Letter Sequence Approval |
---|
EPID:L-2020-LLL-0009, Enclosure 1 - Columbia Fuel Fabrication Facility Evaluation in Support of 10 CFR 20.2003 Request for Alternate Waste Disposal (Approved, Closed) |
|
MONTHYEARML20129J9362020-05-0808 May 2020 Enclosure 1 - Columbia Fuel Fabrication Facility Evaluation in Support of 10 CFR 20.2003 Request for Alternate Waste Disposal Project stage: Request ML20129J9352020-05-0808 May 2020 Request for Alternate Disposal Approval and Exemptions for Specific Columbia Fuel Fabrication Facility Waste Project stage: Request ML20170A5492020-06-25025 June 2020 Letter to E/Malek: Acceptance for Review of Request for Alternate Disposal Approval of Specified Low-Activity Radioactive Materials Project stage: Acceptance Review ML20230A0202020-09-0404 September 2020 Letter to E. Malek: RAI - WEC Request for Alternate Disposal Approval of Specified Low-Activity Radioactive Materials Project stage: RAI ML20254A1622020-09-11011 September 2020 Summary of the September 1, 2020 Closed Meeting with Westinghouse to Discuss Staffs Draft RAIs on Alternate Disposal Approval of Specified Low Activity Radioactive Materials Project stage: Draft RAI ML20266G5512020-09-22022 September 2020 Westinghouse Electric Company, LLC - Response to Request for Additional Information - Alternate Disposal Approval and Exemptions for Specific Columbia Fuel Fabrication Facility Waste Project stage: Response to RAI ML20287A5452020-10-13013 October 2020 Westinghouse - Submittal of Response to Request for Additional Information - Alternate Disposal Approval and Exemptions for Specific Columbia Fuel Fabrication Facility Project stage: Response to RAI ML20329A3532020-11-30030 November 2020 Safety Evaluation Report Related to a Request for 10 CFR 20.2002 Alternate Disposal Approval and Exemptions from 10 CFR Part 30 and 10 CFR Part 70 for Disposal of Columbia Fuel Fabrication Facility Waste at the Us Ecology Idaho Facility Project stage: Approval ML20329A3522020-11-30030 November 2020 Safety Evaluation Report Related to a Request for 10 CFR 20.2002 Alternate Disposal Approval and Exemptions from 10 CFR Part 30 and 10 CFR Part 70 for Disposal of Columbia Fuel Fabrication Facility Waste at the Us Ecology Idaho Facility Project stage: Request ML20302A0852020-11-30030 November 2020 Enclosure-Safety Evaluation Report Related to a Request for 10 CFR 20.2002 Alternate Disposal Approval and Exemptions from 10 CFR Part 30 and 10 CFR Part 70 for Disposal of Columbia Fuel Fabrication Facility Waste at the Us Ecology Idaho Fa Project stage: Approval ML20302A0842020-12-0909 December 2020 Westinhouse Electric Company, LLC - Amendment 25 to Material License SNM-1107, Exemption for Alternate Disposal of Specific Waste (Enterprise Project Identifier L-2020-LLL-0009) Project stage: Other 2020-05-08
[Table View] |
|
---|
Category:Memoranda
MONTHYEARML24179A0642024-08-13013 August 2024 Memo - Summary of May 16, 2024, Partially Closed Pre-Application Public Meeting with Westinghouse Columbia Fuel Fabrication Facility ML22103A2422022-04-29029 April 2022 Westinghouse Trip Report March 24, 2022 ML22054A0462022-03-0404 March 2022 Westinghouse Electric Co. LLC - Request for Alternate Disposal and Exemptions for Columbia Fuel Fabrication Facility Waste Disposal at the Us Ecology Idaho Facility (Enterprise Project Identifier L-2021-LLA-0204) ML21202A1112021-10-0404 October 2021 Westinghouse Electric Company, LLC Request for Alternate Disposal and Exemptions for Columbia Fuel Fabrication Facility Waste Disposal at the Us Ecology Idaho Facility ML21054A0922021-03-0404 March 2021 Summary of Public Meeting to Discuss the Status of the Westinghouse Columbia Fuel Fabrication Facility License Renewal ML21053A3372021-03-0303 March 2021 Safety Evaluation Report Related to Request for 10 CFR 20.2002 Alternate Disposal Approval and Exemptions from 10 CFR Part 30 and 10 CFR Part 70 for Disposal of Specific Columbia Fuel Fabrication Facility Waste at the Us Ecology Idaho Facil ML21033A6722021-02-19019 February 2021 Memorandum to J.Quintero, NRC, Re Environmental Impact Statement Scoping Summary Report for Westinghouse Columbia Fuel Fabrication Facility License Renewal Application