Issuance of Amendment Nos. 277 and 259 Revise Technical Specifications to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules
ML20297A564
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/22/2020
From: Sujata Goetz
NRC/NRR/DORL/LPL1
To: Cimorelli K
Susquehanna
Goetz S
References
EPID L-2020-LLA-0139
Download: ML20297A564 (32)


Text

December 22, 2020 Mr. Kevin Cimorelli Site Vice President Susquehanna Nuclear, LLC 769 Salem Boulevard NUCSB3 Berwick, PA 18603-0467

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENT NOS. 277 AND 259 RE: REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-529, REVISION 4, CLARIFY USE AND APPLICATION RULES (EPID L-2020-LLA-0139)

Dear Mr. Cimorelli:

The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 277 to Renewed Facility Operating License No. NPF-14 and Amendment No. 259 to Renewed Facility Operating License No. NPF-22 for the Susquehanna Steam Electric Station (Susquehanna), Units 1 and 2, respectively. These amendments consist of changes to the technical specifications (TSs) in response to your application dated June 25, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20177A534).

The amendments revise Technical Specification (TS) 1.3, Completion Times, and TS 3.0, Limiting Condition for Operation (LCO) Applicability and Surveillance Requirement (SR)

Applicability. The changes clarify and expand the use and application of the plants TS usage rules consistent with the NRC-approved Technical Specifications Task Force (TSTF) Traveler, TSTF-529, Revision 4, Clarify Use and Application Rules, dated February 29, 2016 (ADAMS Accession No. ML16062A271).

A copy of the related safety evaluation is also enclosed. Notice of Issuance will be included in the Commissions monthly Federal Register notice.

Sincerely,

/RA/

Sujata Goetz, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosures:

1. Amendment No. 277 to No. NPF-14
2. Amendment No. 259 to No. NPF-22
3. Safety Evaluation cc: Listserv SUSQUEHANNA NUCLEAR, LLC ALLEGHENY ELECTRIC COOPERATIVE, INC.

DOCKET NO. 50-387 SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 277 Renewed License No. NPF-14

1.

The U.S. Nuclear Regulatory Commission (NRC, the Commission) has found that:

A.

The application for the amendment filed by Susquehanna Nuclear, LLC, dated June 25, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-14 is hereby amended to read as follows:

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 277, and the Environmental Protection Plan contained in Appendix B are hereby incorporated in the license. Susquehanna Nuclear, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 90 days.

FOR THE NUCLEAR REGULATORY COMMISSION James G. Danna, Chief Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: December 22, 2020 James G.

Danna Digitally signed by James G. Danna Date: 2020.12.22 16:04:32 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NO. 277 SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. NPF-14 DOCKET NO. 50-387 Replace the following page of the Renewed Facility Operating License with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.

Remove Insert Page 3 Page 3 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert 1.3-1 1.3-1 1.3-2 1.3-2 1.3-3 1.3-3 3.0-2 3.0-2 3.0-4 3.0-4

Renewed Operating License No. NPF-14 Amendment No. 277 (3)

Susquehanna Nuclear, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, posses, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed neutron sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Susquehanna Nuclear, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, posses, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Susquehanna Nuclear, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission nor or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level Susquehanna Nuclear, LLC is authorized to operate the facility at reactor core power levels not in excess of 3952 megawatts thermal in accordance with the conditions specified herein. The preoperational tests, startup tests and other items identified in License Conditions 2.C.(36), 2.C.(37), 2.C.(38), and 2.C.(39) to this license shall be completed as specified.

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 277, and the Environmental Protection Plan contained in Appendix B are hereby incorporated in the license. Susquehanna Nuclear, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

For Surveillance Requirements (SRs) that are new in Amendment 178 to Facility Operating License No. NPF-14, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 178. For SRs that existed prior to Amendment 178, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 178.

Completion Times 1.3 SUSQUEHANNA - UNIT 1 1.3-1 Amendment 178, 277 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.

BACKGROUND Limiting Conditions for Operation (LCOs) specify minimum requirements for ensuring safe operation of the unit. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Times(s).

DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the discovery of a situation (e.g., inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the unit is in a MODE or specified condition stated in the Applicability of the LCO.

