 2140 2340 Q

2550 Q

5 U

Salinity 2.26 2.08 2.12 2.24 2.47 NA Tritium pCi/L (1) -2.9 (4.7)

UJ 3.2 (6.3)

UJ

-3.6 (4.9)

UJ 7.8 (4.6)

-5.2 (6.2)

UJ

-4.8 (5.1)

UJ NOTES:

Laboratory results are reported with 3 digits although only the first 2 are significant figures.

  • PSS-78 salinity is unitless.

KEY:

°C = Degrees Celsius.

pCi/L = PicoCuries per liter.

S/cm = MicroSiemen(s) per centimeter.

Q = Holding time exceeded FB = Field blank.

SU = Standard unit(s).

I = Value between the MDL and PQL.

TKN = Total Kjeldahl nitrogen.

mg/L = Milligram(s) per liter.

TPBBSW = Turkey Point Biscayne Bay Surface Water.

mg/m3 = Milligram(s) per cubic meter.

U = Analyzed for but not detected at the reported value.

NA = Not available.

NTU = Nephelometric Turbidity Units(s).

F-5-Well F-1-Well F-3-Well F-4-Well 12/15/2016 12/12/2016 12/12/2016 12/12/2016 121516-FB1 12/15/2016 F-6-Well 12/12/2016

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix C PRELIMINARY DATA Table C-3 Floridan Well Sampling Event (March 2017)

Parameter Units Field Temperature

°C NA 23.90 24.10 24.30 24.40 Field pH SU NA 7.60 7.59 7.57 7.60 Oxygen, Dissolved mg/L NA 0.32 0.28 0.49 0.27 Specific Conductance S/cm NA 3955 4082 4253 4707 Turbidity NTU NA 0.07 0.23 0.00 0.07 Copper mg/L NA 0.0028 I

0.0027 I

0.0029 I

0.0028 I

Calcium mg/L NA 71.00 74.30 77.90 82.40 Magnesium mg/L NA 69.40 70.90 72.30 77.80 Potassium mg/L NA 29.40 30.40 30.50 32.10 Sodium mg/L NA 611 612 643 735 Boron mg/L NA 0.54 0.57 0.57 0.61 Strontium mg/L NA 3.67 3.81 4.23 4.71 Bromide mg/L NA 3.31 3.44 3.58 4.00 Chloride mg/L NA 1000 1010 1060 1190 Fluoride mg/L NA 1.44 1.36 1.36 1.41 Sulfate mg/L NA 304 290 306 351 Ammonia as N mg/L NA 0.16 I

0.17 I

0.17 I

0.20 I

Nitrate Nitrite as N mg/L NA 0.0050 U

0.0050 U

0.0050 U

0.0050 U

Nitrogen, Kjeldahl mg/L NA 0.32 I

0.30 I

0.25 I

0.30 I

Nitrogen, Total mg/L NA 0.32 0.30 0.25 0.30 Orthophosphate as P mg/L NA 0.0051 I

0.0046 U

0.0046 U

0.005 U

Phosphorus as P mg/L NA 0.0080 I

0.0078 I

0.0069 I

0.006 I

Total Dissolved Solids mg/L NA 2030 2100 2250 2460 Salinity NA 2.09 2.16 2.26 2.52 Tritium pCi/L (1)

NA P

P P

P NOTES:

Laboratory results are reported with 3 digits although only the first 2 are significant figures.

  • PSS-78 salinity is unitless.

KEY:

°C = Degrees Celsius.

P = Pending.

S/cm = MicroSiemen(s) per centimeter.

pCi/L = PicoCuries per liter.

FB = Field blank.

Q = Holding time exceeded I = Value between the MDL and PQL.

SU = Standard unit(s).

mg/L = Milligram(s) per liter.

TKN = Total Kjeldahl nitrogen.

mg/m3 = Milligram(s) per cubic meter.

TPBBSW = Turkey Point Biscayne Bay Surface Water.

NA = Not available, well not sampled.

U = Analyzed for but not detected at the reported value.

NTU = Nephelometric Turbidity Units(s).

F-1-Well F-3-Well F-4-Well F-6-Well 03/17/2017 03/17/2017 03/17/2017 03/17/2017 03/17/2017 F-5-Well

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix C PRELIMINARY DATA Table C-4 Floridan Well Sampling Event (June 2017)

Parameter Units Field Temperature

°C 24.30 24.50 24.50 24.70 24.90 NA Field pH SU 7.96 7.58 7.60 7.55 7.52 NA Oxygen, Dissolved mg/L 1.77 0

0 0

0 NA Specific Conductance S/cm 4264 4086 4209 4308 4774 NA Turbidity NTU 0.09 0.19 0.18 1.28 0.25 NA Copper mg/L 0.0025 U

0.0025 U

0.0025 U

0.0025 U

0.0025 U

0.0025 U

Calcium mg/L 74.80 72.00 74.60 77.90 83.70 0.1 U

Magnesium mg/L 73.90 70.00 72.50 73.90 80.90 0.0393 I

Potassium mg/L 33.00 31.20 32.20 32.00 34.70 0.19 U

Sodium mg/L 664 573 559 637 744 0.5 U

Boron mg/L 0.58 0.56 0.56 0.57 0.61 NA Strontium mg/L 4.07 3.72 3.80 4.22 4.81 NA Bromide mg/L 3.62 3.41 3.53 3.61 4.01 0.025 U

Chloride mg/L 1100 1040 1080 1080 1250 0.2 U

Fluoride mg/L 1.46 1.37 1.27 1.27 1.35 0.032 U

Sulfate mg/L 291 278 283 288 343 0.4 U

Ammonia as N mg/L 0.16 I

0.14 I

0.19 I

0.17 I

0.19 I

NA Nitrate Nitrite as N mg/L 0.0050 U

0.0050 U

0.0050 U

0.0050 U

0.0050 U

NA Nitrogen, Kjeldahl mg/L 0.31 I

0.20 U

0.20 U

0.20 U

0.20 U

NA Nitrogen, Total mg/L 0.31 0.21 U

0.21 U

0.21 U

0.21 U

NA Orthophosphate as P mg/L 0.0081 I

0.0047 I

0.0046 U

0.0046 U

0.005 U

NA Phosphorus as P mg/L 0.0166 0.0070 I

0.0046 U

0.0046 U

0.005 U

NA Total Dissolved Solids mg/L 2290 2140 2250 2310 2590 5.0 U

Salinity 2.26 2.16 2.23 2.29 2.55 NA Tritium pCi/L (1)

P P

P P

P NA NOTES:

Laboratory results are reported with 3 digits although only the first 2 are significant figures.

  • PSS-78 salinity is unitless.

KEY:

°C = Degrees Celsius.

P = Pending.

S/cm = MicroSiemen(s) per centimeter.

pCi/L = PicoCuries per liter.

FB = Field Blank.

Q = Holding time exceeded.

I = Value between the MDL and PQL.

SU = Standard unit(s).

mg/L = Milligram(s) per liter.

TKN = Total Kjeldahl nitrogen.

mg/m3 = Milligram(s) per cubic meter.

TPBBSW = Turkey Point Biscayne Bay Surface Water.

NA = Not available.

U = Analyzed for but not detected at the reported value.

NTU = Nephelometric Turbidity Units(s).

F-1-Well F-3-Well F-4-Well 06/07/2017 F-6-Well 060717-FB2 06/07/2017 06/07/2017 06/07/2017 06/07/2017 06/07/2017 F-5-Well

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix D Appendix D Daily Summary of Average CCS Salinity

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix D Table D-1 Daily Summary of Average CCS Salinity Day CCS-1 CCS-2 CCS-3 CCS-4 CCS-5 CCS-6 CCS-7 Average 10/1/2016 58.1 59.5 54.4 59.7 60.4 59.7 57.0 58.4 10/2/2016 57.4 59.6 54.5 60.4 60.4 59.0 56.7 58.3 10/3/2016 58.2 59.7 53.8 60.1 60.7 59.6 56.7 58.4 10/4/2016 58.0 59.5 53.6 60.3 60.6 59.0 56.7 58.3 10/5/2016 58.5 59.5 53.4 60.2 60.6 59.3 57.0 58.4 10/6/2016 58.0 59.5 53.7 60.1 60.3 58.8 56.2 58.1 10/7/2016 57.9 59.1 49.8 59.3 59.7 58.7 57.1 57.4 10/8/2016 57.6 59.2 51.6 60.0 60.0 58.3 57.0 57.7 10/9/2016 57.3 59.4 53.4 59.9 60.3 58.8 56.8 58.0 10/10/2016 57.0 60.0 N.A.

60.3 60.4 58.7 57.0 58.9 10/11/2016 56.7 59.9 53.4 60.4 60.5 59.0 56.5 58.1 10/12/2016 57.4 60.2 52.3 60.5 60.5 58.9 56.9 58.1 10/13/2016 56.7 59.7 52.2 60.0 60.0 58.7 56.3 57.7 10/14/2016 57.2 59.7 52.4 60.2 60.0 58.4 56.4 57.8 10/15/2016 58.1 59.3 53.7 59.9 60.1 58.6 56.8 58.1 10/16/2016 57.0 58.3 53.6 58.9 58.7 57.5 56.5 57.2 10/17/2016 56.5 57.9 53.8 58.7 58.8 57.2 55.5 56.9 10/18/2016 56.9 58.4 53.8 58.8 58.5 56.9 56.2 57.1 10/19/2016 56.7 58.2 54.7 59.1 58.8 57.0 55.9 57.2 10/20/2016 56.9 58.6 54.6 59.1 58.7 57.4 56.3 57.4 10/21/2016 57.5 58.7 55.1 59.3 59.1 56.3 56.6 57.5 10/22/2016 57.9 59.0 56.1 59.5 59.3 57.1 56.7 58.0 10/23/2016 58.0 59.3 56.4 59.9 59.6 N.A.

