(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Letter Sequence Meeting |
---|
|
|
MONTHYEARML19275G9682019-09-26026 September 2019, 9 October 2019, 23 October 2019, 24 October 2019 Oct 24, 2019 Topical Report Transformation Workshop Project stage: Request ML19295F8752019-10-17017 October 2019, 11 November 2019, 5 February 2020 Nov 12, 2019 Presubmittal Meeting on Common Q TR Surveillance Project stage: Request ML19309C3752019-11-11011 November 2019 U.S. Nuclear Regulatory Commission Proprietary Determination Letter for WCAP-18461-P (Draft) Common Q Platform Elimination of Technical Specification Surveillance Requirements Project stage: Draft Other ML19304A0932020-02-0505 February 2020 Summary of Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss the Topical Report Related to Removing the Technical Specification Requirements for the Common Qualification System Project stage: Meeting 2019-11-11
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24179A0642024-08-13013 August 2024 Memo - Summary of May 16, 2024, Partially Closed Pre-Application Public Meeting with Westinghouse Columbia Fuel Fabrication Facility ML24179A0662024-08-13013 August 2024 Enclosure 2 - Open Session Meeting Summary - Public ML24109A0002024-04-19019 April 2024 Public Meeting Summary - Licensee Performance Review for Westinghouse Columbia Fuel Fabrication Facility, Docket Number 70-1151 ML22041A2022022-03-14014 March 2022 Westinghouse Trip Summary January 19-20, 2022 ML22161A9412021-10-18018 October 2021 Westinghouse, September 2021 Virtual Meeting Summary & Proposed Actions ML21054A0922021-03-0404 March 2021 Summary of Public Meeting to Discuss the Status of the Westinghouse Columbia Fuel Fabrication Facility License Renewal ML20254A1622020-09-11011 September 2020 Summary of the September 1, 2020 Closed Meeting with Westinghouse to Discuss Staff'S Draft RAIs on Alternate Disposal Approval of Specified Low Activity Radioactive Materials ML20121A2592020-04-30030 April 2020 Westinghouse License Renewal - ISA Review- Conference Call Summary Dec 2017 ML20115E3972020-04-29029 April 2020 Summary of April 23, 2020, Pre-Submittal Meeting with Westinghouse Electric Company (WEC) Regarding WEC Quality Management System(Qms) Changes Due to COVID-19 ML20100H1432020-04-16016 April 2020 Summary of Closed Pre-Submittal Meeting for the Future Submittal of Westinghouse Electric Company (Westinghouse) WCAP-18482-P, Westinghouse Advanced Doped Pellet Technology(Adopt Tm) Fuel ML20083H9552020-04-10010 April 2020 Summary of September 18-19, 2019, Partially Closed Meeting to Discuss Westinghouse Electric Company Encore Accident Tolerant Fuel: Chromium Coated Cladding ML20094L4682020-04-0303 April 2020 Summary of Meeting with Westinghouse to Discuss Nrc'S Evaluation of Performance in Four Major Areas of Safety Operations, Radiological Controls, Facility Support and Safeguards During Calendar Year 2019 ML19304A0932020-02-0505 February 2020 Summary of Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss the Topical Report Related to Removing the Technical Specification Requirements for the Common Qualification System ML19218A1682019-08-16016 August 2019 Memo: Summary of June 27, 2019, Closed Meeting with the Westinghouse Electric Company to Discuss Future Submittal of WCAP-18446-P, Incremental Extension of Burnup Limit for Westinghouse Fuel with Zirlo Cladding and Optimized Zirlo Cladding ML19218A2232019-08-16016 August 2019 Summary of June 27, 2019, Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-18443-P/NP, Qualification of the Two-Dimensional Transport Code Paragon2 ML19175A1602019-07-0909 July 2019 04/01-04/15/2019 Summary of Closed Audit of the Westinghouse Electric Company Topical Report WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (Wtdp) ML19150A5572019-06-24024 June 2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Common Qualified Platform Topic Report (WCAP-16097) Watchdog Timer Changes ML19143A1362019-06-12012 June 2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-10965-P-A, Addendum 3, Updated Nexus Cross-Section Methodology (EPID-L-2019-TOP-0009) ML19092A3082019-05-0101 May 2019 03/27/19 Summary for Public Meeting to Discuss the Responses to the RAIs Regarding the WEC License Renewal with Enclosures ML19028A1242019-02-14014 February 2019 Summary of January 17, 2019 Closed Meeting to Discuss Westinghouse Electric Company Accident Tolerant Fuel Technology ML19022A0722019-01-28028 January 2019 Summary of Meeting with Westinghouse Electric Company to