Unless otherwise specified, the Completion Time begins when a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and an ACTIONS Condition is entered. The otherwise specified exceptions are varied, such as a Required Action Note or Surveillance Requirement Note that provides an alternative time to perform specific tasks, such as testing, without starting the Completion Time. While utilizing the Note, should a Condition be applicable for any reason not addressed by the Note, the Completion Time begins. Should the time allowance in the Note be exceeded, the Completion Time begins at that point. The exceptions may also be incorporated into the Completion Time. For example, LCO 3.8.1, AC Sources - Operating, Required Action B.2, requires declaring required feature(s) supported by an inoperable diesel generator, inoperable when the redundant required feature(s) are inoperable. The Completion Time states, 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s). In this case the Completion Time does not begin until the conditions in the Completion Time are satisfied.

Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the unit is not within the LCO Applicability.

Completion Times 1.3 SUSQUEHANNA - UNIT 1 1.3-2 Amendment 178, 273, 277 1.3 Completion Times DESCRIPTION (continued)

If situations are discovered that require entry into more than one Condition at a time within a single LCO (multiple Conditions), the Required Actions for each Condition must be performed within the associated Completion Time.

When in multiple Conditions, separate Completion Times are tracked for each Condition starting from the discovery of the situation that required entry into the Condition, unless otherwise specified.

Once a Condition has been entered, subsequent divisions, subsystems, components, or variables expressed in the Condition, discovered to be inoperable or not within limits, will not result in separate entry into the Condition unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition, unless otherwise specified.

However, when a subsequent division, subsystem, component, or variable expressed in the Condition is discovered to be inoperable or not within limits, the Completion Time(s) may be extended. To apply this Completion Time extension, two criteria must first be met. The subsequent inoperability:

a.

Must exist concurrent with the first inoperability; and

b.

Must remain inoperable or not within limits after the first inoperability is resolved.

The total Completion Time allowed for completing a Required Action to address the subsequent inoperability shall be limited to the more restrictive of either:

a.

The stated Completion Time, as measured from the initial entry into the Condition, plus an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; or

b.

The stated Completion Time as measured from discovery of the subsequent inoperability.

The above Completion Time extensions do not apply to those Specifications that have exceptions that allow completely separate re-entry into the Condition (for each division, subsystem, component or variable expressed in the Condition) and separate tracking of Completion Times based on this re-entry. These exceptions are stated in individual Specifications.

Completion Times 1.3 SUSQUEHANNA - UNIT 1 1.3-3 Amendment 178, 277 1.3 Completion Times DESCRIPTION (continued)

The above Completion Time extension does not apply to a Completion Time with a modified "time zero." This modified "time zero" may be expressed as a repetitive time (i.e., "once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />," where the Completion Time is referenced from a previous completion of the Required Action versus the time of Condition entry) or as a time modified by the phrase "from discovery..."

EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.

EXAMPLE 1.3-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and associated Completion Time not met.

B.1 Be in MODE 3.

AND B.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours Condition B has two Required Actions. Each Required Action has its own separate Completion Time. Each Completion Time is referenced to the time that Condition B is entered.

The Required Actions of Condition B are to be in MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> AND in MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. A total of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is allowed for reaching MODE 3 and a total of 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (not 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />) is allowed for reaching MODE 4 from the time that Condition B was entered. If MODE 3 is reached within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, the time allowed for reaching MODE 4 is the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> because the total time allowed for reaching MODE 4 is 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

If Condition B is entered while in MODE 3, the time allowed for reaching MODE 4 is the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

LCO Applicability 3.0 3.0 LCO APPLICABILITY SUSQUEHANNA - UNIT 1 3.0-2 Amendment 178, 219, 277 LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

a.

When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;

b.

After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate (exceptions to this Specification are stated in the individual Specifications); or

c.

When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.

LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered. Only the support system LCO ACTIONS are required to be entered. This is an exception to LCO 3.0.2 for the supported system. In this event, an evaluation shall be performed in accordance with Specification 5.5.11, "Safety Function Determination Program (SFDP)." If a loss of safety function is determined to exist by this

SR Applicability 3.0 SUSQUEHANNA - UNIT 1 3.0-4 Amendment 178, 205, 277 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR.

Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a "once per..."

basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. The delay period is only applicable when there is a reasonable expectation the surveillance will be met when performed. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be SUSQUEHANNA NUCLEAR, LLC ALLEGHENY ELECTRIC COOPERATIVE, INC.