56.9 58.4 10/24/2016 58.3 59.6 56.7 60.2 59.8 N.A.

57.3 58.6 10/25/2016 58.5 59.9 56.8 60.5 60.1 59.1 57.5 58.9 10/26/2016 58.6 60.2 56.8 60.8 60.3 59.4 57.6 59.1 10/27/2016 57.9 59.0 55.2 59.3 59.5 58.9 56.5 58.0 10/28/2016 56.0 58.0 53.2 57.5 56.7 56.9 55.6 56.3 10/29/2016 54.7 57.1 53.7 58.5 57.6 56.1 53.8 55.9 10/30/2016 55.5 56.5 51.7 57.4 57.2 56.8 54.1 55.6 10/31/2016 55.2 57.2 52.2 56.7 55.8 56.2 54.2 55.3 11/1/2016 54.3 56.7 52.7 57.5 56.2 55.1 53.3 55.1 11/2/2016 55.0 56.4 52.8 57.5 56.6 56.1 53.4 55.4 11/3/2016 55.2 57.2 53.3 57.4 56.2 56.4 54.2 55.7 11/4/2016 55.0 57.3 54.0 58.1 56.7 56.1 54.0 55.9 11/5/2016 55.5 57.4 54.2 58.1 56.9 56.8 54.2 56.2 11/6/2016 55.6 57.9 53.7 58.0 56.5 56.9 54.4 56.1 11/7/2016 54.5 58.1 53.5 58.3 56.5 56.7 54.1 56.0 11/8/2016 53.7 58.0 53.1 58.5 56.8 56.9 53.6 55.8

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix D Table D-1 Daily Summary of Average CCS Salinity Day CCS-1 CCS-2 CCS-3 CCS-4 CCS-5 CCS-6 CCS-7 Average 11/9/2016 55.6 58.3 52.3 58.5 56.8 57.2 53.0 56.0 11/10/2016 55.6 59.4 52.2 58.8 57.0 58.0 53.4 56.3 11/11/2016 55.8 60.0 53.2 58.9 57.0 58.8 52.9 56.7 11/12/2016 55.9 60.0 53.2 58.9 57.0 58.8 53.4 56.7 11/13/2016 55.7 60.2 53.5 59.0 57.0 58.8 53.0 56.8 11/14/2016 56.2 60.4 53.2 59.1 57.0 58.9 54.4 57.0 11/15/2016 56.3 60.5 N.A.

59.3 58.3 58.9 55.2 58.1 11/16/2016 56.1 60.6 N.A.

59.7 60.4 58.8 55.4 58.5 11/17/2016 55.7 60.7 53.7 59.8 60.6 58.7 54.8 57.7 11/18/2016 55.8 60.8 53.6 59.9 60.8 58.9 54.3 57.7 11/19/2016 56.6 61.0 53.7 60.2 61.1 59.0 54.8 58.1 11/20/2016 56.8 61.0 54.4 60.2 61.4 59.2 56.0 58.4 11/21/2016 58.8 61.2 55.9 60.3 61.4 59.2 57.8 59.2 11/22/2016 59.8 61.3 56.6 60.6 61.7 59.2 59.0 59.7 11/23/2016 59.5 61.4 57.1 60.8 61.9 59.4 58.2 59.8 11/24/2016 59.0 61.6 56.4 61.1 62.2 59.6 58.5 59.8 11/25/2016 59.5 61.7 56.5 61.4 62.6 59.7 58.8 60.0 11/26/2016 60.5 62.0 56.7 61.6 62.8 59.9 59.5 60.4 11/27/2016 60.4 62.2 57.4 61.7 63.1 60.1 60.0 60.7 11/28/2016 60.0 62.4 57.3 61.6 63.0 60.2 59.1 60.5 11/29/2016 60.6 62.4 56.1 62.1 63.6 60.2 58.2 60.5 11/30/2016 61.2 62.7 56.0 62.2 63.7 60.8 58.4 60.7 12/1/2016 60.9 63.2 56.6 62.5 64.1 60.7 57.6 60.8 12/2/2016 60.9 62.1 56.7 61.7 63.9 60.6 59.8 60.8 12/3/2016 59.9 63.0 57.4 61.3 62.9 60.7 59.6 60.7 12/4/2016 59.9 62.7 57.2 62.3 64.0 60.2 58.6 60.7 12/5/2016 61.1 63.0 55.8 61.9 63.9 61.1 58.5 60.8 12/6/2016 60.8 63.8 55.7 62.5 64.0 60.8 60.4 61.2 12/7/2016 61.4 63.8 56.6 61.4 64.0 61.2 60.3 61.2 12/8/2016 60.7 63.0 56.8 61.7 63.8 60.8 60.2 61.0 12/9/2016 60.3 62.6 53.9 60.0 62.4 61.5 59.7 60.1 12/10/2016 58.7 62.2 54.7 60.5 62.3 60.4 57.9 59.5 12/11/2016 57.8 59.3 51.8 58.3 60.7 59.4 55.6 57.6 12/12/2016 57.6 60.6 50.9 58.3 59.5 58.3 56.3 57.4 12/13/2016 57.7 59.3 52.2 58.9 60.9 58.5 56.3 57.7 12/14/2016 57.9 59.7 52.5 58.2 60.3 59.1 57.3 57.8 12/15/2016 56.5 59.7 53.5 59.0 60.8 58.5 57.3 57.9 12/16/2016 56.7 59.6 53.7 58.8 61.0 59.1 57.0 58.0 12/17/2016 57.6 60.4 53.4 59.0 60.7 59.0 56.6 58.1

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix D Table D-1 Daily Summary of Average CCS Salinity Day CCS-1 CCS-2 CCS-3 CCS-4 CCS-5 CCS-6 CCS-7 Average 12/18/2016 57.8 60.5 52.7 59.3 61.4 59.0 56.3 58.1 12/19/2016 58.2 60.8 53.0 59.1 61.3 59.5 57.2 58.4 12/20/2016 58.0 60.9 53.9 59.4 61.6 59.4 57.6 58.7 12/21/2016 59.0 60.9 54.2 59.4 61.9 59.8 58.0 59.0 12/22/2016 59.0 61.2 54.3 59.3 61.9 60.0 58.4 59.2 12/23/2016 58.0 60.7 54.4 59.3 62.1 59.9 57.4 58.8 12/24/2016 58.2 60.8 53.5 58.6 61.3 60.0 57.4 58.6 12/25/2016 57.4 61.0 53.6 59.2 61.7 59.5 57.3 58.5 12/26/2016 57.9 60.7 53.5 59.0 62.0 59.9 57.5 58.6 12/27/2016 58.6 61.3 53.9 59.1 61.6 60.2 57.9 58.9 12/28/2016 58.7 61.2 54.2 59.1 62.0 60.3 58.1 59.1 12/29/2016 59.4 61.6 54.4 58.8 61.8 60.8 58.5 59.3 12/30/2016 59.3 61.9 55.2 59.0 62.1 60.8 58.7 59.6 12/31/2016 59.5 61.9 54.7 59.1 62.0 61.1 58.6 59.5 1/1/2017 59.5 62.2 54.3 59.3 62.0 61.1 58.1 59.5 1/2/2017 59.5 62.1 54.3 59.4 62.5 61.2 57.9 59.6 1/3/2017 59.8 62.4 54.3 59.2 62.5 61.4 58.6 59.7 1/4/2017 59.9 61.9 54.2 58.5 62.3 61.4 59.1 59.6 1/5/2017 59.3 61.9 54.6 58.0 61.7 60.9 58.6 59.3 1/6/2017 59.1 61.6 55.2 59.4 62.5 60.6 58.2 59.5 1/7/2017 59.2 61.7 54.1 62.5 62.5 61.0 58.5 60.0 1/8/2017 59.4 61.7 55.3 62.7 62.5 61.0 58.6 60.2 1/9/2017 58.4 61.5 54.2 62.7 62.4 61.1 58.4 59.8 1/10/2017 58.4 61.5 54.3 63.0 62.2 59.5 58.5 59.6 1/11/2017 59.9 61.3 54.1 63.3 62.6 58.4 58.3 59.7 1/12/2017 60.3 61.5 54.4 63.3 62.7 59.7 58.7 60.1 1/13/2017 59.3 61.2 54.9 63.6 63.1 60.5 58.6 60.2 1/14/2017 59.9 61.5 55.1 63.7 63.4 61.3 58.8 60.5 1/15/2017 60.7 62.3 55.7 63.8 63.6 61.5 59.1 60.9 1/16/2017 61.3 62.5 55.9 64.0 63.9 61.7 59.0 61.2 1/17/2017 62.2 62.8 56.1 64.3 64.3 61.8 59.1 61.5 1/18/2017 62.9 62.9 58.1 64.6 64.8 62.1 60.8 62.3 1/19/2017 63.5 63.2 59.6 64.7 65.1 62.3 62.6 63.0 1/20/2017 63.6 63.5 59.8 65.0 65.3 62.4 62.8 63.2 1/21/2017 63.7 63.9 60.0 65.2 65.5 62.7 63.4 63.5 1/22/2017 63.4 64.4 58.1 65.6 65.6 63.0 62.8 63.3 1/23/2017 63.8 63.8 54.0 64.4 65.0 62.8 64.0 62.5 1/24/2017 63.6 63.8 58.7 65.0 65.1 62.1 64.0 63.2 1/25/2017 63.9 63.5 59.4 64.9 65.5 62.6 63.7 63.4

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix D Table D-1 Daily Summary of Average CCS Salinity Day CCS-1 CCS-2 CCS-3 CCS-4 CCS-5 CCS-6 CCS-7 Average 1/26/2017 63.8 64.2 60.0 65.5 65.5 62.6 64.0 63.6 1/27/2017 64.3 64.1 60.3 65.7 66.1 62.9 64.2 63.9 1/28/2017 64.2 64.7 60.8 65.9 66.1 63.3 N.A.

