ML24109A000

From kanterella
Jump to navigation Jump to search
Public Meeting Summary - Licensee Performance Review for Westinghouse Columbia Fuel Fabrication Facility, Docket Number 70-1151
ML24109A000
Person / Time
Site: Westinghouse
Issue date: 04/19/2024
From: Eric Michel
NRC/RGN-II/DFFI
To: Pope A
Westinghouse
References
Download: ML24109A000 (3)


Text

Annette Pope Senior Director, Columbia Fuel Fabrication Facility Westinghouse Electric Company 5801 Bluff Road Hopkins, SC 29061

SUBJECT:

PUBLIC MEETING

SUMMARY

- LICENSEE PERFORMANCE REVIEW FOR WESTINGHOUSE COLUMBIA FUEL FABRICATION FACILITY, DOCKET NUMBER 70-1151

Dear Annette Pope:

This letter refers to our virtual meeting on April 10, 2024, during which we discussed the Nuclear Regulatory Commissions (NRCs) evaluation of your performance in the four major areas of safety operations, radiological controls, facility support, and safeguards (details not discussed with the public) during calendar years 2022-2023. The meeting was beneficial and provided the NRC the opportunity to discuss your facilitys performance during the last assessment period. The meeting also afforded you the opportunity to provide feedback to the NRC regarding your perception of the NRC performance review.

The meeting also afforded members of the public the opportunity to ask questions and provide feedback to the NRC regarding our inspection program for the Columbia Fuel Fabrication Facility. The list of meeting attendees is enclosed. The meeting slide presentation is available from the Publicly Available Records (PARS) component of NRC's document system (ADAMS) under accession number ML24075A079.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

April 19, 2024

A. Pope 2

Should you have any questions concerning this letter, please contact me at 404-997-4555.

Sincerely, Eric C. Michel, Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 70-1151 License No. SNM-1107

Enclosure:

List of Meeting Attendees cc: Distribution via Listserv Signed by Michel, Eric on 04/19/24

A. Pope 3

SUBJECT:

PUBLIC MEETING

SUMMARY

- LICENSEE PERFORMANCE REVIEW FOR WESTINGHOUSE COLUMBIA FUEL FABRICATION FACILITY, DOCKET NUMBER 70-1151 dated on April 19, 2024 DISTRIBUTION:

S. Lav, NMSS A. Masters, RII E. Michel, RII J. Worosilo, RII T. Vukovinsky, RII D. Gasperson, RII J. Pelchat, RII K. Henry, RII ADAMS ACCESSION No. ML24107A000 OFFICE RII:DFFI/PB2 RII:DFFI/PB2 RII:DFFI/PB2 NAME T. Vukovinsky J. Raudabaugh E. Michel DATE 4/18/2024 4/18/2024 4/19/2024 OFFICIAL RECORD COPY

Meeting Attendees List Enclosure NAME ORGANIZATION E. Michel NRC T. Vukovinsky NRC J. Raudabaugh NRC D. Gasperson NRC J. Tobin NRC J. Pelchat NRC A. Masters NRC M. Day NRC N. Pitoniak NRC K. Sullivan NRC C. Ubben NRC D. Bock SC Emergency Management Division A. Pope Westinghouse J. Ferguson Westinghouse S. Subosits Westinghouse N. Parr Westinghouse M. Warren Member of Public J. Berresford Member of Public P. Preston Member of Public K. Taylor Member of Public K. Kuhn Member of Public D. Lesnick Member of Public P. Greenlaw Member of Public J. Grego Member of Public 2 anonymous callers