DOCKET NO. 50-388 SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 259 Renewed License No. NPF-22

1.

The U.S. Nuclear Regulatory Commission (NRC or the Commission) has found that:

A.

The application for the amendment filed by Susquehanna Nuclear, LLC, dated June 25, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations, and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-22 is hereby amended to read as follows:

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 259, and the Environmental Protection Plan contained in Appendix B are hereby incorporated in the license. Susquehanna Nuclear, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 90 days.

FOR THE NUCLEAR REGULATORY COMMISSION James G. Danna, Chief Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: December 22, 2020 James G.

Danna Digitally signed by James G. Danna Date: 2020.12.22 16:05:17 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NO. 259 SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 RENEWED FACILITY OPERATING LICENSE NO. NPF-22 DOCKET NO. 50-388 Replace the following page of the Renewed Facility Operating License with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.

Remove Insert Page 3 Page 3 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert 1.3-1 1.3-1 1.3-2 1.3-2 1.3-3 1.3-3 3.0-2 3.0-2 3.0-4 3.0-4 Renewed Operating License No. NPF-22 Amendment No. 259 (3)

Susquehanna Nuclear, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, posses, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed neutron sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Susquehanna Nuclear, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, posses, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Susquehanna Nuclear, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission nor or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level Susquehanna Nuclear, LLC is authorized to operate the facility at reactor core power levels not in excess of 3952 megawatts thermal in accordance with the conditions specified herein. The preoperational tests, startup tests and other items identified in License Conditions 2.C.(20), 2.C.(21), 2.C.(22), and 2.C.(23) to this license shall be completed as specified.

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 259, and the Environmental Protection Plan contained in Appendix B are hereby incorporated in the license. Susquehanna Nuclear, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

For Surveillance Requirements (SRs) that are new in Amendment 151 to Facility Operating License No. NPF-22, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 151. For SRs that existed prior to Amendment 151, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 151.

Completion Times 1.3 SUSQUEHANNA - UNIT 2 1.3-1 Amendment 151, 259 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.

BACKGROUND Limiting Conditions for Operation (LCOs) specify minimum requirements for ensuring safe operation of the unit. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Times(s).

DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the discovery of a situation (e.g., inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the unit is in a MODE or specified condition stated in the Applicability of the LCO.

Unless otherwise specified, the Completion Time begins when a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and an ACTIONS Condition is entered. The otherwise specified exceptions are varied, such as a Required Action Note or Surveillance Requirement Note that provides an alternative time to perform specific tasks, such as testing, without starting the Completion Time. While utilizing the Note, should a Condition be applicable for any reason not addressed by the Note, the Completion Time begins. Should the time allowance in the Note be exceeded, the Completion Time begins at that point. The exceptions may also be incorporated into the Completion Time. For example, LCO 3.8.1, AC Sources - Operating, Required Action B.2, requires declaring required feature(s) supported by an inoperable diesel generator, inoperable when the redundant required feature(s) are inoperable. The Completion Time states, 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s). In this case the Completion Time does not begin until the conditions in the Completion Time are satisfied.

Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the unit is not within the LCO Applicability.

Completion Times 1.3 SUSQUEHANNA - UNIT 2 1.3-2 Amendment 151, 255, 259 1.3 Completion Times DESCRIPTION (continued)

If situations are discovered that require entry into more than one Condition at a time within a single LCO (multiple Conditions), the Required Actions for each Condition must be performed within the associated Completion Time.

When in multiple Conditions, separate Completion Times are tracked for each Condition starting from the discovery of the situation that required entry into the Condition, unless otherwise specified.

Once a Condition has been entered, subsequent divisions, subsystems, components, or variables expressed in the Condition, discovered to be inoperable or not within limits, will not result in separate entry into the Condition unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition, unless otherwise specified.

However, when a subsequent division, subsystem, component, or variable expressed in the Condition is discovered to be inoperable or not within limits, the Completion Time(s) may be extended. To apply this Completion Time extension, two criteria must first be met. The subsequent inoperability:

a. Must exist concurrent with the first inoperability; and
b. Must remain inoperable or not within limits after the first inoperability is resolved.