ML20329A3532020-11-30030 November 2020 Safety Evaluation Report Related to a Request for 10 CFR 20.2002 Alternate Disposal Approval and Exemptions from 10 CFR Part 30 and 10 CFR Part 70 for Disposal of Columbia Fuel Fabrication Facility Waste at the Us Ecology Idaho Facility ML20254A1622020-09-11011 September 2020 Summary of the September 1, 2020 Closed Meeting with Westinghouse to Discuss Staffs Draft RAIs on Alternate Disposal Approval of Specified Low Activity Radioactive Materials ML20115E3972020-04-29029 April 2020 Summary of April 23, 2020, Pre-Submittal Meeting with Westinghouse Electric Company (WEC) Regarding WEC Quality Management System(Qms) Changes Due to COVID-19 ML20100H1432020-04-16016 April 2020 Summary of Closed Pre-Submittal Meeting for the Future Submittal of Westinghouse Electric Company (Westinghouse) WCAP-18482-P, Westinghouse Advanced Doped Pellet Technology(Adopt Tm) Fuel ML20083H9552020-04-10010 April 2020 Summary of September 18-19, 2019, Partially Closed Meeting to Discuss Westinghouse Electric Company Encore Accident Tolerant Fuel: Chromium Coated Cladding ML19304A0932020-02-0505 February 2020 Summary of Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss the Topical Report Related to Removing the Technical Specification Requirements for the Common Qualification System ML19283A8112019-10-16016 October 2019 Summary of May 2019 Site Visit and Information Needs Related to the U.S. Nuclear Regulatory Commission'S Review of the Environmental Program in the License Renewal Application for the Westinghouse Columbia Fuel Fabrication Facility ML19231A0212019-08-30030 August 2019 Verification Letter of the Approval Version of Westinghouse Electric Company Topical Report WCAP-18032-P, Revision 0, and WCAP-18032-NP, Revision 0, Calculation of Mixed Core Safety Limit Minimum Critical Power Ratio ML19218A1682019-08-16016 August 2019 Memo: Summary of June 27, 2019, Closed Meeting with the Westinghouse Electric Company to Discuss Future Submittal of WCAP-18446-P, Incremental Extension of Burnup Limit for Westinghouse Fuel with Zirlo Cladding and Optimized Zirlo Cladding ML19218A2122019-08-16016 August 2019 07/23-25/2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Fuel Performance ML19175A1602019-07-0909 July 2019 04/01-04/15/2019 Summary of Closed Audit of the Westinghouse Electric Company Topical Report WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (Wtdp) ML19150A5572019-06-24024 June 2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Common Qualified Platform Topic Report (WCAP-16097) Watchdog Timer Changes ML19143A1362019-06-12012 June 2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-10965-P-A, Addendum 3, Updated Nexus Cross-Section Methodology (EPID-L-2019-TOP-0009) ML19092A3082019-05-0101 May 2019 03/27/19 Summary for Public Meeting to Discuss the Responses to the RAIs Regarding the WEC License Renewal with Enclosures ML19028A1242019-02-14014 February 2019 Summary of January 17, 2019 Closed Meeting to Discuss Westinghouse Electric Company Accident Tolerant Fuel Technology ML19022A0722019-01-28028 January 2019 Summary of Meeting with Westinghouse Electric Company to Discuss RAI Response Related to NRC Review of WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement. ML18361A6652019-01-25025 January 2019 Summary of December 4-5, 2018, Closed Audit of the Westinghouse Electric Company Topical Report WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0, 10x10 Svea Fuel Critical Power Experiments and New CPR Correlation: D5 for SVEA-96 Opti ML18330A2552018-12-18018 December 2018 Summary for Public Meeting and Enclosures 1-3: Held November 8, 2018, to Discuss the License Renewal, Environmental Analysis and Leaks at the Westinghouse Columbia Fuel Fabrication Facility ML18278A0262018-10-16016 October 2018 Summary of Closed Meeting to Discuss Westinghouse Electric Company Accident Tolerant Fuel Licensing Plan ML18213A0702018-08-16016 August 2018 Summary of Westinghouse Electric Company 2018 Fuel Performance Update Meeting ML18213A1402018-08-16016 August 2018 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-18240-P, Westinghouse Thermal Design Procedure (Wtdp) ML18177A2702018-07-0909 