64.2 1/29/2017 64.7 64.3 60.1 65.8 66.3 63.4 N.A.

64.1 1/30/2017 64.5 64.5 58.8 65.1 65.2 63.1 N.A.

63.5 1/31/2017 63.9 64.4 59.9 66.1 66.3 63.0 N.A.

63.9 2/1/2017 64.8 64.6 59.8 65.9 66.1 63.7 N.A.

64.2 2/2/2017 64.4 64.9 60.3 66.5 66.7 63.5 N.A.

64.4 2/3/2017 64.8 65.2 60.1 66.5 66.9 64.1 N.A.

64.6 2/4/2017 64.8 65.5 60.7 67.0 67.3 64.2 N.A.

64.9 2/5/2017 65.1 65.6 60.5 67.1 67.5 64.5 N.A.

65.1 2/6/2017 64.9 66.0 60.9 67.4 67.8 64.6 N.A.

65.3 2/7/2017 65.6 66.2 59.6 67.7 68.1 65.0 N.A.

65.4 2/8/2017 65.9 66.5 60.2 67.9 68.3 65.3 N.A.

65.7 2/9/2017 66.6 66.8 61.5 68.2 68.7 65.3 N.A.

66.2 2/10/2017 65.6 67.2 62.1 68.5 68.9 66.0 N.A.

66.4 2/11/2017 66.4 67.3 60.6 68.9 69.2 66.2 N.A.

66.4 2/12/2017 66.9 67.7 61.4 69.2 69.5 66.5 N.A.

66.9 2/13/2017 67.5 68.0 62.1 69.5 69.9 66.8 66.4 67.2 2/14/2017 67.7 68.3 62.3 69.7 70.1 67.1 62.9 66.9 2/15/2017 67.8 68.6 60.4 69.6 70.3 67.2 64.9 67.0 2/16/2017 68.1 68.7 62.1 69.9 70.3 67.1 67.2 67.6 2/17/2017 67.7 68.6 61.4 69.9 70.6 67.4 65.6 67.3 2/18/2017 67.5 68.9 61.3 70.3 70.4 67.2 66.8 67.5 2/19/2017 67.9 68.5 60.7 70.0 70.6 67.6 67.4 67.5 2/20/2017 66.6 68.9 61.1 70.8 70.8 67.3 63.7 67.0 2/21/2017 67.9 68.6 56.3 70.1 70.6 68.0 59.4 65.8 2/22/2017 67.1 67.8 54.6 69.4 69.8 66.7 59.8 65.0 2/23/2017 66.3 66.7 54.4 67.5 67.4 65.7 66.0 64.9 2/24/2017 65.5 66.0 57.1 68.4 68.7 65.0 64.8 65.1 2/25/2017 65.8 66.6 57.6 68.0 68.0 65.4 65.7 65.3 2/26/2017 64.8 66.3 59.1 68.6 69.0 65.7 64.9 65.5 2/27/2017 65.1 67.8 58.2 68.7 68.6 66.0 64.9 65.6 2/28/2017 65.4 68.8 58.6 69.0 69.3 66.2 64.8 66.0 3/1/2017 65.8 69.5 59.3 69.2 69.4 66.3 65.1 66.4 3/2/2017 66.9 69.7 59.8 69.4 69.9 66.6 65.5 66.8 3/3/2017 66.9 70.2 62.2 69.7 70.0 67.2 65.9 67.5 3/4/2017 66.2 70.4 60.7 70.3 70.3 67.8 65.0 67.3 3/5/2017 67.1 70.9 61.7 70.7 70.5 68.2 65.8 67.8

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix D Table D-1 Daily Summary of Average CCS Salinity Day CCS-1 CCS-2 CCS-3 CCS-4 CCS-5 CCS-6 CCS-7 Average 3/6/2017 67.8 71.1 61.8 71.0 71.0 68.6 66.4 68.2 3/7/2017 69.4 71.5 62.5 69.9 N.A.

69.4 66.9 68.3 3/8/2017 69.7 71.8 64.3 69.8 68.0 70.8 65.9 68.6 3/9/2017 69.4 71.5 62.6 69.6 68.8 71.2 59.6 67.5 3/10/2017 69.4 71.4 62.3 69.3 68.9 70.9 64.2 68.1 3/11/2017 68.6 70.8 66.8 69.6 69.2 N.A.

67.5 68.7 3/12/2017 68.9 70.5 64.7 68.9 68.7 70.5 67.0 68.5 3/13/2017 68.3 70.8 64.4 69.3 68.4 69.7 62.6 67.6 3/14/2017 68.3 69.0 60.4 67.8 68.0 69.8 65.4 67.0 3/15/2017 68.2 70.0 63.2 67.9 67.2 68.9 67.4 67.5 3/16/2017 67.5 68.9 63.4 68.4 68.3 69.2 66.1 67.4 3/17/2017 67.6 69.5 64.0 68.0 67.3 69.4 66.6 67.5 3/18/2017 67.7 69.7 64.5 68.8 68.2 69.1 66.9 67.8 3/19/2017 69.0 70.0 64.9 69.0 68.2 69.8 67.7 68.4 3/20/2017 67.8 70.6 65.7 69.2 68.3 69.9 67.5 68.4 3/21/2017 68.5 70.4 65.3 69.6 68.7 70.1 67.5 68.6 3/22/2017 69.3 70.5 65.6 69.7 68.7 70.5 68.0 68.9 3/23/2017 68.4 70.3 65.5 69.9 68.8 70.7 68.1 68.8 3/24/2017 66.3 66.6 53.8 63.7 66.0 69.1 63.3 64.1 3/25/2017 65.8 69.4 55.0 65.2 62.4 67.1 63.2 64.0 3/26/2017 64.3 67.5 53.8 67.6 65.5 65.7 61.2 63.6 3/27/2017 65.2 66.7 54.0 66.0 66.1 67.6 61.9 63.9 3/28/2017 66.6 68.3 54.4 65.5 64.8 67.8 63.7 64.4 3/29/2017 65.3 68.8 56.5 66.7 64.7 67.0 61.9 64.4 3/30/2017 64.5 67.9 57.5 67.3 65.9 67.4 60.5 64.4 3/31/2017 64.8 67.1 56.8 66.7 66.6 68.3 61.8 64.6 4/1/2017 65.8 68.0 58.3 66.0 66.0 68.2 64.0 65.2 4/2/2017 65.2 67.9 60.5 66.5 65.7 67.8 62.9 65.2 4/3/2017 64.2 67.7 60.0 66.8 66.0 67.7 60.5 64.7 4/4/2017 64.2 67.5 58.8 66.7 66.2 68.2 61.3 64.7 4/5/2017 64.5 67.7 59.7 66.5 66.0 68.3 61.6 64.9 4/6/2017 64.7 67.6 60.6 67.1 66.1 68.1 63.4 65.4 4/7/2017 66.2 68.1 61.9 67.1 66.5 68.5 64.7 66.1 4/8/2017 66.3 67.8 63.9 66.9 66.1 68.9 64.1 66.3 4/9/2017 65.1 67.9 64.0 66.8 65.9 68.7 64.3 66.1 4/10/2017 64.4 67.8 63.5 67.0 65.8 68.5 63.5 65.8 4/11/2017 63.7 67.7 62.6 67.2 66.0 68.5 63.4 65.6 4/12/2017 64.0 66.9 61.6 67.0 65.9 68.5 63.1 65.3 4/13/2017 63.3 65.5 58.3 64.5 64.2 68.1 62.8 63.8