The total Completion Time allowed for completing a Required Action to address the subsequent inoperability shall be limited to the more restrictive of either:

a. The stated Completion Time, as measured from the initial entry into the Condition, plus an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; or
b. The stated Completion Time as measured from discovery of the subsequent inoperability.

The above Completion Time extensions do not apply to those Specifications that have exceptions that allow completely separate re-entry into the Condition (for each division, subsystem, component or variable expressed in the Condition) and separate tracking of Completion Times based on this re-entry. These exceptions are stated in individual Specifications.

Completion Times 1.3 SUSQUEHANNA - UNIT 2 1.3-3 Amendment 151, 259 1.3 Completion Times DESCRIPTION (continued)

The above Completion Time extension does not apply to a Completion Time with a modified "time zero." This modified "time zero" may be expressed as a repetitive time (i.e., "once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />," where the Completion Time is referenced from a previous completion of the Required Action versus the time of Condition entry) or as a time modified by the phrase "from discovery..."

EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.

EXAMPLE 1.3-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and associated Completion Time not met.

B.1 Be in MODE 3.

AND B.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours Condition B has two Required Actions. Each Required Action has its own separate Completion Time. Each Completion Time is referenced to the time that Condition B is entered.

The Required Actions of Condition B are to be in MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> AND in MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. A total of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is allowed for reaching MODE 3 and a total of 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (not 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />) is allowed for reaching MODE 4 from the time that Condition B was entered. If MODE 3 is reached within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, the time allowed for reaching MODE 4 is the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> because the total time allowed for reaching MODE 4 is 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

If Condition B is entered while in MODE 3, the time allowed for reaching MODE 4 is the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

LCO Applicability 3.0 3.0 LCO APPLICABILITY SUSQUEHANNA - UNIT 2 3.0-2 Amendment 151, 195, 259 LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

a.

When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time; b.

After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate (exceptions to this Specification are stated in the individual Specifications); or c.

When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.

LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered.

Only the support system LCO ACTIONS are required to be entered.

This is an exception to LCO 3.0.2 for the supported system. In this event, an evaluation shall be performed in accordance with Specification 5.5.11, "Safety Function Determination Program (SFDP)."

If a loss of safety function is determined to exist by this

SR Applicability 3.0 SUSQUEHANNA - UNIT 2 3.0-4 Amendment 151, 179, 259 3.0 SURVEILLANCE REQUIREMENTS (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO.

Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3.

Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a "once per..." basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. The delay period is only applicable when there is a reasonable expectation the surveillance will be met when performed. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 277 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-14 AND AMENDMENT NO. 259 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-22 SUSQUEHANNA NUCLEAR, LLC ALLEGHENY ELECTRIC COOPERATIVE, INC.

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 DOCKET NOS. 50-387 AND 50-388

1.0 INTRODUCTION

By application dated June 25, 2020 (Agencywide Documents Access and Management system (ADAMS) Accession No. ML20177A534), Susquehanna Nuclear, LLC (the licensee) submitted a license amendment request for changes to the Susquehanna Steam Electric Station (Susquehanna), Units 1 and 2, Technical Specifications (TSs). Specifically, the licensee requested changes consistent with Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules, dated February 29, 2016 (ADAMS Accession No. ML16062A271)

The licensee proposed changes to the Susquehanna, Units 1 and 2, TS 1.3, Completion Times, and TS 3.0, Limiting Condition for Operation (LCO) Applicability and Surveillance Requirement (SR) Applicability. The proposed changes would clarify and expand the use and application of Susquehanna, Units 1 and 2, TS usage rules. The U.S. Nuclear Regulatory Commission (NRC, the Commission) reviewed the proposed TS changes against NRC-approved TSTF-529, Revision 4.

2.0 REGULATORY EVALUATION

2.1 Description of Subject TS Sections Limiting conditions for operation (LCOs) specify minimum requirements for ensuring safe operation of the unit. The actions associated with an LCO state conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated condition are required action(s) and completion time(s).

Susquehanna, Units 1 and 2, TS 1.3, Completion Times, currently describes completion times as follows:

The completion time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the unit is in a MODE or specified condition stated in the Applicability of the LCO. Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the unit is not within the LCO Applicability.

If situations are discovered that require entry into more than one Condition at a time within a single LCO (multiple Conditions), the Required Actions for each Condition must be performed within the associated Completion Time. When in multiple Conditions, separate Completion Times are tracked for each Condition starting from the time of discovery of the situation that required entry into the Condition.

