NRC-2020-000123 - Resp 5 - Final, 2018-08-08 Spreadsheet Response to WRI-12
ML21035A198
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/21/2021
From:
NRC/OCIO
To:
Shared Package
ML21035A187 List:
References
NRC-2020-000123
Download: ML21035A198 (2)


Text

L-2018-136 10 CFR 54.17 August 8, 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re: Florida Power & Light Company Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Turkey Point Units 3 and 4 Subsequent License Renewal Application Environmental Report Requests for Additional Information (RAI) Responses

Reference:

1. FPL Letter L-2018-004 to NRC dated January 30, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application (ADAMS Accession No. ML18037A812)
2. FPL Letter L-2018-086 to NRC dated April 10, 2018, Turkey Point Units 3 and 4 Subsequent License Renewal Application - Appendix E Environmental Report Supplemental Information (ADAMS Accession Nos. ML18102A521 and ML1811A132)
3. NRC RAI E-Mail to FPL dated July 9, 2018, Requests for Additional Information for the Environmental Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-LNE-0001) (ADAMS Accession No. ML18190A499)
4. NRC RAI E-Mail to FPL dated July 17, 2018, Requests for Additional Information for the Environmental Review of the Turkey Point Subsequent License Renewal Application - Set 2 (EPID No. L-2018-LNE-0001) (ADAMS Accession No. ML18198A274)

Florida Power & Light Company (FPL) submitted a subsequent license renewal application (SLRA) for Turkey Point Units 3 and 4 to the NRC on January 30, 2018 (Reference 1), and also supplemental information for the SLRA Environmental Report (ER) on April 10, 2018 (Reference 2).

The purpose of this letter is to provide, as attachments to this letter, responses to the environmental review RAIs issued by the NRC on July 9, 2018 and July 17, 2018 (References 3 and 4). Each RAI response and its corresponding attachment are indexed on page 3 of this letter. These attachments include associated information on the enclosed Optical Storage Media (OSM) as indexed on page 4 of this letter. The enclosed OSM is not intended to comply with the recommendations for electronic Florida Power & Light Company 700 Universe Boulevard, Juno Beach, FL 33408

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 FPL Response to NRC RAI No. WR-12 L-2018-136 Attachment 53 Page 1 of 2 NRC RAI E-Mail No. EPID No. L-2018-LNE-0001 Dated July 9, 2018 Water Resources (WR)

NRC RAI Number: WR-12 Document Needs:

As specifically referenced in the applicants Environmental Report or identified during the Environmental Site Audit, provide the following documents for review (or provide a specific web location (URL) for a publicly available repository where the document can be downloaded):

1. McNabb Hydrogeologic Consulting. Report on the Mechanical Integrity Testing of Deep Injection Well DIW-1 at the Florida Power and Light Turkey Point Power Plant. June 2017.
2. June 2018 presentation by FPL to FDEP regarding operational impacts of the CCS on the saltwater interface.
3. FPL 2018 Site Conceptual Model Report for PTN, if available.
4. Provide an electronic copy of the current spreadsheet with recent values used to model and project water levels and salinities within the CCS.

FPL Response:

1. The requested document, Report on the Mechanical Integrity Testing of Deep Injection Well DIW-1 at the Florida Power & Light Turkey Point Power Plant, June 2017, is available from the Florida Department of Environmental Protection (FDEP) public Oculus website at

<https://depedms.dep.state.fl.us:443/Oculus/servlet/shell?command=getEntity&[

guid=35.102286.1]&[profile=Discovery_Compliance]>. The link brings the viewer to the Occulus login page, must select button "PUBLIC OCULUS LOGIN", then select the Acrobat symbol under "File Type" to open the file (accessed July 17, 2018).

2. The FPLs June 20, 2018, presentation to FDEP: TetraTech presentation Variable Density Ground Water Flow and Salinity Transport Model Analysis, Attribution Analysis Results, June 19, 2018, is provided as Enclosure 1.
3. The 2018 site conceptual model (SCM) report is currently in draft format pending FPL review. Due to its draft status, the SCM report is not available at this time and the current date for completion is under review.
4. The current spreadsheet with recent values used to model and project water levels and salinities within the CCS is provided in Enclosure 2.