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix D Table D-1 Daily Summary of Average CCS Salinity Day CCS-1 CCS-2 CCS-3 CCS-4 CCS-5 CCS-6 CCS-7 Average 4/14/2017 62.2 66.3 59.9 65.9 63.8 67.1 62.6 64.0 4/15/2017 62.5 66.9 60.3 66.4 65.0 67.1 61.6 64.2 4/16/2017 63.8 66.1 58.7 66.0 64.7 67.3 61.1 63.9 4/17/2017 64.1 66.1 58.0 65.4 64.4 67.4 61.0 63.8 4/18/2017 63.9 66.2 59.2 65.6 63.8 67.3 61.5 63.9 4/19/2017 63.4 66.5 60.5 65.9 64.3 67.1 61.4 64.2 4/20/2017 63.6 66.1 60.7 66.2 64.5 67.2 61.3 64.2 4/21/2017 65.0 66.2 60.4 65.9 64.3 67.4 61.1 64.3 4/22/2017 64.6 66.3 60.0 65.9 64.2 67.4 60.8 64.2 4/23/2017 64.4 65.6 58.7 65.2 64.0 67.1 61.1 63.7 4/24/2017 64.7 64.7 56.6 64.3 62.8 66.5 63.1 63.2 4/25/2017 63.6 64.2 59.4 65.8 64.2 65.7 62.5 63.6 4/26/2017 64.8 63.6 59.3 64.8 66.5 66.5 62.6 64.0 4/27/2017 63.7 66.3 59.7 65.3 66.1 65.3 61.6 64.0 4/28/2017 64.1 66.7 59.5 65.4 66.7 67.0 61.8 64.4 4/29/2017 64.6 68.0 60.8 65.4 66.2 67.3 63.1 65.0 4/30/2017 64.5 67.9 61.0 66.1 67.1 67.4 62.5 65.2 5/1/2017 62.7 68.4 61.7 67.1 66.9 68.0 63.8 65.5 5/2/2017 61.7 67.8 63.1 68.8 68.0 68.0 61.0 65.5 5/3/2017 63.3 66.6 62.2 67.5 67.6 68.5 63.6 65.6 5/4/2017 63.1 67.1 63.9 68.4 67.2 67.6 65.0 66.0 5/5/2017 64.8 66.3 64.0 68.3 68.3 68.3 64.0 66.3 5/6/2017 66.6 66.4 64.8 67.5 66.8 68.3 67.1 66.8 5/7/2017 66.2 65.9 66.5 69.0 68.5 67.9 65.9 67.1 5/8/2017 66.8 65.9 65.8 68.3 67.8 68.8 64.7 66.9 5/9/2017 65.8 65.9 64.9 69.1 68.4 68.2 65.7 66.9 5/10/2017 66.8 65.8 66.0 69.0 68.3 68.8 66.5 67.3 5/11/2017 67.3 65.9 66.7 69.5 68.6 68.7 62.6 67.0 5/12/2017 68.2 65.9 61.9 68.8 68.7 69.1 65.6 66.9 5/13/2017 68.0 66.4 66.4 69.7 68.7 68.7 67.0 67.8 5/14/2017 69.4 65.8 66.9 69.8 69.6 69.3 67.3 68.3 5/15/2017 69.4 66.3 66.8 69.7 69.1 69.4 59.3 67.1 5/16/2017 69.7 66.1 58.2 69.2 69.2 69.6 59.3 65.9 5/17/2017 69.4 66.4 56.8 69.1 68.6 69.3 61.2 65.8 5/18/2017 68.9 65.5 63.5 69.8 69.0 69.1 62.3 66.9 5/19/2017 68.8 65.4 53.8 68.3 68.1 69.1 60.2 64.8 5/20/2017 67.7 65.1 64.5 69.1 67.7 68.1 65.2 66.8 5/21/2017 68.6 64.9 65.3 69.2 68.4 69.0 65.7 67.3 5/22/2017 69.0 65.6 65.3 69.5 68.4 69.0 57.9 66.4

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix D Table D-1 Daily Summary of Average CCS Salinity Day CCS-1 CCS-2 CCS-3 CCS-4 CCS-5 CCS-6 CCS-7 Average 5/23/2017 69.1 65.6 57.0 69.3 68.8 69.3 63.8 66.1 5/24/2017 69.2 66.3 63.2 69.1 68.1 69.2 63.3 66.9 5/25/2017 68.7 65.4 63.1 68.5 67.8 68.6 67.1 67.0 5/26/2017 N.A.

63.4 63.8 67.9 67.9 68.4 63.4 65.8 5/27/2017 N.A.

63.9 60.4 66.9 65.8 67.8 66.0 65.1 5/28/2017 N.A.

63.1 63.8 68.2 67.3 67.5 65.4 65.9 5/29/2017 67.6 63.6 65.1 67.8 67.0 68.6 66.2 66.6 5/30/2017 67.3 63.9 65.4 68.8 67.9 68.3 61.6 66.2 5/31/2017 68.2 64.1 62.2 68.5 68.1 69.2 54.3 64.9 6/1/2017 67.8 64.5 63.0 68.8 67.7 68.9 66.2 66.7 6/2/2017 67.9 63.8 59.9 68.8 68.2 69.2 65.0 66.1 6/3/2017 67.4 64.0 64.2 68.3 66.9 68.7 66.7 66.6 6/4/2017 67.1 63.2 64.6 68.4 67.3 68.3 65.6 66.4 6/5/2017 67.2 63.7 64.1 68.3 66.7 68.8 63.0 66.0 6/6/2017 66.7 63.5 62.9 68.3 67.1 68.6 61.2 65.5 6/7/2017 66.2 61.5 58.7 64.9 64.8 67.6 62.1 63.7 6/8/2017 62.9 60.6 57.8 63.1 62.0 64.0 62.7 61.9 6/9/2017 62.7 56.6 58.0 62.3 62.1 63.0 60.9 60.8 6/10/2017 59.5 57.1 54.5 56.5 56.0 59.8 59.1 57.5 6/11/2017 57.5 55.4 56.9 61.5 59.5 58.7 55.9 57.9 6/12/2017 60.3 55.8 54.0 58.7 58.2 61.2 59.0 58.2 6/13/2017 58.4 56.7 56.5 60.5 57.9 59.1 57.2 58.0 6/14/2017 59.0 54.3 53.9 59.3 58.9 59.8 56.7 57.4 6/15/2017 58.9 56.3 54.0 58.3 56.0 59.4 57.9 57.2 6/16/2017 57.9 54.6 55.3 59.8 58.1 58.5 56.8 57.3 6/17/2017 59.2 55.6 53.6 57.9 56.6 59.8 57.9 57.2 6/18/2017 57.5 55.6 54.2 59.5 57.0 58.5 56.4 57.0 6/19/2017 58.7 55.0 52.5 58.2 56.9 59.4 56.7 56.8 6/20/2017 58.2 55.9 53.3 59.3 58.2 58.7 56.7 57.2 6/21/2017 58.3 N.A.

53.3 60.8 61.2 59.7 56.3 58.3 6/22/2017 59.2 61.6 53.4 60.1 60.6 61.0 57.9 59.1 6/23/2017 59.7 61.7 55.9 61.2 61.4 60.4 58.0 59.8 6/24/2017 61.1 62.1 56.3 61.2 61.9 61.4 59.4 60.5 6/25/2017 61.3 63.1 57.2 61.8 62.0 61.5 60.0 61.0 6/26/2017 61.7 63.3 57.4 62.4 62.9 62.0 60.2 61.4 6/27/2017 62.2 63.6 57.7 62.6 63.0 62.6 61.2 61.8 6/28/2017 62.3 64.0 58.6 63.1 63.5 62.8 61.5 62.3 6/29/2017 62.8 63.8 58.7 63.3 63.8 63.3 61.8 62.5 6/30/2017 62.9 64.6 59.1 63.7 63.9 63.5 61.8 62.8

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix D Table D-1 Daily Summary of Average CCS Salinity Day CCS-1 CCS-2 CCS-3 CCS-4 CCS-5 CCS-6 CCS-7 Average 7/1/2017 63.2 64.5 59.0 64.4 64.7 64.0 62.0 63.1 7/2/2017 63.8 64.7 59.3 64.4 64.6 64.6 62.9 63.5 7/3/2017 63.9 64.7 60.1 65.4 65.3 64.8 62.8 63.9 7/4/2017 64.6 65.2 60.2 65.6 65.8 65.6 63.4 64.4 7/5/2017 65.0 65.0 61.2 66.2 65.9 65.8 63.9 64.7 7/6/2017 65.4 62.7 61.4 66.6 66.5 66.2 64.2 64.7 7/7/2017 66.1 64.2 62.2 67.0 66.4 66.6 64.9 65.3 7/8/2017 66.4 62.5 61.8 67.1 66.9 66.9 65.1 65.2 7/9/2017 66.4 64.3 61.9 67.0 66.4 67.0 65.6 65.5 7/10/2017 66.1 64.2 62.2 68.1 67.7 67.4 64.9 65.8 7/11/2017 64.7 60.9 58.7 63.2 64.7 65.9 63.3 63.0 7/12/2017 62.8 63.7 59.9 64.9 63.8 64.3 62.1 63.1 7/13/2017 62.9 62.6 55.7 61.4 62.1 63.8 61.2 61.4 7/14/2017 61.5 62.6 58.2 63.7 62.0 61.6 60.2 61.4 7/15/2017 62.5 60.1 56.9 63.0 62.9 63.4 61.3 61.4 7/16/2017 62.6 60.1 58.5 63.7 62.1 62.9 61.7 61.7 7/17/2017 62.6 61.5 57.9 64.3 63.5 63.3 61.3 62.0 7/18/2017 63.8 63.7 58.6 63.9 62.8 63.8 62.0 62.6 7/19/2017 63.6 64.2 59.5 64.6 63.3 63.8 61.7 63.0 7/20/2017 64.1 64.9 58.4 64.0 63.0 64.3 62.3 63.0 7/21/2017 63.4 65.0 58.6 63.5 62.0 63.6 61.8 62.5 7/22/2017 62.7 64.0 58.3 63.4 61.7 63.4 60.7 62.0 7/23/2017 63.2 64.7 57.9 63.6 61.7 63.5 60.9 62.2 7/24/2017 63.2 64.7 58.0 64.0 62.0 63.6 60.9 62.3 7/25/2017 63.4 64.9 58.3 64.2 62.1 64.0 61.2 62.6 7/26/2017 63.5 65.0 58.8 64.3 62.1 64.2 61.2 62.7 7/27/2017 63.8 65.1 58.8 64.7 62.2 64.3 61.2 62.9 7/28/2017 64.2 64.6 59.0 64.8 62.4 64.7 61.5 63.0 7/29/2017 64.2 64.9 58.9 63.9 62.0 64.7 62.0 62.9 7/30/2017 63.6 64.7 57.6 63.1 61.3 63.9 61.4 62.2 7/31/2017 62.3 63.8 55.8 61.7 59.4 62.7 60.4 60.9 8/1/2017 61.4 62.3 56.9 62.3 60.2 62.2 59.1 60.6 8/2/2017 62.3 63.2 57.3 61.6 59.6 63.0 60.1 61.0 8/3/2017 61.7 63.2 58.1 62.9 60.4 62.4 59.2 61.1 8/4/2017 62.4 63.3 57.4 62.7 61.0 63.3 59.7 61.4 8/5/2017 62.7 64.1 57.9 63.2 60.9 63.4 60.0 61.8 8/6/2017 62.9 63.8 58.1 63.6 61.6 63.6 60.0 61.9 8/7/2017 63.7 64.4 58.2 63.5 61.7 64.1 60.4 62.3 8/8/2017 63.7 64.7 58.7 64.2 62.0 64.2 60.4 62.6