Once a Condition has been entered, subsequent divisions, subsystems, components, or variables expressed in the Condition, discovered to be inoperable or not within limits, will not result in separate entry into the Condition, unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition.

Susquehanna, Units 1 and 2, TS LCO 3.0.1 through LCO 3.0.8 establish the general requirements applicable to all specifications and apply at all times, unless otherwise stated.

Similarly, SR 3.0.1 through SR 3.0.4 establish the general requirements for surveillances that are applicable to all specifications and apply at all times, unless otherwise stated.

2.2 Description of TS Changes The proposed changes will revise the Susquehanna, Units 1 and 2, TS 1.3, Completion Times, and TS 3.0, LCO Applicability, and SR Applicability. The proposed changes are described in more detail below.

2.2.1 Proposed Changes to Time of Discovery Susquehanna, Units 1 and 2, TS 1.3, Description, currently states, in part, the following (with emphasis added on time of):

The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the unit is in a MODE or specified condition stated in the Applicability of the LCO.

Susquehanna, Units 1 and 2, TS 1.3, Description, also currently states, in part, the following (with emphasis added on time of):

If situations are discovered that require entry into more than one Condition at a time within a single LCO (multiple Conditions), the Required Actions for each Condition must be performed within the associated Completion Time. When in multiple Conditions, separate Completion Times are tracked for each Condition starting from the time of discovery of the situation that required entry into the Condition.

The proposed Susquehanna, Units 1 and 2, TS 1.3 would delete time of from the previous statements and read as follows:

The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the discovery of a situation (e.g., inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the unit is in a MODE or specified condition stated in the Applicability of the LCO.

[]

If situations are discovered that require entry into more than one Condition at a time within a single LCO (multiple Conditions), the Required Actions for each Condition must be performed within the associated Completion Time. When in multiple Conditions, separate Completion Times are tracked for each Condition starting from the discovery of the situation that required entry into the Condition.

The adequacy of this change is discussed in Section 3.1.1.1 of this safety evaluation (SE).

2.2.2 Proposed Addition to Time of Discovery The licensee proposed to add the following paragraph to TS 1.3 of the Susquehanna, Units 1 and 2, TSs under

Description:

Unless otherwise specified, the Completion Time begins when a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and an ACTIONS Condition is entered.

The otherwise specified exceptions are varied, such as a Required Action Note or Surveillance Requirement Note that provides an alternative time to perform specific tasks, such as testing, without starting the Completion Time. While utilizing the Note, should a Condition be applicable for any reason not addressed by the Note, the Completion Time begins. Should the time allowance in the Note be exceeded, the Completion Time begins at that point. The exceptions may also be incorporated into the Completion Time. For example, LCO 3.8.1, AC Sources - Operating, Required Action B.1, requires declaring required feature(s) supported by an inoperable diesel generator, inoperable when the redundant required feature(s) are inoperable. The Completion Time states, immediately from discovery of Condition B concurrent with inoperability of redundant required feature(s). In this case the Completion Time does not begin until the conditions in the Completion Time are satisfied.

The proposed change augments the NRC staffs expectation that a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and a condition is entered. The adequacy of this change is discussed in Section 3.1.1.2.

2.2.3 Proposed Addition of Unless Otherwise Specified Susquehanna, Units 1 and 2, TS 1.3, Description, currently states the following (with emphasis added on unless otherwise specified):

The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the unit is in a MODE or specified condition stated in the Applicability of the LCO.

The licensee proposed to add the following sentence right after the above statement to Susquehanna, Units 1 and 2, TS 1.3, which contains the phrase unless otherwise specified:

Unless otherwise specified, the Completion Time begins when a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and an ACTIONS Condition is entered.

In addition, the licensee proposed adding the phrase unless otherwise specified to the following two statements:

When in multiple Conditions, separate Completion Times are tracked for each Condition starting from the discovery of the situation that required entry into the Condition, unless otherwise specified.

and The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition, unless otherwise specified.

The adequacy of this change is discussed in Section 3.1.1.3 of this SE.

2.2.4 Proposed Changes to LCO 3.0.4 Susquehanna, Units 1 and 2, TS LCO 3.0.4 currently states:

When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

a.

