ML11251A153
ML11251A153 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 08/24/2011 |
From: | Susquehanna |
To: | Gerlach R Office of Nuclear Reactor Regulation |
References | |
Download: ML11251A153 (28) | |
Text
Aug. 24, 2011 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2011-49705 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 08/24/2011 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 08/01/2011 ADD MANUAL TABLE OF CONTENTS DATE: 08/23/2011 CATEGORY: DOCUMENTS TYPE: TRM2
)U2boo
Aug. 24, 2011 Page 2 of 2 ID: TEXT LOES ADD: REV: 69 REMOVE: REV:68 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT TOC ADD: REV: 20 REMOVE: REV:19 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Datee: 08/23/2011 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 69 08/23/2011
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 20 08/23/2011
Title:
TABLE OF CONTENTS TEXT 1.1 0 11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 10 01/13/2011
Title:
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 4 05/23/2008
Title:
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 1 11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 4 05/14/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 9 04/20/2011
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
LDCN 4712 Report Date: 08/24/11 Page .2.
Page 1 of of 15 15 Report Date: 08/24/11
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)
TEXT 3.4.4 2 05/14/2009
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS D TEXT 3.4.6 0 07/20/2010
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/19/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 3 of 15 Report Date: 08/24/11
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 2 06/27/2008
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 7 12/03/2010
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 1 10/02/2009
Title:
PLANT SYSTEMS TEXT 3.8.1 2 02/04/2005
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES LDCN 4775 TEXT 3.8.2.1 2 11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 2 12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page 5 of 15 Report Date: 08/24/11
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 2 05/02/2007
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 3 11/14/2006
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 4 09/16/2009
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM Report Date: 08/24/11 Page 2 Page 7 of of 15 15 Report Date: 08/24/11
SSES MANTA-L Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 4 05/23/2008
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 1 11/09/2007
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 0 11/19/2002
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2 11/09/2007
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 4 07/09/2010
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 4 01/13/2011
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION Report Date: 08/24/11 Page .9.
9 of of 15 15 Report Date: 08/24/11
SSSMANUAL~
Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0 11/19/2002
Title:
ECCS AND RC] I C BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007 I
Title:
ECCS AND RCI C BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007 I
Title:
ECCS AND RC3 C BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1 04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002
Title:
PLANT SYSTED*S BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEDLS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010
Title:
PLANT SYSTED*S BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006
Title:
PLANT SYSTE1 [S BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002
Title:
PLANT SYSTED/[S BASES C02 SYSTEMS Report Date: 08/24/11 Page 21 Page 11 of of 15 15 Report Date: 08/24/11
SSES MANUJAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 1 12/14/2004
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2 04/14/2010
Title:
STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1 09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0 11/19/2002
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1 02/04/2005
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 1 06/15/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME Report Date: 08/24/11 Page ia Page 13 of of 15 15 Report Date: 08/24/11
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 4 11/14/2006
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 3 07/09/2010
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 08/24/11 Page j~
15 of of 15 15 Report Date: 08/24/11
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 69 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 08/11/2011 1.0 USE AND APPLICATION Page TRM / 1.0-1 08/31/1998 Page TRM / 1.0-2 10/04/2002 Page TRM / 1.0-3 08/31/1998 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM / 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 04/12/1999 Page TRM / 2.0-6 04/15/2009 Page TRM / 2.0-7 05/15/2008 Pages TRM / 2.0-8 and TRM / 2.0-9 01/07/2011 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 04/15/2009 Pages TRM / 2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 04/14/2008 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 11/30/2005 3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 10/31/2007 Pages TRM / 3.1-2 through TRM / 3.1-5 08/31/1998 Page TRM / 3.1-6 03/27/2007 Page TRM / 3.1-7 04/15/2009 Page TRM / 3.1-8 03/27/2007 Pages TRM / 3.1-9 and TRM / 3.1-9a 02/18/1999 Page TRM / 3.1-10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 08/31/1998 Pages TRM / 3.2-2 through TRM / 3.2-54 04/12/2011 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Pages TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page TRM / 3.3-6 03/10/2011 Page TRM 3.3-7 10/31/2007 Page 3.3-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 08/11/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 69 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / 3.3-9 and TRM / 3.3-9a 06/30/2010 Page TRM / 3.3-10 10/31/2007 Pages TRM /3.3-11 and TRM / 3.3-11a 06/30/2010 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 01/07/2011 Page TRM / 3.3-14 12/14/1998 Pages TRM / 3.3-15 and TRM / 3.3-16 01/07/2011 Page TRM / 3.3-17 06/14/2002 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 and TRM / 3.3-20 10/22/2003 Page TRM / 3.3-21 04/15/2009 Page TRM / 3.3-21a 11/15/2004 Pages TRM /3.3-21b through TRM / 3.3-21d 03/27/2007 Page TRM / 3.3-22 12/03/2004 Pages TRM / 3.3-23 and TRM / 3.3-24 05/16/2003 Page TRM / 3.3-25 10/22/2003 Pages TRM / 3.3-26 and TRM / 3.3-27 04/07/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page 3.4-9 08/31/1998 Page 3.4-10 10/31/2007 Page 3.4-11 08/31/1998 Page TRM / 3.4-12 04/17/2009 Page TRM / 3.4-13 03/31/2006 Page TRM / 3.4-14 07/15/2010 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 10/31/2007 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 and 3.6-2 08/31/1998 Pages TRM / 3.6-3 and TRM / 3.6-3a 08/11/2011 Page 3.6-4 08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM / 3.6-7 through TRM / 3.6-9 12/31/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 08/11/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 69 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 07/29/1999 Page 3.7-3 08/31/1998 Page TRM / 3.7-4 03/31/2006 Page TRM / 3.7-5 04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM / 3.7-11 01/21/2000 Page TRM / 3.7-12 08/02/1999 Page TRM / 3.7-13 04/07/2009 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 04/07/2009 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2009 Page TRM / 3.7-24 03/31/2006 Pages TRM / 3.7-25 and TRM / 3.7-26 08/02/1999 Page TRM / 3.7-27 10/31/2007 Page TRM / 3.7-28 11/29/2006 Page TRM / 3.7-29 01/13/2010 Page TRM / 3.7-30 11/30/2005 Page TRM / 3.7-31 11/16/2001 Page TRM / 3.7-32 09/16/2010 Page TRM / 3.7-33 10/05/2002 Page TRM / 3.7-34 03/31/2006 Pages TRM / 3.7-35 and TRM / 3.7-36 02/01/1999 Pages 3.7-37 through 3.7-38 08/31/1998 Page TRM / 3.7-39 03/31/2006 Page TRM / 3.7-40 02/14/2005 Page TRM / 3.7-40a 06/20/2008 Page TRM / 3.7-41 09/04/2008 Page TRM / 3.7-42 08/31/1998 Pages TRM / 3.7-43 through TRM / 3.7-45 10/05/2006 Page TRM / 3.7-46 06/07/2007 Page TRM / 3.7-47 11/29/2010 Page TRM / 3.7-48 06/07/2007 Page TRM / 3.7-49 03/09/2001 Page TRM / 3.7-50 08/16/2006 Page TRM / 3.7-51 12/03/2004 Page TRM / 3.7-52 04/15/2003 Page TRM / 3.7-53 07/29/1999 Page TRM / 3.7-54 04/01/2009 Page TRM / 3.7-55 09/25/2009 Page TRM / 3.7-56 04/01/2009 TRM / LOES-3 EFFECTIVE DATE 08/11/2011 SUSQUEHANNA-UNIT2 SUSQUEHANNA - UNIT 2 TIRM / LOES-3 EFFECTIVE DATE 08/11/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 69 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Pages TRM / 3.8-2 and TRM / 3.8-3 01/28/2005 Page TRM / 3.8-4 01/31/2005 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Pages TRM / 3.8-7 through TRM / 3.8-10 10/31/2007 Page TRM / 3.8-11 08/10/2004 Page TRM / 3.8-12 12/03/2004 Page TRM / 3.8-13 03/25/2010 Page TRM / 3.8-14 08/31/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM / 3.8-16 and TRM / 3.8-17 04/02/2002 Page 3.8-18 02/01/1999 Page TRM / 3.8-19 04/02/2002 Page TRM / 3.8-20 02/01/1999 Pages TRM / 3.8-21 through TRM / 3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 Page TRM / 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Page TRM / 3.8-28 05/28/2009 Page TRM / 3.8-29 10/20/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.10-4 08/30/1998 Pages TRM / 3.10-5 and TRM / 3.10-6 03/27/2007 Page TRM / 3.10-7 06/10/2010 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 through 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages 3.11-7 through 3.11-9 08/31/1998 Page TRM / 3.11-10 12/03/2004 Pages 3.11-11 and 3.11-12 08/31/1998 Page TRM / 3.11-13 04/12/2007 Page TRM / 3.11-14 12/03/1004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 08/11/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 69 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 11/14/2006 Page TRM / 3.11-24 05/13/2005 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27 01/21/2004 Page TRM / 3.11-28 09/08/2009 Page TRM / 3.11-29 12/03/2004 Pages TRM 3.11-30 through TRM / 3.11-32 01/21/2004 Page TRM / 3.11-33 03/31/2006 Page 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Pages 3.11-40 through 3.11-44 08/31/1998 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 08/31/1998 Page TRM / 4.0-4 12/11/2008 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 08/11/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 69 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 01/10/2007 Page TRM / B 3.0-5 04/14/2008 Page TRM / B 3.0-6 08/31/1998 Page TRM / B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 and TRM / B 3.0-14 11/30/2005 Page TRM / B 3.0-15 03/15/2002 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 07/13/1999 Pages TRM / B 3.1-2 and TRM / B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Pages TRM / B 3.1-5 through TRM / B 3.1-7 03/27/2007 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/07/2000 Page TRM / B 3.3-2 03/10/2011 Page TRM / B-3.3-2a 10/31/2007 Pages TRM / B 3.3-3 and TRM / B 3.3-3a 10/31/2007 Page TRM / B 3.3-4 06/30/2010 Page TRM / B 3.3-5 05/30/2006 Page TRM / B 3.3-6 06/30/2010 Page TRM / B 3.3-7 10/31/2007 Page TRM / B 3.3-8 