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix D Table D-1 Daily Summary of Average CCS Salinity Day CCS-1 CCS-2 CCS-3 CCS-4 CCS-5 CCS-6 CCS-7 Average 8/9/2017 63.9 64.8 59.1 64.2 62.5 64.7 61.2 62.9 8/10/2017 64.4 64.8 59.4 63.2 62.2 64.9 61.7 62.9 8/11/2017 62.9 63.9 58.6 61.9 60.4 63.1 60.3 61.6 8/12/2017 62.2 62.5 58.9 62.3 60.7 62.7 59.2 61.2 8/13/2017 62.7 63.6 58.9 62.2 60.7 63.2 59.6 61.5 8/14/2017 62.6 63.9 59.7 62.9 61.3 63.1 59.8 61.9 8/15/2017 63.3 63.9 60.0 62.7 61.8 63.8 60.0 62.2 8/16/2017 63.4 63.7 60.6 63.2 62.0 64.3 60.2 62.5 8/17/2017 63.6 63.8 60.8 64.6 64.5 64.8 60.0 63.2 8/18/2017 64.9 64.3 62.3 65.7 65.7 65.0 60.1 64.0 8/19/2017 64.9 64.6 63.5 66.2 66.0 65.3 62.4 64.7 8/20/2017 65.0 64.4 61.8 64.9 65.6 65.2 63.3 64.3 8/21/2017 64.3 64.4 61.6 64.7 64.5 64.4 61.9 63.7 8/22/2017 63.9 63.3 60.5 64.2 64.8 63.9 59.4 62.9 8/23/2017 63.6 62.9 60.0 64.0 64.1 63.6 60.6 62.7 8/24/2017 62.8 62.5 58.5 62.2 62.8 62.9 62.2 62.0 8/25/2017 60.7 59.9 54.9 58.9 60.4 60.7 59.7 59.3 8/26/2017 57.1 58.0 52.0 56.3 56.9 57.1 57.4 56.4 8/27/2017 56.5 57.2 55.0 58.0 57.8 56.8 56.0 56.8 8/28/2017 57.4 57.0 54.7 57.6 58.0 57.6 55.3 56.8 8/29/2017 57.4 56.9 55.1 57.9 57.8 57.3 52.1 56.4 8/30/2017 57.6 56.7 55.5 58.8 58.7 57.6 50.0 56.4 8/31/2017 58.4 58.0 55.1 58.7 58.8 58.3 57.0 57.8 9/1/2017 58.6 58.9 55.2 59.4 59.2 58.3 57.2 58.1 9/2/2017 59.0 58.6 54.7 59.6 59.8 58.8 58.4 58.4 9/3/2017 59.1 59.4 55.1 59.2 59.2 59.1 58.4 58.5 9/4/2017 58.6 59.4 55.6 60.3 60.0 58.9 58.2 58.7 9/5/2017 59.6 59.7 54.7 60.0 60.4 59.7 58.8 59.0 9/6/2017 59.7 60.0 N.A.

60.4 N.A.

59.6 N.A.

59.9 9/7/2017 59.6 59.8 N.A.

60.3 N.A.

59.7 N.A.

59.8 9/8/2017 59.1 60.5 N.A.

60.5 N.A.

59.9 N.A.

60.0 9/9/2017 55.9 57.8 N.A.

58.3 N.A.

58.2 N.A.

57.6 9/10/2017 40.8 50.4 N.A.

49.6 N.A.

38.0 N.A.

44.7 9/11/2017 40.9 44.6 N.A.

45.3 N.A.

43.2 N.A.

43.5 9/12/2017 40.9 41.4 N.A.

43.0 N.A.

43.0 N.A.

42.1 9/13/2017 40.0 42.2 N.A.

43.0 N.A.

42.1 N.A.

41.9 9/14/2017 39.4 41.7 N.A.

44.1 N.A.

41.6 N.A.

41.7 9/15/2017 39.9 41.4 N.A.

44.4 N.A.

42.2 N.A.

42.0 9/16/2017 40.2 41.7 N.A.

44.2 N.A.

42.6 N.A.

42.2

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix D Table D-1 Daily Summary of Average CCS Salinity Day CCS-1 CCS-2 CCS-3 CCS-4 CCS-5 CCS-6 CCS-7 Average 9/17/2017 40.2 41.9 N.A.

44.5 N.A.

42.5 N.A.

42.3 9/18/2017 40.3 41.9 N.A.

44.8 N.A.

42.6 N.A.

42.4 9/19/2017 40.4 42.0 N.A.

44.8 N.A.

42.8 N.A.

42.5 9/20/2017 40.3 42.5 N.A.

44.6 N.A.

43.0 N.A.

42.6 9/21/2017 39.9 42.8 N.A.

44.7 N.A.

43.0 N.A.

42.6 9/22/2017 39.9 42.5 N.A.

44.7 N.A.

43.0 N.A.

42.5 9/23/2017 39.6 41.3 N.A.

43.8 N.A.

42.4 N.A.

41.8 9/24/2017 39.8 41.9 N.A.

43.5 N.A.

42.4 N.A.

41.9 9/25/2017 39.3 41.8 N.A.

44.1 N.A.

41.9 N.A.

41.8 9/26/2017 39.6 41.0 42.6 44.0 44.9 42.2 N.A.

42.4 9/27/2017 39.9 41.5 42.6 43.6 44.4 42.4 N.A.

42.4 9/28/2017 39.5 41.4 42.5 43.6 44.2 42.0 N.A.

42.2 9/29/2017 39.0 41.0 42.3 43.0 43.9 41.8 N.A.

41.8 9/30/2017 38.7 40.5 41.3 42.5 43.1 41.2 N.A.

41.2

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix E Appendix E Monitoring Well Logs and Construction Details

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix E Figure E-1 G-3991 Well Log

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix E Figure E-2 TPGW-19 Well Log

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix E Figure E-3 TPGW-20 Well Log

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix E Figure E-4 Geophysical Logs for RW-1 Note: Due to size constraints, this file is available for download and review on the accompanying data disc/drive or in the EDMS website.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix E Figure E-5 Geophysical Logs for RW-4 Note: Due to size constraints, this file is available for download and review on the accompanying data disc/drive or in the EDMS website.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix E Figure E-6 Geophysical Logs for RW-6 Note: Due to size constraints, this file is available for download and review on the accompanying data disc/drive or in the EDMS website.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix E Figure E-7 Sub-Geophysical Logs for RW-7 Note: Due to size constraints, this file is available for download and review on the accompanying data disc/drive or in the EDMS website.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix E Figure E-8 Geophysical Logs for RW-8 Note: Due to size constraints, this file is available for download and review on the accompanying data disc/drive or in the EDMS website.