When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;

b.

After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or

c.

When an allowance is stated in the individual value, parameter, or other Specification.

The licensee proposed to clarify the statement b above by placing the statement regarding exceptions in parenthesis and replacing the ending comma with a semicolon. The proposed Susquehanna, Units 1 and 2, TS LCO 3.0.4 would state the following:

When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

a.

When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;

b.

After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate (exceptions to this Specification are stated in the individual Specifications); or

c.

When an allowance is stated in the individual value, parameter, or other Specification.

The adequacy of this change is discussed in Section 3.1.2 of this SE.

2.2.5 Proposed Changes to TS SR 3.0.3 Susquehanna, Units 1 and 2, TS SR 3.0.3 currently states the following:

If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

The licensee proposed Susquehanna, Units 1 and 2, TS LCO SR 3.0.3 states the following (the additional sentence is underlined):

If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. The delay period is only applicable when there is a reasonable expectation the surveillance will be met when performed. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

The adequacy of this change is discussed in Section 3.1.3 of this SE.

2.3 Regulatory Requirements, Licensing Information, and Guidance Documents The NRC staff considered the following regulatory requirements, guidance, and licensing information during its review of the proposed changes:

Paragraph 50.36(c) of Title 10 of the Code of Federal Regulations (10 CFR) requires TSs to include the following categories: (1) safety limits, limiting safety systems settings, and control settings; (2) LCOs; (3) SRs; (4) design features; (5) administrative controls; (6) decommissioning; (7) initial notification; and (8) written reports. Section 50.36(c)(2) of 10 CFR states:

Limiting conditions for operation are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications until the condition can be met. When a limiting condition for operation of any process step in the system of a fuel reprocessing plant is not met, the licensee shall shut down that part of the operation or follow any remedial action permitted by the technical specifications until the condition can be met.

Section 50.36(c)(3) of 10 CFR states:

Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.

The NRC staffs guidance for review of the TSs is in NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light-Water Reactor]

Edition, Chapter 16, Technical Specifications, Revision 3, dated March 2010 (ADAMS Accession No. ML100351425). As described therein, as part of the regulatory standardization effort, the staff has prepared improved standard technical specifications (STSs) for each of the LWR nuclear steam supply systems and associated balance-of-plant equipment systems. The licensees proposed amendments are based on TSTF-529, Revision 4, which is an NRC-approved change to the improved STSs.

The NRC staffs review includes consideration of whether the proposed changes are consistent with TSTF-529, Revision 4. Special attention is given to TS provisions that depart from the improved STSs, as modified by NRC-approved TSTF travelers, to determine whether proposed differences are justified by uniqueness in plant design or other considerations so that 10 CFR 50.36 is met. In addition, the guidance states that comparing the change to previous STS can help clarify the TS intent.

3.0 TECHNICAL EVALUATION

During the review of TSTF-529, Revision 4, the NRC staff considered generally the guidance on acceptance criteria of the SRP sections described in Section 2.3 of this SE, and, in particular, the acceptance criteria in Chapter 16, Technical Specifications, of NUREG- 0800, Revision 3.

Additionally, the NRC staff evaluated the proposed changes to the Susquehanna, Units 1 and 2, TSs against what is required to be in the TSs under 10 CFR 50.36.

3.1 Requested Changes 3.1.1 Proposed Changes to TS 1.3, Completion Times 3.1.1.1 Proposed Changes to Time of Discovery The only mention of the term time of discovery in relation to completion times is in Susquehanna, Units 1 and 2, TS 1.3 (quoted in Section 2.2.1 of this SE). Throughout the Susquehanna, Units 1 and 2, TSs, the term discovery is used to describe the point in time that it is recognized that the requirements of an LCO are not met. For example, TS LCO 3.0.2 requires in part that upon discovery of a failure to meet an LCO, the required actions of the associated conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6. In addition, the Bases to LCO 3.0.2, state, in part, LCO 3.0.2 establishes that upon discovery of a failure to meet an LCO, the associated ACTIONS shall be met.

The proposed changes to Susquehanna, Units 1 and 2, TS 1.3 would delete time of from the previous statements. The NRC staff finds the proposed change acceptable because it makes TS 1.3 consistent with the language used throughout the rest of the TSs. This provides clarity to the term discovery, and therefore, provides a clear and objective application of the TS required actions and associated completion times. The change is editorial since it does not change the requirements currently in TS. Therefore, the NRC staff finds the proposed change acceptable.