Discuss RAI Response Related to NRC Review of WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement. ML18361A6652019-01-25025 January 2019 Summary of December 4-5, 2018, Closed Audit of the Westinghouse Electric Company Topical Report WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0, 10x10 Svea Fuel Critical Power Experiments and New CPR Correlation: D5 for SVEA-96 Opti ML18330A2552018-12-18018 December 2018 Summary for Public Meeting and Enclosures 1-3: Held November 8, 2018, to Discuss the License Renewal, Environmental Analysis and Leaks at the Westinghouse Columbia Fuel Fabrication Facility ML18278A0262018-10-16016 October 2018 Summary of Closed Meeting to Discuss Westinghouse Electric Company Accident Tolerant Fuel Licensing Plan ML18177A2392018-07-0202 July 2018 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Restart of WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies, Topical Report ML18156A2282018-06-15015 June 2018 Summary of April 13-18, 2018, Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss Future Submittal of WNG-2 Topical Report ML18130A7332018-05-10010 May 2018 Westinghouse Public Meeting Summary May 2018 ML18057A0382018-03-19019 March 2018 Summary of Closed Meeting to Discuss Implementation Plan for the Westinghouse Electric Company Topical Report WCAP-17642-P-A/WCAP-17642-NP-A, Revision 1 ML18036A4672018-02-0808 February 2018 Meeting Summary on Westinghouse Sale and License Transfer Application ML18039A0012018-02-0707 February 2018 Westinghouse Public Meeting Summary February 2018 ML17353A0802018-01-24024 January 2018 December 13, 2017 Summary of Teleconference with South Carolina Department of Health and Environmental Control Related to the Rc Review of Westinghouse'S Columbia Fuel Fabrication Facility License Renewal Application ML17332A4452018-01-17017 January 2018 Summary of the December 12, 2017, Meeting with Westinghouse Regarding the AC160 Controller Watchdog Timer Issue Causal Analysis 2024-08-13
[Table view] Category:Memoranda
MONTHYEARML24179A0642024-08-13013 August 2024 Memo - Summary of May 16, 2024, Partially Closed Pre-Application Public Meeting with Westinghouse Columbia Fuel Fabrication Facility ML22103A2422022-04-29029 April 2022 Westinghouse Trip Report March 24, 2022 ML22054A0462022-03-0404 March 2022 Westinghouse Electric Co. LLC - Request for Alternate Disposal and Exemptions for Columbia Fuel Fabrication Facility Waste Disposal at the Us Ecology Idaho Facility (Enterprise Project Identifier L-2021-LLA-0204) ML21202A1112021-10-0404 October 2021 Westinghouse Electric Company, LLC Request for Alternate Disposal and Exemptions for Columbia Fuel Fabrication Facility Waste Disposal at the Us Ecology Idaho Facility ML21054A0922021-03-0404 March 2021 Summary of Public Meeting to Discuss the Status of the Westinghouse Columbia Fuel Fabrication Facility License Renewal ML21053A3372021-03-0303 March 2021 Safety Evaluation Report Related to Request for 10 CFR 20.2002 Alternate Disposal Approval and Exemptions from 10 CFR Part 30 and 10 CFR Part 70 for Disposal of Specific Columbia Fuel Fabrication Facility Waste at the Us Ecology Idaho Facil ML21033A6722021-02-19019 February 2021 Memorandum to J.Quintero, NRC, Re Environmental Impact Statement Scoping Summary Report for Westinghouse Columbia Fuel Fabrication Facility License Renewal Application ML20329A3532020-11-30030 November 2020 Safety Evaluation Report Related to a Request for 10 CFR 20.2002 Alternate Disposal Approval and Exemptions from 10 CFR Part 30 and 10 CFR Part 70 for Disposal of Columbia Fuel Fabrication Facility Waste at the Us Ecology Idaho Facility ML20254A1622020-09-11011 September 2020 Summary of the September 1, 2020 Closed Meeting with Westinghouse to Discuss Staff'S Draft RAIs on Alternate Disposal Approval of Specified Low Activity Radioactive Materials ML20115E3972020-04-29029 April 2020 Summary of April 23, 2020, Pre-Submittal Meeting with Westinghouse Electric Company (WEC) Regarding WEC Quality Management System(Qms) Changes Due to COVID-19 ML20100H1432020-04-16016 April 2020 Summary of Closed Pre-Submittal Meeting for the Future Submittal of Westinghouse Electric Company (Westinghouse) WCAP-18482-P, Westinghouse Advanced Doped Pellet Technology(Adopt Tm) Fuel ML20083H9552020-04-10010 April 2020 Summary of September 18-19, 2019, Partially Closed Meeting to Discuss Westinghouse Electric Company Encore Accident Tolerant Fuel: Chromium Coated Cladding ML19304A0932020-02-0505 February 2020 Summary of Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss the Topical Report Related to Removing the Technical Specification Requirements for the Common Qualification System ML19283A8112019-10-16016 October 2019 Summary of May 2019 Site Visit and Information Needs Related to the U.S. Nuclear Regulatory Commission'S Review of the Environmental Program in the License Renewal Application for the Westinghouse Columbia Fuel Fabrication Facility ML19231A0212019-08-30030 August 2019 Verification Letter of the Approval Version of Westinghouse Electric Company Topical Report WCAP-18032-P, Revision 0, and WCAP-18032-NP, Revision 0, Calculation of Mixed Core Safety Limit Minimum Critical Power Ratio ML19218A1682019-08-16016 August 2019 Memo: Summary of June 27, 2019, Closed Meeting with the Westinghouse Electric Company to Discuss Future Submittal of WCAP-18446-P, Incremental Extension of Burnup Limit for Westinghouse Fuel with Zirlo Cladding and Optimized Zirlo Cladding ML19218A2122019-08-16016 August 2019 07/23-25/2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Fuel Performance ML19175A1602019-07-0909 July 2019 04/01-04/15/2019 Summary of Closed Audit of the Westinghouse Electric Company Topical Report WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (Wtdp) ML19150A5572019-06-24024 June 2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Common Qualified Platform Topic Report (WCAP-16097) Watchdog Timer Changes ML19143A1362019-06-12012 June 2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-10965-P-A, Addendum 3, Updated Nexus Cross-Section Methodology (EPID-L-2019-TOP-0009) ML19092A3082019-05-0101 May 2019 03/27/19 Summary for Public Meeting to Discuss the Responses to the RAIs Regarding the WEC License Renewal with Enclosures ML19028A1242019-02-14014 February 2019 Summary of January 17, 2019 Closed Meeting to Discuss Westinghouse Electric Company Accident Tolerant Fuel Technology ML19022A0722019-01-28028 January 2019 Summary of Meeting with Westinghouse Electric Company to Discuss RAI Response Related to NRC Review of WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement. ML18361A6652019-01-25025 January 2019 Summary of December 4-5, 2018, Closed Audit of the Westinghouse Electric Company Topical Report WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0, 10x10 Svea Fuel Critical Power Experiments and New CPR Correlation: D5 for SVEA-96 Opti ML18330A2552018-12-18018 December 2018 Summary for Public Meeting and Enclosures 1-3: Held November 8, 2018, to Discuss the License Renewal, Environmental Analysis and Leaks at the Westinghouse Columbia Fuel Fabrication Facility ML18278A0262018-10-16016 October 2018 Summary of Closed Meeting to Discuss Westinghouse Electric Company Accident Tolerant Fuel Licensing Plan ML18213A0702018-08-16016 August 2018 Summary of Westinghouse Electric Company 2018 Fuel Performance Update Meeting ML18213A1402018-08-16016 August 2018 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-18240-P, Westinghouse Thermal Design Procedure (Wtdp) ML18177A2702018-07-0909 July 2018 Summary of the Closed Audit June 11-12, 2018, of the Westinghouse Electric Company Topical Report WCAP-16747-P/WCAP-16747-NP, Appendices C and D, POLCA-T: System Analysis Code with Three-Dimensional Core Model, Appendices C and D. ML18177A2392018-07-0202 July 2018 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Restart of WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies, Topical Report ML18156A2282018-06-15015 June 2018 Summary of April 13-18, 2018, Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss Future Submittal of WNG-2 Topical Report ML18057A0382018-03-19019 March 2018 Summary of Closed Meeting to Discuss Implementation Plan for the Westinghouse Electric Company Topical Report WCAP-17642-P-A/WCAP-17642-NP-A, Revision 1 ML18036A4672018-02-0808 February 2018 Meeting Summary on Westinghouse Sale and License Transfer Application ML17353A0802018-01-24024 January 2018 December 13, 2017 Summary of Teleconference with South Carolina Department of Health and Environmental Control Related to the Rc Review of Westinghouse'S Columbia Fuel Fabrication Facility License Renewal Application ML17356A0842018-01-24024 January 2018 12/13/2017 NMFS Call Summary Regarding Westinghouse Cfff License Renewal Sturgeon Consultation ML17352A6402018-01-10010 January 2018 Summary of Closed Audit for the Westinghouse Electric Company Topical Report WCAP-18032-P, Revision 0 and Wcap-18032-NP, Revision 0, Calculation of Mixed Core Safety Limit Minimum Critical Power Ratio. 2024-08-13