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix F Appendix F USGS Analytical Results

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix F Table F-1 USGS Analytical Data Well Date Specific Conductance

(µS/cm)

Chloride (mg/L)

October 2016 G-3699 10/27/2016 31400 10900 G-3900 10/12/2016 583 35 G-3946-S 10/12/2016 9080 2780 G-3966-D 10/12/2016 1490 285 G-3966-S 10/12/2016 17300 5720 G-3976 10/12/2016 541 34 November 2016 G-3900 11/2/2016 591 39 G-3946-S 11/2/2016 8860 2890 G-3966-D 11/2/2016 1750 424 G-3966-S 11/2/2016 17600 5900 G-3976 11/2/2016 545 37 December 2016 G-3900 12/15/2016 582 37 G-3946-S 12/15/2016 8360 2620 G-3966-D 12/15/2016 4740 1380 G-3966-S 12/15/2016 17400 5860 G-3976 12/15/2016 536 36 January 2017 G-3699 1/18/2017 32100 11000 G-3900 1/13/2017 590 36 G-3946-S 1/13/2017 8480 2440 G-3966-D 1/13/2017 5430 1630 G-3966-S 1/13/2017 18100 5930 G-3976 1/13/2017 553 37 February 2017 G-3900 2/9/2017 600 38 G-3946-S 2/9/2017 8970 2880 G-3966-D 2/9/2017 6680 2020 G-3966-S 2/9/2017 18500 6250 G-3976 2/9/2017 544 36 March 2017 G-3900 3/21/2017 627 44 G-3946-S 3/21/2017 9740 2980 G-3966-D 3/21/2017 6750 2110

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix F Table F-1 USGS Analytical Data Well Date Specific Conductance

(µS/cm)

Chloride (mg/L)

G-3966-S 3/21/2017 19000 6500 G-3976 3/21/2017 548 40 April 2017 G-3699 4/13/2017 31700 11300 G-3900 4/11/2017 638 50 G-3946-S 4/11/2017 9530 2950 G-3966-D 4/13/2017 6690 2070 G-3966-S 4/11/2017 18900 6010 G-3976 4/4/2017 545 39 May 2017 G-3699 5/18/2017 31200 G-3900 5/10/2017 618 55 G-3900 5/17/2017 649 G-3946-D 5/10/2017 9760 3330 G-3966-D 5/10/2017 7060 2340 G-3966-S 5/10/2017 18500 6950 G-3976 5/10/2017 526 39 June 2017 G-3900 6/20/2017 629 56 G-3946-S 6/20/2017 9660 3210 G-3966-D 6/20/2017 8270 2670 G-3966-S 6/20/2017 18700 6340 G-3976 6/20/2017 531 37 July 2017 G-3699 7/25/2017 30900 10900 G-3900 7/11/2017 620 51 G-3946-S 7/11/2017 9790 3260 G-3966-D 7/11/2017 7190 2100 G-3966-S 7/11/2017 19200 6700 G-3976 7/11/2017 533 37 August 2017 G-3900 8/16/2017 629 52 G-3946-S 8/16/2017 9270 3050 G-3966-D 8/16/2017 7890 2500 G-3966-S 8/16/2017 19500 6940 G-3976 8/16/2017 538 40

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix F Table F-1 USGS Analytical Data Well Date Specific Conductance

(µS/cm)

Chloride (mg/L)

September 2017 G-3900 9/20/2017 620 46 G-3966-D 9/20/2017 8000 2440 G-3966-S 9/20/2017 19400 6550 G-3976 9/20/2017 532 37

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix G Appendix G Biscayne Bay Bimonthly Analytical Results

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix G Table G-1 Biscayne Bay Bimonthly Analytical Results - September 2016 Temperature

°C 30.50 30.38 30.48 30.33 30.99 30.45 30.00 29.88 29.92 29.84 29.89 29.97 pH SU 8.15 8.27 8.12 8.13 8.13 8.15 8.25 8.25 8.15 8.15 8.05 7.99 Dissolved Oxygen mg/L 5.14 7.68 5.88 5.94 5.63 6.55 5.17 5.45 5.8 5.84 5.53 5.12 Specific Conductance S/cm 47792 50541 50636 50811 52279 52540 49781 49879 49540 49553 49956 52675 Turbidity NTU 1.11 0.69 0.51 0.67 0.89 0.74 0.62 0.47 0.72 0.78 0.84 1.84 Total Ammonia mg/L as N 0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

Nitrate/Nitrite mg/L as N 0.0250 U

0.0250 U

0.0250 U

0.0250 U

0.0302 I

0.0299 I

0.0250 U

0.0250 U

0.0250 U

0.0250 U

0.0250 U

0.0250 U

0.00500 U

TKN mg/L 0.550 0.500 0.436 0.438 0.374 I

0.414 0.412 0.366 I

0.544 0.330 I

0.520 0.424 0.100 U

ortho-Phosphate mg/L 0.00210 U J3 0.00210 U J3 0.00210 U J3 0.00210 U J3 0.00210 U J3 0.00210 U J3 0.00210 U J3 0.00210 U J3 0.00210 U J3 0.00210 U J3 0.00210 U J3 0.0021 U J3 0.00210 U J3 Total Phosphorus (P) mg/L 0.00300 U

0.00320 I

0.00338 I

0.00455 I

0.00635 I

0.00535 I

0.00578 I

0.00410 I

0.00300 U

0.00300 U

0.00300 U

0.003 U

0.00300 U

Salinity 30.97 32.98 33.04 33.18 34.24 34.45 32.44 32.51 32.26 32.28 32.57 34.57 Chlorophyll a mg/m 3

0.50 0.50 0.50 0.53 0.50 0.53 0.53 0.50 0.53 1.6 QR-04 0.50 Secchi Disk Measurement ft

>5.5

>5.5

>6.5

>6.5

>8.0

>8.0

<6.0

<6.0

>11.0

>11.0

>11.5

>11.5 Total Depth ft 5.5 5.5 6.5 6.5 8.0 8.0 6.0 6.0 11.5 11.5 11.5 11.5 NOTES:

Laboratory results are reported with 3 digits although only the first 2 are significant figures.

  • PSS-78 salinity is unitless.

KEY:

°C = Degrees Celsius.

NTU = Nephelometric Turbidity Units(s).

S/cm = MicroSiemen(s) per centimeter.

pCi/L = PicoCuries per liter.

FB = Field Blank.

QR-04 = Duplicate precision outside acceptance limits due to low analyte concentration.

I = Value between the MDL and PQL.

SU = Standard Unit(s).

J3 = Estimated.

TKN = Total Kjeldahl nitrogen.

mg/L = Milligram(s) per liter.

TPBBSW = Turkey Point Biscayne Bay Surface Water.

mg/m 3 = Milligram(s) per cubic meter.

U = Analyzed for but not detected at the reported value.

Parameter Units 091216-FB1 09/12/2016 09/12/2016 09/12/2016 09/12/2016 09/12/2016 TPBBSW-19B TPBBSW-19T TPBBSW-20B TPBBSW-20T 09/12/2016 09/12/2016 09/12/2016 TPBBSW-18B TPBBSW-18T TPBBSW-17B TPBBSW-17T TPBBSW-16B TPBBSW-16T TPBBSW-15B TPBBSW-15T 09/12/2016 09/12/2016 09/12/2016 09/12/2016 09/12/2016

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix G Table G-2 Biscayne Bay Bimonthly Analytical Results - November 2016 Temperature

°C 25.17 25.29 24.78 25.26 24.67 24.93 24.81 24.86 24.59 24.65 24.44 24.8 pH SU 8.16 8.17 8.15 8.08 8.12 8.09 8.12 8.10 7.96 7.98 8.1 7.95 Dissolved Oxygen mg/L 6.68 7.15 6.99 5.71 7.00 6.30 6.29 6.73 6.87 6.39 6.93 5.32 Specific Conductance S/cm 31942 33592 36597 45723 43073 50018 46900 46886 47198 47453 46529 49971 Turbidity NTU 1.45 1.76 1.23 0.95 1.13 1.02 0.55 0.47 0.55 0.54 0.65 3.13 Total Ammonia mg/L as N 0.200 I

0.191 I

0.144 I

0.100 U

0.109 I

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

Nitrate/Nitrite mg/L as N 0.237 0.219 0.195 0.0960 0.103 0.0496 I

0.0439 I

0.0485 I

0.0287 I

0.0268 I

0.0324 I

0.0250 U

0.005 U

TKN mg/L 0.340 I

0.574 0.376 I

0.408 0.474 0.256 I

0.318 I

0.200 U

0.268 I

0.200 U

0.378 I

0.200 U

0.100 U

ortho-Phosphate mg/L 0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

Total Phosphorus (P) mg/L 0.00300 U

0.00300 U

0.00300 U

0.00300 U

0.00300 U

0.00300 U

0.00300 U

0.00300 U

0.00300 U

0.00300 U

0.00300 U

0.0101 0.00300 U

Salinity 19.90 21.03 23.13 29.61 27.71 32.75 30.48 30.47 30.7 30.88 30.22 32.72 Chlorophyll a mg/m 3

0.53 0.80 0.80 0.50 0.53 0.53 0.50 0.50 1.1 QR-04 0.80 0.53 1.1 0.50 Secchi Disk Measurement ft

>7.2

>7.2

>8.0

>8.0

>9.0

>9.0

>6.3

>6.3

>11.5

>11.5

>12.0

>12.0 Total Depth ft 7.2 7.2 8.0 8.0 9.0 9.0 6.3 6.3 11.5 11.5 12.0 12.0 NOTES:

Laboratory results are reported with 3 digits although only the first 2 are significant figures.

  • PSS-78 salinity is unitless.

KEY:

°C = Degrees Celsius.

NTU = Nephelometric Turbidity Units(s).

S/cm = MicroSiemen(s) per centimeter.

pCi/L = PicoCuries per liter.

FB = Field Blank.

QR-04 = Duplicate precision outside acceptance limits due to low analyte concentration.

I = Value between the MDL and PQL.

SU = Standard Unit(s).

mg/L = Milligram(s) per liter.

TKN = Total Kjeldahl nitrogen.

mg/m 3 = Milligram(s) per cubic meter.

TPBBSW = Turkey Point Biscayne Bay Surface Water.