3.1.1.2 Proposed Addition to Time of Discovery The licensee also proposed to add the following paragraph to TS 1.3 of the Susquehanna, Units 1 and 2, TSs under

Description:

Unless otherwise specified, the Completion Time begins when a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and an ACTIONS Condition is entered.

The otherwise specified exceptions are varied, such as a Required Action Note or Surveillance Requirement Note that provides an alternative time to perform specific tasks, such as testing, without starting the Completion Time. While utilizing the Note, should a Condition be applicable for any reason not addressed by the Note, the Completion Time begins. Should the time allowance in the Note be exceeded, the Completion Time begins at that point. The exceptions may also be incorporated into the Completion Time. For example, LCO 3.8.1, AC Sources - Operating, Required Action B.1, requires declaring required feature(s) supported by an inoperable diesel generator, inoperable when the redundant required feature(s) are inoperable. The Completion Time states, immediately from discovery of Condition B concurrent with inoperability of redundant required feature(s). In this case the Completion Time does not begin until the conditions in the Completion Time are satisfied.

The operating shift crew is responsible for overall control of facility operation. As part of that responsibility, the operating shift crew must be aware of the status of the plant and condition of structures, systems and components. This includes status of degraded or nonconforming conditions that may affect plant operation. Therefore, the proposed change simply augments the NRC staffs expectation that a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and a condition is entered. The phrase and an ACTIONS Condition is entered in the above proposed insertion is necessary to accommodate circumstances in which LCO 3.0.6 allows an LCO to not be met without entry into the conditions. In those circumstances, a Completion Time does not begin. In addition, an example is added to the proposed insertion in order to explain the concept presented.

The NRC staff finds the proposed change acceptable since it clarifies senior reactor operators responsibilities and the allowances of LCO 3.0.6, and therefore, provides a clear and objective application of the TS required actions and associated completion times.

3.1.1.3 Proposed Addition of Unless Otherwise Specified The phrase, unless otherwise specified, in Susquehanna, Units 1 and 2, TS 1.3 refers to those instances in which TS LCOs define the start of the completion time as different from discovery.

For example, Susquehanna, Units 1 and 2, TS 3.8.1, AC Sources - Operating, Required Action B.1, calls for declaring required feature(s) supported by an inoperable diesel generator inoperable when the redundant required feature(s) are inoperable. The completion time states, Immediately from discovery of Condition B concurrent with inoperability of redundant required feature(s). In this case, the completion time does not begin until the conditions in the completion time are satisfied.

As discussed in Section 2.2.3 of this SE, the licensee proposed to add the following sentence to Susquehanna, Units 1 and 2, TS 1.3, which contains the phrase unless otherwise specified:

Unless otherwise specified, the Completion Time begins when a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and an ACTIONS Condition is entered.

In addition, the licensee proposed adding the phrase unless otherwise specified to the following two statements:

When in multiple Conditions, separate Completion Times are tracked for each Condition starting from the discovery of the situation that required entry into the Condition, unless otherwise specified.

and The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition, unless otherwise specified.

The addition of the phrase unless otherwise specified acknowledges that there are instances, as indicated in the individual TSs, when the completion time does not start at discovery. These exceptions are varied, such as when a required action note or SR note provides an alternative time to perform specific tasks, such as testing, without starting the completion time. While utilizing the note, should a condition be applicable for any reason not addressed by the note, the completion time begins. Should the time allowance in the note be exceeded, the completion time begins at that point.

The NRC staff finds the proposed change acceptable since it clarifies that there are exceptions and therefore provides a clear and objective application of the Susquehanna, Units 1 and 2, TS required actions and associated completion times.

3.1.2 Proposed Changes to LCO 3.0.4 As stated in Section 2.2.4 of this SE, the current Susquehanna, Units 1 and 2, TS LCO 3.0.4 contains three options (a, b, and c). Paragraph a ends with a semicolon and paragraph b ends with, or.

The LCO 3.0.4.b, After performance of a risk assessment stated in the individual Specifications, or, could lead to operator misinterpretation. Operators could misapply this statement by believing the or applies to the phrase regarding exceptions and that LCO 3.0.4.a, b, and c apply concurrently.

