ML22073A124
Jump to navigation
Jump to search
| ML22073A124 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/25/2022 |
| From: | Vaughn Thomas NRC/NRR/DNRL/NLRP |
| To: | Coffey B Florida Power & Light Co |
| Thomas V | |
| Shared Package | |
| ML22073A121 | List: |
| References | |
| Download: ML22073A124 (1) | |
Text
8 Subsequent Renewed License No. DPR-41 the air-to-borated water interface inside the piping, and confirm that the installation of the stainless steel piping exceeds this elevation.
- 4.
This subsequent renewed license is effective as of the date of issuance, and shall expire at midnight April 10, 2033.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Ho K. Nieh, Director Office of Nuclear Reactor Regulation Attachments:
Appendix A - Technical Specifications for Unit 4 Appendix B - Environmental Protection Plan Date of Issuance: December 4, 2019