N = Nitrogen.

U = Analyzed for but not detected at the reported value.

110416-EB1 11/04/2016 11/04/2016 11/04/2016 11/04/2016 11/04/2016 11/04/2016 11/04/2016 11/04/2016 11/04/2016 11/04/2016 11/04/2016 TPBBSW-18T TPBBSW-19B TPBBSW-19T TPBBSW-20B TPBBSW-20T TPBBSW-16B TPBBSW-16T TPBBSW-17B TPBBSW-17T TPBBSW-18B TPBBSW-15B TPBBSW-15T 11/04/2016 11/04/2016 Parameter Units

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix G Table G-3 Biscayne Bay Bimonthly Analytical Results - January 2017 Temperature

°C 22.30 22.20 22.20 22.40 21.90 22.00 22.00 22.10 21.7 22.50 22.3 22.3 pH SU 8.10 8.11 8.12 8.13 8.06 8.06 8.03 8.06 7.99 8.01 8.07 8.08 Dissolved Oxygen mg/L 6.81 6.99 7.03 6.90 6.39 6.81 5.96 7.06 7.18 6.36 6.33 6.08 Specific Conductance S/cm 52587 52594 52597 52581 54103 54116 49866 49761 50321 53034 54224 54210 Turbidity NTU 1.62 1.47 2.82 2.51 2.27 2.66 1.74 1.69 3.3 5.93 10.4 11.11 Total Ammonia mg/L as N 0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

Nitrate/Nitrite mg/L as N 0.00500 U

0.00500 U

0.00500 U

0.00500 U

0.00500 U

0.00500 U

0.0196 0.0143 0.0100 0.00727 I

0.00500 U

0.00500 U 0.00500 U

TKN mg/L 0.252 I

0.200 U

0.200 U

0.200 U

0.200 U

0.200 U

0.200 U

0.200 U

0.286 I

0.200 U

0.200 U

0.200 U

0.200 U

ortho-Phosphate mg/L 0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U

0.00210 U 0.00210 U

Total Phosphorus (P) mg/L 0.00300 U

0.00300 U

0.0405 0.00300 U

0.00300 U

0.00300 U

0.00300 U

0.00300 U

0.00300 U J3 0.00300 U J3 0.00300 U J3 0.00300 U 0.00300 U J3 Salinity 34.70 34.70 34.70 34.68 35.82 35.83 32.69 32.61 33.02 35.02 35.91 35.9 Chlorophyll a mg/m 3

1.1 0.53 0.80 0.80 0.80 0.50 0.53 0.80 0.53 0.80 0.80 0.53 0.50 Secchi Disk Measurement ft

>6.0

>6.0

>5.6

>5.6 6.5 6.5

>5.1

>5.1 5.0 5.0 3.0 3.0 Total Depth ft 6.0 6.0 5.6 5.6 8.0 8.0 5.1 5.1 11.4 11.4 12.0 12.0 NOTES:

Laboratory results are reported with 3 digits although only the first 2 are significant figures.

  • PSS-78 salinity is unitless.

KEY:

°C = Degrees Celsius.

N = Nitrogen.

S/cm = MicroSiemen(s) per centimeter.

NTU = Nephelometric Turbidity Units(s).

FB = Field Blank.

pCi/L = PicoCuries per liter.

I = Value between the MDL and PQL.

SU = Standard Unit(s).

J3 = Estimated.

TKN = Total Kjeldahl nitrogen.

mg/L = Milligram(s) per liter.

TPBBSW = Turkey Point Biscayne Bay Surface Water.

mg/m 3 = Milligram(s) per cubic meter.

U = Analyzed for but not detected at the reported value.

012417-FB1 01/24/2017 01/24/2017 01/24/2017 01/24/2017 01/24/2017 01/24/2017 01/24/2017 01/24/2017 01/24/2017 01/24/2017 01/24/2017 TPBBSW-18T TPBBSW-19B TPBBSW-19T TPBBSW-20B TPBBSW-20T TPBBSW-16B TPBBSW-16T TPBBSW-17B TPBBSW-17T TPBBSW-18B Parameter Units TPBBSW-15B TPBBSW-15T 01/24/2017 01/24/2017

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix G Table G-4 Biscayne Bay Bimonthly Analytical Results - March 2017 Temperature

°C 20.50 20.60 20.60 20.60 20.60 20.70 21.20 21.30 21.2 21.30 21.5 21.5 pH SU 8.20 8.21 8.21 8.20 8.18 8.18 8.21 8.21 8.18 8.18 8.15 8.15 Dissolved Oxygen mg/L 7.36 7.42 6.96 6.48 6.49 6.66 6.51 7.08 6.4 6.71 5.95 6.65 Specific Conductance S/cm 52855 53020 56275 56304 55971 56932 55363 55325 55230 55146 55716 55658 Turbidity NTU 1.61 1.86 1.36 1.32 0.94 1.18 0.48 0.78 0.84 0.81 2.99 3.15 Total Ammonia mg/L as N 0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

Nitrate/Nitrite mg/L as N 0.00506 I

0.00500 U

0.0291 0.00500 U

0.00500 U

0.00500 U

0.00500 U

0.00500 U

0.00707 I

0.00500 U

0.00500 U

0.00500 U

0.00500 U

TKN mg/L 0.242 I

0.218 I

0.320 I

0.200 U

0.308 I

0.374 I

0.364 I

0.414 0.250 I

0.312 I

0.262 I

0.370 I

0.100 U

ortho-Phosphate mg/L 0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

Total Phosphorus (P) mg/L 0.00456 U

0.00456 U

0.174 0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

Salinity 34.91 35.03 37.45 37.47 37.98 37.95 36.77 36.74 36.67 36.60 37.03 36.99 Chlorophyll a mg/m 3

0.50 0.53 0.50 0.53 0.50 0.53 0.50 0.50 0.53 0.53 0.53 1.1 0.50 Secchi Disk Measurement ft

>6.4

>6.4 7.8 7.8

>8.7

>8.7

>6.0

>6.0

>11.3

>11.3 7.0 7.0 Total Depth ft 6.4 6.4 7.8 7.8 8.7 8.7 6.0 6.0 11.3 11.3 12.0 12.0 NOTES:

Laboratory results are reported with 3 digits although only the first 2 are significant figures.

  • PSS-78 salinity is unitless.

KEY:

°C = Degrees Celsius.

N = Nitrogen.

S/cm = MicroSiemen(s) per centimeter.

NTU = Nephelometric Turbidity Units(s).

FB = Field Blank.

pCi/L = PicoCuries per liter.

ft = Feet.

SU = Standard Unit(s).

I = Value between the MDL and PQL.

TKN = Total Kjeldahl nitrogen.

mg/L = Milligram(s) per liter.

TPBBSW = Turkey Point Biscayne Bay Surface Water.

mg/m 3 = Milligram(s) per cubic meter.

U = Analyzed for but not detected at the reported value.

Parameter Units TPBBSW-15B TPBBSW-15T 03/16/2017 03/16/2017 TPBBSW-20T TPBBSW-16B TPBBSW-16T TPBBSW-17B TPBBSW-17T TPBBSW-18B 031617-FB1 03/16/2017 03/16/2017 03/16/2017 03/16/2017 03/16/2017 03/16/2017 03/16/2017 03/16/2017 03/16/2017 03/16/2017 03/16/2017 TPBBSW-18T TPBBSW-19B TPBBSW-19T TPBBSW-20B

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix G Table G-5 Biscayne Bay Bimonthly Analytical Results - May 2017 Temperature

°C 28.60 28.70 28.20 28.20 27.20 27.20 28.20 28.30 27.7 27.80 27.9 28 pH SU 8.19 8.20 8.15 8.15 8.08 8.10 8.13 8.14 8.11 8.12 8.08 8.08 Dissolved Oxygen mg/L 6.46 6.36 5.82 5.87 5.68 5.92 5.88 5.94 5.9 5.97 5.51 5.78 Specific Conductance S/cm 57426 57418 56832 56890 57272 57333 57874 57899 58211 58271 57812 57800 Turbidity NTU 0.84 0.79 0.97 0.72 0.64 0.76 1.16 0.98 0.84 0.60 1.12 1.79 Total Ammonia mg/L as N 0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

Nitrate/Nitrite mg/L as N 0.00500 U

0.00500 U

0.00500 U

0.00500 U

0.00500 U

0.00500 U

0.00500 U

0.00500 U

0.00500 U

0.00500 U

0.00500 U

0.00500 U 0.00500 U TKN mg/L 0.200 U

0.300 I

0.236 I

0.252 I

0.344 I

0.312 I

0.246 I

0.200 U

0.390 I

0.200 U

0.254 I

0.400 0.100 U

ortho-Phosphate mg/L 0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U 0.0046 U

Total Phosphorus (P) mg/L 0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U 0.0046 U

Salinity 38.16 38.15 37.72 37.75 38.08 38.08 38.50 38.52 38.76 38.81 38.47 38.45 Chlorophyll a mg/m 3

0.50 0.53 0.50 0.53 0.53 0.53 0.53 0.53 0.55 0.53 0.53 0.53 0.53 Secchi Disk Measurement ft

>5.0

>5.0

>6.3

>6.3

>8.2

>8.2

>5.5

>5.5

>11.0

>11.0

>12.0

>12.0 Total Depth ft 5.0 5.0 6.3 6.3 8.2 8.2 5.5 5.5 11.0 11.0 12.0 12.0 NOTES:

Laboratory results are reported with 3 digits although only the first 2 are significant figures.