July 2018 Summary of the Closed Audit June 11-12, 2018, of the Westinghouse Electric Company Topical Report WCAP-16747-P/WCAP-16747-NP, Appendices C and D, POLCA-T: System Analysis Code with Three-Dimensional Core Model, Appendices C and D. ML18177A2392018-07-0202 July 2018 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Restart of WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies, Topical Report ML18156A2282018-06-15015 June 2018 Summary of April 13-18, 2018, Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss Future Submittal of WNG-2 Topical Report ML18057A0382018-03-19019 March 2018 Summary of Closed Meeting to Discuss Implementation Plan for the Westinghouse Electric Company Topical Report WCAP-17642-P-A/WCAP-17642-NP-A, Revision 1 ML18036A4672018-02-0808 February 2018 Meeting Summary on Westinghouse Sale and License Transfer Application ML17353A0802018-01-24024 January 2018 December 13, 2017 Summary of Teleconference with South Carolina Department of Health and Environmental Control Related to the Rc Review of Westinghouse'S Columbia Fuel Fabrication Facility License Renewal Application ML17356A0842018-01-24024 January 2018 12/13/2017 NMFS Call Summary Regarding Westinghouse Cfff License Renewal Sturgeon Consultation ML17352A6402018-01-10010 January 2018 Summary of Closed Audit for the Westinghouse Electric Company Topical Report WCAP-18032-P, Revision 0 and Wcap-18032-NP, Revision 0, Calculation of Mixed Core Safety Limit Minimum Critical Power Ratio. 2024-08-13
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 30, 2020 MEMORANDUM TO: Damaris Marcano, Acting Fuel Fancily Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards FROM:
David H. Tiktinsky, Sr. Project Manager Fuel Fancily Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards
SUBJECT:
SAFETY EVALUATION REPORT RELATED TO A REQUEST FOR 10 CFR 20.2002 ALTERNATE DISPOSAL APPROVAL AND EXEMPTIONS FROM 10 CFR PART 30 AND 10 CFR PART 70 FOR DISPOSAL OF COLUMBIA FUEL FABRICATION FACILITY WASTE AT THE US ECOLOGY IDAHO FACILITY (ENTERPRISE PROJECT IDENTIFIER L-2020-LLL-0009)
On May 8, 2020, Westinghouse Electric Company, LLC (WEC) requested that the U.S. Nuclear Regulatory Commission (NRC) approve an alternate disposal request (Agencywide Documents Access and Management System (ADAMS) ML20129J934), pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 20.2002, Method for obtaining approval of proposed disposal procedures, for the disposal of specified low-activity radioactive materials from the Columbia Fuel Fabrication Facility (CFFF). Characterization of the material identified byproduct material and special nuclear material (SNM). US Ecology, Inc. (USEI), in coordination with WEC, is also requesting corresponding specific exemptions from 10 CFR 30.3 and 10 CFR 70.3 pursuant to 10 CFR 30.11(a) and 10 CFR 70.17(a). The NRCs approval of the 10 CFR 20.2002 request, along with the requested exemptions, would allow WEC to transfer the specific waste for disposal at the USEI Resource Conservation and Recovery Act Subtitle C disposal facility, rather than requiring the disposal of the material in a 10 CFR Part 61 Low-Level Waste disposal facility.
Enclosed is the Staffs Safety Evaluation report that evaluated the request.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this memorandum will be available electronically for public inspection in the NRC Public Document Room or from ADAMS. The ADAMS database is accessible from the NRC Web site at: http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
CONTACT:
David Tiktinsky, NMSS/FCSE 301-415-8740 David H.
Tiktinsky Digitally signed by David H. Tiktinsky Date: 2020.11.30 13:23:37 -05'00'
If you have any questions concerning this letter, please contact me at 301-415-8740, or via e-mail to David.Tiktinsky@nrc.gov.
Docket No. 70-1151 License No. SNM-1107
Enclosure:
Safety Evaluation Report cc: Westinghouse_ff@listmgr.nrc.gov
ML20329A352 (Pkg)
ML20329A353 (Ltr)
ML20302A085 (Encl.)
- via email OFFICE DFM/FFLB/PM*
DFM/FFLB/LA*
DUWP/RTAB*
OGC*
DFM/FFLB/BC (A)*
NAME DTiktinsky ELee ASchwartzman/
HArit AGendelman DMarcano DATE 11/20/2020 11/24/2020 11/24/2020 and 11/30/2020 11/20/2020 11/30/2020