06/30/2010 Page TRM / B 3.3-9 10/31/2007 Pages TRM / B 3.3-10 through TRM / B 3.3-13 01/07/2011 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 10/31/2007 Page TRM / B 3.3-14b 06/14/2002 Pages TRM / B 3.3-15 through TRM / B 3.3-17 10/22/2003 Pages TRM / B 3.3-18 and TRM / B 3.3-19 03/27/2007 Pages TRM / B 3.3-19a and TRM / B 3.3-19b 03/27/2007 Page TRM / B 3.3-19c 04/17/2009 Pages TRM / B 3.3-19d and TRM / B 3.3-19e 03/27/2007 Pages TRM / B 3.3-20 and TRM / B 3.3-21 08/03/2010 Page TRM / B 3.3-22 10/22/2003 Page TRM / B 3.3-23 05/16/2003 Pages TRM / B 3.3-24 and TRM / B 3.3-25 04/07/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 08/11/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 69 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.4 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 08/31/1998 Pages TRM / B 3.4-2 and TRM / B3.4-3 04/01/2009 Pages TRM / B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 Page TRM / B 3.4-7 07/15/2010 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 and TRM / B 3.5-3a 10/31/2007 Page B 3.5-4 08/31/1998 Page TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/29/2007 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B 3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM / B 3.7-3 06/10/2010 Page TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Pages TRM / B 3.7-6 and TRM / B 3.7-6a 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM B B 3.7-8 08/02/1999 Page TRM / B 3.7-9 03/31/2006 Page TRM / B 3.7-10 08/02/1999 Pages TRM / B 3.7-10a through TRM / B 3.7-11 a 03/31/2006 Pages TRM / B 3.7-12 through TRM / B 3.7-14 08/02/1999 Pages TRM / B 3.7-14a and TRM / B 3.7-14b 01/09/2004 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM / B 3.7-21 02/14/2005 Page TRM / B 3.7-21a 06/20/2008 Pages TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Pages TRM / B 3.7-24 through TRM / B 3.7-29 10/05/2006 TRM / LOES-7 EFFECTIVE DATE 08/11/2011 UNIT 2 SUSQUEHANNA - UNIT SUSQUEHANNA 2 TRM / LOES-7 EFFECTIVE DATE 08/11/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 69 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.7-30 06/07/2007 Pages TRM / B 3.7-30a and TRM / B 3.7-30b 10/05/2006 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 Pages TRM / B 3.7-36 and TRM / B 3.7-37 04/01/2009 Page TRM / B 3.7-38 09/25/2009 Page TRM / B 3.7-39 04/01/2009 Page TRM / B 3.7-40 04/08/2010 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Pages TRM / B 3.8-2 and TRM / B 3.8-2 01/28/2005 Page TRM / B 3.8-2a 03/01/2010 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 04/02/2002 Page TRM / B 3.8-4a 08/10/2004 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-16 04/02/2002 Page TRM / B 3.8-17 01/28/2005 Pages TRM / B 3.8-18 through TRM / B 3.8-20 11/29/2006 Pages TRM / B 3.8-21 through TRM / B 3.8-24 05/28/2009 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 08/31/1998 Pages B 3.9-3 through B 3.9-7 10/23/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/27/2007 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/31/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-11 a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 TRM / LOES-8 EFFECTIVE DATE 08/11/2011 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 22 TRM / LOES-8 EFFECTIVE DATE 08/11/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 69 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23 11/14/2006 Page TRM / B 3.11-23a 05/13/2005 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 08/31/1998 Pages TRM / B 3.11-28 and TRM / B 3.11-29 11/30/2005 Page TRM / B 3.11-30 06/30/2010 Pages TRM / B 3.11-31 and TRM / B 3.11-32 08/31/1998 Page TRM / B 3.11-33 06/30/2010 Pages TRM / B 3.11-34 and TRM / B 3.11-35 08/31/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 09/19/2007 Page TRM / B 3.12-2 11/29/2010 Page TRM / B 3.12-3 02/05/1999 TRM2 text LOES.doc 8/15/2011 SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 08/11/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 20 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 1.0 USE AND APPLICATION ............................................................................ 1.0-1 1.1 Defin itio ns ..................................................................................... T RM/1.0-2 2.0 PLANT PROGRAMS ................................................................................... 2.0-1 2 .1 P lant P rog ra ms ...................................................................................... 2 .0-1 2.2 Instrument Trip Setpoint Table ..................................................... TRM/2.0-5 3.0 AP P LIC ABILITY ................................................................................. T RM/3.0-1 3.0 (TRO) - TR for Operation (TRO) Applicability ............................... TRM/3.0-1 3.0 (TRS) - TR Surveillance (TRS) Applicability .................................. TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS .................................................. TRM/3.1-1 3.1.1 Alternate Rod Injection ................................................................. TRM/3.1-1 3.1.2 C RD Housing S upport ........................................................................... 3.1-4 3.1.3 Control Rod Block Instrumentation ....................................................... 3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck Valve ................................................................................. T RM/3 .1-9 3.2 CORE OPERATING LIMITS REPORT ........................................................ 3.2-1 3.2.1 Core Operating Limits Report ................................................................ 