  • PSS-78 salinity is unitless.

KEY:

°C = Degrees Celsius.

N = Nitrogen.

S/cm = MicroSiemen(s) per centimeter.

NTU = Nephelometric Turbidity Units(s).

FB = Field Blank.

pCi/L = PicoCuries per liter.

ft = Feet.

SU = Standard Unit(s).

I = Value between the MDL and PQL.

TKN = Total Kjeldahl nitrogen.

mg/L = Milligram(s) per liter.

TPBBSW = Turkey Point Biscayne Bay Surface Water.

mg/ m 3 = Milligrams per cubic meter.

U = Analyzed for but not detected at the reported value.

Parameter Units TPBBSW-15B TPBBSW-15T 05/03/2017 05/03/2017 TPBBSW-20T TPBBSW-16B TPBBSW-16T TPBBSW-17B TPBBSW-17T TPBBSW-18B 050317-FB1 05/03/2017 05/03/2017 05/03/2017 05/03/2017 05/03/2017 05/03/2017 05/03/2017 05/03/2017 05/03/2017 05/03/2017 05/03/2017 TPBBSW-18T TPBBSW-19B TPBBSW-19T TPBBSW-20B

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix G Table G-6 Biscayne Bay Bimonthly Analytical Results - July 2017 Parameter Units Field Temperature Degrees C 31.30 31.40 31.10 31.20 30.40 30.40 30.50 30.50 30.90 30.9 31 30.9 Field pH SU 8.20 8.20 8.13 8.13 8.06 8.02 8.21 8.22 8.09 8.08 8.07 8.07 Oxygen, Dissolved mg/L 5.52 5.87 5.64 5.42 5.25 5.17 4.53 5.40 5.13 5.11 5.15 5.1 Specific Conductance S/cm 58298 58219 57361 57373 56908 56893 57948 57828 57351 57311 56829 56955 Turbidity NTU 0.42 1.31 1.06 0.96 1.10 1.32 1.71 1.37 0.85 0.22 1.29 1.42 Sulfate mg/L Ammonia as N, Dissolved mg/L 0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

0.100 U

Ammonium ion (NH4

+)

mg/L Unionized NH3 mg/L Nitrate Nitrite as N mg/L 0.0050 U

0.0050 U

0.0071 I

0.0075 I

0.0050 U

0.0050 U

0.0153 0.0116 0.0050 U

0.005 U

0.005 U

0.005 U

0.005 U

Nitrogen, Kjeldahl mg/L 0.26 I

0.25 I

0.20 U

0.20 U

0.256 I

0.24 I

0.424 0.276 I

0.50 0.256 I

0.2 U

0.2 U

0.1 U

Nitrogen, Total mg/L Orthophosphate as P, mg/L 0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.0046 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

Phosphorus as P mg/L 0.0046 U

0.0046 U

0.0046 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

0.0046 U

0.00456 U

0.00456 U

0.00456 U

0.00456 U

Alkalinity mg/L Dissolved Inorganic Carbon mg/L Salinity 38.71 38.65 38.01 38.02 37.70 37.69 38.48 38.36 38.01 37.98 37.62 37.72 d

87Sr Tritium pCi/L (1)

Turbidity NTU Chlorophyll a mg/m3 0.53 0.53 0.53 0.5 0.5 0.53 1.1 1

0.8 0.8 0.8 0.5 0.5 Secchi Disk Measurement ft Total Depth ft 6

6 7

7 9

9 6.3 6.3 11.5 11.5 12.5 12.5 NOTES:

Laboratory results are reported with 3 digits although only the first 2 are significant figures.

  • PSS-78 salinity is unitless.

KEY:

°C = Degrees Celsius.

NTU = Nephelometric Turbidity Units(s).

S/cm = MicroSiemen(s) per centimeter.

pCi/L = PicoCuries per liter.

FB = Field Blank.

QR-04 = Duplicate precision outside acceptance limits due to low analyte concentration.

I = Value between the MDL and PQL.

SU = Standard Unit(s).

J3 = Estimated.

TKN = Total Kjeldahl nitrogen.

mg/L = Milligram(s) per liter.

TPBBSW = Turkey Point Biscayne Bay Surface Water.

mg/m3 = Milligram(s) per cubic meter.

U = Analyzed for but not detected at the reported value.

N = Nitrogen.

070617-TPBBSW-15B 070617-TPBBSW-15T 07/06/2017 07/06/2017 070617-TPBBSW-20T 070617-TPBBSW-16B 070617-TPBBSW-16T 070617-TPBBSW-17B 070617-TPBBSW-17T 070617-TPBBSW-18B 070617-FB1 07/06/2017 07/06/2017 07/06/2017 07/06/2017 07/06/2017 07/06/2017 07/06/2017 07/06/2017 07/06/2017 07/06/2017 07/06/2017 070617-TPBBSW-18T 070617-TPBBSW-19B 070617-TPBBSW-19T 070617-TPBBSW-20B

2017 Annual Turkey Point Power Plant Remediation/Restoration Report November 2017 Appendix G Table G-7 Biscayne Bay Bimonthly Analytical Results - September 2017 Parameter Units Field Temperature Degrees 30.40 30.30 29.80 30.40 29.80 29.80 29.70 29.60 29.90 29.2 29.1 29 Field pH SU 7.86 7.86 7.77 7.74 7.73 7.75 7.67 7.67 7.63 7.75 7.76 7.71 Oxygen, Dissolved mg/L 6.07 6.09 4.47 4.22 4.63 5.00 4.15 3.96 3.49 5.32 6.08 5.14 Specific Conductance S/cm 42223 37803 45651 40691 47549 46985 44220 44233 46843 42242 40673 41335 Turbidity NTU 6.92 1.86 2.93 2.26 5.85 2.65 1.26 1.84 2.75 2.06 2.04 2.16 Ammonia as N mg/L 0.263 0.276 0.183 0.257 0.153 0.169 0.216 0.239 0.181 0.197 0.219 0.223 0.041 U

0.229 Ammonium ion (NH4

+)

mg/L 0.319 0.335 0.225 0.318 0.190 0.207 0.268 0.299 0.226 0.242 0.270 0.277 Unionized NH3 mg/L 0.0192 0.0201 0.0108 0.0121 0.0072 0.0099 0.0102 0.0080 0.0068 0.0108 0.0120 0.0098 Nitrate Nitrite as N mg/L 0.2600 U

0.3000 J

0.2600 U

0.2600 U

0.2600 U

0.2600 U

0.2600 U

0.2600 U

0.2600 U

0.26 U

0.26 U

0.26 U

0.26 U

0.26 U

Nitrogen, Kjeldahl mg/L 0.58 0.87 1.00 0.79 0.820 0.95 1.100 1.100 0.78 0.88 0.69 1.1 0.13 U

1.1 Nitrogen, Total mg/L 0.58 1.17 1.00 0.79 0.820 0.95 1.100 1.100 0.78 0.88 0.69 1.1 0.39 U

1.1 Orthophosphate as P mg/L 0.00930 U

0.00930 U

0.00930 U

0.00930 U

0.00930 U

0.00930 U

0.00930 U

0.00930 U

0.0093 U

0.0093 U

0.0093 U

0.0093 U

0.0093 U

0.0093 U

Total Phosphorus as P mg/L 0.0082 U

0.0082 U

0.0082 U

0.00820 U

0.00820 U

0.00820 U

0.00820 U

0.00820 U

0.0082 U

0.67 4.8 0.0082 U

0.0082 U

0.0082 U

Salinity 26.96 23.84 29.44 25.88 30.81 30.40 28.41 28.42 30.30 27.01 25.9 26.37 Chlorophyll a mg/m3 0.8 1.9 1.3 1.3 1.1 1.1 1.6 2

1.6 1.1 1.7 2

0.5 2.1 092817-DUP1 was collected at TPBBSW-20T NOTES:

Laboratory results are reported with 3 digits although only the first 2 are significant figures.

  • PSS-78 salinity is unitless.

KEY:

°C = Degrees Celsius.

NTU = Nephelometric Turbidity Units(s).

S/cm = MicroSiemen(s) per centimeter.

pCi/L = PicoCuries per liter.

FB = Field Blank.

QR-04 = Duplicate precision outside acceptance limits due to low analyte concentration.

I = Value between the MDL and PQL.

SU = Standard Unit(s).

J3 = Estimated.

TKN = Total Kjeldahl nitrogen.

mg/L = Milligram(s) per liter.

TPBBSW = Turkey Point Biscayne Bay Surface Water.

mg/m3 = Milligram(s) per cubic meter.

U = Analyzed for but not detected at the reported value.

N = Nitrogen.

DUP1 09/28/2017 TPBBSW-15B TPBBSW-15T 09/28/2017 09/28/2017 TPBBSW-20T TPBBSW-16B TPBBSW-16T TPBBSW-17B TPBBSW-17T TPBBSW-18B FB1 09/28/2017 09/28/2017 09/28/2017 09/28/2017 09/28/2017 09/28/2017 TPBBSW-18T TPBBSW-19B TPBBSW-19T TPBBSW-20B 09/28/2017 09/28/2017 09/28/2017 09/28/2017 09/28/2017