[Table view] |
Text
February 5, 2020 MEMORANDUM TO: Dennis C. Morey, Chief Licensing Processes Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Joseph J. Holonich, Senior Project Manager /RA/
Licensing Processes Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF NOVEMBER 12, 2019, CLOSED PRE-SUBMITTAL MEETING WITH WESTINGHOUSE ELECTRIC COMPANY TO DISCUSS THE TOPICAL REPORT RELATED TO REMOVING THE TECHNICAL SPECIFICATION REQUIREMENTS FOR THE COMMON QUALIFICATION SYSTEM (EPID L-2019-TOP-0042)
On November 12, 2019, the U.S. Nuclear Regulatory Commission (NRC) staff held a closed, pre-submittal meeting with representatives of Westinghouse Electric Company (Westinghouse).
The meeting was a pre-submittal meeting to discuss WCAP-18461, Common Q Platform Elimination of Technical Specification Surveillance Requirements. Information related to the meeting can be found in the Agencywide Documents Access and Management System Package Accession No. ML19295F875.
In the meeting, Westinghouse representatives made a presentation on the basis for the proposed topical report (TR). During the discussion, the NRC staff and Westinghouse representatives engaged in numerous clarifications and questions and answers.
One point raised by the NRC staff was consistency between the report title and the proprietary scope documented in the report. Westinghouse agreed that the two were not completely aligned and took an action from the meeting to consider retitling the report and making the scope nonproprietary. The latter would then provide a clear understanding of the content of the report, so no misconceptions could come from the title.
The staff also noted that there were other Westinghouse TRs that dealt with surveillance test exemptions for specific platforms. The NRC staff questioned why there was a need for this TR.
Westinghouse explained that none of the other TRs dealt with the Common Qualification (Common Q) platform.
Docket No. 99902038 CONTACT: Joseph Holonich, NRR/DORL 301-415-7297
D. Morey In addition, Westinghouse elaborated that this TR was intended to provide a basis for referencing in plant-specific licensing actions. The NRC staff asked if this matter was going to be considered by the Technical Specifications Task Force (TSTF). Westinghouse stated that they had not considered this for the TSTF and that there were no planned changes to the Standard Technical Specifications (STS). Changes to STS were instead being considered as a separate effort. However, WCAP-18461 will show what changes to individual plant STS will be needed.
The NRC staff asked about performing surveillance activities on the diagnostics functions themselves. Westinghouse responded that licensees were not expected to perform such surveillance activities and that WCAP-18461 will include an explanation for why such surveillance activities are unnecessary. It was also explained that system monitoring activities such as system engineer walkdowns could still be performed but these activities would be optional and performed at the discretion of the licensee. The staff stated that a justification would need to demonstrate that and (1) successful performance of system diagnostic monitoring activities will provide reasonable assurance that all credited system diagnostics are functioning correctly and (1) system diagnostic monitoring activities will be reliably performed and documented by the licensee.
When the technical discussions were finished, Westinghouse discussed the desired schedule.
Westinghouse noted that during a public workshop on October 24, 2019, the NRC staff presented options for conducting TR reviews (ADAMS Package Accession No. ML19275G968).
Westinghouse asked if the review of WCAP-18461 could be done under the simplified safety evaluation (SE) option.
The NRC staff explained that there was a flowchart showing when a simplified SE could be used. In its submittal of WCAP-18461, Westinghouse should address the questions that need to be answered to determine if a simplified SE could be used.
In addition, the staff noted that the modified TR review process could be used in this evaluation.
This option entails development of a draft SE with open items and there would be no requests for additional information.
The lone action from the meeting was for Westinghouse to consider retitling the report and making the scope nonproprietary.
PKG: ML19295F875 Summary: ML19304A093 *concurrence via email OFFICE NRR/DORL/LLPB/PM* NRR/DORL/LLPB/LA* NRR/DE/EICB/BC*