3.2-1 3.3 INSTRUMENTATION ......................................................................... TRM/3.3-1 3.3.1 Radiation Monitoring Instrumentation ........................................... TRM/3.3-1 3.3.2 Seismic Monitoring Instrumentation .............................................. TRM/3.3-4 3.3.3 Meteorological Monitoring Instrumentation ................................... TRM/3.3-7 3.3.4 TRM Post-Accident Monitoring Instrumentation ............................ TRM/3.3-9 3.3.5 Section Not Used .......................................................................... TRM/3.3-12 3.3.6 TRM Containment Isolation Instrumentation ................................. TRM/3.3-13 3.3.7 Turbine Overspeed Protection System ......................................... TRM/3.3-17 3.3.8 Section Not Used .......................................................................... TRM/3.3-19 3.3.9 OPRM Instrumentation ................................................................. TRM/3.3-21 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops ......................................................................... TRM/3.3-22 3.3.11 MVP Isolation Instrumentation ...................................................... TRM/3.3-24 3.3.12 Water Monitoring Instrumentation ................................................. TRM/3.3-26 3.4 REACTOR COOLANT SYSTEM .......................................................... TRM/3.4-1 3.4.1 Reactor Coolant System Chemistry ....................................................... 3.4-1 3 .4 .2 Not Used ......................................................................................... T RM/3 .4-6 3.4.3 High/Low Pressure Interface Leakage Monitors .................................... 3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit ............................ TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program ........................... TRM/3.4-13 3.4.6 Reactor Recirculation Single Loop Operation (SLO)
Flow Rate Restriction .................................................................... TRM/3.4-14 TRM / TOC-1 EFFECTIVE DATE 08/11/2011 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 2 2 TRM / TOC-1 EFFECTIVE DATE 08/11/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 20 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.5 EMERGENCY CORE COOLING AND RCIC ...................................... TRM/3.5-1 3.5.1 ADS Manual Inhibit ....................................................................... TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation ............................ 3.5-3 3.5.3 Long Term Nitrogen Supply to ADS ...................................................... 3.5-6 3 .6 C O NTA INME NT .......................................................................................... 3 .6-1 3.6.1 VENTING or PURGING ......................................................................... 3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Ind icatio n ..................................................................................... T RM/3 .6-3 3.6.3 Suppression Pool Alarm Instrumentation ............................................... 3.6-4 3.6.4 Primary Containment Closed System Boundaries ........................ TRM/3.6-7 3.7 PLANT SYSTEMS .............................................................................. TRM/3.7-1 3.7.1 Emergency Service Water System (Shutdown) ............................ TRM/3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level ......................................... 3.7-3 3.7.3.1 Fire Suppression Water Supply System ....................................... TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems ....................................................... TRM/3.7-8 3.7.3.3 C 0 2 system s ................................................................................ T RM/3.7-12 3.7.3.4 Halon Systems ............................................................................. TRM/3.7-16 3.7.3.5 Fire Hose Stations ........................................................................ TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ............................. TRM/3.7-22 3.7.3.7 Fire Rated Assemblies .................................................................. TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation ...................................................... TRM/3.7-26 3.7.4 Solid Radwaste System ................................................................ TRM/3.7-34 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ........................................... 3.7-37 3.7.5.2 Main Condenser Explosive Gas Mixture ....................................... TRM/3.7-38 3.7.5.3 Liquid Holdup Tanks ..................................................................... TRM/3.7-39 3.7.6 ESSW Pumphouse Ventilation .............................................................. 3.7-40 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation ........................................................... TRM/3.7-41 3.7 .8 S nubbers ...................................................................................... T RM/3.7-43 3.7.9 Control Structure HVAC ................................................................ TRM/3.7-49 3.7.10 Spent Fuel Storage Pools (SFSPs) .............................................. TRM/3.7-51 3.7.11 Structural Integrity ......................................................................... TRM/3.7-54 3.8 ELECTRICAL POWER ....................................................................... TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices ........................................................................ TRM/3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -
Continuous ................................................................................... T RM/3 .8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -
Auto m atic ...................................................................................... T RM/3 .8-11 3.8.3 Diesel Generator (DG) Maintenance Activities ............................. TRM/3.8-13 SUSQUEHANNA - UNIT 2 TRM / TOC-2 EFFECTIVE DATE 08/11/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 20 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.8.4 24VDC Electrical Power Subsystem ............................................. TRM/3.8-15 3.8.5 Degraded Voltage Protection ....................................................... TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling .................................................. 3.8-24 3.8.7 Battery Monitoring and Maintenance Program .............................. TRM/3.8-26 3.9 REFUELING OPERATIONS ........................................................................ 3.9-1 3 .9 .1 De ca y T ime ........................................................................................... 3 .9-1 3.9 .2 C om m unications .................................................................................... 3.9-2 3.9 .3 Refueling P latform ................................................................................. 3.9-3 3.10 MISCELLANEOUS ............................................................................. TRM/3.10-1 3.10.1 Sealed Source Contamination ...................................................... TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation ............ 3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) .................... TRM/3.10-7 3.10.4 Section Not Used .......................................................................... TRM/3.10-8 3.11 RADIOACTIVE EFFLUENTS ............................................................. TRM/3.11-1 3.11.1 Liquid Effluents ............................................................................. T RM/3.11-1 3.11.1.1 Liquid Effluents Concentration ...................................................... TRM/3.11-1 3.11.1.2 Liquid Effluents Dose ................................................................... TRM/3.11-4 3.11.1.3 Liquid Waste Treatment System ...................... TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation ............................ 3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation ............... TRM/3.11-13 3.11.2 Gaseous Effluents ......................................................................... TRM/3.11-17 3.11.2.1 Dose Rate ....................... TRM/3.11-17 3.11.2.2 Dose - Noble Gases ..................................................................... TRM/3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form ........................................................................... T RM/3.11-21 3.11.2.4 Gaseous Radwaste Treatment System ........................................ TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System ......................................... TRM/3.11-23 3.11.2.6, Radioactive Gaseous Effluent Monitoring Instrum entation ............................................................................. T RM/3.11-25 3.11.3 Total Dose .................................................................................... T RM/3.11-33 3.11.4 Radiological Environmental Monitoring ......................................... TRM/3.11-35 3.11.4.1 Monitoring Program ...................................................................... TRM/3.11-35 3.11.4.2 Land Use Census ......................................................................... TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program .................... TRM/3.11-47 3.12 LOADS CONTROL PROGRAM .......................................................... TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool ....................................... TRM/3.12-1 3.12.2 Heavy Loads Requirements ......................................................... TRM/3.12.3 3.12.3 Light Loads Requirements ............................................................ TRM/3.12-5 TRM/TOC-3 EFFECTIVE DATE 08/11/2011 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 22 TRM / TOC-3 EFFECTIVE DATE 08/11/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 20 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 4.0 ADMINISTRATIVE CONTROLS .................................................................. 4.0-1 4 .1 O rg a nizatio n .......................................................................................... 4 .0 -1 4.2 Reportable Event Action ........................................................................ 4.0-2 4.3 Safety Limit Violation ............................................................................. 4.0-3 4.4 Procedures and Programs ..................................................................... 4.0-4 4.5 Reporting Requirements ........................................................................ 4.0-5 4.6 Radiation Protection Program ................................................................ 4.0-7 4 .7 T ra ining .................................................................................................. 