MONTHYEARML23333A0122023-11-27027 November 2023 Attachment D - Bill Nuttle 2023 Expert Declaration ML23263A9872023-09-0707 September 2023 FOIA-2023-000207 - Resp 1- Final, Agency Records Subject to the Request Are Enclosed ML23263A9892023-09-0707 September 2023 FOIA-2023-000207 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed ML23031A1992023-02-0101 February 2023 Nd 4 Environmental Remote Audit Requests for Confirmation of Information ML22073A1242022-03-25025 March 2022 SLR License ML22073A1232022-03-25025 March 2022 SLR License ML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML21035A2112021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2017 Annual Monitoring Report ML21035A2052021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix C ML21035A2072021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix a ML21035A2062021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix J ML21035A2102021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Combined CCS Modeling Reports 2012-2017 Part 1 ML21035A2082021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix G ML21035A1932021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, FPL 2019_a_2018 Annual Remediation Report_R327649-004 (Dup) ML21035A1942021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2017-09 FPL Annual Monitoring Report ML21035A2132021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Combined CCS Modeling Reports 2012-2017 Part 2 ML21035A2122021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Combined CCS Modeling Reports 2012-2017 ML21035A2142021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2015 Post Power Uprate Report ML21035A2162021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2012 Preuprate Report - Evaporation ML21035A2152021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2014 Turkey Point Post-Uprate Monitoring Report ML21035A2182021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2016 Annual Monitoring Report ML21035A2172021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2012 Preuprate Report ML21035A2022021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix B ML21035A1892021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2016-01-29 Freshening Effectiveness Report ML21035A1902021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2017-01-27 FPL Phase One Remediation Plan ML21035A1912021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Re_ Turkey Point_ _More Favorable Climatic Conditions_ ML21035A1922021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2017-09 FPL Annual Monitoring Report-03 ML21035A1962021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, FPL 2017_b_2017-11 Annual Remediation Restoration Report ML21035A1952021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, FPL 2018 Appg EDMS CSEM Summary ML21035A1972021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Fw_ List of Documents for PNNL ML21035A2042021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2019 Annual Monitoring Report ML21035A2012021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix E ML21035A1992021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2017-01-27 FPL Attachment 1 Gw Flow and Transport Model ML21035A1982021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2018-08-08 Spreadsheet Response to WRI-12 ML21035A2032021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix N ML21013A1612021-01-12012 January 2021 NRC-2020-000123 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed, Part 2 of 4 ML21013A1622021-01-12012 January 2021 NRC-2020-000123 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed, Part 4 of 4 ML21013A1632021-01-12012 January 2021 NRC-2020-000123 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed, Part 1 of 4 ML21013A1592021-01-12012 January 2021 NRC-2020-000123 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed, Part 3 of 4 ML20315A0862020-10-30030 October 2020 NRC-2020-000123 - Resp 3 - Interim, Agency Records Subject to the Request Are Enclosed ML20272A1402020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 3 of 9 ML20272A1432020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 6 of 9 ML20272A1442020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 7 of 9 ML20272A1452020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 8 of 9 ML20272A1462020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 9 of 9 ML20272A1412020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed.Part 4 of 9 ML20272A1382020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 1 of 9 ML20272A1392020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 2 of 9 2023-09-07
[Table view] |
Text
L-2018-136 10 CFR 54.17 August 8, 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re: Florida Power & Light Company Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Turkey Point Units 3 and 4 Subsequent License Renewal Application Environmental Report Requests for Additional Information (RAI) Responses
Reference:
- 1. FPL Letter L-2018-004 to NRC dated January 30, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application (ADAMS Accession No. ML18037A812)
- 2. FPL Letter L-2018-086 to NRC dated April 10, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application - Appendix E Environmental Report Supplemental Information (ADAMS Accession Nos. ML18102A521 and ML1811A132)
- 3. NRC RAI E-Mail to FPL dated July 9, 2018, Requests for Additional Information for the Environmental Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-LNE-0001) (ADAMS Accession No. ML18190A499)
- 4. NRC RAI E-Mail to FPL dated July 17, 2018, Requests for Additional Information for the Environmental Review of the Turkey Point Subsequent License Renewal Application - Set 2 (EPID No. L-2018-LNE-0001) (ADAMS Accession No. ML18198A274)
Florida Power & Light Company (FPL) submitted a subsequent license renewal application (SLRA) for Turkey Point Units 3 and 4 to the NRC on January 30, 2018 (Reference 1), and also supplemental information for the SLRA Environmental Report (ER) on April 10, 2018 (Reference 2).
The purpose of this letter is to provide, as attachments to this letter, responses to the environmental review RAIs issued by the NRC on July 9, 2018 and July 17, 2018 (References 3 and 4). Each RAI response and its corresponding attachment are indexed on page 3 of this letter. These attachments include associated information on the enclosed Optical Storage Media (OSM) as indexed on page 4 of this letter. The enclosed OSM is not intended to comply with the recommendations for electronic Florida Power & Light Company 700 Universe Boulevard, Juno Beach, FL 33408
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 FPL Response to NRC RAI No. WR-12 L-2018-136 Attachment 53 Page 1 of 2 NRC RAI E-Mail No. EPID No. L-2018-LNE-0001 Dated July 9, 2018 Water Resources (WR)
NRC RAI Number: WR-12 Document Needs:
As specifically referenced in the applicants Environmental Report or identified during the Environmental Site Audit, provide the following documents for review (or provide a specific web location (URL) for a publicly available repository where the document can be downloaded):
- 1. McNabb Hydrogeologic Consulting. Report on the Mechanical Integrity Testing of Deep Injection Well DIW-1 at the Florida Power and Light Turkey Point Power Plant. June 2017.
- 2. June 2018 presentation by FPL to FDEP regarding operational impacts of the CCS on the saltwater interface.
- 3. FPL 2018 Site Conceptual Model Report for PTN, if available.
- 4. Provide an electronic copy of the current spreadsheet with recent values used to model and project water levels and salinities within the CCS.
FPL Response:
- 1. The requested document, Report on the Mechanical Integrity Testing of Deep Injection Well DIW-1 at the Florida Power & Light Turkey Point Power Plant, June 2017, is available from the Florida Department of Environmental Protection (FDEP) public Oculus website at
<https://depedms.dep.state.fl.us:443/Oculus/servlet/shell?command=getEntity&[
guid=35.102286.1]&[profile=Discovery_Compliance]>. The link brings the viewer to the Occulus login page, must select button "PUBLIC OCULUS LOGIN", then select the Acrobat symbol under "File Type" to open the file (accessed July 17, 2018).
- 2. The FPLs June 20, 2018, presentation to FDEP: TetraTech presentation Variable Density Ground Water Flow and Salinity Transport Model Analysis, Attribution Analysis Results, June 19, 2018, is provided as Enclosure 1.
- 3. The 2018 site conceptual model (SCM) report is currently in draft format pending FPL review. Due to its draft status, the SCM report is not available at this time and the current date for completion is under review.
- 4. The current spreadsheet with recent values used to model and project water levels and salinities within the CCS is provided in Enclosure 2.