FPL Turkey Point Annual Monitoring Report September 2017 Section 5 5-31 (A)
(B)
Figure 5.2-1. Flow into (A) and out of (B) the CCS, Shown in Cross-Section.
FPL Turkey Point Annual Monitoring Report September 2017 Section 5 5-32 Figure 5.2-2. Modeled versus Measured Net Monthly Flows of Water for the CCS during the Period from June 2015 - May 2017.
-60
-40
-20 0
20 40 60 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Average Water Flow (MGD)
Observed Simulated
FPL Turkey Point Annual Monitoring Report September 2017 Section 5 5-33 Figure 5.2-3. Modeled versus Measured Net Monthly Flows of Salt Mass for the CCS during the Period from June 2015 - May 2017.
-25000
-20000
-15000
-10000
-5000 0
5000 10000 15000 20000 25000 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Average Salt Flow (lb x 1000/day)
Observed Simulated
FPL Turkey Point Annual Monitoring Report September 2017 Section 5 5-34 Figure 5.2-4. Modeled versus Measured Water Elevations (NAVD 88) in the CCS during the Reporting Period; Used to Validate the Conceptual Model and Calibrate the Water Balance Model to Temporal Trends in Water Elevation.
-2
-1.5
-1
-0.5 0
0.5 1
1.5 2
2.5 3
CCS Water Elevation (ft NAVD 88)
Simulated Water Elevations Measured Water Elevations
FPL Turkey Point Annual Monitoring Report September 2017 Section 5 5-35 Figure 5.2-5. Modeled versus Measured Salinity in the CCS during the Reporting Period; Used to Validate the Conceptual Model and Calibrate the Water Balance Model to Temporal Trends in Salinity.
0 20 40 60 80 100 120 CCS Salinity (g/L)
Simulated Concentration (g/L)
Measured Concentration (g/L)
FPL Turkey Point Annual Monitoring Report September 2017 Section 5 5-36 Figure 5.2-6. Modeled Monthly Differences between Precipitation and Evaporation (precipitation minus evaporation) for the 24-month Simulation.
-60
-40
-20 0
20 40 60 Precipitation Minus Evaporation (MGD) 2015 2016 2017
FPL Turkey Point Annual Monitoring Report September 2017 Section 5 5-37 Figure 5.2-7. Modeled Monthly Vertical Salt Mass Seepage between the CCS and Biscayne Aquifer; Negative Values Indicate Seepage of Salt Mass out of the CCS.
-20000
-15000
-10000
-5000 0
5000 Vertical Salt Mass Flow (lb x 1000/day) 2015 2016 2017