4 .0-8 TRM / TOC-4 EFFECTIVE DATE 08/11/2011 SUSQUEHANNA - UNIT 2 SUSQUEHANNA - UNIT 2 TRM / TOC-4 EFFECTIVE DATE 08/11/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 20 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.0 (TRO) - TR for Operation (TRO) Applicability ...................................... B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability ......................................... B 3.0-9 B 3.1.1 Alternate Rod Injection ................................................................ TRM/B 3.1-1 B 3.1.2 CRD Housing Support ......................................................................... B 3.1-4 B 3.1.3 Control Rod Block Instrumentation .............................................. TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve ......................................................................... TRM/B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR) ................................................. B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation .......................................... TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation ............................................. TRM/B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation .................................. TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation ........................... TRM/B 3.3-4 B 3.3.5 Section Not Used ......................................................................... TRM/B 3.3-9 B 3.3.6 TRM Containment Isolation Instrumentation ................................ TRM/B 3.3-10 B 3.3.7 Turbine Overspeed Protection System ........................................ TRM/B 3.3-14 B 3.3.8 Section Not Used ......................................................................... TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation ................................................................ TRM/B 3.3-18 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops ........................................................................ TRM/B 3.3-20 B 3.3.11 MVP Isolation Instrumentation ..................................................... TRM/B 3.3-22 B 3.3.12 Water Monitoring Instrumentation ................................................ TRM/B 3.3-24 B 3.4.1 Reactor Coolant System Chemistry ..................................................... B 3.4-1 B 3 .4 .2 Not Used ...................................................................................... T RM/B 3.4-2 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit ........................... TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program .................................. B 3.4-6 B 3.4.6 Reactor Recirculation Single Loop Operation (SLO)
Flow Rate Restriction .................................................................... TRM/B3.4-7 B 3.5.1 ADS Manual Inhibit .............................................................................. B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation .................. TRM/B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS .................................................... B 3.5-4 B 3.6.1 VENTING or PURGING ............................................................... TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indic atio n ............................................................................................. B 3 .6-3 B 3.6.3 Suppression Pool Alarm Instrumentation ............................................. B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries ....................... TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown) ................................... B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level ....................................... B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System ...................................... TRM/B 3.7-3 SUSQUEHANNA - UNIT 2 TRM /TOC-5 EFFECTIVE DATE 08/11/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 20 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.7.3.2 Spray and Sprinkler Systems ...................................................... TRM/B 3.7-5 B 3.7.3.3 C02 Systems ............................................................................... TRM/B 3.7-7 B 3.7.3.4 Halon Systems ............................................................................ TRM/B 3.7-8 B 3.7.3.5 Fire Hose Stations ....................................................................... TRM/B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ............................ TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assemblies ................................................................. TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation ..................................................... TRM/B 3.7-14 B 3.7.4 Solid Radwaste System ............................................................... TRM/B 3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ........................................ B 3.7-17 B 3.7.5.2 Main Condenser Explosive Gas Mixture .............................................. B 3.7-19 B 3.7.5.3 Liquid Holdup Tanks ............................................................................ B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation .................................................... TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation .......................................................... TRM/B 3.7-22 B 3 .7.8 S nubbers ..................................................................................... T RM/B 3.7-24 B 3.7.9 Control Structure HVAC ............................................................... TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools ............................................................ TRM/B 3.7-33 B 3.7.11 Structural Integrity ........................................................................ TRM/B 3.7-36 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices .................................................... ;.................. TRM/B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -
C ontinuous .................................................................................. T RM/B 3.8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -
Autom atic ..................................................................................... T RM/B 3 .8-4 B 3.8.3 Diesel Generator (DG) Maintanence Activities ............................ TRM/B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem ............................................ TRM/B 3.8-6 B 3.8.5 Degraded Voltage Protection ...................................................... TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling ........................................ TRM/B 3.8-17 B 3.8.7 Battery Monitoring and Maintenance Program ............................. TRM/B 3.8-18 B.3.9 .1 Decay T ime ......................................................................................... B 3 .9-1 B 3.9.2 C omm unications .................................................................................. B 3.9-2 B 3.9.3 Refueling P latform ............................................................................... B 3.9-3 B 3.10.1 Sealed Source Contamination ............................................................. B 3.10-1 B 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation ........................ B 3.10-2 B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) ................... TRM/B 3.10-4 B 3.10.4 Section Not Used ......................................................................... TRM/B 3.10-6 B 3.11.1.1 Liquid Effluents Concentration ............................................................. B 3.11-1 B 3.11.1.2 Liquid Effluents Dose .......................................................................... B 3.11-4 B 3.11.1.3 Liquid Waste Treatment System ......................................................... B 3.11-6 B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation .......................... B 3.11-7 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation .............. TRM/B 3.11-10 SUSQUEHANNA - UNIT 2 TRM / TOC-6 EFFECTIVE DATE 08/11/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 20 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.11.2.1 Dose Rate .................................................................................... TRM/B 3.11-12 B 3.11.2.2 Dose - Noble Gases ............................................................................ B 3.11-16 B 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form ................................................................................... B 3.11-18 B 3.11.2.4 Gaseous Radwaste Treatment System ....................................... TRM/B 3.11-20 B 3.11.2.5 Ventilation Exhaust Treatment System ........................................ TRM/B 3.11-21 B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation ............................................................................ TRM/B 3.11-24 B 3.11.3 Total Dose ........................................................................................... B 3.11-26 B 3.11.4.1 Monitoring Program ..................................................................... TRM/B 3.11-28 B 3.11A4.2 Land Use Census ................................................................................ B 3.11-34 B 3.11.4.3 Interlaboratory Comparison Program ........................................... TRM/B 3.11-36 B 3.12 LOADS CONTROL PROGRAM ................................................... TRM/B 3.12-1 B.3.12.1 Crane Travel - Spent Fuel Storage Pool ..................................... TRM/1B 3.12-1 B.3.12.2 Heavy Loads Requirements ........................................................ TRM/B 3.12-2 B.3.12.3 Light Loads Requirements ........................................................... TRM/B 3.12-3 TRM2 Text TOC 8/1112011 SUSQUEHANNA - UNIT 2 TRM / TOC-7 EFFECTIVE DATE 08/11/2011
Suppression Chamber-to-Drywell Vacuum Breaker Position Indication PPL Rev. 1 3.6.2 3.6 Containment 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication TRO 3.6.2 The Suppression Chamber-to-Drywell Vacuum Breaker Position Indication shall be OPERABLE APPLICABILITY: MODES 1, 2, and 3 ACTIONS
NOTE ---------------------------------------------------------
Separate condition entry is allowed for each instrurn CONDITION REQUIRED ACTION COMPLETION TIME A. One or more position A. 1.1 Verify that the associated 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> indicators of any suppression chamber -
suppression chamber - drywell vacuum breaker is AND drywell vacuum breaker closed.
inoperable Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter OR A.1.2 Enter CONDITION B of Immediately LCO 3.6.1.6 AND A.2 Restore the suppression chamber - drywell vacuum 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> breaker indication to OPERABLE status.
SUSQUEHANNA - UNIT 2 TRM / 3.6-3 EFFECTIVE DATE 08/11/2011
Suppression Chamber-to-Drywell Vacuum Breaker Position Indication PPL Rev. 1 3.6.2 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.6.2.1 Observe expected actuation of both valve As required by SR 3.6.1.6.2 position during the Technical Specification Functional cycling.
TRS 3.6.2.2 Perform a CHANNEL CALIBRATION on 24 months each vacuum breaker position indicator.
SUSQUEHANNA - UNIT 2 TRM / 3.6-3a EFFECTIVE DATE 08/11/2011