The licensee proposed to clarify this sentence by placing the statement regarding exceptions in parenthesis and replacing the ending comma with a semicolon. The proposed Susquehanna, Units 1 and 2, TS LCO 3.0.4 would state the following: After performance of a risk assessment if appropriate (exceptions to this specification are stated in the individual specifications); or.

The NRC staff finds that the change is editorial since it does not change the requirements currently in the TSs. The NRC staff finds the proposed change acceptable since it removes potential for misapplication of LCO 3.0.4 allowances, and therefore, provides a clear and objective application of the Susquehanna, Units 1 and 2, TS required actions.

3.1.3 Proposed Changes to SR 3.0.3 The NRC has typically interpreted SR 3.0.3, which is quoted in Section 2.2.5 of this SE, as inapplicable to SRs that have never been previously performed. This is because the allowance provided by SR 3.0.3 is based on the fact that the SR was satisfactorily met in the past and the most probable result of performing the SR is the verification of conformance with the requirements. Therefore, there is reasonable expectation the SR will be met when performed.

However, the NRC staff recognizes that there are instances in which an SR may not have been performed in the past, but there is still a reasonable expectation the SR will be met when performed. For example, an SR requires testing of a relay contact. A licensee finds the relay contact has never been tested as required in accordance with a particular SR. That licensee, however, finds there is a reasonable expectation the SR will be met when performed because the subject relay contact has been tested by another SR or historical operation of the subject relay contact has been successful.

The delay period allowed by Susquehanna, Units 1 and 2, TS SR 3.0.3 offers adequate time to complete SRs that have been missed. In addition, this delay period permits the completion of an SR before complying with required actions or other remedial measures that might preclude completion of the SR. The NRC staff finds the application of the delay period provided by Susquehanna, Units 1 and 2, TS SR 3.0.3 acceptable for use on SRs that have never been performed when licensees have a reasonable expectation the SR will be met when performed.

The licensee-proposed Susquehanna, Units 1 and 2, TS LCO SR 3.0.3 states the following (the new sentence reflecting the inclusion of SRs that have never been performed is underlined):

If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. The delay period is only applicable when there is a reasonable expectation the surveillance will be met when performed. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When making a determination of reasonable expectation that the SR will be met when performed, the licensee should consider many factors. These factors include, but are not limited to, things such as the period of time since the SR was last performed, or whether the SR, or a portion thereof, has ever been performed, and many other indications, tests, or activities that might support the expectation that the SR will be met when performed. It is not sufficient to infer the behavior of the associated equipment from the performance of similar equipment. The rigor of determining whether there is a reasonable expectation an SR will be met when performed should increase based on the length of time since the last performance of the SR. If the SR has been performed recently, a review of the SR history and equipment performance may be sufficient to support a reasonable expectation that the SR will be met when performed.

For SRs that have not been performed for a long period or that have never been performed, a rigorous evaluation based on objective evidence should provide a high degree of confidence that the equipment is capable of performing its specified safety function(s). The evaluation should be documented in sufficient detail to allow a knowledgeable individual to understand the basis for the determination.

The proposed change, which expands the scope of SR 3.0.3 to SRs that have never been performed, is acceptable because it requires there to be an adequate determination of a reasonable expectation the SR will be met when performed. In addition, the proposed change augments plant safety since it could prevent unnecessary shutdowns by providing adequate time to complete SRs that have never been performed but are expected to achieve satisfactory results.

4.0 STATE CONSULTATION

In accordance with the Commissions regulations, the Commonwealth of Pennsylvania State official was notified of the proposed issuance of the amendments on October 29, 2020. The State official had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendments change requirements with respect to the installation or use of facility components located within the restricted area as defined in 10 CFR Part 20 and changes SRs.

The NRC staff has determined that the amendments involve no significant increase in the amounts and no significant change in the types of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding published in the Federal Register on September 22, 2020 (85 FR 5963). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that:

(1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: J. Wilson Date: December 22, 2020

ML20297A564 (for TSTF-529, OGC review exempted)

OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DRR/STSB/BC NAME SGoetz LRonewicz VCusumano DATE 12/21/2020 12/18/2020 10/27/2020 OFFICE NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME JDanna SGoetz DATE 12/22/2020 12/22/2020